6100 Form.pdf
PDF 96 KB Posted
- Attached to
- Cold Milling/Paving/Overlay PMC Project
- Solicitation number
- RFP-591-190000002292-3
- Issued by
- Wayne County, Brooklyn Village, Michigan
About this file
This is a Michigan Department of Transportation (MDOT) Maintenance Contract Request for Proposal Cover Sheet for a highway maintenance and paving project located in Saginaw County. The project involves two primary road segments: I-75 Northbound at Eastbound M-46 Exit Ramp and M-81 East of Portsmouth Road, with work scheduled to commence on 09/03/19 and complete by 09/20/19. Specific activities include 2" cold milling HMA surface and HMA paving, including a 1 1/2" HMA overlay on M-46 over I-75 with a 15-foot butt joint, and pavement markings. The contract requires HMA Paving prequalification and will utilize unit prices for billing, with reference to the 2012 MDOT Standard Specifications for Construction.
The project is structured with detailed documentation including a project-specific description of work, maintaining traffic requirements, and estimated quantities. The payment method is set for unit prices, and potential bidders must submit any inquiries in writing to the MDOT Proposal Manager, Laura Dotson from the MDOT Purchasing Unit, by 07/15/19. The routes involved are I-75, M-46, and M-81, with specific geographical limits within Saginaw County. Bidders will need to comply with MDOT's standard construction specifications and be prepared to provide comprehensive documentation as part of their proposal submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bay_standard_contract_terms.docx | DOCX document | |
| I-75 Skip Patching PACKAGE.pdf | ||
| M-81 Skip Patching Bid Package.pdf | ||
| Schedule B.docx | DOCX document | |
| M-46 Overlay Bid Package.pdf | ||
| Schedule A _ld.docx | DOCX document | |
| 6110 Form.pdf | ||
| proposal-instructions-confidential-treatment-vendor-questions-worksheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAINTENANCE CONTRACT REQUEST
FOR PROPOSAL COVER SHEET
PROJECT TITLE BID SUBMISSION DATE
PROJECT DESCRIPTION
PROJECT LOCATION
ROUTE: LIMITS:
REQUIRED MAINTENANCE PREQUALIFICATION ( Category and Name)
PROJECT START DATE PROJECT COMPLETION DATE
PAYMENT METHOD (Check one)
FIXED-PRICE, LUMP SUM UNIT PRICES
SPECIFICATIONS THAT APPLY TO THIS PROJECT (Check all apply)
2012 MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION
MDOT MAINTENANCE GUIDES (Attached)
PROJECT SPECIFIC SPECIFICATIONS (Attached)
ADDITIONAL PROJECT DETAILS ATTACHED (Check all that apply or Mark N/A)
_______ DETAILED DESCRIPTION OF WORK
_______ PROGRESS SCHEDULE REQUIREMENTS
_______ LIQUIDATED DAMAGES
_______ BONDING REQUIREMENTS
_______ MAINTAINING TRAFFIC REQUIREMENTS
_______ PROJECT SPECIFIC DETAILS OR SPECIFICATIONS
_______ ESTIMATED QUANTITIES
ANY QUESTIONS OR INQUIRIES RELATED TO THIS REQUEST FOR PROPOSALS MUST BE SUBMITTED IN WRITING TO THE MDOT PROPOSAL MANAGER LISTED BELOW. THE DEADLINE FOR SUBMITTING INQUIRIES IS _________.
MDOT PROPOSAL MANAGER NAME TITLE EMAIL
COUNTY:
Michigan Department Of Transportation 6100 (05/17)
| BID SUBMISSION DATE: |
| PROJECT DESCRIPTION: I-75 Northbound at Eastbound M-46 Exit Ramp project will consist of 2” Cold Milling HMA Surface and HMA Paving on I-75 and M-46 Exit Ramp and pavement markings. Areas outlined in attached planview. |
M-46 over I-75 project will consist of 1 1/2” HMA overlay on M-46 over I-75. Overlay to include a 15 foot Butt Joint to be milled in on either side of the bridge. The overlay to be tapered at the bridge railings and pavement markings.
M-81 0.94 Miles East of Portsmouth Road project will consist of 2” Cold Milling HMA Surface and HMA Paving on mainline, gaping out the bridge deck. Areas outlined in attached planview.
| REQUIRED MAINTENANCE PREQUALIFICATION CATEGORY AND NAME: HMA Paving |
| PROJECT START DATE: 09/03/2019 |
| DETAILED DESCRIPTION OF WORK: |
| PROGRESS SCHEDULE REQUIREMENTS: |
| LIQUIDATED DAMAGES: |
| BONDING REQUIREMENTS: |
| MAINTAINING TRAFFIC REQUIREMENTS: |
| PROJECT SPECIFIC DETAILS OR SPECIFICATIONS: |
| ESTIMATED QUANTITIES: |
| undefined: 07/15/19 |
| MDOT PROJECT MANAGER NAME: Laura Dotson |
| TITLE: MDOT Purchasing Unit |
| EMAIL: DotsonL2@michigan.gov |
| PROJECT COMPLETION DATE: 09/20/2019 |
| Check Box1: |
| 1: Off |
| 2: Off |
| 3: Yes |
| 4: Off |
| 5: Off |
| 6: Off |
| 7: Yes |
| 8: Yes |
| 9: Yes |
| 0: |
| 0: Yes |
| Check Box10: no |
| PROJECT TITLE: |
| 0: HMA Milling/Paving/Overlay/Pavement Markings |
| 1: I-75, M-46, M-81 |
| 2: Saginaw |
| 3: |
Button3:
File details come from the government source that posted it. Updated .