3_Exhibit A - Statement of Work_Pre-Solicitation_1.pdf
PDF 2 MB Posted
- Solicitation number
- 0000040884
- Issued by
- California
About this file
This Statement of Work is issued by the California State Water Resources Control Board (State Water Board) for the design, development, and implementation of the California Wetland and Riparian Area Protection Portal (CalWRAPP), a modern system to support dredge and fill application intake, review, and tracking. The project seeks a Commercial Off-the-Shelf (COTS) or Software-as-a-Service (SaaS) solution with minimal customization (limited to 5 percent modification), to be hosted in a cloud environment (Azure). CalWRAPP will serve approximately 6,000 total active users annually, including approximately 1,300 external applicants and 200 internal staff at launch, supporting online application submission, document uploads, status tracking, and comprehensive reporting for permit processing. The contract term consists of one year for system development including three months of stabilization, followed by one year of Maintenance and Operations (M&O) services, with an optional one-year extension available at the State's discretion for a potential maximum term of three years. The Contractor must provide fifteen key staff positions including an Engagement Director, Delivery Manager, Senior Project Manager, Technical Architect, Technical Lead, Senior Developer, Data Architect, Database Analyst, GIS Architect, GIS Developer, GIS System Administrator, Testing Manager, Testing Engineer, Business Solutions Analyst, and System Administrator, with detailed mandatory qualifications and desirable experience criteria specified for each role. All work shall be performed during normal State business hours (8:00 AM to 5:00 PM PT, Monday through Friday), though remote work within the continental United States is permitted with pre-approval, and key staff must be available on-site at Sacramento headquarters as needed.
The contract structure is based on fixed-rate deliverable-based services through Work Order Authorizations (WOAs) and Deliverable Expectation Documents (DEDs), with costs detailed in the Cost Workbook (Exhibit E). The State is responsible for procuring all software licenses and subscriptions, server hardware, network infrastructure, and patches, while the Contractor must provide its own equipment and qualified staffing. The State will provide access to resources including Microsoft Office 365, programming standards documentation, source control software, project management support, and workspace as needed. The project is subject to approval by the California Department of Technology (CDT) Office of Statewide Technology Procurement under Public Contract Code Section 12100, and no work shall commence prior to full contract execution. GenAI technology is permitted only for administrative and productivity-enhancing tasks with prior State approval and is explicitly prohibited for automated decision-making affecting regulatory determinations or environmental data predictive modeling. The Contractor must comply with California Government Enterprise Network (CGEN) requirements, State security and privacy policies, and established change control procedures, with the State serving as sole judge of work acceptability and retaining the right to require key staff replacements for poor performance or non-compliance.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of California State Water Resources Control Board (State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
EXHIBIT A: STATEMENT OF WORK
1. INTRODUCTION
This Statement of Work (SOW) (hereinafter also referred to as "Agreement" or "Contract") is between the California State Water Resources Control Board (hereinafter referred to as "State Water Board", or the "State") and the [Contractor Name], hereinafter referred to as the "Contractor" to design, develop, and implement the California Wetland and Riparian Area Protection Portal (CalWRAPP) solution. Contractor agrees to provide fixed-rate deliverable-based services including the development, design, and implementation (DD&I) of the CalWRAPP solution and optional
Maintenance and Operation (M & O) Services as described in this SOW.
This engagement consists of services which must be completed in accordance with this SOW. All services rendered and deliverables produced under the Contract will be based on Work Order
Authorizations (WOAs) and Deliverable Expectation Documents (DEDs). The Contractor is responsible for completing all tasks, work products, and services as detailed in the SOW at the costs provided in EXHIBIT E: COST WORKBOOK.
The term "Contractor" refers to the firm that shall provide the staffing to perform the services and produce the deliverables. The term "Consultant(s)" refers to the Contractor's staff who will perform the services and produce the deliverables. The terms "Contract" or “Agreement” will be used interchangeably throughout the documents.
