6 - Mechanical.pdf.url
URL file 144 B Posted
- Solicitation number
- 2025.07
- Issued by
- Eau Claire County, Wisconsin
About this file
This is a government file reference for the Dunn County Judicial Center HVAC System Upgrades project in Wisconsin, a design-build procurement seeking qualified firms to replace and modernize the HVAC system at an active judicial facility. The project scope encompasses comprehensive design, engineering, procurement, construction, commissioning, and warranty services for a complete turnkey HVAC system replacement with a focus on geothermal energy efficiency technologies. The procurement requires a single design-build entity responsible for all aspects of implementation, including adherence to Davis-Bacon Act wage standards, obtaining all required permits, conducting system testing, providing operator training, and delivering complete documentation. Proposals were due on January 28, 2026, with the project posted on December 8, 2025. The selected firm must deliver a fully functional, code-compliant HVAC system with modern controls and geothermal efficiency capabilities that enhances comfort, sustainability, and operational reliability within the existing judicial environment.
The project does not include solar generation components and is focused exclusively on HVAC system modernization and associated controls. No specific budget ranges or funding sources are explicitly stated in the available documentation. The procurement does not identify incumbent vendor information or include explicit set-aside designations, appearing to be open to qualified design-build firms with demonstrated expertise in complex institutional HVAC system upgrades. Successful respondents should possess extensive experience with geothermal systems, institutional facility upgrades, active facility operations, comprehensive technical design-build capabilities, and demonstrated proficiency in energy efficiency technologies. The evaluation criteria will likely emphasize technical qualifications, design-build experience, understanding of geothermal and sustainability technologies, and the ability to provide comprehensive documentation, training, and warranty services as part of the complete system implementation.
Text of this file
[InternetShortcut] URL=https://codunnwius.sharepoint.com/:b:/s/FacilitiesDepartmentDocuments2/IQCiKsb7zYmiTZ2E7c5vccHzAfWIs_GBHwYDVBi9tX77qyI
Other files
| File | Type | Posted |
|---|---|---|
| 3 - Architectural.pdf.url | URL file | |
| 2025.07 HVAC - Addendum 2.pdf | ||
| 5 - Structural.pdf.url | URL file | |
| 7 - Electrical.pdf.url | URL file | |
| 2 - Civil.pdf.url | URL file | |
| 2025.07 HVAC - Addendum 1.pdf | ||
| Judicial Damper Schedule.pdf.url | URL file | |
| 4 - Food Service.pdf.url | URL file | |
| 2025.07 RFP Dunn County Judicial Center HVAC System Upgrades – Design-Build Project.pdf | ||
| 1 - Title Sheet.pdf.url | URL file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .