609052 Bid Items List Summary

This bid items list document, issued by the Massachusetts Department of Transportation (MassDOT), details the work components for intersection improvements at Centre Street (Route 123) and Plymouth Street in Brockton, Massachusetts (Federal Aid Project No. STP/HPP-0035(072)X). The project encompasses selective clearing and thinning, tree trimming and removal, herbicide treatment of invasive plants, tree protection measures, trash and debris removal within the riverfront area, and extensive excavation and grading work. Specific bid items include 1,300 cubic yards of unclassified excavation, 530 cubic yards of gravel borrow, 170 cubic yards of test pit exploration, drainage structure removal (7 units), crushed stone placement (38 tons), and controlled low-strength material installation. Proposals are due October 6, 2026, at 2:00 p.m., submitted through www.bidx.com. Bidders must be pre-qualified by MassDOT in the HIGHWAY-CONSTRUCTION category and submit a Request Proposal Form (R109) at least 14 days prior to bid opening. The estimated contract value is $3.23 million.

The project is subject to prevailing wage rates, Title VI of the Civil Rights Act of 1964, and Executive Order 11246 regarding equal employment opportunity. A Proposal Guaranty equal to 5% of the bid value is required. The contract includes price adjustments for hot mix asphalt ($712.50 per ton base price), Portland cement ($452.13 per ton), diesel fuel ($4.693 per gallon), gasoline ($3.341 per gallon), and structural steel (base index 378.1), with updated adjustments posted on the MassDOT Highway Division website. Bidders must obtain a valid vendor code and Digital ID from MassDOT and www.bidx.com, respectively. Proposal documents are available on www.bidx.com for official bidders, with informational contract documents available free of charge upon request to MassDOTBidDocuments@dot.state.ma.us. Bidders are explicitly instructed not to use COMMBUYS to submit bids for this project.

Text of this file

PRO_FILENO = 609052,DESCPT = Intersection Improvements at Centre Street (Route 123) and Plymouth Street,Location = BROCKTON,DB_CONTRACT = 136652

OFF_QUANT,UNITS,DESCPT1,ITEM_NO

"0.100","A","SELECTIVE CLEARING AND THINNING","102."

"1.000","LS","TREE TRIMMING","102.2"

"24.000","HR","HERBICIDE TREATMENT OF INVASIVE PLANTS","102.3"

"24.000","HR","INVASIVE PLANT MANAGEMENT STRATEGY","102.33"

"7.000","EA","TREE PROTECTION - ARMORING AND PRUNING","102.511"

"3.000","EA","TREE REMOVED - DIAMETER UNDER 24 INCHES","103."

"1.000","EA","TREE REMOVED - DIAMETER 24 INCHES AND OVER","104."

"1.000","LS","TRASH AND DEBRIS REMOVAL WITHIN RIVERFRONT AREA","108.269"

"1300.000","CY","UNCLASSIFIED EXCAVATION","120.1"

"170.000","CY","TEST PIT FOR EXPLORATION","141.1"

"12.000","CY","CLASS B TRENCH EXCAVATION","142."

"2.000","CY","CLASS B ROCK EXCAVATION","144."

"7.000","EA","DRAINAGE STRUCTURE REMOVED","146."

"50.000","CY","ORDINARY BORROW","150."

"530.000","CY","GRAVEL BORROW","151."

"17.000","CY","GRAVEL BORROW FOR BACKFILLING STRUCTURES AND PIPES","151.2"

"38.000","TON","CRUSHED STONE","156."

"10.000","CY","CONTROLLED LOW-STRENGTH MATERIAL - MANUAL EXCAVATABLE (<= 100 PSI)","160.1"

"2420.000","SY","FINE GRADING AND COMPACTING - SUBGRADE AREA","170."

"1.000","LS","ENVIRONMENTAL HEALTH AND SAFETY PROGRAM","180.01"

"40.000","HR","PERSONAL PROTECTION LEVEL C UPGRADE","180.02"

"40.000","HR","LICENSED SITE PROFESSIONAL SERVICES","180.03"

"660.000","TON","DISPOSAL OF UNREGULATED SOIL","181.11"

"275.000","TON","DISPOSAL OF REGULATED SOIL - IN-STATE FACILITY","181.12"

"110.000","TON","DISPOSAL OF REGULATED SOIL - OUT-OF-STATE FACILITY","181.13"

"55.000","TON","DISPOSAL OF HAZARDOUS WASTE","181.14"

"1.000","LS","INSPECTION AND TESTING FOR ASBESTOS","182.1"

"20.000","FT","REMOVAL OF ASBESTOS","182.2"

"6.000","EA","CATCH BASIN","201."

"1.000","EA","CATCH BASIN - MUNICIPAL STANDARD","201.5"

"4.000","EA","MANHOLE","202."

"1.000","EA","OUTLET CONTROL STRUCTURE","202.9"

"1.000","EA","GUTTER INLET","204."

"33.000","EA","DRAINAGE STRUCTURE ADJUSTED","220."

"5.000","FT","DRAINAGE STRUCTURE REBUILT","220.2"

"1.000","EA","DRAINAGE STRUCTURE CHANGE IN TYPE","220.3"

"1.000","EA","DRAINAGE STRUCTURE REMODELED","220.5"

"4.000","FT","SANITARY STRUCTURE REBUILT","220.6"

"7.000","EA","SANITARY STRUCTURE ADJUSTED","220.7"

"1.000","EA","SANITARY STRUCTURE REMODELED","220.8"

"23.000","EA","FRAME AND GRATE (OR COVER) MUNICIPAL STANDARD","222.3"

"8.000","EA","FRAME AND GRATE (OR COVER) REMOVED AND STACKED","223.1"

"1.000","EA","10 INCH HOOD","224.10"

"6.000","EA","12 INCH HOOD","224.12"

"4.000","EA","15 INCH HOOD","224.15"

"7.000","CY","REMOVAL OF DRAINAGE STRUCTURE SEDIMENT","227.3"

"1970.000","FT","REMOVAL OF DRAINAGE PIPE SEDIMENT","227.31"

"1.000","SF","MASONRY PLUG","227.4"

"10.000","FT","10 INCH DUCTILE IRON PIPE","238.10"

"44.000","FT","12 INCH DUCTILE IRON PIPE","238.12"

"21.000","FT","12 INCH REINFORCED CONCRETE PIPE CLASS III","241.12"

"2.000","FT","15 INCH REINFORCED CONCRETE PIPE CLASS III","241.15"

"10.000","FT","8 INCH POLYVINYL CHLORIDE SANITARY SEWER PIPE","250.081"

"73.000","FT","6 INCH DUCTILE IRON WATER PIPE (MECHANICAL JOINT)","303.06"

"710.000","LB","DUCTILE IRON FITTINGS FOR WATER PIPE","309."

"55.000","FT","6 INCH WATER MAIN REMOVED AND DISCARDED","315.061"

"20.000","FT","1 INCH COPPER TUBING TYPE K","347.1"

"40.000","FT","2 INCH COPPER TUBING TYPE K","347.2"

"1.000","EA","6 INCH GATE BOX","357.06"

"1.000","EA","8 INCH GATE BOX","357.08"

"1.000","EA","12 INCH GATE BOX","357.12"

"14.000","EA","GATE BOX ADJUSTED","358."

"1.000","EA","1 INCH CORPORATION COCK","363.1"

"2.000","EA","2 INCH CORPORATION COCK","363.2"

"1.000","EA","12 X 6 INCH TAPPING SLEEVE, VALVE AND BOX","370.4"

"2.000","EA","HYDRANT - REMOVED AND RESET","376.2"

"1.000","EA","SERVICE BOX","381."

"7.000","EA","SERVICE BOX ADJUSTED","381.3"

"3.000","EA","CURB STOP","384."

"70.000","CY","DENSE GRADED CRUSHED STONE FOR SUB-BASE","402."

"6060.000","SY","PAVEMENT MICRO MILLING","415.3"

"86.000","SY","BRIDGE PAVEMENT MILLING","415.4"

"21.000","SY","HIGH EARLY STRENGTH CEMENT CONCRETE BASE COURSE","431."

"2580.000","LB","CALCIUM CHLORIDE FOR ROADWAY DUST CONTROL","440."

"22.000","MGL","WATER FOR ROADWAY DUST CONTROL","443."

"640.000","TON","SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5)","450.23"

"58.000","TON","SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC - 19.0)","450.32"

"98.000","TON","SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5)","450.42"

"20.000","TON","SUPERPAVE LEVELING COURSE - 9.5 (SLC - 9.5)","450.52"

"9.000","TON","SUPERPAVE BRIDGE SURFACE COURSE - 12.5 (SSC-B - 12.5)","450.61"

"240.000","TON","HMA FOR PATCHING","451."

"560.000","GAL","ASPHALT EMULSION FOR TACK COAT","452."

"5280.000","FT","HMA JOINT ADHESIVE","453."

"190.000","TON","TEMPORARY ASPHALT PATCHING","472."

"50.000","FT","SAWCUTTING ASPHALT PAVEMENT","482.3"

"74.000","FT","SAWING AND SEALING JOINTS IN ASPHALT PAVEMENT AT BRIDGES","482.31"

"540.000","FT","SAWCUTTING PORTLAND CEMENT CONCRETE","482.4"

"115.000","FT","SAWCUTTING ASPHALT PAVEMENT FOR BOX WIDENING","482.5"

"170.000","FT","GRANITE CURB TYPE VA4 - STRAIGHT","504."

"16.000","FT","GRANITE CURB TYPE VA4 - CURVED","504.1"

"670.000","FT","GRANITE CURB TYPE VB - STRAIGHT","506."

"350.000","FT","GRANITE CURB TYPE VB - CURVED","506.1"

"120.000","FT","GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS - STRAIGHT","509."

"77.000","FT","GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS - CURVED","509.1"

"1.000","EA","GRANITE CURB INLET - STRAIGHT","514."

"4.000","EA","GRANITE CURB INLET - CURVED","515."

"1000.000","FT","CURB REMOVED AND RESET","580."

"10.000","EA","CURB CORNER REMOVED, RELOCATED AND RESET","582.2"

"50.000","FT","EDGING REMOVED AND RESET","583."

"700.000","FT","CURB REMOVED AND STACKED","590."

"6.000","EA","CURB INLET REMOVED AND STACKED","591."

"8.000","EA","CURB CORNER REMOVED AND STACKED","592."

"520.000","FT","CURB REMOVED AND DISCARDED","594."

"38.000","FT","GUARDRAIL - CURVED, TL-2 (SINGLE FACED)","620.32"

"1.000","EA","TRAILING ANCHORAGE","627.1"

"1.000","EA","GUARDRAIL TANGENT END TREATMENT, TL-2","627.82"

"2.000","EA","TRANSITION TO BRIDGE RAIL","628.24"

"75.000","FT","HIGHWAY GUARD REMOVED AND DISCARDED","630.2"

"3.000","EA","GUARDRAIL POST - STEEL","632."

"70.000","FT","72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) W/BARB (LINE POST OPTION)","647.072"

"1.000","EA","48 INCH CHAIN LINK FENCE END POST","652.048"

"13.000","EA","48 INCH CHAIN LINK FENCE CORNER OR INTERMEDIATE BRACE POST","653.048"

"96.000","FT","CHAIN LINK FENCE REMOVED AND RESET","666."

"78.000","FT","FENCE REMOVED AND STACKED","669."

"125.000","FT","SEDIMENTATION FENCE","697."

"16.000","EA","SILT SACK","697.1"

"1030.000","SY","CEMENT CONCRETE SIDEWALK","701."

"320.000","SY","CEMENT CONCRETE SIDEWALK AT DRIVEWAYS","701.1"

"200.000","SY","CEMENT CONCRETE PEDESTRIAN CURB RAMP","701.2"

"66.000","TON","HOT MIX ASPHALT SIDEWALK OR DRIVEWAY","702."

"175.000","SY","BRICK WALK","706."

"8.000","EA","BOUND REMOVED AND RESET","711."

"1.000","LS","SCHEDULE OF OPERATIONS (TYPE C) - FIXED PRICE $28000","722.3"

"30.000","MO","ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE A)","740."

"1.000","LS","MOBILIZATION","748."

"120.000","CY","LOAM FOR LAWNS","751.1"

"1.000","LS","NPDES STORMWATER POLLUTION PREVENTION PLAN","756."

"265.000","SY","SEEDING","765."

"120.000","SY","SLOPE AND SHOULDER MIX WITH WHITE CLOVER","765.09"

"325.000","SY","ROADSIDE UPLAND SEED MIX","765.19"

"315.000","FT","SEDIMENT CONTROL BARRIER","767.121"

"9.000","CY","AGED PINE BARK MULCH","767.6"

"140.000","FT","PAVEMENT MILLING MULCH UNDER GUARD RAIL","769."

"1.000","EA","MAPLE - RED - RED SUNSET 2-2.5 INCH CALIPER","776.557"

"3.000","EA","SERVICEBERRY - ALLEGHENY CLUMP 7-8 FEET","783.039"

"5.000","EA","SERVICEBERRY - SHADBLOW 7-8 FEET","783.047"

"10.000","EA","SPIREA 2-3 FEET / #3","793.729"

"6.000","EA","PERENNIAL #1","796."

"115.000","EA","BEARBERRY #1","796.009"

"275.000","EA","PERENNIAL GRASS #1","796.200"

"1670.000","FT","2 INCH ELECTRICAL CONDUIT - TYPE NM (DOUBLE)","801.22"

"45.000","FT","2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC (UL)","804.2"

"210.000","FT","3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -(UL)","804.3"

"105.000","FT","4 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -(UL)","804.4"

"15.000","FT","3 INCH ELECTRICAL CONDUIT TYPE RM - GALVANIZED STEEL","806.3"

"4.000","EA","ELECTRIC HANDHOLE - SD2.022","811.22"

"17.000","EA","ELECTRIC HANDHOLE - (MUNICIPAL STANDARD)","811.27"

"3.000","EA","PULL BOX 12 X 12 INCHES - SD2.031","811.31"

"15.000","EA","LIGHT STANDARD FOUNDATION PRECAST","812.09"

"10800.000","FT","WIRE TYPE 8 NO. 8 DIRECT BURIAL","813.41"

"9280.000","FT","WIRE TYPE 8 NO. 6 DIRECT BURIAL","813.42"

"165.000","FT","WIRE TYPE 8 NO. 1 DIRECT BURIAL","813.45"

"20.000","FT","WIRE TYPE 8 NO. 3/0 DIRECT BURIAL","813.48"

"1.000","LS","EQUIPMENT GROUNDING","813.60"

"1.000","LS","TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 1","816.01"

"1.000","LS","TRAFFIC CONTROL SIGNAL REMOVED AND STACKED","816.80"

"15.000","EA","HIGHWAY LIGHTING - ROADWAY","823.101"

"4.000","EA","HIGHWAY LIGHTING - ROADWAY - MASTARM","823.102"

"1.000","LS","HIGHWAY LIGHTING LOAD CENTER","823.60"

"1.000","EA","RRFB (3-POST ASSEMBLY SYSTEM)","825.3"

"2.000","EA","ELECTRIC SERVICE RISER RELOCATION","826.7"

"7.000","EA","ELECTRIC SERVICE RELOCATION","826.71"

"170.000","SF","WARNING-REGULATORY AND ROUTE MARKER - ALUMINUM PANEL (TYPE A)","832."

"2.000","EA","REFLECTORIZED FLEXIBLE DELINEATOR POST (WHITE)","834.18"

"31.000","EA","SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST ASSEMBLY - STEEL","847.1"

"320.000","HR","ROADWAY FLAGGER","850.41"

"700.000","SF","SAFETY SIGNING FOR TRAFFIC MANAGEMENT","852."

"185.000","FT","TEMPORARY PEDESTRIAN BARRICADE","852.11"

"7.000","EA","TEMPORARY PEDESTRIAN CURB RAMP","852.12"

"20.000","EA","PORTABLE BREAKAWAY BARRICADE TYPE III","853.1"

"8.000","DAY","TEMPORARY ILLUMINATION FOR WORK ZONE","853.8"

"6820.000","FT","TEMPORARY PAVING MARKINGS - 6 INCH (PAINTED)","854.016"

"480.000","DAY","ARROW BOARD (TYPE B)","856.060"

"115.000","DAY","PORTABLE CHANGEABLE MESSAGE SIGN","856.12"

"9600.000","DAY","REFLECTORIZED DRUM","859."

"160.000","DAY","REFLECTORIZED DRUMS WITH SEQUENTIAL FLASHING WARNING LIGHTS","859.1"

"10.000","SF","PAVEMENT ARROW AND LEGENDS - TAPE","864.02"

"450.000","SF","PAVEMENT ARROWS AND LEGENDS REFLECTORIZED WHITE (THERMOPLASTIC)","864.04"

"680.000","SF","GREEN FRICTION SURFACE","864.41"

"4640.000","FT","6 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)","866.106"

"1830.000","FT","12 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)","866.112"

"445.000","FT","24 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)","866.124"

"2160.000","FT","6 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC)","867.106"

"150.000","FT","12 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC)","867.112"

"4.000","EA","STREET NAME SIGN","874."

"6.000","EA","TRAFFIC SIGN REMOVED AND RESET","874.2"

"25.000","EA","TRAFFIC SIGN AND POST REMOVED AND DISCARDED","874.41"

"1.000","CY","4000 PSI, 1.5 INCH, 565 CEMENT CONCRETE FOR POST FOUNDATION","901.3"

"1.000","CY","3000 PSI, 1.5 INCH, 470 CEMENT CONCRETE","903."

"2.000","EA","MODIFIED CONCRETE PARAPET","916."

"2.000","EA","PRECAST HIGHWAY GUARDRAIL TRANSITION (INCLUDES BASE)","916.02"

Other files for this state and local contract opportunity

Other files attached to 609052 BROCKTON FAP No. STP/HPP-0035(072)X Intersection Improvements at Centre Street (Route 123), newest first.
File Type Posted
609052 - Notice to Contractors.pdf PDF
A00861-609052.pdf PDF
A00802-609052.pdf PDF
A00875-609052.pdf PDF
A00808-609052.pdf PDF
A00801-609052.pdf PDF
609052 - Plan Holders List 9-22-2026.pdf PDF
A00810-609052.pdf PDF
A00820-609052.pdf PDF
A00860-609052.pdf PDF
A00811-609052.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .