6-ITB-26-00312 Attachment C - NWRWRF Process Flow Diagram.pdf

PDF 418 KB Posted

Attached to
Centrifuge Mobile Sludge Dewatering Unit Equipment Rental
Solicitation number
ITB-26-00312
Issued by
Hillsborough County, Florida

About this file

This is a process flow diagram for the Northwest Regional Water Reclamation Facility (NWRWRF) operated by Hillsborough County, Florida, depicting the advanced wastewater treatment process as of October 2010. The diagram illustrates the complete treatment pathway from influent through the headworks, anoxic basins, fermentation basin, aeration basin, clarifier, deep bed filters, ultraviolet disinfection, and ultimately to either reclaimed water storage tanks for reuse customers or surface water discharge. The facility incorporates multiple treatment stages including two anoxic basins for nutrient removal, aeration for biological treatment, and ultraviolet disinfection as a final barrier. The diagram also shows auxiliary processes including a biosolids management facility connection, sludge handling through a waste sludge holding tank, grit and screenings removal, spent backwash water management through reject water basins and holding tanks, and odor control systems. The facility supports reclaimed water distribution to reuse customers while managing byproducts and maintaining environmental compliance.

This process flow diagram serves as supporting documentation for the related county solicitation for centrifuge mobile sludge dewatering unit equipment rental across multiple Hillsborough County wastewater treatment facilities over a five-year contract period valued at $6,623,000. The diagram demonstrates the scale and complexity of the NWRWRF operations, identifying the specific treatment infrastructure where mobile dewatering equipment would integrate to support sludge handling and biosolids management processes. The inclusion of this facility schematic in the bid package indicates that prospective vendors must understand the facility's operational requirements and be capable of deploying compatible mobile centrifuge equipment for on-site sludge dewatering support.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

October 2010

Pump

Anoxic Basin #1

Fermentation Basin Aeration Basin

Deep Bed Filters

Headworks

Influent

Aluminum Sulfate

RAS

Odor Control

Waste Sludge Holding

Tank

Sidestream Influent from Biosolids Management Facility

Clarifier

Plant Drain Pump

Station

Plant Drains

Reaeration Basin

Anoxic Basin #2

To Biosolids Management

Facility

Scum

WAS

Ultraviolet (UV) Disinfection

Surface Water Discharge Pump

Reclaimed Water Storage Tanks

Reuse Customers Pump

Plant Reuse

To Biosolids Management Facility

Pump

Pump

Spent Backwash Holding Tank

Backwash Pump

Reject Water Basins

Grit & Screenings

Spent Backwash Water Spent

Backwash Pump

Pump

Pump

RAS

Northwest Regional Water Reclamation Facility

File details come from the government source that posted it. Updated .