This is a pricing section document for the Abington Township American Rescue Plan Act (ARPA) Park Improvements project in Montgomery County, Pennsylvania. The project encompasses improvements across eleven separate parks, including resurfacing baseball infields, re-sodding soccer and baseball fields, and replacing bleachers, benches, dugouts, and backstops. The scope of work includes erosion and sediment control, chain link fencing, bleachers, surfacing materials, dugouts, stormwater management, soccer field work, and various sports equipment installations. The sealed bid submission deadline is 11:00 AM on Tuesday, November 11, 2025, with Township Responsible Contractor (RCO) qualification documents due by October 28, 2025. A certified check or bid bond equal to 10 percent of the total bid price is required with each submission. The project is subject to Pennsylvania Prevailing Wage Act requirements, with work classified as Public Works by a Public Body.
Three contractors submitted bids for the base bid items: James R Kenney Excavating & Paving Inc. at $4,816,085.00, MECO Constructors, Inc. at $3,947,719.00, and WG Land Company, LLC at $3,450,260.00. The pricing document details line items across the eleven parks with varying unit prices and quantities, such as erosion and sediment control (ranging from $1,200 to $5,000 lump sum), chain link fencing (ranging from $20,030 to $60,000 per each), bleachers and seating (ranging from $5,250 to $16,500 per each), and field surfacing work. Additional items include baseball field resurfacing, equipment installations, foul pole painting, backstop replacements, and material deliveries measured in tons. The document also references multiple alternate bid items numbered 1 through 8, with specific pricing variations across the three bidding contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Cost Selected #
Selected ($) # Locked Items Selected Lowest UnitofMea QuantityRequired UnitPrice TotalCost UnitPrice TotalCost UnitPrice TotalCost
#1-1 FALSE Project Mo $ 0 $ 104,500.0LS 1 $ 104,500.0 $ 104,500.0 $ 174,500.0 $ 174,500.0 $ 142,500.0$ 142,500.0 #2-1 FALSE E&S Contro$ 0 $ 2,500.0 LS 1 $ 15,000.0 $ 15,000.0 $ 12,130.0 $ 12,130.0 $ 2,500.0 $ 2,500.0 #2-2 FALSE Chain Link $ 0 $ 40,060.0 EA 2 $ 55,000.0 $ 110,000.0 $ 20,030.0 $ 40,060.0 $ 34,000.0 $ 68,000.0 #2-3 FALSE 3 Row 15 F $ 0 $ 21,000.0 EA 4 $ 16,500.0 $ 66,000.0 $ 11,060.0 $ 44,240.0 $ 5,250.0 $ 21,000.0 #2-4 FALSE Dugouts $ 0 $ 80,000.0 EA 2 $ 40,000.0 $ 80,000.0 $ 46,440.0 $ 92,880.0 $ 43,000.0 $ 86,000.0 #2-5 FALSE 15 FT Surfa $ 0 $ 11,248.0 EA 8 $ 3,060.0 $ 24,480.0 $ 1,406.0 $ 11,248.0 $ 4,400.0 $ 35,200.0 #2-6 FALSE Stormwate $ 0 $ 5,300.0 LS 1 $ 16,000.0 $ 16,000.0 $ 10,810.0 $ 10,810.0 $ 5,300.0 $ 5,300.0 #3-1 FALSE E&S Contro$ 0 $ 5,000.0 LS 1 $ 15,000.0 $ 15,000.0 $ 12,130.0 $ 12,130.0 $ 5,000.0 $ 5,000.0 #3-2 FALSE Chain Link $ 0 $ 56,200.0 EA 2 $ 60,000.0 $ 120,000.0 $ 28,100.0 $ 56,200.0 $ 37,000.0 $ 74,000.0 #3-3 FALSE 3 Row 15 F $ 0 $ 21,000.0 EA 4 $ 16,500.0 $ 66,000.0 $ 11,060.0 $ 44,240.0 $ 5,250.0 $ 21,000.0 #3-4 FALSE Dugout $ 0 $ 160,000.0EA 4 $ 40,000.0 $ 160,000.0 $ 44,270.0 $ 177,080.0 $ 43,000.0 $ 172,000.0 #3-5 FALSE 15 FT Surfa $ 0 $ 11,248.0 EA 8 $ 3,060.0 $ 24,480.0 $ 1,406.0 $ 11,248.0 $ 4,400.0 $ 35,200.0 #3-6 FALSE Soccer Field $ 0 $ 82,500.0 SF 55000 $ 1.5 $ 82,500.0 $ 3.1 $ 170,500.0 $ 1.85 $ 101,750.0 #3-7 FALSE Soccer Field $ 0 $ 1,150.0 LF 2300 $ 3 $ 6,900.0 $ 0.5 $ 1,150.0 $ 1.5 $ 3,450.0 #4-1 FALSE E&S Contro$ 0 $ 2,500.0 LS 1 $ 15,000.0 $ 15,000.0 $ 12,130.0 $ 12,130.0 $ 2,500.0 $ 2,500.0 #4-2 FALSE Chain Link $ 0 $ 41,860.0 EA 2 $ 60,000.0 $ 120,000.0 $ 20,930.0 $ 41,860.0 $ 34,000.0 $ 68,000.0 #4-3 FALSE 3 Row 15 F $ 0 $ 21,000.0 EA 4 $ 16,500.0 $ 66,000.0 $ 11,060.0 $ 44,240.0 $ 5,250.0 $ 21,000.0 #4-4 FALSE 15 FT Surfa $ 0 $ 12,240.0 EA 4 $ 3,060.0 $ 12,240.0 $ 3,148.0 $ 12,592.0 $ 4,400.0 $ 17,600.0 #5-1 FALSE E&S Contro$ 0 $ 2,500.0 LS 1 $ 15,000.0 $ 15,000.0 $ 3,428.0 $ 3,428.0 $ 2,500.0 $ 2,500.0 #5-2 FALSE Chain Link $ 0 $ 40,060.0 EA 2 $ 55,000.0 $ 110,000.0 $ 20,030.0 $ 40,060.0 $ 34,000.0 $ 68,000.0 #5-3 FALSE Fence Repl $ 0 $ 10,800.0 LF 90 $ 150 $ 13,500.0 $ 129 $ 11,610.0 $ 120 $ 10,800.0 #6-1 FALSE E&S Contro$ 0 $ 1,200.0 LS 1 $ 15,000.0 $ 15,000.0 $ 8,387.0 $ 8,387.0 $ 1,200.0 $ 1,200.0 #6-2 FALSE Chain Link $ 0 $ 20,030.0 EA 1 $ 55,000.0 $ 55,000.0 $ 20,030.0 $ 20,030.0 $ 34,000.0 $ 34,000.0 #6-3 FALSE 3 Row 15 F $ 0 $ 10,500.0 EA 2 $ 16,500.0 $ 33,000.0 $ 11,060.0 $ 22,120.0 $ 5,250.0 $ 10,500.0 #6-4 FALSE 15 FT Surfa $ 0 $ 5,624.0 EA 4 $ 3,060.0 $ 12,240.0 $ 1,406.0 $ 5,624.0 $ 5,000.0 $ 20,000.0 #6-5 FALSE Open Air D $ 0 $ 80,000.0 EA 2 $ 40,000.0 $ 80,000.0 $ 46,440.0 $ 92,880.0 $ 42,000.0 $ 84,000.0 #7-1 FALSE E&S Contro$ 0 $ 1,200.0 LS 1 $ 15,000.0 $ 15,000.0 $ 4,980.0 $ 4,980.0 $ 1,200.0 $ 1,200.0 #7-2 FALSE Chain Link $ 0 $ 28,890.0 EA 1 $ 60,000.0 $ 60,000.0 $ 28,890.0 $ 28,890.0 $ 34,000.0 $ 34,000.0 #7-3 FALSE 3 Row 15 F $ 0 $ 10,500.0 EA 2 $ 16,500.0 $ 33,000.0 $ 11,060.0 $ 22,120.0 $ 5,250.0 $ 10,500.0 #7-4 FALSE 15 FT Surfa $ 0 $ 6,120.0 EA 2 $ 3,060.0 $ 6,120.0 $ 3,157.0 $ 6,314.0 $ 5,000.0 $ 10,000.0 #8-1 FALSE E&S Contro$ 0 $ 1,200.0 LS 1 $ 15,000.0 $ 15,000.0 $ 11,850.0 $ 11,850.0 $ 1,200.0 $ 1,200.0 #8-2 FALSE Chain Link $ 0 $ 20,030.0 EA 1 $ 55,000.0 $ 55,000.0 $ 20,030.0 $ 20,030.0 $ 34,000.0 $ 34,000.0 #8-3 FALSE Chain Link $ 0 $ 57,780.0 EA 2 $ 60,000.0 $ 120,000.0 $ 28,890.0 $ 57,780.0 $ 58,000.0 $ 116,000.0 #8-4 FALSE 3 Row 15 F $ 0 $ 31,500.0 EA 6 $ 16,500.0 $ 99,000.0 $ 11,060.0 $ 66,360.0 $ 5,250.0 $ 31,500.0 #8-5 FALSE 15 FT Surfa $ 0 $ 18,360.0 EA 6 $ 3,060.0 $ 18,360.0 $ 3,138.0 $ 18,828.0 $ 4,400.0 $ 26,400.0
CONWAY PARK - BASE BID (3)
CRESTMONT PARK - BASE BID (5)
ETHEL JORDAN PARK- BASE BID (4)
HALLOWELL PARK - BASE BID (5)
NORTH HILL/DOUGHERTY PARK - BASE BID (5)
Base Bid Items (1)
ALVERTHORPE PARK - BASE BID (6)
ARSDLEY PARK - BASE BID (7)
ARDSLEY COMMUNITY PARK - BASE BID (4)
0 0 0 $ 0 $ 0 $ 0
James R Kenney Excavating & Paving Inc. MECO Constructors, Inc. WG Land Company, LLC $ 4,816,085.0 $ 3,947,719.0 $ 3,450,260.0
#9-1 FALSE E&S Contro$ 0 $ 2,500.0 LS 1 $ 15,000.0 $ 15,000.0 $ 12,170.0 $ 12,170.0 $ 2,500.0 $ 2,500.0 #9-2 FALSE Chain Link $ 0 $ 40,060.0 EA 2 $ 55,000.0 $ 110,000.0 $ 20,030.0 $ 40,060.0 $ 46,000.0 $ 92,000.0 #9-3 FALSE 3 Row 15 F $ 0 $ 5,800.0 EA 1 $ 16,500.0 $ 16,500.0 $ 11,060.0 $ 11,060.0 $ 5,800.0 $ 5,800.0 #9-4 FALSE 15 FT Surfa $ 0 $ 11,248.0 EA 8 $ 3,060.0 $ 24,480.0 $ 1,406.0 $ 11,248.0 $ 4,400.0 $ 35,200.0 #9-5 FALSE Open Air D $ 0 $ 156,000.0EA 4 $ 40,000.0 $ 160,000.0 $ 44,270.0 $ 177,080.0 $ 39,000.0 $ 156,000.0 #10-1 FALSE E&S Contro$ 0 $ 3,700.0 LS 1 $ 15,000.0 $ 15,000.0 $ 12,060.0 $ 12,060.0 $ 3,700.0 $ 3,700.0 #10-2 FALSE Chain Link $ 0 $ 40,060.0 EA 2 $ 55,000.0 $ 110,000.0 $ 20,030.0 $ 40,060.0 $ 34,000.0 $ 68,000.0 #10-3 FALSE Chain Link $ 0 $ 28,890.0 EA 1 $ 60,000.0 $ 60,000.0 $ 28,890.0 $ 28,890.0 $ 34,000.0 $ 34,000.0 #10-4 FALSE 3 Row 15 F $ 0 $ 28,200.0 EA 6 $ 16,500.0 $ 99,000.0 $ 11,060.0 $ 66,360.0 $ 4,700.0 $ 28,200.0 #10-5 FALSE 15 FT Surfa $ 0 $ 18,360.0 EA 6 $ 3,060.0 $ 18,360.0 $ 3,138.0 $ 18,828.0 $ 4,400.0 $ 26,400.0 #11-1 FALSE E&S Contro$ 0 $ 3,700.0 LS 1 $ 15,000.0 $ 15,000.0 $ 12,060.0 $ 12,060.0 $ 3,700.0 $ 3,700.0 #11-2 FALSE Chain Link $ 0 $ 40,060.0 EA 2 $ 55,000.0 $ 110,000.0 $ 20,030.0 $ 40,060.0 $ 54,000.0 $ 108,000.0 #11-3 FALSE Chain Link $ 0 $ 28,890.0 EA 1 $ 60,000.0 $ 60,000.0 $ 28,890.0 $ 28,890.0 $ 107,000.0$ 107,000.0 #11-4 FALSE 3 Row 15 F $ 0 $ 31,500.0 EA 6 $ 16,500.0 $ 99,000.0 $ 11,060.0 $ 66,360.0 $ 5,250.0 $ 31,500.0 #11-5 FALSE 15 FT Surfa $ 0 $ 18,360.0 EA 6 $ 3,060.0 $ 18,360.0 $ 3,138.0 $ 18,828.0 $ 4,400.0 $ 26,400.0 #11-6 FALSE Soccer Field $ 0 $ 62,175.0 SF 41450 $ 1.5 $ 62,175.0 $ 3.2 $ 132,640.0 $ 1.8 $ 74,610.0 #11-7 FALSE Soccer Field $ 0 $ 1,150.0 LF 2300 $ 3 $ 6,900.0 $ 0.5 $ 1,150.0 $ 1.5 $ 3,450.0 #12-1 FALSE E&S Contro$ 0 $ 2,500.0 LS 1 $ 15,000.0 $ 15,000.0 $ 25,860.0 $ 25,860.0 $ 2,500.0 $ 2,500.0 #12-2 FALSE Chain Link $ 0 $ 56,200.0 EA 2 $ 55,000.0 $ 110,000.0 $ 28,100.0 $ 56,200.0 $ 47,000.0 $ 94,000.0 #12-3 FALSE 3 Row 15 F $ 0 $ 21,000.0 EA 4 $ 16,500.0 $ 66,000.0 $ 11,880.0 $ 47,520.0 $ 5,250.0 $ 21,000.0 #12-4 FALSE 15 FT Surfa $ 0 $ 12,240.0 EA 4 $ 3,060.0 $ 12,240.0 $ 3,148.0 $ 12,592.0 $ 4,625.0 $ 18,500.0 #12-5 FALSE Baseball Fie $ 0 $ 57,000.0 EA 2 $ 50,000.0 $ 100,000.0 $ 81,580.0 $ 163,160.0 $ 28,500.0 $ 57,000.0 #12-6 FALSE Baseball Fie $ 0 $ 52,000.0 EA 2 $ 26,000.0 $ 52,000.0 $ 47,080.0 $ 94,160.0 $ 53,000.0 $ 106,000.0 #13-1 FALSE Existing Spo $ 0 $ 85,800.0 EA 11 $ 26,000.0 $ 286,000.0 $ 12,500.0 $ 137,500.0 $ 7,800.0 $ 85,800.0 #14-1 FALSE Equipment $ 0 $ 39,820.0 EA 22 $ 2,500.0 $ 55,000.0 $ 1,810.0 $ 39,820.0 $ 3,100.0 $ 68,200.0 #15-1 FALSE Foul Pole P $ 0 $ 143,000.0EA 22 $ 6,500.0 $ 143,000.0 $ 7,057.0 $ 155,254.0 $ 9,100.0 $ 200,200.0 #16-1 FALSE Baseball Ba $ 0 $ 85,800.0 EA 22 $ 38,000.0 $ 836,000.0 $ 22,810.0 $ 501,820.0 $ 3,900.0 $ 85,800.0 #17-1 FALSE Hallowell F $ 0 $ 35,000.0 LS 1 $ 35,000.0 $ 35,000.0 $ 88,000.0 $ 88,000.0 $ 69,000.0 $ 69,000.0 #18-1 FALSE Hallowell F $ 0 $ 35,000.0 LS 1 $ 35,000.0 $ 35,000.0 $ 88,000.0 $ 88,000.0 $ 73,000.0 $ 73,000.0 #19-1 FALSE Roslyn Park $ 0 $ 84,700.0 TONS 700 $ 121 $ 84,700.0 $ 240 $ 168,000.0 $ 220 $ 154,000.0 #20-1 FALSE Penbryn Pa $ 0 $ 127,050.0TONS 1050 $ 121 $ 127,050.0 $ 230 $ 241,500.0 $ 220 $ 231,000.0
ADD ALTERNATE #8 (1)
ADD ALTERNATE #3 (1)
ADD ALTERNATE #4 (1)
ADD ALTERNATE #5 (1)
ADD ALTERNATE #6 (1)
ADD ALTERNATE #7 (1)
PENNBRYN PARK - BASE BID (5)
ROSLYN PARK - BASE BID (7)
ROYCHESTER PARK - BASE BID (6)
ADD ALTERNATE #1 (1)
ADD ALTERNATE #2 (1)
Sheet 1
File details come from the government source that posted it. Updated .