6100 Form.pdf

PDF 96 KB Posted

Attached to
Cold Milling/Paving/Overlay PMC Project
Solicitation number
RFP-591-190000002292-3
Issued by
Wayne County, Brooklyn Village, Michigan

About this file

This is a Michigan Department of Transportation (MDOT) Maintenance Contract Request for Proposal Cover Sheet for a highway maintenance and paving project located in Saginaw County. The project involves two primary road segments: I-75 Northbound at Eastbound M-46 Exit Ramp and M-81 East of Portsmouth Road, with work scheduled to commence on 09/03/19 and complete by 09/20/19. Specific activities include 2" cold milling HMA surface and HMA paving, including a 1 1/2" HMA overlay on M-46 over I-75 with a 15-foot butt joint, and pavement markings. The contract requires HMA Paving prequalification and will utilize unit prices for billing, with reference to the 2012 MDOT Standard Specifications for Construction.

The project is structured with detailed documentation including a project-specific description of work, maintaining traffic requirements, and estimated quantities. The payment method is set for unit prices, and potential bidders must submit any inquiries in writing to the MDOT Proposal Manager, Laura Dotson from the MDOT Purchasing Unit, by 07/15/19. The routes involved are I-75, M-46, and M-81, with specific geographical limits within Saginaw County. Bidders will need to comply with MDOT's standard construction specifications and be prepared to provide comprehensive documentation as part of their proposal submission.

View the file

Other files

File Type Posted
Bay_standard_contract_terms.docx DOCX document
I-75 Skip Patching PACKAGE.pdf PDF
M-81 Skip Patching Bid Package.pdf PDF
Schedule B.docx DOCX document
M-46 Overlay Bid Package.pdf PDF
Schedule A _ld.docx DOCX document
6110 Form.pdf PDF
proposal-instructions-confidential-treatment-vendor-questions-worksheet.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTENANCE CONTRACT REQUEST

FOR PROPOSAL COVER SHEET

PROJECT TITLE BID SUBMISSION DATE

PROJECT DESCRIPTION

PROJECT LOCATION

ROUTE: LIMITS:

REQUIRED MAINTENANCE PREQUALIFICATION ( Category and Name)

PROJECT START DATE PROJECT COMPLETION DATE

PAYMENT METHOD (Check one)

FIXED-PRICE, LUMP SUM UNIT PRICES

SPECIFICATIONS THAT APPLY TO THIS PROJECT (Check all apply)

2012 MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION

MDOT MAINTENANCE GUIDES (Attached)

PROJECT SPECIFIC SPECIFICATIONS (Attached)

ADDITIONAL PROJECT DETAILS ATTACHED (Check all that apply or Mark N/A)

_______ DETAILED DESCRIPTION OF WORK

_______ PROGRESS SCHEDULE REQUIREMENTS

_______ LIQUIDATED DAMAGES

_______ BONDING REQUIREMENTS

_______ MAINTAINING TRAFFIC REQUIREMENTS

_______ PROJECT SPECIFIC DETAILS OR SPECIFICATIONS

_______ ESTIMATED QUANTITIES

ANY QUESTIONS OR INQUIRIES RELATED TO THIS REQUEST FOR PROPOSALS MUST BE SUBMITTED IN WRITING TO THE MDOT PROPOSAL MANAGER LISTED BELOW. THE DEADLINE FOR SUBMITTING INQUIRIES IS _________.

MDOT PROPOSAL MANAGER NAME TITLE EMAIL

COUNTY:

Michigan Department Of Transportation 6100 (05/17)

BID SUBMISSION DATE:
PROJECT DESCRIPTION: I-75 Northbound at Eastbound M-46 Exit Ramp project will consist of 2” Cold Milling HMA Surface and HMA Paving on I-75 and M-46 Exit Ramp and pavement markings. Areas outlined in attached planview.

M-46 over I-75 project will consist of 1 1/2” HMA overlay on M-46 over I-75. Overlay to include a 15 foot Butt Joint to be milled in on either side of the bridge. The overlay to be tapered at the bridge railings and pavement markings.

M-81 0.94 Miles East of Portsmouth Road project will consist of 2” Cold Milling HMA Surface and HMA Paving on mainline, gaping out the bridge deck. Areas outlined in attached planview.

REQUIRED MAINTENANCE PREQUALIFICATION CATEGORY AND NAME: HMA Paving
PROJECT START DATE: 09/03/2019
DETAILED DESCRIPTION OF WORK:
PROGRESS SCHEDULE REQUIREMENTS:
LIQUIDATED DAMAGES:
BONDING REQUIREMENTS:
MAINTAINING TRAFFIC REQUIREMENTS:
PROJECT SPECIFIC DETAILS OR SPECIFICATIONS:
ESTIMATED QUANTITIES:
undefined: 07/15/19
MDOT PROJECT MANAGER NAME: Laura Dotson
TITLE: MDOT Purchasing Unit
EMAIL: DotsonL2@michigan.gov
PROJECT COMPLETION DATE: 09/20/2019
Check Box1:
1: Off
2: Off
3: Yes
4: Off
5: Off
6: Off
7: Yes
8: Yes
9: Yes
0:
0: Yes
Check Box10: no
PROJECT TITLE:
0: HMA Milling/Paving/Overlay/Pavement Markings
1: I-75, M-46, M-81
2: Saginaw
3:

Button3:

File details come from the government source that posted it. Updated .