About this file

This is a Request for Qualifications announcement issued by MassDOT (Massachusetts Department of Transportation) for a Design-Build project involving the replacement of three bridges in Springfield, Massachusetts. The project encompasses the final design and construction of bridge replacements carrying St. James Avenue and Tapley Street over I-291 and the CSX Railroad, with work including roadway reconstruction, interchange reconfiguration, a multi-lane roundabout at St. James Avenue and Page Boulevard, utility relocation, stormwater management facilities, a 1,700-foot noise barrier along I-291 Westbound, street lighting, bicycle and pedestrian improvements, and all related highway work. The project is located within MassDOT District 2 in Hampden County. Letters of Interest must be submitted by December 29, 2026 at 12:00 PM to MassDOTBidDocuments@dot.state.ma.us, with the Request for Qualifications to be issued on or around the same date. Statements of Qualifications are due on or around February 2, 2027 by 12:00 PM. The Notice to Proceed is anticipated in December 2027. Prospective Design-Builders, Consultants, and Contractors are invited to submit qualifications for consideration.

The estimated contract value is $226,000,000.00. The new bridge structures will provide a minimum 75-year design life and must meet established design criteria while minimizing environmental impacts, right-of-way impacts, and disruption to the traveling public. The project requires staged construction to maintain three traffic lanes on I-291 during peak periods, keep existing interchange ramps open, maintain two-way traffic on St. James Avenue, and ensure emergency vehicle, pedestrian, and bicycle access throughout construction. Environmental considerations include potential oil and hazardous materials in soil near disposal sites, possible lead-based paint management, and compliance with Massachusetts Stormwater Standards and MassDOT drainage requirements. The project qualifies as a Type 1 project under 23 CFR 772 Federal Highway Noise Regulations.

View the file

Other files

File Type Posted
612167 -SPRINGFIELD -LOI~1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WTO Announcement

Intent to Procure Doc ID # 612167

***Announcement***

Title: SPRINGFIELD– 3 Bridge Replacements, (S-24-017) St. James Avenue Over CSX, (S-24-070) Tapley Street Over I-291 and CSX, (S-24-071) St. James Avenue Over I-291 Design-Build (612167)

There will be a Request for Qualifications issued that invites prospective, qualified Design-Builders, Consultants and Contractors who submit a Letter of Interest by the specified date, to submit Statements of Qualifications. The Project is located within the boundary of MassDOT District 2 in Hampden County and the limits of the Project begin along I-291 from approximately 400 feet south of Tapley Street, northerly for approximately 3,550 feet to St. James Avenue over I-291 and CSX Railroad and extend from the existing roundabout at St. James Avenue / Tapley Street to Cuff Avenue and Tapley Street over I-291 and CSX Railroad and extend from St. James Avenue to the intersection of Nottingham Street and Merrimac Avenue.

The scope of work includes, but is not limited to, final design and construction of the replacement of three bridges carrying Tapley and St. James Streets over I-291 in Springfield, Massachusetts. The Bridges will provide a minimum 75-year design life and meet the design criteria established for the Project while minimizing impacts to the environment, right of way, and the traveling public. The work on and approaching the bridges, and on I-291 includes landscaping, sidewalk reconstruction, lighting, drainage improvements, pavement milling and overlay and striping.

Purpose and Need

The purpose and need of the Project is to replace the existing bridge structures (that carry St. James Avenue (Bridge No. S-24-017 and S-24-071) and Tapley Street (Bridge No. S-24-070) over I-291/US-20 and CSX railroad. The three existing bridges that carry St. James Avenue and Tapley Street over I-291/US-20 and CSX railroad are nearing the end of their service life. The new bridge structures will provide a minimum 75-year design life.

Summary

The scope of work includes, but is not limited to, the replacement of three existing bridge structures (that carry St. James Avenue (Bridge No. S-24-017 and S-24-071) and Tapley Street (Bridge No. S-24-070) over I-291/US-20 and CSX Railroad, the removal of bridge structure (S-24-072) that carries the existing I-291 Eastbound offramp to Page Boulervard, the reconfiguration of the St. James Avenue / Page Boulevard / I-291 interchange, the reconstruction of the intersection of St. James Avenue and Page Boulevard into a multi-lane roundabout, and various bicycle / pedestrian improvements throughout the Project. The Project includes construction of 1,700-feet of noise barrier along I-291 Westbound, replacement of the existing ITS camera on I-291, street lighting along St. James Avenue, roadway reconstruction, highway drainage/storm water management facilities, traffic management, pavement markings and signage, utility relocation/protection and all other related bridge and highway work.

Roadway Reconstruction

The Project includes roadway reconstruction of St. James Avenue, Tapley Street, Page Boulevard, the new I-291 Eastbound off-ramp, the reconfiguration of the I-291 Westbound off-ramp, and minor improvements to both on-ramps to I-291. A shared use path is proposed along St. James Avenue and Tapley Street to provide bicycle and pedestrian improvements and connectivity. Interchange improvements are proposed to enhance traffic operations and safety along St, James Avenue between the existing roundabout at Tapley Street and the new, proposed roundabout at Page Boulevard. The proposed interchange improvements include cross-over traffic signals and improved connections to I-291. Work along I-291 includes removing the existing westbound ramp and the bridge (S-24-072) to Page Boulevard, replacement of the existing ITS camera system, relocation of an existing traffic counting station, highway guard improvements and pavement milling and overlay.

Bridge Reconstruction

The Project includes replacement of three (3) bridges carrying St. James Avenue (Bridge No. S-24-017 and S-24-071) and Tapley Street (Bridge No. S-24-070) over I-291/US-20 and CSX railroad. The Tapley Street Bridge will remain in its approximate location while the St. James Avenue bridges will be reconstructed.

Bridge S-24-017 carrying St. James Avenue over the CSX Railroad will be replaced with a wider structure to accommodate the interchange improvements and include full replacement of the existing abutments and steel superstructure. Bridge S-24-071 carrying St. James Avenue over I-291 will be replaced with two (2) independent bridge structures to carry northbound and southbound traffic respectively as part of the interchange configuration. The existing bridge abutments and concrete piers will be replaced. An infill section is proposed between the I-291 and the railroad to accommodate new ramp connections to the interchanges. The Project includes construction of several retaining walls to support the reconfigured ramps and multiple temporary walls to support the proposed temporary traffic configuration during construction.

The Project also includes removal of the existing bridge carrying the I-291 Eastbound offramp (S-24-072) to Page Boulevard.

Traffic

Staged construction is required to complete the major work elements (bridge demolition/construction, ramp reconfiguration and roundabout construction) within the project limits. The Project will maintain three traffic lanes on I-291 during peak traffic periods. The existing interchange ramps will remain open during Project construction. . Two-way traffic will be maintained on St. James Avenue throughout construction through the staged construction approach. Tapley Street bridge will be constructed in two primary stages. In the first construction stage, vehicles will be detoured in both directions. In the second stage, only one-way vehicle traffic, in the northbound direction, will be maintained.

Emergency vehicle access through the work zone will be maintained at all times. Pedestrian and bicycle access will also be maintained through the work zone at all times.

Utility Impacts

Utilities are carried on both the Tapley Street and St. James Avenue bridges. Given the bridge replacement, utilities relocations will be required. The roadway reconstruction will require adjustment of both public and private castings, frames, grates and/or covers.

For the Tapley Street bridge, the Project will relocate a 12” gas line, electric duct back, streetlight conduit, a Comcast conduit and a telecom duct bank. The utility relocations will be staged in close coordination with the bridge construction staging.

For the St. James Avenue bridges (over I-291 and CSX Railroad), the Project will relocate a telecom duct bank. The existing water line on these bridges has been discontinued by Springfield Water and Sewer.

Existing water pipes will be removed from the existing bridges. Both traffic signal and streetlight conduit will be added to these bridges. The existing 36” sanitary sewer line along the south abutment of the St. James Avenue bridge over the CSX Railroad and running parallel with the railroad tracks will need to be temporarily relocated and then ultimately replaced to allow for the bridge demolition and construction. This work will require close coordination with CSX and Springfield Water and Sewer.

Finally, the existing ITS camera system located on I-291 Eastbound, east of St. James Avenue will be replaced with a new ITS camera system. The new location will be west of St. James Avenue along I-291 Westbound.

The existing streetlights along St. James Avenue will be replaced to accommodate the new Interchange configuration and the new multi-lane roundabout at St. James Avenue and Page Boulevard. Highway lighting along I-291 will be removed and reset or replaced as needed to facilitate the Project construction.

Stormwater

The Project includes temporary and permanent stormwater management facilities including the design and construction of a stormwater control measure (SCM). The Project intends to meet the Massachusetts Stormwater Standards to the maximum extent practicable and will meet the MassDOT closed drainage requirements.

The Project proposes to improve the existing closed drainage systems to suit the new intersections at either side of St. James Avenue over I-291. Catch basin to catch basin connections will be eliminated throughout the site wherever possible. Reducing these connections will provide improvements to drainage system performance and increase resilience to structure clogging at critical points. Proposed catch basins will have deep sumps and will be designed to be offline of the main drainage trunkline. The deep sump catch basins will provide additional water quality treatment throughout the entire project area, improving existing conditions.

An infiltration basin is proposed off-site that will provide both groundwater recharge and water quality treatment of a portion of the project area.

Environmental

Based on the existence of nearby disposal sites, oil and/or hazardous materials (OHM) impacted soil is expected to be encountered during excavation and construction, particularly of the south abutment of the St.

James Avenue Overpass associated with Release Tracking Number (RTN) 1-596. In addition, hazardous building materials may be identified in existing soil or soil imported and placed as part of past road construction.

Dewatering shall be conducted in accordance with applicable MassDOT standards, the requirements of the National Pollutant Discharge Elimination System (NPDES), and applicable General Permit for Storm Water Discharges from Construction Activities (CGP) and/or Dewatering and Remediation General Permit (DRGP) issued by the U.S. Environmental Protection Agency (EPA).

Due to the age of the existing bridges, lead-based paint may require management during the Project.

Additionally, paint chips from the existing bridge can also result in lead impacts to soil surrounding the structure.

This Project qualifies as a Type 1 project under 23 CFR 772 (Federal Highway Noise Regulations).

Preliminary analysis and calculations indicated that a 1,700 feet noise barrier along I-291 Westbound will be required on the west end of the project limits.

The Request for Letters of Interest is to be advertised on November 14, 2026. The Notice to Proceed is anticipated to be in December of 2027.

The estimated dollar amount for this Contract is $226,000,000.00

Letters of Interest will be due to MassDOT December 29, 2026 by 12:00 PM (Noon). The Request for Qualifications (Phase 1) will be issued on or around December 29, 2026. The Statement of Qualifications will be due on or around February 2, 2027 by 12:00 PM (Noon).

All Letters of Interest are to be emailed to MassDOTBidDocuments@dot.state.ma.us:

Bid Document Distribution Center MassDOT Highway Division 10 Park Plaza, Suite 7874 Boston, MA 02116 Attn: Eric M. Cardone, P.E., Construction Contracts Engineer

Letter of Interest SPRINGFIELD– 3 Bridge Replacements, (S-24-017) St. James Avenue Over CSX, (S-24-070) Tapley Street Over I-291 and CSX, (S-24-071) St. James Avenue Over I-291 Design-Build (612167)

Keywords to Search by:

Eric M. Cardone, Design-Build, 612167, SPRINGFIELD mailto:MassDOTBidDocuments@dot.state.ma.us

File details come from the government source that posted it. Updated .