610-24-508 - Drawings.pdf
PDF 3 MB Posted
- Solicitation number
- 36C25024B0043
About this file
This document is a set of drawings and specifications for the Provide Asphalt Sealcoating and Line Striping - 610-24-508 project at the Marion, Indiana Veterans Affairs Medical Center. The contractor will be required to provide all labor, equipment, materials, and supervision necessary to prep existing asphalt parking lots and install asphalt seal coating and line striping across multiple buildings and parking lots. The work includes repairing cracks, removing old markings, and applying two coats of reflective line striping. The contractor must coordinate closely with the project manager and provide a work schedule for approval prior to starting. High traffic areas will require after-hours or weekend work. Bids are being accepted electronically and the solicitation number is 36C25024B0043. The document provides detailed general notes, parking stall specifications, and site plans for the parking lots to be addressed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25024B0043 0003.docx | DOCX document | |
| 36C25024B0043 0003.docx | DOCX document | |
| RFI 610-24-508 Additional 1.pdf | ||
| 36C25024B0043 0002.docx | DOCX document | |
| RFI 610-24-508.pdf | ||
| 610-24-508 Site Visit Attendance.pdf | ||
| 36C25024B0043 0001.docx | DOCX document | |
| IFB 36C25024B0043.pdf | ||
| IFB 36C25024B0043.pdf | ||
| VHA Directive 1192 01.pdf | ||
| Wage Determination - Indy - Jan 2024.pdf | ||
| 610-24-508 - Specifications.pdf | ||
| EMR 36C25024R0047.docx | DOCX document | |
| RFI Form 36C25024R0047.doc | DOC document | |
| Contractor Certification Regarding Safety and Environmental 610-24-508.docx | DOCX document | |
| 36C25024R0094 Synopsis 610-24-508 - Provide Asphalt Sealcoating and Line Striping.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
Approved: Interim Medical Center Director
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot
B
A
C
D
E re es
6" an d ha lf qu ar te rs s r i nc h
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
97 8654321
U N
I T E D S TAT ES OF A M ERIC
SR
IA
FF
SNARETEVFOTNEMTRAPE
Approved: Interim Medical Center Assoc. Director
Approved: Engineering Department Zachary I. McDaniel
Drawing Title
610-24-508
Various
22-102M 1 708/16/2023
Marion, IN
Cover Sheet Stephen Sheets
NORTHERN INDIANA HEALTH CARE SYSTEMS,
VETERANS ADMINISTRATION
1700 E. 38TH. STREET MARION, INDIANA 46953
PROJECT # 610-24-508
PROVIDE ASPHALT SEAL COATING AND LINE STRIPING
PROVIDE ASPHALT SEAL
COATING AND LINE STRIPING
Anthony Colon
M
IS
SI
SS
IN
EW
RI
VE
R
NATIO
NAL CEM
ETARY
NATIONAL CEMETARY
N
ATIO
AL C
EM
ETAR
Y
65 114
COMPOUND
MATERIAL
51 52
(2) 30,000
GAL. U.S.T.
T516
9 8
1301 / 733002 / 72
3001 / 69
ES / 3004
MB / 3
G01
3003 / 83
T504
E 38TH ST.
E 38TH ST. E 38TH ST. E 38TH ST.
S LIN
O
LN
BLVD
41 97
177 49
HA7
HA8
R.T.
HA9
HA1
DIESEL
HA6
HA3
HA4
WATER ST.
CM
AH
AV
E.
CO
TT
AG
RD
BLACK RD.
RAILROAD AVE.
BL
AC
K
EA
RTH
FI
LL
HA2 HA5
HA10
HA11
GRAY
D.
G
AY
. STEELE CIRCLE
MCMAHON AVE.
MAIN ENTRANCE
DIA
NA
INDIANA AVE.
STEELE CIRCLE
BLACK RD. BLACK RD.
ORCHARD AVE.
RIVER RD.
RCHARD AVE.
NELSON ST.
CHAPMAN AVE.
ISSISSIN
A R
KUDER PL. KUDER PL.
NATIONAL CEMETERY
HYDE RD.
H
YD
E R
AR
IO
HYD
RD.
IR
W
CHAPM
AN AVE.
STEELE C
LE
SHORT ST.
EC
AN
IC
S AVE.
SH
RT
S
T.
FLO
ER ST.
ER
ST.
VINE RD.
DOCTOR'S RD.
TO
'S R
IX R
Z. MCDANIEL B.COLEMAN
AutoCAD SHX Text
Sheets and Views
Model
Dwg. ofRevisions: Date
I T E D S TAT ES OF A M ERIC
3 708/16/2023
Marion, IN
Project Location Site Map
IS
SI
SS
VE
NATIO
NAL CEM
ETARY
NATIONAL CEMETARY
65 114
MATERIAL
51 52
(2) 30,000
GAL. U.S.T.
9 8
1301 / 733002 / 72
3001 / 69
ES / 3004
MB / 3
G01
3003 / 83
E 38TH ST.
E 38TH ST. E 38TH ST. E 38TH ST.
41 97
177 49
HA7
HA8
R.T.
HA9
HA1
DIESEL
HA6
HA3
HA4
CM
AH
EA
RTH
FI
LL
HA2 HA5
HA10
HA11
GRAY
D.
. STEELE CIRCLE
DIA
NA
STEELE CIRCLE
BLACK RD. BLACK RD.
RCHARD AVE.
ISSISSIN
A R
KUDER PL. KUDER PL.
NATIONAL CEMETERY
HYDE RD.
HYD
RD.
CHAPM
AN AVE.
STEELE C
LE
SHORT ST.
SH
RT
T.
ER ST.
ER
ST.
DOCTOR'S RD.
TO
'S R
4A
Sheets and Views
Model
D S
Dwg. of
1 62 3 84 5 7 9
U
I T E
TAT E
ACIREMAFOS
AF
FA
BUILDING 6, 47, AND 138
PARKING LOT DETAIL
MARION, IN
1.
2.
3.
4.
5.
7.
8.
9.
10.
11.
13.
14.
15.
16.
12.
18.
19.
20.
21.
22.
23.
24.
26.
27.
28.
29.
30.
31.
32.
33.
35.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
62.
63.
64.
65.
66.
6.
17.
25.
34.
36.
37.
38.
39.
41.
42.
38.
39. 55.
56.
57.
58.
59.
60.
61.
WATER
VAN
19. 20. 21. 22. 23.
9. 8. 7. 6. 5. 4. 3. 2. 1.
GOVERNM
ENT
VEHICLE
SHUTTLE
P O
FF 15
DROP
OFF
MIN
DAV
6, 47, & 138
408/16/2023
67.
Sheets and Views
Model
UN
I T E D S TAT ES OF A MERIC
BUILDING 172 & 172A
PARKING LOT DETAIL
Z. MCDANIEL
70.
73.
74.
86.
134.
137.
66.
68.
69.
71.
72.
75.
76. 77. 78.
81. 82. 83. 84. 85. 87. 88. 89. 90.
93. 94. 95. 96. 97. 98. 99.
100.
101.
102.
103.
104.
105.
106.
107.
108.
109.
110.
111.
114.
115.
116.
117.
118.
119.
121.
122.
123.124.125.126.127.128.129.130. 131. 132. 133. 135.
136.
138.
146.
172 & 172A
M1.
M2.
M3.
M4.
13. 14.
15. 16.
18. 19. 20. 21. 22.
38. 39.
41. 42. 43. 44. 45. 46. 47. 48. 49. 50. 51. 52. 53. 54. 55. 56. 57. 58. 59. 60. 61. 62. 63.
64.
65.
79. 80.
91. 92.
67.
120.
112.
113.
139. 140. 141.142.143.
144. 145.
147.148.149.150. 151.152.
153.154.155.156.157.158.159.160.161.162.
163. 164. 165. 166.167. 168. 169.170. 171.172.
173.
174.
175.
176.
177.
178.
179.
180.
181.
182.
183.
184. 185. 186. 187. 188. 189. 190. 191. 192. 193. 194. 195. 196. 197. 198.
200.199.
MOTORCYCLE
PARKING
B.COLEMAN08/16/2023
1. 2. 3. 4. 5. 6. 7.
15. 14. 13. 12. 11. 10. 9. 8.
