6-SU-25-001 BID PACKAGE.pdf

PDF 18 MB Posted

Attached to
INVITATION TO BID: Stream Stabilization Project at 454 Fairman Road, Muncy Valley, PA 17758 - SU-25-001
Solicitation number
US.224136
Issued by
Susquehanna County, Pennsylvania

About this file

This is a bid schedule document for Sullivan County, Pennsylvania's Emergency Watershed Protection Project (SU-25-001), developed in partnership with the Natural Resources Conservation Service (NRCS), Department of Environmental Protection (DEP), and Sullivan County Conservation District. The project involves stream stabilization work at 454 Fairman Road, Muncy Valley, PA 17758, encompassing nine lump sum bid items: mobilization/demobilization, stream diversion and dewatering, R-8 riprap installation (both standard and grouted), eroded void remediation, gravel deposit removal, topsoiling with seeding and mulching, chain-link fencing, and guide rail installation per Larson Design Group specifications. A mandatory pre-bid showing is scheduled for May 27, 2026, at 11:00 AM at Davidson Township Building, with sealed bids due electronically via PennBid by 4:00 PM on June 12, 2026, and opening scheduled for June 16, 2026, at 10:00 AM at Sullivan County Courthouse. The project performance period is 28 calendar days from Notice-to-Proceed, with all in-stream work on Big Run required to be completed by September 30, 2026, unless a variance from the PA Fish and Boat Commission is obtained.

Bidders must submit pricing on all nine line items as a complete project package with a total bid amount. The bid must be accompanied by a bid bond or certified check equal to 10% of the total bid payable to Sullivan County. The successful contractor must provide a performance bond and payment bond, each equal to 100% of the contract value, within ten business days of award notification. Work is subject to Pennsylvania Prevailing Wage Project Rates and must comply with in-stream work restrictions and a maximum workweek of 10 hours per day, Monday through Friday, excluding Federal Holidays. The contractor is responsible for providing all equipment, labor, materials, supplies, and identifying required borrow and disposal sites. Quality assurance inspection will be conducted by NRCS and/or Sullivan County Conservation District, with all materials requiring pre-use approval. Funding is provided through NRCS Emergency Watershed Protection Program and Department of Environmental Protection sources.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .