6-RFB 4441 - Attachments.pdf
PDF 24 MB Posted
- Attached to
- 2025 Fall Paving
- Solicitation number
- 4441
- Issued by
- Daviess County, Kentucky
About this file
This file is an attachment document containing a summary of quantities for a 2025 milling and paving project in Owensboro, Kentucky, where the City of Owensboro is seeking a contractor to provide milling and resurfacing services for various streets, parking lots, and walking trails. The document details approximately 40 street segments requiring full mill treatment, with specific measurements including street names, beginning and ending points, lengths ranging from 114 to 2,023 linear feet, and widths typically between 27-38.5 feet. Notable locations include Trinity Drive, Asbury Road, Kelly Lane, various residential streets with themed naming (Yellowstone, Colorado, Madison), and numbered streets (14th, 17th). The project also encompasses several parking areas including City Hall East Parking Lot, Fisher Park Walking Trail, Thompson Berry Main Lot, and Transit Office Parking Lot.
The document includes mapping imagery showing anticipated milling locations with polygon and rectangle markers indicating work zones throughout the city. The comprehensive scope covers street rehabilitation through milling existing surfaces and applying new asphalt resurfacing as directed by the City Engineer, with the contractor responsible for providing all labor, materials, supervision, equipment, construction staking, and incidental work necessary for project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary of Quantities
Street From To Length Width Comments Trinity Dr Old Hartford Asbury varies varies Full Mill
Trinity Dr Ct Asbury End 36R 27 Full Mill
Asbury Pl 2806 Asbury Redford Dr 2418 27 Full Mill
Cokesbury Pl Asbury End 36R 27 Full Mill
Greenhill Asbury End 31R 27 Full Mill
Aldersgate N Trinity End
38.5R 28 Full Mill
Aldersgate S Trinity End 37R 28 Full Mill
Kelly Ln Asbury Strawbridge 1225 27 Full Mill Epworth Strawbridge Kelly 1040 27 Full Mill
Idaho Yosemite Yellowstone 577 27 Full Mill Madison Yosemite Yellowstone 631 27 Full Mill
Wandering Way Colorado Yellowstone 1448 27 Full Mill Yosemite Madison Colorado 1440 27 Full Mill
Yellowstone Ewing Colorado 2023 27 Full Mill Colorado Yosemite Yellowstone 372 27 Full Mill Sioux Pl S. Griffith Windsor 595 27 Full Mill
Seminole Pl Pawnee Mohawk 630 27 Full Mill Iroquois Pawnee Mohawk 800 27 Full Mill
South York Cater Dallas 620 27 Full Mill Frost Ave Park Plaza Booth 295 33 Full Mill
Park Plaza Frost Frederica 650 37 Full Mill 14th Frederica JR Miller 1202 33-37 Full Mill
Allen W 14 th
Parrish 365 37 Full Mill
St. Ann W 14 th
Parrish 365 25 Full Mill Wayside Dr E Holly Holly 1270 27 Full Mill
Holly McFarland Flamingo 1410 28 Full Mill
Pensive Reigh Ct End
28.5R 27 Full Mill Reigh Count 20 Grand Citation 980 27 Full Mill
Hoop Jr Reigh Ct End
31.5R 27 Full Mill Hamilton E 4th E 2nd 730 27 Full Mill
Greyhound Hamilton E 2nd 230 27 Full Mill 17th JR Miller Moseley 383 36 Full Mill 17th Sweeney Triplett 411 37 Full Mill
Summary of Quantities
2025 MILLING AND PAVING PROJECT
Image © 2025 Airbus
Image © 2025 Airbus
Image © 2025 Airbus
Image © 2025 Maxar Technologies
Image © 2025 Maxar Technologies
Image © 2025 Maxar Technologies
Anticipated Milling Locations goetzjt Polygon goetzjt Polygon goetzjt Polygon goetzjt Rectangle goetzjt Rectangle goetzjt Rectangle goetzjt Rectangle goetzjt Rectangle
| Summary of Quantities |
| 2025 Fall Paving Map - FINAL |
| City Hall East Parking Lot |
| Fisher Park Walking Trail |
| Thompson Berry Main Lot |
| Thompson Berry Raven Dr |
| Transit Office Parking Lot |
File details come from the government source that posted it. Updated .