6_Exhibit E - Cost Workbook_Pre-Solicitation_1.xlsx

XLSX spreadsheet 100 KB Posted

Attached to
State Water Board - California Wetland and Riparian Area Protection Portal (CalWRAPP)
Solicitation number
0000040884
Issued by
California

About this file

Cost Workbook for CalWRAPP Pre-Solicitation No. 0000040884

This document is a cost workbook template for the California State Water Resources Control Board's CalWRAPP (California Wetland and Riparian Area Protection Portal) pre-solicitation No. 0000040884. The workbook is designed for bidders to enter detailed cost proposals for the design, configuration, integration, and implementation of a modern dredge and fill application intake, review, and tracking system. Bidders must complete multiple worksheets including base contract payment costs, licensing and tools costs, maintenance and operations costs, and staff rate information across a project duration spanning up to 60 months. The cost workbook requires bidders to propose costs for deliverables organized across 12 primary deliverable groups, including project management, requirements clarification, design and development, system interfaces, data management, testing, training, configuration and release management, security and data protection, software and SaaS subscriptions, transition to maintenance and operations, and project closeout. Additionally, bidders may propose optional maintenance and operations support for Years 2 and 3. The estimated user base includes 1,300 annual permit applications, 175 concurrent external users, 200 total internal staff users, 100 concurrent Water Board staff users, and 20 concurrent non-program staff users; however, a Best and Final Offer (BAFO) adjustment notes that approximately 150 users will not require licensing in the first year during beta testing and stakeholder demonstrations.

The cost proposal structure includes separate sections for SaaS subscription licensing, software tools licensing (including third-party and open-source options), and hosting costs across the base contract year and optional renewal years. Bidders must provide detailed staff rate sheets identifying key positions such as engagement directors, delivery managers, senior project managers, technical architects, and developers, along with associated hourly rates and full-time equivalent (FTE) allocations. The workbook includes a projected staff hours section spanning 60 months to capture resource planning, and a user licenses section requiring bidders to specify whether licenses are named or concurrent, provide tiered pricing based on user ranges, and clearly indicate initial annual costs versus renewal costs. The BAFO section specifies that contractors must include 262 business intelligence (BI) licenses as part of their cost proposal. All cost data entered must reflect white cells only, with static content and formulas protected from modification. The Cost Summary worksheet automatically aggregates data from detailed worksheets, applies a 10 percent state withhold, and calculates the bidder's proposed total cost.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Instructions

CalWRAPP Pre-Solicitation No. 0000040884 Cost Workbook
1. Instructions
ItemGeneral Cost Workbook Instructions:
1Bidder shall enter data into white cells only and shall not alter any static content or formulas.
2Bidder shall enter their company name on the Cost Summary (worksheet #2) and Bidder proposed cost data in worksheets #3 through #6.
3Bid amount shall reflect all Project Cost elements specified in the applicable SOW Sections.
4Bidder shall refer to, and comply with, the instructions provided in item 6-13 below.
5Bidder shall use the following information for guidance while filling out the worksheets and cost estimates.
6Water Boards estimates a total of 1,300 permit applications submitted through the system annually
7Water Boards estimates a total of concurrent 175 Users.
8Water Boards estimates a total of 200 internal staff that will access the system for program related job duties.
9Water Boards estimates a total of 100 concurrent Water Boards staff users.
10Water Boards estimates a total of 20 concurrent Non-Program staff users, e.g. IT system support staff, database administration staff.
11Bidder shall provide options for user licensing and associated costs based on estimates provided on items 6 through 10. If applicable, the options provided shall include different tiers based on user volumes. Please note that the estimates and user roles may change during discovery activities for the design phase of the project. However, those estimates will be used for evaluation purposes.
12Bidder shall include the frequency (e.g., monthly, annual, etc.) for billing of any software licensing costs (e.g., Software, third-party, etc.).
Changes - BAFO
* CDFA - AHFSS is planning for deployments the first year for beta testing with stakeholders, demo's and outreach. We will not be needing licensing for approximately 150 users in the first year. Use the instructions below to adjust the cost and break it down by the category in the functional requirements
* CDFA - AHFSS estimates a total number of active external users (that will need to be able to login and report as well as save an application into the system), XXX concurrent active external users, XXX total active staff users, and XXX concurrent staff users at the end of the first year.
* CDFA - AHFSS estimates a total number of ~XXXX total active external users (that will need to be able to login and report as well as save an application into the system), XXXX concurrent active external users, XXX total active staff users, and 100 concurrent staff users at the end of the second year, beginning of third year.

2. Cost Summary

2. Cost Summary
Item #
Bidder Name:
Base Contract and M&O Costs
1Base Contract Payment (Tab 3)$ - 0
2Licensing, Tools and SAAS Cost (Tab 4) - Base Contract Year 1 (Tab 4)$ - 0
3Licensing, Tools, and SAAS Cost - Optional Year 2 for M&O (Tab 4)$ - 0
4Licensing, Tools, and SAAS Cost - Optional Year 3 for M&O (Tab 4)$ - 0
5Maintenance and Operations Planning Costs - Year 2 (Tab 5)$ - 0
6Maintenance and Operations - Optional Year 2 (Tab 5)$ - 0
7Maintenance and Operations - Optional Year 3 (Tab 5)$ - 0
Total Base Contract Cost Items$ - 0
Total Base M&O Cost Items$ - 0
Unanticipated Tasks (10%) of the Total Base Contract$ - 0
Bidder's Proposed Total Cost$ - 0

Note: Enter Bidder Name in Cell C3. All other fields in this worksheet will auto-populate from data input in Tabs 3 through 6.

State of California State Water Resources Control Board CalWRAPP Pre-Solicitation No. 0000040884 Cost Workbook

3. Base Contract Payment

`3. Base Contract Payment
Bidder Name:
Item #DeliverableDelivery GroupDeliverable CategoryQuantityUnit CostTotal CostState 10% Withhold
1.1Project Management PlansDeliverable Group #1
1.1.1Project Management PlanDocumentation1$ - 0$ - 0$ - 0
1.1.2Communication Management PlanDocumentation1$ - 0$ - 0$ - 0
1.1.3Implementation Management PlanDocumentation1$ - 0$ - 0$ - 0
1.1.4Project Organization ChartDocumentation1$ - 0$ - 0$ - 0
1.1.5Schedule Management PlanDocumentation1$ - 0$ - 0$ - 0
1.1.6Project ScheduleDocumentation1$ - 0$ - 0$ - 0
1.1.7Project Schedule (Weekly Updates)Documentation42$ - 0$ - 0$ - 0
1.1.8Requirements Traceability Management PlanDocumentation1$ - 0$ - 0$ - 0
1.1.9Requirements Traceability MatrixDocumentation1$ - 0$ - 0$ - 0
1.1.10Risk Management PlanDocumentation1$ - 0$ - 0$ - 0
1.1.11Risk Register (Weekly Updates)Documentation42$ - 0$ - 0$ - 0
1.1.12Issue Management PlanDocumentation1$ - 0$ - 0$ - 0
1.1.13Issue Log (Weekly Updates)Documentation42$ - 0$ - 0$ - 0
1.1.14Change Management PlanDocumentation1$ - 0$ - 0$ - 0
1.1.15Change Log (Monthly Updates)Documentation10$ - 0$ - 0$ - 0
1.1.16Weekly Status MeetingsService42$ - 0$ - 0$ - 0
1.1.17Weekly Status ReportsDocumentation42$ - 0$ - 0$ - 0
1.1.18Monthly Status MeetingsService10$ - 0$ - 0$ - 0
1.1.19Monthly Status ReportsDocumentation10$ - 0$ - 0$ - 0
1.2Agile ManagementDeliverable Group #1
1.2.1Project RoadmapDocumentation1$ - 0$ - 0$ - 0
1.2.2Product BacklogDocumentation1$ - 0$ - 0$ - 0
1.2.3Sprint Planning SessionsService21$ - 0$ - 0$ - 0
1.2.4Sprint BacklogDocumentation1$ - 0$ - 0$ - 0
1.2.5Daily Stand-UpsService210$ - 0$ - 0$ - 0
1.2.6Burndown ChartsDocumentation1$ - 0$ - 0$ - 0
1.2.7Testing and Validation ResultsDocumentation1$ - 0$ - 0$ - 0
1.2.8Sprint RetrospectivesDocumentation1$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0
2.0Requirements Clarification/FinalizationDeliverable Group #2
2.1Business Process and Requirements AnalysisDocumentation1$ - 0$ - 0$ - 0
2.2Fit Gap AnalysisDocumentation1$ - 0$ - 0$ - 0
2.3Requirements Clarifications (Functional, Non-Functional, Transitional)Documentation1$ - 0$ - 0$ - 0
2.4Requirements Finalization (Functional, Non-Functional, Transitional)Documentation1$ - 0$ - 0$ - 0
2.5Requirements Traceability MatrixDocumentation1$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0
3.0Design, Development, and ImplementationDeliverable Group #3
3.1Business Requirements DocumentDocumentation1$ - 0$ - 0$ - 0
3.2System Architecture DocumentationDocumentation1$ - 0$ - 0$ - 0
3.3Data Architecture DocumentationDocumentation1
3.4Functional and Technical Design DocumentationDocumentation1$ - 0$ - 0$ - 0
3.5Solution Implementation PlanDocumentation1$ - 0$ - 0$ - 0
3.6System Environments

1. Development

2. System Integration Testing

3. User Acceptance Testing

4. Training

5. ProductionDeliverable Milestone5$ - 0$ - 0$ - 0
3.7Development Data SetsDeliverable Milestone1$ - 0$ - 0$ - 0
3.8Solution Implementation Completion ReportDeliverable Milestone1$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0
4.0System InterfacesDeliverable Group #4
4.1Interface Management PlanDocumentation1$ - 0$ - 0$ - 0
4.2Interface Development PlanDocumentation1$ - 0$ - 0$ - 0
4.3Interface Design DocumentDocumentation1$ - 0$ - 0$ - 0
4.4Interface Control DocumentsDocumentation1$ - 0$ - 0$ - 0
4.5Interface ImplementationsDeliverable Milestone1$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0
5.0Data ManagementDeliverable Group #5
5.1Data Management PlanDocumentation1$ - 0$ - 0$ - 0
5.2Data Inventory and Classification RegisterDeliverable Milestone1$ - 0$ - 0$ - 0
5.3Data Model/Database SchemaDocumentation1$ - 0$ - 0$ - 0
5.4Data DictionaryDocumentation1$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0
6.0TestingDeliverable Group #6
6.1Master Test PlanDocumentation1$ - 0$ - 0$ - 0
6.2Use Cases and Test Cases DocumentationDocumentation1$ - 0$ - 0$ - 0
6.3Test ScriptsDocumentation1$ - 0$ - 0$ - 0
6.4Testing ExecutionDeliverable Milestone1$ - 0$ - 0$ - 0
6.4.1SystemDocumentation1$ - 0$ - 0$ - 0
6.4.2IntegrationDocumentation1$ - 0$ - 0$ - 0
6.4.3UATDocumentation1$ - 0$ - 0$ - 0
6.4.4Performance, LoadDocumentation1$ - 0$ - 0$ - 0
6.4.5Security, PenetrationDocumentation1$ - 0$ - 0$ - 0
6.4.6InterfacesDocumentation1$ - 0$ - 0$ - 0
6.5Test Data SetsDocumentation1$ - 0$ - 0$ - 0
6.6Testing Results Reports (System, Integration, UAT, Performance, Load, Security, Penetration, Interfaces)Documentation1$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0
7.0TrainingDeliverable Group #7
7.1Training Management PlanDocumentation1$ - 0$ - 0$ - 0
7.2Training MaterialsDocumentation1$ - 0$ - 0$ - 0
7.3Training ExecutionDeliverable Milestone1$ - 0$ - 0
7.4Training Completion ReportDocumentation1$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0
8.0Configuration and Release ManagementDeliverable Group #8
8.1Release Management PlanDocumentation1$ - 0$ - 0$ - 0
8.2Configuration Management PlanDocumentation1$ - 0$ - 0$ - 0
8.3Cut-Over PlanDocumentation
8.4Configuration Implementation (Development, QA, Staging, Production, Training)Deliverable Milestone1$ - 0$ - 0$ - 0
8.5Pilot Deployment Report and SignoffDocumentation1
8.6System Stabilization ReportDeliverable Milestone1$ - 0$ - 0$ - 0
8.7Formal System Acceptance and Final Go-Live ReportDocumentation1$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0
9.0Security and Data ProtectionDeliverable Group #9
9.1System Security Management PlanDocumentation1$ - 0$ - 0$ - 0
9.1Security Test Management PlanDocumentation1$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0
10.0Software/SaaS/Hosting SubscriptionsDeliverable Group #10
10.1List of Software LicensingDocumentation1$ - 0$ - 0$ - 0
10.2List of SaaS LicensingDocumentation1$ - 0$ - 0$ - 0
10.3List of Hosting LicensingDocumentation1$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0
11.0System Transition to Maintenance and Operations (M&O)Deliverable Group #11
11.1M&O Management PlanDocumentation1$ - 0$ - 0$ - 0
11.2Transition to M&O PlanDocumentation1$ - 0$ - 0$ - 0
11.3System Maintenance ManualDocumentation1$ - 0$ - 0$ - 0
11.4System Administration GuideDocumentation1
11.5System Performance and Capacity Management PlanDocumentation1
11.6Technology Recovery PlanDocumentation1$ - 0$ - 0$ - 0
11.7Help Desk Management PlanDocumentation1
11.8Help Desk Support ManualDocumentation1
11.9Help Desk ImplementationService1$ - 0$ - 0$ - 0
11.10Help Desk Statistics Reporting FrameworkDocumentation1
11.11System Transition to M&ODeliverable Milestone1$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0
12.0Project CloseoutDeliverable Group #12
12.1Updated DocumentationDocumentation1$ - 0$ - 0$ - 0
12.2Participation in Lessons Learned/Retrospective SessionsService1$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0
OPTIONAL
13.0M&O Support - Optional Year 1Deliverable Group #13
13.1M&O SupportService1$ - 0$ - 0$ - 0
13.2Monthly M&O ReportDocumentation12$ - 0$ - 0$ - 0
13.3Help Desk SupportService1$ - 0$ - 0$ - 0
13.4Monthly Help Desk Statistics ReportDocumentation12$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0
14.0M&O Support - Optional Year 2Deliverable Group #14
13.1M&O SupportService1$ - 0$ - 0$ - 0
13.2Monthly M&O ReportDocumentation12$ - 0$ - 0$ - 0
13.3Help Desk SupportService1$ - 0$ - 0$ - 0
13.4Monthly Help Desk Statistics ReportDocumentation12$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0

State of California State Water Resources Control Board CalWRAPP Pre-Solicitation No. 0000040884

4.Licensing Tools Hosting Costs

4. LICENSING, TOOLS, HOSTING COSTS
Bidder Name:
A. SaaS SUBSCRIPTION LICENSING
Item #Product NameProduct Information | DescriptionSLP Contract Number (if applicable)License SKUPurposeLicensing Start DateQty.1 Year Base Contract Licensing
Unit CostUnit Maintenance Cost (Monthly)1 - Year Base Contract Extended CostM&O Optional Year 1
Licensing Unit CostM&O Optional Year 1
Licensing Extended CostM&O Optional Year 2
Licensing Unit CostM&O Optional Year 2

Licensing Extended Cost

1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0$ - 0
B. SOFTWARE TOOLS COSTS (Including Third Party or Other)
Item #Product NameProduct Information | Description
(Open Source or Proprietary)SLP Contract Number (if applicable)License SKUPurposeLicensing Start DateQty.1 Year Base Contract Licensing Unit CostUnit Maintenance Cost (Monthly)1 Year Base Contract Extended CostM&O Optional Year 1
Licensing Unit CostM&O Optional Year 1
Licensing Extended CostM&O Optional Year 2
Licensing Unit CostM&O Optional Year 2

Licensing Extended Cost

1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotals$ - 0$ - 0$ - 0

Total Licensing Costs (Base Contract & Optional Years) $ - 0 $ - 0 $ - 0

Notes: Software Licensing is mandatory optional

State of California State Water Resources Control Board CalWRAPP Pre-Solicitation No. 0000040884

5. Maintenance & Operations

5. Maintenance & Operations
Bidder Name:
Item #Cost CategoryDeliverable TypeQuantityDeliverable
Unit CostDeliverable
Cost TotalBidder Comments
1. Maintenance and Operations Planning - Implementation Project Year 1
1Transition to Maintenance and Operations Plan UpdatesDocumentation1$ - 0$ - 0
2Maintenance and Operations Plan UpdatesDocumentation1$ - 0$ - 0
3Maintenance and Operations Reporting PlanDocumentation1$ - 0$ - 0
4Technology Recovery Plan (TRP)Documentation1$ - 0$ - 0
5System Performance and Capacity Management PlanDocumentation1$ - 0$ - 0
Subtotal$ - 0
Cost CategoryDeliverable TypeQuantityMonthly Service CostAnnual
Service CostBidder Comments
2. Maintenance & Operations - Optional Year 1
1Maintenance and Operations ActivitiesMonthly Service Fee12$ - 0$ - 0
2Monthly Maintenance and Operations ReportDocumentation12$ - 0$ - 0
3Help Desk SupportMonthly Service Fee12$ - 0$ - 0
Subtotal$ - 0
3. Maintenance & Operations - Optional Year 2
1Maintenance and Operations ActivitiesMonthly Service Fee12$ - 0$ - 0
2Monthly Maintenance and Operations ReportDocumentation12$ - 0$ - 0
3Help Desk SupportMonthly Service Fee12$ - 0$ - 0
Subtotal$ - 0
TOTAL$ - 0
Notes:

State of California State Water Resources Control Board CalWRAPP Pre-Solicitation No. 0000040884

6. Staff Rate Sheet

6A. Staff Rate Sheet - Project (Informational Only)
Bidder Name:
Item #Job Classification TitleHourly RateNumber of Resources (FTE)Duration
(Months)Total Staff Costs
Key Staff
1Engagement Director$ - 01.036$ - 0
2Delivery Manager$ - 01.036$ - 0
3Senior Project Manager$ - 01.036$ - 0
4Technical Architect$ - 01.036$ - 0
5Technical Lead$ - 01.036$ - 0
6Senior Developer$ - 01.0$ - 0
7Data Architect$ - 01.0$ - 0
8Database Analyst$ - 01.0$ - 0
9GIS Architect$ - 01.0$ - 0
10GIS Developer$ - 01.0
11GIS System Administrator$ - 01.0
12Testing Manager$ - 01.0
13Testing Engineer$ - 01.0
14Business Solutions Analyst$ - 01.0
15System Adminstrator$ - 01.0$ - 0
All Other Non-Key Staff
1$ - 00.0$ - 0
2$ - 00.0$ - 0
3$ - 00.0$ - 0
4$ - 00.0$ - 0
5$ - 00.0$ - 0
6$ - 00.0$ - 0
7$ - 00.0$ - 0
8$ - 00.0$ - 0
9$ - 00.0$ - 0
10$ - 00.0$ - 0
Total Key Staff Resources15$ - 0
Total Non-Key Staff Resources0$ - 0
FTE = 1,920 Hours/Year
6B. Staff Rate Sheet - Maintenance & Operations (Informational Only)
Bidder Name:
Item #Job Classification TitleHourly RateNumber of Resources (FTE)Duration
(Months)Total Staff Costs
Key Staff
1$ - 00.0$ - 0
2$ - 00.0$ - 0
3$ - 00.0$ - 0
4$ - 00.0$ - 0
5$ - 00.0$ - 0
6$ - 00.0$ - 0
7$ - 00.0$ - 0
8$ - 00.0$ - 0
9$ - 00.0$ - 0
10$ - 00.0$ - 0
All Other Non-Key Staff
1$ - 00.0$ - 0
2$ - 00.0$ - 0
3$ - 00.0$ - 0
4$ - 00.0$ - 0
5$ - 00.0$ - 0
6$ - 00.0$ - 0
7$ - 00.0$ - 0
8$ - 00.0$ - 0
9$ - 00.0$ - 0
10$ - 00.0$ - 0
Total Key Staff Resources0$ - 0
Total Non-Key Staff Resources0$ - 0

State of California State Water Resources Control Board CalWRAPP Pre-Solicitation No. 0000040884