16. 17. 18. 19. 20. 21. 22. 23.
28. 27. 26. 25. 24.29.30.
4A
25.24.
Sheets and Views
Model
WATER STREET, MCMAHONE AVE., B-124 AND
B-170 PARKING DETAIL
6. 7. 8. 9.
MOTORCYCLE
PARKING
2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.
11.10.9.8.6.5.4.3.2.1.
cM ah ve n u
Water Street
Li co ln le va rd ra y a
GAS VALVE
ADPCS
608/16/2023
Sheets and Views
Model
ENGINEERING COMPLEX
PARKING DETAIL
51 5258
145 165
Black Road a ic v
WATER WATER
3.
4.
5.
6.
27. 28. 29. 30. 31. 32. 33. 34. 35.
10. 11.12. 13. 14. 15. 16. 17.
18. 19. 20. 21. 22. 23. 25. 26.24.
1. 2. 3. 4.
1. 2. 3. 4.
15.16.17.18.14.13.12.11.10.
9.5. 6. 7. 8.4.3.2.1.
1. 2.
1.2.3.4.
156S rt t.
Orchard Ave.
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.
12. 13. 14. 15. 16. 17. 18. 19. 20. 21.22. 23. 24. 25. 26.
5. 6. 7.4.3.2.1.
27. 28. 29. 30.
2. 3.
5. 6. 7.
8. 9.
10. 11. 12. 13. 14. 15.GSA
GSA
11.12.13.10.9.8.
3. 4. 5. 6. 7. 8.
4.
3.
708/16/2023
Sheets and Views
Model
GENERAL NOTES &
PARKING STALL DETAIL
PARKING STALL DETAIL (1):
06/10/2022 7
GENERAL NOTES:
PARKING STALL DETAIL(2):
10 100 1
1. CONTRACTOR WILL PROVIDE ALL LABOR, EQUIPMENT, MATERIALS AND SUPERVISION NECESSARY TO PREP BUILDING 6, BUILDING 47, BUILDING 138 CIRCLE, BUILDING 172 & BUILDING 172A, BUILDINGS 124 & 170, BUILDINGS 52 & 153, BUILDINGS 54, T516 & T504, BUILDING 51, BUILDING 58, BUILDINGS 76, 53 & 165, PARKING LOTS FOR INSTALLATION OF ASPHALT SEAL COATING. THIS WORK WILL ALSO INCLUDE LINE STRIPING (2 COATS WITH
REFLECTIVE GLASS BEADS). LINE STRIPING DETAIL PROVIDED BY VA.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE AND PERFORMING ANY AND ALL REQUIRED MEASUREMENTS USED IN PREPARATION OF BIDDING DOCUMENTS. ALL DIMENSIONS ARE APPROXIMATE.
3. IT WILL BE THE CONTRACTORS RESPONSIBILITY TO LOCATE ALL SITE UTILITIES. IF DAMAGE OCCURS TO ANY
UTILITIES, IT MUST BE REPAIRED AT CONTRACTORS OWN EXPENSE.
4. WORK AREAS SHALL BE ROPED OFF AROUND WORK SITES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR BLOCKING OFF AREAS AS REQUIRED, FURNISHING THE NECESSARY BARRICADES, SIGNS, ETC... ALL ENTRANCES SHALL REMAIN OPERATIONAL AT ALL TIMES UNLESS PRIOR PERMISSION HAS BEEN OBTAINED FROM THE PROJECT ENGINEER TO RESTRICT OTHER THAN EMERGENCY ACCESS. HIGH TRAFFIC AREAS OR ENTRANCE INTO THE HOSPITAL WILL REQUIRE AFTER HOURS OR WEEKEND WORK, INCLUDING AREAS BUT NOT LIMITED TO: 4, 4A & 3.
5. TOOLS AND EQUIPMENT SHALL BE SECURED ANY TIME WORKERS ARE NOT IN THE IMMEDIATE AREA. THE WORK
SITE SHALL BE CLEANED UP AT THE CONCLUSION OF EACH DAYS WORK.
6. UPON FINAL CLEAN-UP, THE CONTRACTOR SHALL REMOVE ANY DEBRIS, RUBBISH, AND EXCESS MATERIAL FROM
THE STATION.
7. THE CONTRACTOR SHALL FOLLOW ALL APPLICABLE VAMC REGULATIONS, OSHA STANDARDS AND INTERIM LIFE
SAFETY MEASURES.
8. THE CONTRACTOR SHALL TAKE EVERY PRECAUTION TO PREVENT DAMAGING ADJACENT PAVING, SIDEWALKS, SHRUBBERY, ETC... IF DAMAGE OCCURS IT MUST BE REPAIRED AT CONTRACTORS OWN EXPENSE.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REQUIRED REPAIRS TO DAMAGED SOD. COMPLETED REPAIRS
MADE BY EXPERIENCED PERSONNEL SHALL MATCH THE EXISTING.
10. THE WORK PREFORMED IN THIS CONTRACT SHALL BE CAREFULLY COORDINATED WITH THE PROJECT MANAGER/ COR AND A WORK SCHEDULE SHALL BE SUBMITTED BY THE CONTRACTOR FOR APPROVAL, PRIOR TO THE START OF ANY WORK. EACH PARKING LOT CLOSURE WILL REQUIRE A MINIMUM OF 4 WORKING DAYS NOTIFICATION PRIOR TO WORK STARTING. IF MORE THAN ONE PARKING LOT CLOSURE IS REQUESTED, SUCH PLANNING MUST BE
SUBMITTED FOR REVIEW/CONSIDERATION AND APPROVED BY THE PROJECT MANAGER/COR.
11. THE CONTRACTOR SHALL HAVE ON THE JOB AT ALL TIMES DURING THE PROGRESS A FORMAN, SUPERINTENDENT OR OTHER COMPETENT REPRESENTATIVE TO WHOM ORDERS AND INSTRUCTIONS MAY BE GIVEN. HIS NAME IS TO BE CERTIFIED TO THE VA AND ANY ORDERS GIVEN TO SUCH REPRESENTATIVE SHALL HAVE THE SAME FORCE AND EFFECT AS IF GIVEN DIRECTLY TO THE CONTRACTOR. A PHONE NUMBER WHERE A RESPONSIBLE PERSON CAN BE
REACHED AFTER HOURS IN CASE OF PROBLEMS ETC... SHALL BE PROVIDED ALSO.
12. THE CONTRACTOR MUST HAVE A PRE-INSTALLATION MEETING WITH THE COR WITHIN 48-HOURS PRIOR TO
STARTING.
13. LINE STRIPING/AISLES ON BOTH SIDES OF HANDICAP STALL(S)ALONG WITH NUMBERING FOR HANDICAP SPACES SHOULD ALL BE BLUE, THE HANDICAP SYMBOL(S) SHOULD BE WHITE WITH A BLUE BACKGROUND. ALL OTHER LINE
STRIPING IS TO BE WHITE UNLESS NOTED OTHERWISE IF ANY QUESTIONS CONSULT COR.
14. ALL STALL NUMBERING TO BE LOCATED AT THE AT THE OPEN END OF THE STALL AND CENTERED, IF IT IS A HANDICAP STALL THE SYMBOL SHOULD BE LOCATED ABOVE NUMBERING AND ALSO CENTERED. PARKING STALL
DETAIL (2) FOR REFERENCE.
15. CONCRETE SHOULD RECEIVE NO SEAL COATING, ONLY LINE STRIPING WHERE IT IS CALLED FOR.
16. STALLS TO BE 10' WIDE, HANDICAP STALLS SHOULD INCLUDE 5' WIDE AISLES ON BOTH SIDES UNLESS STALL IS VAN
ACCESSIBLE WHICH REQUIRES 11' WIDE STALLS AND 8' WIDE AISLES, ANY DEVIATION MUST BE APPROVED BY COR
BEFORE INSTALLATION.
17. MOTORCYCLE PARKING SPOTS TO BE 5' WIDE AND THE LENGTH OF THE CONCRETE PAD.
18. FIRE HYDRANT ACCESS LINE STRIPING TO BE RED.
ONE DIGIT
TWO DIGITS THREE DIGITS
30"
30" 20'
60"8' MIN.
2'
11' MIN. VAN
Sheets and Views
Model
File details come from the government source that posted it. Updated .