6-Section 002601 - REQUEST FOR SUBSTITUTION FORM, BIDDING PHASE.pdf

PDF 144 KB Posted

Attached to
Keystone Human Services Homes Remodel Rebid
Solicitation number
Not on record
Issued by
Luzerne County, Pennsylvania

About this file

This is a Request for Substitution Form document issued by Keystone Service Systems, the owner of the KHS Homes Remodel project, with Martina Bacarella Architect (Project Number 25020) serving as the architect overseeing three residential properties located at 594 Warren Avenue in Kingston, Pennsylvania; 6 Valleyview Drive in Swoyersville, Pennsylvania; and 137 Stucker Avenue in Wilkes-Barre, Pennsylvania. The form provides the official process and requirements for prime bidders to request consideration of unnamed manufacturers, unnamed products, or alternative fabrication methods prior to bid submission when specific manufacturers, products, or fabrication methods are required by the contract specifications. Bidders may submit substitution requests no later than 10 days prior to the bid opening date. The architect will evaluate all qualifying requests and notify bidders of acceptance through addendum issued to all bidders. Substitution requests require comprehensive documentation including point-by-point comparisons of specified and proposed products, product data and drawings, independent third-party test reports, samples where applicable, lists of similar completed installations with project and contact information, manufacturer certifications of equality or superiority, and coordination information detailing any changes or modifications needed to other work. The form is submitted electronically via the project's web-based bidding management software site.

By submitting a bid, bidders represent that their bid is based on materials and equipment described in the procurement and contracting documents, including all addenda. Procurement substitution requests will be received and considered only when extensive revisions to contract documents are not required, proposed changes are consistent with the general intent and quality level of the contract documents, and the request is fully documented and properly submitted. The architect may request additional information necessary for evaluation, and approval of a substitute during bidding does not relieve the contractor of responsibility to submit required shop drawings or comply with other contract document requirements. Bidders certify that proposed substitutions are equal to or superior to specified products, that manufacturer and installer qualifications meet specifications, that warranties and maintenance services are equivalent, that dimensions and functional clearances are unaffected, and that the substitution will not impact contract time, work of other trades, or sustainable design properties. By submitting a substitution request, bidders waive rights to additional payment or contract time extension if the substitute fails to perform as represented.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07/08/2026 Construction Documents Set

KHS Homes Remodel

REQUEST FOR SUBSTITUTION FORM,

BIDDING PHASE

002601 - 1

DOCUMENT 002601 - REQUEST FOR SUBSTITUTION FORM, BIDDING PHASE

PART 1 - GENERAL

1.1 SUMMARY

A. Prime Bidders: Use this form to request consideration of an unnamed manufacturer, an unnamed product, or an alternative fabrication method prior to submittal of bids when use of specific manufacturers, products, or fabrications methods are required by the Specifications.

B. This form is not required to be submitted when named products are introduced by the phrase "Available products include…" unless the intended product differs substantially from the requirements of the Contract Documents.

C. Response to this request by Architect will be in the form of a written response to the Bidder and, if approved, by Addendum issued to all Bidders.

D. Procurement Substitution Requests: Requests for changes in products, materials, equipment, and methods of construction from those indicated in the Procurement and Contracting Documents, submitted prior to receipt of bids in accordance with Instructions to Bidders.

E. Procurement Prior Approval Requests: Requests for approval of products or manufacturers from those required by the Contract Documents as defined by product selection procedures in Section 016000 "Product Requirements."

1. Procurement prior approval is required when products or manufacturers are listed in specifications under "Sole Product," "Sole Manufacturer," "Limited List of Products," or "Limited List of Manufacturers" introductory paragraphs.

2. Where use of "Sole Product," "Sole Manufacturer," "Limited List of Products," or "Limited List of Manufacturers" introductory paragraphs is not allowed by statute, procurement prior approval request is not required.

1.2 QUALITY ASSURANCE

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.

1.3 PROCUREMENT SUBSTITUTIONS

A. Procurement Substitutions, General: By submitting a bid, the Bidder represents that its bid is based on materials and equipment described in the Procurement and Contracting Documents, including Addenda. Bidders are encouraged to request approval of qualifying substitute materials and equipment when the Specifications Sections list materials and equipment by product or manufacturer name.

002601 - 2

B. Procurement Substitution Requests will be received and considered by Owner when the following conditions are satisfied, as determined by Architect; otherwise requests will be returned without action:

1. Extensive revisions to the Contract Documents are not required.

2. Proposed changes are in keeping with general intent of the Contract Documents, including level of quality of the Work represented by requirements therein.

3. Request is fully documented and properly submitted.

1.4 SUBMITTALS

A. Procurement Substitution Request: Submit to Architect. Procurement Substitution Request must be made in writing by prime contract Bidder only in compliance with the following requirements:

1. Requests for substitution of materials and equipment will be considered if received no later than 10 days prior to date of bid opening.

2. Submittal Format, Electronic: Submit Procurement Substitution Request, using format provided on Project web-based bidding management software site.

a. Identify the product or the fabrication or installation method to be replaced in each request. Include related Specifications Sections and Drawing numbers.

b. Provide complete documentation on both the product specified and the proposed substitute, including the following information as appropriate:

1) List of similar installations for completed projects, with project names and addresses as well as names and addresses of architects and owners.

2) Product data, including drawings and descriptions of products and fabrication and installation procedures.

3) Point-by-point comparison of specified and proposed substitute product data, fabrication drawings, and installation procedures.

4) Copies of current, independent third-party test data of salient product or system characteristics.

5) Samples where applicable or when requested by Architect.

6) Detailed comparison of significant qualities of proposed substitute with those of the Work specified. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.

7) Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.

8) Research reports, where applicable, evidencing compliance with building code in effect for Project, from ICC-ES.

9) Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by Owner and separate contractors, which will become necessary to accommodate proposed substitute.

002601 - 3

c. Provide certification by manufacturer that proposed substitute is equal to or superior to that required by the Procurement and Contracting Documents, and that its in-place performance will be equal to or superior to product or equipment specified in the application indicated.

d. Bidder, in submitting the Procurement Substitution Request, waives the right to additional payment or an extension of Contract Time because of the failure of substitute to perform as represented in the Procurement Substitution Request.

B. Architect's Action:

1. Architect may request additional information or documentation necessary for evaluation of the Procurement Substitution Request. Architect will notify all Bidders of acceptance of proposed substitute by means of an Addendum to the Procurement and Contracting Documents.

C. Architect's approval of substitute during bidding does not relieve Contractor of the responsibility to submit required Shop Drawings and to comply with all other requirements of the Contract Documents.

1.5 PROJECT INFORMATION

A. Project Name: KHS Homes Remodel.

B. Project Locations:

1. 594 Warren Ave, Kingston, PA.

2. 6 Valleyview Drive, Swoyersville, PA

3. 137 Stucker Ave, Wilkes-Barre, PA.

C. Owner: Keystone Service Systems.

D. Architect: Martina Bacarella Architect.

E. Architect Project Number: 25020.

1.6 BIDDING REQUEST INFORMATION

A. Bidder: ____________________________. Email: ____________________________.

B. Specification Section No.:

1.7 SPECIFIED PRODUCT

A. Specified Product/Fabrication Method (List Name, Description, Model Number, and Manufacturer):

002601 - 4

B. Specified Product Information (Attach Point-by-Point Data to This Form):

1. ▢ Point-by-point comparative product data.

2. ▢ Test reports.

3. ▢ Fabrication drawings.

4. ▢ Samples (where applicable).

1.8 PROPOSED PRODUCT

A. Specified Product/Fabrication Method (List Name, Description, Model Number, and Manufacturer):

B. Proposed Product Information (Attach Point-by-Point Data to This Form):

1. ▢ Point-by-point comparative product data.

2. ▢ Test reports.

3. ▢ Fabrication drawings.

4. ▢ Samples (where applicable).

1.9 IMPACT OF PROPOSED SUBSTITUTION

A. List of Related Changes Required by Substitution: ▢ None. Explain:

B. Differences between Specified Product and Proposed Substitution: ▢ None. Explain:

C. Proposed Product/Fabrication Method Effects on Other Parts of the Work: ▢ None.

Explain:

D. Proposed Product/Fabrication Method Effects on the Contract Time: ▢ None. Explain:

1.10 CERTIFICATION

A. Undersigned certifies the following:

1. Proposed substitution has been investigated by the Bidder and determined to be equal or superior to specified product as used for this Project, except as noted herein.