7. Projected Staff Hours

7. Projected Staff HoursBidder Proposed FTEs per calendar month. (For information purposes only)
Bidder Name:Month 1Month 2Month 3Month 4Month 5Month 6Month 7Month 8Month 9Month 10Month 11Month 12Month 13Month 14Month 15Month 16Month 17Month 18Month 19Month 20Month 21Month 22Month 23
Item #Key ActivitiesTotal Staff HoursSubtotal Key Staff FTE HoursSubtotal Non-Key Staff FTE HoursKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKeyNon-KeyKey
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
TOTAL HOURS- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0

8. User Licenses

8. User Licenses
Bidder Name:
Item #CategoryLicense TypeNamed or ConcurrentNumber of User Licenses (Range)Bidder Proposed Initial Annual Cost per YearBidder Proposed Annual Renewal Cost per YearBidder Range offered as part of the Bidder's Cost ProposalTotal Cost
(Core Contract 1-3)Total Cost
(Optional Years 4-5)BIDDER COMMENTS

(Enter comment if Named vs Concurrent column is Other.)

1$ - 0$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0
29$ - 0$ - 0$ - 0$ - 0
30$ - 0$ - 0$ - 0$ - 0
31$ - 0$ - 0$ - 0$ - 0
32$ - 0$ - 0$ - 0$ - 0
33$ - 0$ - 0$ - 0$ - 0
34$ - 0$ - 0$ - 0$ - 0
35$ - 0$ - 0$ - 0$ - 0
36$ - 0$ - 0$ - 0$ - 0
37$ - 0$ - 0$ - 0$ - 0
38$ - 0$ - 0$ - 0$ - 0
39$ - 0$ - 0$ - 0$ - 0
40$ - 0$ - 0$ - 0$ - 0
41$ - 0$ - 0$ - 0$ - 0
42$ - 0$ - 0$ - 0$ - 0
43$ - 0$ - 0$ - 0$ - 0
44$ - 0$ - 0$ - 0$ - 0
45$ - 0$ - 0$ - 0$ - 0
46$ - 0$ - 0$ - 0$ - 0
47$ - 0$ - 0$ - 0$ - 0
48$ - 0$ - 0$ - 0$ - 0
49$ - 0$ - 0$ - 0$ - 0
50$ - 0$ - 0$ - 0$ - 0
TOTALS$ - 0$ - 0
NOTES:

• BI Licenses: To meet the needs of the State, Contractor shall include 262 BI licenses as part of their cost proposal. Costs for the first 262 will roll up to Tab 2 Cost Summary, cells G12 and G21. See RFP Section 6.5 (EVV Solution Reporting) for applicable requirements.

• License Type: Bidder shall enter the type of license per their licensing model, such as core EVV solution, portal, BI, etc.

• Named vs Concurrent: Bidder shall whether the licenses are named or concurrent.

• Number of Users Licenses: Bidder shall update the number of user licenses (column C) with the BI user ranges which the Bidder leverages for their user license pricing model. For example, C4 could equal "1 to 500", C5 "501 to 1,000", C6 "1,001 to 2,000", etc.

• Bidder Proposed Initial Annual Cost: Bidder shall provide their initial cost per range (column D), which captures the first time annual cost of the license range.

• Bidder Proposed Annual Renewal Cost: Bidder shall provide their renewal cost per range (column E).

• Bidder Range Offered: Bidder shall use the drop down to indicate which user ranges are included within their cost proposal (i.e. Tabs 4-6), so that the State understands how many licenses are included in the Contract.

• Total Columns: Total Cost (Core Contract) totals the total costs for the 5 year contract. Total Cost (Optional Years) totals the 4 years of potential optional extension years. Total Amount Included in BAFO totals the core contract and optional years if the range (column H) is indicated as Yes; whereas Total Amount Not Included in BAFO totals the core contract and optional years if the range (column H) indicates No.

• Bidder Comments: Enter comment if Named vs Concurrent column is Other; or if additional clarification is needed.

Sheet1

1. SaaS Subscription License
2. Tools License
3. 3rd Party Software

Sheet2

1. SaaS Subscription Licensing
2. Tools Software Licensing
3. Third Party Software Components Licensing
4. Other (Use Notes Column to Define)

image1.png

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .