612167 -SPRINGFIELD -LOI~1.pdf

PDF 130 KB Posted

Attached to
612167 SPRINGFIELD 3 BRIDGE REPLACEMENTS, S-24-017, ST. JAMES AVENUE OVER CSX, S-24-070, TAPLEY STR
Solicitation number
BD-27-1030-0H100-0H002-135450
Issued by
Hampden County, Massachusetts

About this file

This Letter of Interest document, issued by the Massachusetts Department of Transportation (MassDOT), solicits design-build proposals for the Springfield 3 Bridge Replacements project located in Springfield within MassDOT District 2 (Hampden County). The project involves the replacement of three existing bridge structures carrying St. James Avenue (Bridge Nos. S-24-017 and S-24-071) and Tapley Street (Bridge No. S-24-070) over I-291/US-20 and CSX Railroad, with work also encompassing the reconfiguration of the St. James Avenue/Page Boulevard/I-291 interchange, reconstruction into a multi-lane roundabout, bicycle and pedestrian improvements, a 1,700-foot noise barrier along I-291 Westbound, utility relocations, stormwater management, and roadway reconstruction. Letters of Interest must be submitted to MassDOTBIDDocuments@dot.state.ma.us by December 29, 2026 at 12:00 PM (noon), with the Request for Qualifications package to be distributed on or about December 30, 2026. A virtual briefing is scheduled for January 12, 2027 at 10:00 AM, and Statements of Qualifications are due on or around February 2, 2027 by noon. All construction must be completed within 2,000 calendar days of Notice to Proceed. The project will maintain three traffic lanes on I-291 during peak periods and emergency vehicle access throughout construction, with staged construction required for major work elements.

The project is valued at $226,000,000.00 and will be procured through the Best Value Design-Build process under MGL c 149A ss 14 et seq. Design-Builder teams must have a Major Participant prequalified by the MassDOT Architects and Engineers Review Board in Complex Bridge Design and Rating and Complex Roadway Design, and a Major Participant prequalified by the MassDOT Prequalification Committee in Bridge Construction with a Single Contract Limit of at least $226,000,000.00 (or joint venture partners may combine individual SCLs to meet this threshold). Proposers must demonstrate 100% bonding capacity and will be evaluated on factors including similar project experience, joint team experience, design-build expertise, prior performance quality, key personnel qualifications, accelerated schedule management, financial status, litigation and performance history, safety record, risk management, reference information, current MassDOT workload, traffic management plan implementation, environmental permit compliance experience, innovative design and construction methods, utility coordination experience, Accelerated Bridge Construction experience, and public outreach capabilities. Bid submissions will be conducted through Bid Express, and the Commonwealth reserves the right to reject any or all proposals received.

View the file

Other files

File Type Posted
612167 -SPRINGFIELD -WTO.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN-BUILD PROJECT

Letters of Interest for the following Project should be emailed to MassDOTBIDDocuments@dot.state.ma.us and addressed to:

MassDOT Bid Document Distribution Center MassDOT Highway Division 10 Park Plaza – Suite 7874 Boston, MA 02116 Attn: Eric M. Cardone,P. E., Construction Contracts Engineer

Until the date and time stated below for:

The Bidding for and Award of the Contract for the following Project is to be in accordance with The Best Value Design-Build Procurement process which shall be used for the Project as authorized under MGL c 149A ss 14 et seq.

TUESDAY, DECEMBER 29, 2026 @ 12:00 P.M. (NOON) PROJECT VALUE

SPRINGFIELD- 3 BRIDGE REPLACEMENTS, S-24-017, ST. JAMES

AVENUE OVER CSX, S-24-070, TAPLEY STREET OVER I-291 AND CSX,

S-24-071, ST. JAMES AVENUE OVER I-291 Design-Build (612167)

$226,000,000.00

The Massachusetts Department of Transportation (MassDOT) is soliciting Letters of Interest from parties interested in the Request for Qualifications (RFQ) package for the Design-Build Project consisting of the completion of the design and construction for:

SPRINGFIELD- 3 Bridge Replacements, S-24-017, St. James Avenue over CSX, S-24-070, Tapley Street over I-291 and CSX, S-24-071, St. James Avenue over I-291 Design-Build (612167)

Project Location

The Project is located in Springfield within MassDOT District 2 (Hampden County). The limits of the Project begin along I-291 from approximately 400 feet south of Tapley Street, northerly for approximately 3,550 feet to St. James Avenue over I-291 and CSX Railroad and extend from the existing roundabout at St. James Avenue / Tapley Street to Cuff Avenue and Tapley Street over I-291 and CSX Railroad and extend from St. James Avenue to the intersection of Nottingham Street and Merrimac Avenue. The Project also includes a proposed noise barrier along I-291 Westbound on the west end of the project limits.

It is to be understood that the Project scope includes all aspects of design, demolition, and construction, compliance with all environmental permits to be secured and/or amended by final design, coordination with utilities, public outreach, and any coordination with abutting or interested parties.

Purpose and Need

The purpose and need of the Project is to replace the existing bridge structures (that carries St.

James Avenue (Bridge No. S-24-017 and S-24-071) and Tapley Street (Bridge No. S-24-070) over mailto:MassDOTBIDDocuments@dot.state

I-291/US-20 and CSX Railroad. The three existing bridges that carry St. James Avenue and Tapley Street over I-291/US-20 and CSX Railroad are nearing the end of their service life. The new bridge structures will provide a minimum 75-year design life.

In addition to bridge replacement, the St. James Avenue/Page Boulevard at I-291 Interchange will be reconfigured, the St. James Avenue at Page Boulevard intersection will be reconstructed into a multi-lane roundabout. Enhanced bicycle and pedestrian accommodations will be constructed throughout the project area, and continuous sidewalks and pedestrian curb ramps meeting current standards will be constructed.

The Project will minimize impacts to the environment, right of way, and the traveling public. Proposed work includes staged construction to fully replace the existing bridges, including new foundations, abutments, piers, steel superstructure, infill section, and supporting retaining walls. The Project will allow for continued connectivity and safety along the St. James Avenue and Tapley Street corridors in Springfield.

The proposed improvements are primarily focused on Tapley Street west of St. James Avenue, St.

James Avenue and the termini of the interstate ramps. The I-291 Eastbound off-ramp entrance will be relocated further west, and the I-291 Westbound off-ramp will be extended to St. James Avenue in order to meet the required design criteria. On-ramps connecting to the I-291 Eastbound and Westbound mainline will generally remain in their existing condition. The I-291 mainline will also remain unchanged, with no proposed permanent geometric modifications.

Summary

The scope of work includes, but is not limited to, the replacement of three existing bridge structures that carry St. James Avenue (Bridge No. S-24-017 and S-24-071) and Tapley Street (Bridge No. S- 24-070) over I-291/US-20 and CSX Railroad, the removal of bridge structure (S-24-072) that carries the existing I-291 Eastbound offramp to Page Boulervard, the reconfiguration of the St. James Avenue / Page Boulevard / I-291 interchange, the reconstruction of the intersection of St. James Avenue and Page Boulevard into a multi-lane roundabout, and various bicycle / pedestrian improvements throughout the Project. The Project includes construction of 1,700-feet of noise barrier along I-291 Westbound, replacement of the existing ITS camera on I-291, street lighting along St. James Avenue, roadway reconstruction, highway drainage/storm water management facilities, traffic management, pavement markings and signage, utility relocation/protection and all other related bridge and highway work.

MassDOT will use staged construction to complete the major work elements within the project limits.

Three lanes of travel will be maintained on I-291 during peak traffic periods, vehicle access through the work zone will be maintained at all times and the interchange ramps will remain open during peak travel periods.

Roadway Reconstruction

The Project includes roadway reconstruction of St. James Avenue, Tapley Street, Page Boulevard, the new I-291 Eastbound off-ramp, the reconfiguration of the I-291 Westbound off-ramp, and minor improvements to both on-ramps to I-291. A shared use path is proposed along St. James Avenue and Tapley Street to provide bicycle and pedestrian improvements and connectivity. Interchange improvements are proposed to enhance traffic operations and safety along St. James Avenue between the existing roundabout at Tapley Street and the new, proposed roundabout at Page

Boulevard. The proposed improvements include cross-over traffic signals and improved connections to I-291. Work along I-291 includes removal of the existing westbound ramp and the bridge (S-24-

072) to Page Boulevard, replacement of the existing ITS camera system, relocation of an existing traffic counting station, highway guard improvements and pavement milling and overlay.

Bridge Reconstruction

The Project includes replacement of three (3) bridges carrying St. James Avenue (Bridge No. S-24- 017 and S-24-071) and Tapley Street (Bridge No. S-24-070) over I-291/US-20 and CSX Railroad.

The Tapley Street Bridge will remain in its approximate location while the St. James Avenue bridges will be reconstructed. Bridge S-24-017 carrying St. James Avenue over the CSX Railroad will be replaced with a wider structure to accommodate the interchange improvements and include full replacement of the existing abutments and steel superstructure. Bridge S-24-071 carrying St. James Avenue over I-291 will be replaced with two (2) independent bridge structures to carry northbound and southbound traffic respectively as part of the interchange configuration. The existing bridge abutments and concrete piers will be replaced. An infill section is proposed between the I-291 and the railroad to accommodate new ramp connections to the interchanges. The Project includes construction of several retaining walls to support the reconfigured ramps and multiple temporary walls to support the proposed temporary traffic configuration during construction. The Project also includes removal of the existing bridge carrying the I-291 Eastbound offramp (S-24-072) to Page Boulevard.

Traffic

Staged construction is required to complete the major work elements (bridge demolition/construction, ramp reconfiguration and roundabout construction) within the project limits.

The Project will maintain three traffic lanes on I-291 during peak traffic periods. The existing interchange ramps will remain open during Project construction. Two-way traffic will be maintained on St. James Avenue throughout construction through the staged construction approach. Tapley Street bridge will be constructed in two primary stages. In the first construction stage, vehicles will be detoured in both directions.. In the second stage, one-way vehicle traffic, in the northbound direction only, will be maintained.

Emergency vehicle access through the work zone will be maintained at all times. Pedestrian and bicycle access will also be maintained through the work zone at all times.

Utility Impacts

Utilities are carried on both the Tapley Street and St. James Avenue bridges. Given the bridge replacement, utilities relocations will be required. The roadway reconstruction will require adjustment of both public and private castings, frames, grates and/or covers.

For the Tapley Street bridge, the Project will relocate a 12” gas line, electric duct back, streetlight conduit, a Comcast conduit and a telecom duct bank. The utility relocations will be staged in close coordination with the bridge construction staging.

For the St. James Avenue bridges (over I-291 and CSX Railroad), the Project will relocate a telecom duct bank. The existing water line on these bridges has been discontinued by Springfield Water and Sewer. Existing water pipes will be removed from the existing bridges. Both traffic signal and streetlight conduit will be added to these bridges. The existing 36” sanitary sewer line along the south abutment of the St. James Avenue bridge over the CSX Railroad and running parallel with the railroad tracks will need to be temporarily relocated and then ultimately replaced to allow for the bridge demolition and construction. This work will require close coordination with CSX and Springfield Water and Sewer.

Finally, the existing ITS camera system located on I-291 Eastbound, east of St. James Avenue will be replaced with a new ITS camera system. The new location will be west of St. James Avenue along I-291 Westbound.

The existing streetlights along St. James Avenue will be replaced to accommodate the new Interchange configuration and the new multi-lane roundabout at St. James Avenue and Page Boulevard. Highway lighting along I-291 will be removed and reset or replaced as needed to facilitate the Project construction.

Stormwater

The Project includes temporary and permanent stormwater management facilities including the design and construction of a stormwater control measure (SCM). The Project intends to meet the Massachusetts Standards to the maximum extent practicable and will meet the MassDOT closed drainage requirements.

The Project proposes to improve the existing closed drainage systems to suit the new intersections at either side of St. James Avenue over I-291. Catch basin to catch basin connections will be eliminated throughout the site wherever possible. Reducing these connections will provide improvements to drainage system performance and increase resilience to structure clogging at critical points. Proposed catch basins will have deep sumps and will be designed to be offline of the main drainage trunkline. The deep sump catch basins will provide additional water quality treatment throughout the entire project area, improving existing conditions.

An infiltration basin is proposed off-site that will provide both groundwater recharge and water quality treatment of a portion of the project area.

Environmental

Based on the existence of nearby disposal sites, oil and/or hazardous materials (OHM) impacted soil is expected to be encountered during excavation and construction, particularly of the south abutment of the St. James Avenue Overpass associated with Release Tracking Number (RTN) 1-596. In addition, hazardous building materials may be identified in existing soil or soil imported and placed as part of past road construction.

Dewatering shall be conducted in accordance with applicable MassDOT standards, the requirements of the National Pollutant Discharge Elimination System (NPDES), and applicable General Permit for Storm Water Discharges from Construction Activities (CGP) and/or Dewatering and Remediation General Permit (DRGP) issued by the U.S. Environmental Protection Agency

(EPA).

Due to the age of the existing bridges, lead-based paint may require management during the Project.

Additionally, paint chips from the existing bridge can also result in lead impacts to soil surrounding the structure.

This Project qualifies as a Type 1 project under 23 CFR 772 (Federal Highway Noise Regulations).

Preliminary analysis and calculations indicated that a 1,700 feet noise barrier along I-291 Westbound will be required on the west end of the project limits.

The proposed Project cost is estimated at $226,000,000.00. The Best Value Design-Build Procurement process shall be used for the Project as authorized under MGL c 149A ss 14 et seq.

Letters of Interest

The deadline for receipt of Letters of Interest is December 29, 2026 at 12:00 PM (noon). All parties must send a “Letter of Interest” to MassDOTBIDDocuments@dot.state.ma.us. Letters of Interest MUST include a contact name, address, telephone number, and email address. Late submittals will not be accepted. The Request for Qualifications (RFQ) package will be mailed on or about December 30, 2026 to all parties submitting a Letter of Interest by the above date and time.

The RFQ (without supporting documents) will also be available to be downloaded from COMMBUYS on or about December 30, 2026. The posting on COMMBUYS is for public informational purposes only. Please note that Proposers MUST submit a Letter of Interest by the stated date to become part of future phases of the procurement process for the Project. The Statement of Qualifications (SOQ) will be due on or around February 2, 2027 by noon (12:00 PM). Statements of Qualifications will NOT be accepted from any party not initially submitting a timely Letter of Interest in response to and consistent with the requirements of this Request..

Briefing

MassDOT will host a virtual briefing to discuss the RFQ on or about January 12, 2027 at 10 AM.

Meeting notices will be emailed to the point of contact listed in the Letters of Interest.

Prequalification

All Design-Builders must have a Major Participant that is prequalified by the MassDOT Architects and Engineers Review Board in the areas of:

• Complex Bridge Design and Rating

• Complex Roadway Design

In addition, all Design-Builders must have a Major Participant who is prequalified by the MassDOT Prequalification Committee in Bridge - Construction with a Single Contract Limit (SCL) of at least $226,000,000.00.

Each individual member of a Design-Builder Joint Venture (JV) does not have to be prequalified in Bridge Construction with a single contract limit (SCL) of $226,000,000.00. However, JV Partners who are prequalified in Bridge - Construction can combine their individual SCLs to satisfy the $226,000,000.00 SCL requirement (Per 720 CMR 5.00)

Evaluation Criteria

Proposers (and/or their key personnel) will be evaluated on the following criteria:

• Similar type of work experience for Bridge and Highway reconstruction, including work over mailto:MassDOTBIDDocuments@dot.state.ma.us

Interstate highway and Railroad and interchange improvements.

• Joint experience of the DB team members working together.

• Design-Build experience of the DB team members.

• Quality of performance on prior projects.

• Experience of Key Personnel to be assigned to the Project.

• Experience and success in managing accelerated work schedules with key milestones.

• Financial Status.

• Litigation and Performance/Termination History.

• Safety Record.

• Risk Management.

• Reference Information, including banks, previous clients, and sureties.

• Volume of current work on MassDOT projects.

• Successful implementation of complex Traffic Management Plans

• Prior experience in environmental permit compliance, and environmental agency coordination.

• Prior experience in developing innovative project designs and construction methods of a type similar to this scope.

• Demonstrated prior experience in utility protection/relocation/installation and coordination with construction operations.

• Prior experience with Accelerated Bridge Construction (ABC)

• Prior experience with Public Outreach and Abutter engagement

• Other factors that the Selection Committee determines.

Additional

This Design-Build procurement will follow a two-phase Best Value selection process. MassDOT will send a Request for Qualifications to all parties submitting a Letter of Interest consistent with the requirements described above. Proposers are invited to submit a Statement of Qualifications (SOQ) to the MassDOT contact above in response to the RFQ. It is expected that the SOQ will be due on or about February 2, 2027 at noon (12:00 PM). Firms/Contractors submitting a Letter of Interest by the due date will receive and be notified of addendums to the RFQ up to the submission date of the SOQ.

Proposers are required to prepare an SOQ; be prequalified by MassDOT Architects and Engineers Review Board; and be prequalified by the MassDOT Prequalification Committee. The Proposer must be able to produce evidence of 100% bonding capacity.

Time Period for Completed Project: MassDOT will require that all construction must be completed within 2,000 calendar days of Notice to Proceed.

MassDOT will use Bid Express for this Project. All bidders shall use Bid Express for submittal of bids. Bidders shall subscribe to the BidExpress on-line bidding exchange by following the instructions provided at www.bidx.com or by contacting:

Info Tech Inc.

2970 SW 50th Terrace Gainesville, FL 32608-5076 email: customer.support@bidx.com

Complete instructions for the submission of qualifications are set forth in the RFQ. The Commonwealth reserves the right to reject any or all proposals it may receive.

MassDOT Highway Division projects are subject to the rules and regulations of the Architectural http://www.bidx.com/ mailto:customer.support@bidx.com

Access Board (521 CMR 1.00 et. seq.). Prospective bidders and interested parties can access this information and more via the internet at WWW.COMMBUYS.COM.

BY: Philip Eng, Secretary and CEO, MassDOT

Meghan Haggerty, Interim Highway Administrator, MassDOT

SATURDAY NOVEMBER 14, 2026

http://www.commbuys.com/