2. Qualifications of manufacturer, Installer, and other specified parties meet the specified qualifications.

3. Same warranty will be furnished for proposed substitution as for specified product, if applicable.

4. Same maintenance service and availability of replacement parts as for specified product, if applicable.

002601 - 5

5. Proposed substitution does not affect dimensions and functional clearances, except as noted herein.

6. Proposed substitution will not affect the Contract Time.

7. Proposed substitution will not affect work of other trades.

8. Proposed substitution provides comparable sustainable design properties as specified product, if applicable.

1.11 SUBMISSION OF REQUEST FOR SUBSTITUTION

A. For the Bidder:

1. Submittal Date:

2. Firm Name:

3. Submitted by:

4. Email:

B. For Manufacturer:

1. Submittal Date:

2. Firm Name:

3. Submitted by:

4. Email:

PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used)

END OF DOCUMENT 002601

DOCUMENT 002601 - REQUEST FOR SUBSTITUTION FORM, BIDDING PHASE
PART 1 - GENERAL
1.1 SUMMARY
A. Prime Bidders: Use this form to request consideration of an unnamed manufacturer, an unnamed product, or an alternative fabrication method prior to submittal of bids when use of specific manufacturers, products, or fabrications methods are required...
B. This form is not required to be submitted when named products are introduced by the phrase "Available products include…" unless the intended product differs substantially from the requirements of the Contract Documents.
C. Response to this request by Architect will be in the form of a written response to the Bidder and, if approved, by Addendum issued to all Bidders.
D. Procurement Substitution Requests: Requests for changes in products, materials, equipment, and methods of construction from those indicated in the Procurement and Contracting Documents, submitted prior to receipt of bids in accordance with Instruct...
E. Procurement Prior Approval Requests: Requests for approval of products or manufacturers from those required by the Contract Documents as defined by product selection procedures in Section 016000 "Product Requirements."
1. Procurement prior approval is required when products or manufacturers are listed in specifications under "Sole Product," "Sole Manufacturer," "Limited List of Products," or "Limited List of Manufacturers" introductory paragraphs.
2. Where use of "Sole Product," "Sole Manufacturer," "Limited List of Products," or "Limited List of Manufacturers" introductory paragraphs is not allowed by statute, procurement prior approval request is not required.
1.2 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.
1.3 PROCUREMENT SUBSTITUTIONS
A. Procurement Substitutions, General: By submitting a bid, the Bidder represents that its bid is based on materials and equipment described in the Procurement and Contracting Documents, including Addenda. Bidders are encouraged to request approval of...
B. Procurement Substitution Requests will be received and considered by Owner when the following conditions are satisfied, as determined by Architect; otherwise requests will be returned without action:
1. Extensive revisions to the Contract Documents are not required.
2. Proposed changes are in keeping with general intent of the Contract Documents, including level of quality of the Work represented by requirements therein.
3. Request is fully documented and properly submitted.
1.4 SUBMITTALS
A. Procurement Substitution Request: Submit to Architect. Procurement Substitution Request must be made in writing by prime contract Bidder only in compliance with the following requirements:
1. Requests for substitution of materials and equipment will be considered if received no later than 10 days prior to date of bid opening.
2. Submittal Format, Electronic: Submit Procurement Substitution Request, using format provided on Project web-based bidding management software site.
a. Identify the product or the fabrication or installation method to be replaced in each request. Include related Specifications Sections and Drawing numbers.
b. Provide complete documentation on both the product specified and the proposed substitute, including the following information as appropriate:
1) List of similar installations for completed projects, with project names and addresses as well as names and addresses of architects and owners.
2) Product data, including drawings and descriptions of products and fabrication and installation procedures.
3) Point-by-point comparison of specified and proposed substitute product data, fabrication drawings, and installation procedures.
4) Copies of current, independent third-party test data of salient product or system characteristics.
5) Samples where applicable or when requested by Architect.
6) Detailed comparison of significant qualities of proposed substitute with those of the Work specified. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, sustainable design characteristics, war...
7) Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.
8) Research reports, where applicable, evidencing compliance with building code in effect for Project, from ICC-ES.
9) Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by Owner and separate contractors, which will become necessary to accommodate proposed substitute.
c. Provide certification by manufacturer that proposed substitute is equal to or superior to that required by the Procurement and Contracting Documents, and that its in-place performance will be equal to or superior to product or equipment specified i...
d. Bidder, in submitting the Procurement Substitution Request, waives the right to additional payment or an extension of Contract Time because of the failure of substitute to perform as represented in the Procurement Substitution Request.
B. Architect's Action:
1. Architect may request additional information or documentation necessary for evaluation of the Procurement Substitution Request. Architect will notify all Bidders of acceptance of proposed substitute by means of an Addendum to the Procurement and Co...

C. Architect's approval of substitute during bidding does not relieve Contractor of the responsibility to submit required Shop Drawings and to comply with all other requirements of the Contract Documents.

1.5 PROJECT INFORMATION
A. Project Name: KHS Homes Remodel.
B. Project Locations:
1. 594 Warren Ave, Kingston, PA.
2. 6 Valleyview Drive, Swoyersville, PA
3. 137 Stucker Ave, Wilkes-Barre, PA.
C. Owner: Keystone Service Systems.
D. Architect: Martina Bacarella Architect.
E. Architect Project Number: 25020.
1.6 BIDDING REQUEST INFORMATION
A. Bidder: ____________________________. Email: ____________________________.
B. Specification Section No.: _______________________________________________________.
1.7 SPECIFIED PRODUCT
A. Specified Product/Fabrication Method (List Name, Description, Model Number, and Manufacturer): ____________________________________________________________________.
B. Specified Product Information (Attach Point-by-Point Data to This Form):
1. ▢ Point-by-point comparative product data.
2. ▢ Test reports.
3. ▢ Fabrication drawings.
4. ▢ Samples (where applicable).
1.8 PROPOSED PRODUCT
A. Specified Product/Fabrication Method (List Name, Description, Model Number, and Manufacturer): ____________________________________________________________________.
B. Proposed Product Information (Attach Point-by-Point Data to This Form):
1. ▢ Point-by-point comparative product data.
2. ▢ Test reports.
3. ▢ Fabrication drawings.
4. ▢ Samples (where applicable).
1.9 IMPACT OF PROPOSED SUBSTITUTION
A. List of Related Changes Required by Substitution: ▢ None. Explain: ____________________________________________________________________.
B. Differences between Specified Product and Proposed Substitution: ▢ None. Explain: ____________________________________________________________________.
C. Proposed Product/Fabrication Method Effects on Other Parts of the Work: ▢ None. Explain: ____________________________________________________________________.
D. Proposed Product/Fabrication Method Effects on the Contract Time: ▢ None. Explain: ____________________________________________________________________.
1.10 CERTIFICATION
A. Undersigned certifies the following:
1. Proposed substitution has been investigated by the Bidder and determined to be equal or superior to specified product as used for this Project, except as noted herein.
2. Qualifications of manufacturer, Installer, and other specified parties meet the specified qualifications.
3. Same warranty will be furnished for proposed substitution as for specified product, if applicable.
4. Same maintenance service and availability of replacement parts as for specified product, if applicable.
5. Proposed substitution does not affect dimensions and functional clearances, except as noted herein.
6. Proposed substitution will not affect the Contract Time.
7. Proposed substitution will not affect work of other trades.
8. Proposed substitution provides comparable sustainable design properties as specified product, if applicable.
1.11 SUBMISSION OF REQUEST FOR SUBSTITUTION
A. For the Bidder:
1. Submittal Date: __________________________________________________________.
2. Firm Name: _____________________________________________________________.
3. Submitted by: ___________________________________________________________.
4. Email: _______________________________________________________________.
B. For Manufacturer:
1. Submittal Date: __________________________________________________________.
2. Firm Name: _____________________________________________________________.
3. Submitted by: ___________________________________________________________.
4. Email: _______________________________________________________________.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)

File details come from the government source that posted it. Updated .