2. BACKGROUND AND PURPOSE
A. BACKGROUND
California State Water Resources Control Board
The State Water Resources Control Board (State Water Board) and the nine (9) Regional
Water Quality Control Boards (Regional Water Boards), collectively known as the California https://sb.cityinnovate.com/account/solicitations/documents/410750
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
Water Boards (Water Boards), are dedicated to a single vision: Abundant clean water for human uses and environmental protection to sustain California's future. Under the federal
Clean Water Act (CWA) and the State's pioneering Porter-Cologne Water Quality Control Act, the State and Regional Water Boards have regulatory responsibility for protecting the water quality of nearly 1.6 million acres of lakes, 1.3 million acres of bays and estuaries, 211,000 miles of rivers and streams, and about 1,100 miles of exquisite California coastline.
CWA Title IV - Permits and Licenses - Section 401
Porter-Cologne Water Quality Control Act
Water Quality Certification and Wetlands Program
The Water Quality Certification and Wetlands Program (Program) is responsible for regulating discharges of dredged or fill material to waters of the state. The State Water Board and Water
Boards have the authority to regulate these discharges under section 401 of the Clean Water
Act (CWA) and the Porter-Cologne Water Quality Control Act (Porter-Cologne).
CWA section 401 water quality certifications are issued to applicants for a federal license or permit for activities that may result in a discharge into waters of the United States (U.S.), including but not limited to the discharge or dredged or fill material. Waste discharge requirements under Porter-Cologne are issued for discharges of dredged or fill material to waters of the state.
On April 2, 2019, the State Water Board adopted the State Wetland Definition and
Procedures for the Discharge of Dredged or Fill Material to Waters of the State (Procedures).
The Procedures became effective May 28, 2020. Applicants proposing to discharge dredged or fill material are required to comply with the Procedures unless an exclusion applies, or the discharge qualifies for coverage under a General Order.
https://www.epa.gov/cwa-401/clean-water-act-section-401-state-certification-water-quality https://www.waterboards.ca.gov/laws_regulations/docs/portercologne.pdf
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
Before a Federal Agency, e.g. the U.S. Army Corps of Engineers (Corps), may issue a
Federal permit in California, the State must certify that the activity will meet state water quality standards. Historically, most of the waters within California were also under Federal jurisdiction. However, the May 2023 Supreme Court decision in Sackett v. Environmental
Protection Agency significantly reduced Federal jurisdiction under the CWA. Program staff reviewed existing permit data and estimated that Sackett will result in a significantly higher percentage of State-only permits for dredge or fill activities (25-50% permits will be Non-
Federal, compared to ~5% previously).
Water Board staff review applications in compliance with the Procedures. In accordance with
Executive Order W-59-93 (no net loss policy), the Procedures ensure that the Water Boards’ regulation of dredge or fill activities will be conducted in a manner “to ensure no overall net loss and long-term net gain in the quantity, quality, and permanence of wetlands acreage and values…” The Program’s jurisdiction over dredge and fill discharges provides valuable protection for California’s wetlands, streams, riparian and headwater areas.
The Program is responsible for the following:
Applicants use fillable forms to submit a permit application via email or paper mail to the
Regional Water Board in the region where the project is located, or to the State Water Board for projects that cross regional board boundaries. Staff review applications and manually enter all documentation and project data into the program’s California Integrated Water
Quality System (CIWQS) database. The Water Boards receive approximately 1300 applications annually.
According to State regulations, the Water Boards have thirty (30) days to deem an application complete or incomplete and notify the applicant (Cal. Code Regs. tit. 23, § 3835). For projects in Federal waters, the Water Boards are required to act on a permit request within sixty (60)
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work days of receiving the request, regardless of the completeness review timeframe (40 CFR
325.2 (b)(ii)).
1. Assessing completeness of applications
2. Reviewing and approving complete applications
3. Posting application and draft permit information for public comment
4. Issuing or denying the permit within timeframes set by state or federal regulations
5. Conducting onsite inspections and post-construction requirements
6. Documenting the permitting decision
B. OBJECTIVE
The objective of this Agreement is for the Contractor to provide implementation services for the
Water Boards CalWRAPP system.
1. Develop the CalWRAPP architecture based on the Water Boards' Enterprise Architecture
Common Business Processes, Master Data Management, DWQ Business Needs, Functional and Non-Functional Requirements, and Interfaces with external DWQ program partners.
2. Provide the ability to make changes to one business area/application without causing side-effects to other business areas.
3. Ensure the information/data entered into the CalWRAPP system is complete and consistent by implementing and enforcing business rules when any information is captured.
4. Place tighter controls on changes to all information and data within the CalWRAPP system through the establishment of a data governance process that approves all changes to the systems’ data.
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
5. Provide a standardized set of interfaces implemented through a common interface subsystem, where information can be transmitted to external entities, and the interface can be quickly tailored to individual stakeholder needs.
6. Ensure all information is tightly related and all changes to the information is traceable to who made the change, when the change was made, and what change was made.
7. Provide the business with the capability to track a case from initiation through completion that allows the review of related current and historical data from the Program.
8. Provide management with reporting capabilities to review staff workload, performance, and activities.
9. Provide management with the ability to analyze trends in permitting activity, such as application volumes, processing times, project types, and geographic patterns, to identify areas that may need additional review, outreach, or program attention.
10. Allow all public program applicants to submit applications and payment through an online service.
11. Allow applicants and permittees to review their application information, project details, and the status of any actions or updates online.
3. DESCRIPTION OF PROPOSED NEW SYSTEM OR SERVICE
The State Water Board seeks to implement CalWRAPP, a modern system designed to support all stages of dredge or fill application intake, review, and tracking as defined by the State Water Board’s
Dredge or Fill Program. CalWRAPP will provide applicants and permittees with an online system to submit applications, upload required documents, report project information, and track the status of their submissions. The system will also support staff in project review, permit issuance, monitoring, compliance activities, and program reporting.
CalWRAPP is expected to be delivered as a commercial off‑the‑shelf (COTS), residing in a IaaS or
PaaS environment, or Software‑as‑a‑Service (SaaS) solution, configured to meet program needs with minimal customization. The State anticipates that most system functionality, such as permitting workflows, document handling, role‑based access, task management, and reporting, will be
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work implemented using standard features provided by the selected platform. Any customization should be limited, maintain upgrade‑compatibility, and comply with the maximum allowable COTS modification percentage of five percent (5%), measured by effort or component count, and only where out-of-the-box functionality cannot meet functional requirements, statutory, regulatory, or operational needs.
The solution shall include design, configuration, and integration work necessary to support application intake, staff workflows, program activities, and required connections to existing State Water Board systems, as defined throughout this EXHIBIT A: STATEMENT OF WORK and other associated
Exhibits. Integrations may include identity management, billing services, geospatial services, document repositories, and other required data systems. The Geographic Information System (GIS) capabilities will rely on authoritative GIS data and geospatial services provided by the vendor’s selected platform to determine project location, routing, and review needs.
No purchase of specialized hardware is anticipated for this project. The system is expected to operate in a secure, cloud‑hosted environment consistent with State Water Board policies.
The Contractor shall recommend an implementation approach and sequencing for deploying
CalWRAPP’s major business processes, subject to State Water Board review and approval. The
Contractor shall also recommend configuration and release‑management strategies, testing approaches, and supporting toolsets appropriate for the proposed platform.
Use of Generative AI Technology
Use of Generative AI (GenAI) shall be permitted only under the following conditions:
• GenAI may be used for administrative or productivity‑enhancing tasks such as drafting documentation, generating test scripts, producing training materials, or summarizing requirements, provided no confidential, regulated, or sensitive environmental data is exposed to external AI models.
https://sb.cityinnovate.com/account/solicitations/documents/410746
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
• GenAI may not be used for automated decision‑making affecting regulatory determinations, permit eligibility, compliance judgments, or enforcement actions, predictive modeling of environmental data unless models are fully transparent and validated, any function that replaces professional judgment of State Water Board staff.
• Any GenAI use must comply with all State of California IT security, privacy, and generative AI policies.
• The integrator must disclose all GenAI usage and obtain approval prior to applying GenAI tools during implementation.
The Contractor shall meet the EXHIBIT C: FUNCTIONAL AND NON-FUNCTIONAL
REQUIREMENTS to support the following users of CalWRAPP:
• State Water Board estimates ~6,000 total active users who will need to be able to log in and submit, review, monitor, and report on applications and permits each year.
• State Water Board estimates ~1,300* external users who will need to log in within the first twelve(12) months of the launch to prepare and submit applications.
• State Water Board estimates ~200* internal users who will need to log in and work within
CalWRAPP at launch.
• State Water Board estimates ~4* System Administrators who will need to manage and administer CalWRAPP and its configuration and workflows (two (2) State Water Board staff and two (2) Contractor staff).
NOTE: All user counts denoted with an asterisk (*) are included in the "total active users" above.
Figure 3‑1, shown below, provides a conceptual view of the CalWRAPP system and its key components.
https://sb.cityinnovate.com/account/solicitations/documents/410748
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
Figure 3-1: CalWRAPP Conceptual Architecture
Taken together, these elements describe CalWRAPP as a COTS or SaaS solution that will provide the functionality required to meet the system requirements described throughoutEXHIBIT A:
STATEMENT OF WORK.
4. TERM OF THE CONTRACT
Effective upon approval of CDT, Office of Statewide Technology Procurement (OSTP), the term of the
Contract is two (2) years, consisting of one (1) year to complete all phases of system development
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work including three (3) months of stabilization, followed by an additional one (1) year for the first year of
Maintenance and Operations (M&O) which will run concurrently with the Warranty period.
The State, at its sole discretion, may exercise its option to execute one (1) one-year extension to perform maintenance and operations, help desk for a maximum Contract term of three (3) years.
The Contractor shall not be authorized to deliver goods or commence performance of services described in this Agreement prior to the effective date. Any delivery of goods or performance of services by the Contractor that is commenced prior to the effective date shall be at no cost to the
State.
The State is not obligated to use any or all of these options. The Agreement is of no effect unless approved by the California Department of Technology (CDT) and no work shall begin before full execution of the Agreement.
5. AMENDMENT
The Agreement may be amended, consistent with the terms and conditions of the Agreement, and by mutual consent of both parties, subject to approval by the CDT Office of Statewide Technology
Procurement under Public Contract Code (PCC) Section 12100. No amendment or variation of the terms of this Agreement shall be valid unless made in writing, signed by the parties, and approved by oversight agencies if required. No oral understanding not incorporated in the Agreement is binding on any of the parties.
6. LOCATION AND AVAILABILITY
The Contractor shall provide the services described in this Statement of Work (SOW) during normal
State business hours, which are 8:00AM to 5:00PM PT, Monday through Friday, excluding State holidays. However, the Contractor may be required to provide support beyond the normal business hours, as required to successfully provide contracted services. Some tasks not requiring the
Contractor's on-site presence may be performed offsite if pre-approved in writing by the State. All remote work must be performed within the continental United States. Remote access to the
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
Department's network is only authorized for Department-issued or Department-approved computers, while using Department-provided or approved remote access to software and tools. The Contractor may not specify remote access solutions. The Contractor may be required to travel to site locations at no cost to Department for meetings or to perform tasks. The State will allow the Contractor to propose remote staff, based only in the continental United States. The State will provide collaboration tools
(WebEx, MS Teams, SharePoint, etc.) to facilitate remote work for Department-issued equipment.
Key Staff must be available to be on-site as needed at Department Sacramento project headquarters or locations as determined by the Department Project Manager or Project Director, during normal state business hours (8:00 AM to 5:00 PM PT). Department may consider other options for attendance, such as webinars, phone conferences, and video meetings. Meeting consideration will be at Department’s sole discretion, under circumstances with advance notice of the Department Contract
Manager. All Contractor staff shall have legal authority to work in the United States during the term of the entire Agreement and consent to a background check.
State holidays are listed on the California Department of Human Resources (Cal HR) website in the link below, and are subject to change:
https://www.calhr.ca.gov/employees/Pages/state-holidays.aspx
Permanent offsite work arrangements are allowed under this Contract. The Department may consider accommodating temporary offsite work (e.g., remotely; at the resource's location) for extenuating circumstances (including, but not limited to, Stay at Home Orders, illness, system outages, or natural disasters), which must receive prior approval by the Department.
Table 6-1: Work Locations
Location Name Location Address
State Water Resources Control Board 1001 I Street, Sacramento, CA 95814 https://www.calhr.ca.gov/employees/Pages/state-holidays.aspx
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
7. CONTRACT REPRESENTATIVES
All notices required by, or relating to, this Contract shall be in writing and shall be sent to the contract parties at the email address below unless changed from time to time, in which event each party shall so notify the other in writing within ten (10) days of such change, and all such notices shall be deemed duly given if deposited, postage prepaid, in the United States mail or e-mailed and directed to the addresses then prevailing.
The CalWRAPP contract representatives during the term of this contract will be:
Table 7-1: CalWRAPP Contract Representatives
CalWRAPP CONTRACT REPRESENTATIVES
State Department: State Water Board Contractor: TBD
Name: Name:
Title:
Phone:
Email:
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
Table 7-2: Contract Representatives for Inquiries
CONTRACT REPRESENTATIVES FOR INQUIRIES
State Department: State Water Board Contractor: TBD
Name: Name:
All inquiries during the term of this Contract will be directed to the contract representatives listed above; the contract representatives may be changed by written notice without amending this
Contract.
8. SOLUTION REQUIREMENTS
Functional and Non‑Functional Requirements
The CalWRAPP solution shall support all core business functions needed by the Water Boards and their external stakeholders. The complete, detailed functional and non‑functional requirements are provided in EXHIBIT C: FUNCTIONAL AND NON-FUNCTIONAL REQUIREMENTS, which this section references for full specification and traceability. The Contractor shall ensure that the delivered solution satisfies all requirements documented in Exhibit C.
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
Project/Transition Requirements
CalWRAPP does not require legacy data migration or transition from an existing system. No transition‑specific requirements apply. All solution capabilities are fully defined in EXHIBIT C:
FUNCTIONAL AND NON-FUNCTIONAL REQUIREMENTS.
However, Project/Transition Requirements do apply to ensure operational readiness for go‑live and to support adoption of the solution. These requirements address short‑term project delivery activities needed to prepare Water Boards staff and external users for successful implementation.
Transition‑specific project responsibilities include:
• Vendor‑led training for internal staff, administrators, and end‑users
• Knowledge‑transfer activities that ensure Water Boards staff can operate, administer, and maintain the solution post‑implementation.
• Organizational change‑management support, including readiness activities, communication support, and end‑user guidance.
• Post‑implementation hypercare support, providing enhanced vendor assistance during the stabilization period following go‑live.
These temporary project and transition capabilities are fully defined in EXHIBIT A: STATEMENT OF
WORK, Section 31. Transition of Operation to New Contractor or to State and Section 32. Knowledge
Transfer and/or Training:
9. STATE DATA CENTER OR CONTRACTOR HOSTED FACILITY
ENVIRONMENT
The proposed CalWRAPP solution must be delivered as a COTS or SaaS solution, provided and hosted on the State Water Boards' owned subscription public cloud environment. State Water Board is responsible for procurement and licensing of any software. The hosted environment shall be a single instance of the application accessible to all CalWRAPP customers, ensuring efficient maintenance, updates, and support. The solution must include both native functionality provided by https://sb.cityinnovate.com/account/solicitations/documents/410748 https://sb.cityinnovate.com/account/solicitations/documents/410748
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work the primary software provider and any custom code or configurations required to meet CalWRAPP requirements.
The CalWRAPP solution shall utilize Azure cloud services and State Water Board-owned subscriptions for integration and support. Integration with State Water Board’s cloud environment— supporting GIS services, Active Directory, and next-generation firewalls—is required to maximize use of existing resources and ensure compliance with hosting and security requirements. All hosting environments shall comply with applicable California Government Enterprise Network (CGEN) requirements.
The CalWRAPP solution must include all necessary software tools for management, backup, disaster recovery, and technical support.
Refer to EXHIBIT C: FUNCTIONAL AND NON-FUNCTIONAL REQUIREMENTS for the CalWRAPP solution requirements.
Please refer to SECTION 37. SERVICE LEVEL AGREEMENTS (SLAs) and LIQUIDATED
DAMAGES pertaining to hosting the CalWRAPP solution.
The Contractor shall confirm the use of hosting any additional software components for the
CalWRAPP solution as identified in EXHIBIT E: COST WORKBOOK.
10. STATE’S ROLES AND RESPONSIBILITIES
The State will be responsible for providing systems access and support, software, workspace, and other assets to ensure the smooth and effective operations of the project and project participants. As part of this requirement, the State will provide the following:
1. The State will provide access to State staff, information, resources, and applicable project documentation during normal business hours as approved and needed to facilitate the
Contractor's completion of deliverables and tasks described herein.
https://sb.cityinnovate.com/account/solicitations/documents/410750
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
2. If the Contractor is working onsite, the State will provide access to the work site during normal business hours, with a provision for increased access during critical project periods. Normal business hours are Monday through Friday (8:00 AM - 5:00 PM PT), excluding state holidays.
These hours may be extended with prior State approval.
3. The State will provide the Contractor with physical access to workspace, as needed.
4. The State will provide access to the Microsoft (MS) Office 365 Professional software suite and any other applications as needed.
5. The State will continue to support its existing legacy systems during the Contract.
6. The State will be responsible for the procurement of all server hardware, and all network and communication hardware for CalWRAPP that are outside the scope of the Contractor's responsibilities.
7. The State will be responsible for all server and network patches, upgrades, and configurations.
8. The State will provide access to programming standards that the Contractor must employ during the development of the CalWRAPP solution. The State Water Board’s Coding Standards document will be provided to the Contractor upon onboarding.
9. The State will perform the responsibilities as described in Table 10-1: State Roles and
Responsibilities. The State will administer and maintain the Project Library for the deposit of
Project deliverables and other documents. The Project Library will be maintained on Microsoft
Teams or SharePoint for storing electronic documents.
10. The State will provide source control software to enable check-in, check-out, and version control of documents and system code.
11. The State will define specific requirements, timeframes, and priorities for Contractor tasks within the Implementation Plan.
12. The State will provide project-based decisions in a timely manner.
13. The State will review and approve scope documents (e.g., Deliverable Expectation Document
(DED), Deliverable Acceptance Document (DAD), Work Order Authorization (WOA) and deliverables in compliance with contract timelines.
14. The State will assign a State Water Board Project Manager and a State Water Board Technical
Lead to oversee the Contractor’s performance, completion of requested services, review of the
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
Work Authorizations, deliverables, invoices, and other reports to State Water Boards management on the status of the Contract.
15. The State will provide appropriate access to applications, documentation, and related information that CalWRAPP interfaces with.
16. The State will provide approval of all CalWRAPP production changes prior to implementation, per State Water Board’s standard change management process. Refer to SECTION 16.
CHANGE CONTROL PROCEDURES for additional information.
The State Water Board CalWRAPP project team will consist of Executive Sponsors, Project
Director(s), a Project Manager, a Business Lead, Technical Lead(s), and a Contract Manager. This project team structure establishes clear lines of authority, responsibility, and accountability necessary for the successful execution of CalWRAPP project activities. Each member of the project team will be assigned specific roles and responsibilities, and a single team member may serve in multiple roles as appropriate.
Table 10-1: State Roles and Responsibilities
PROJECT ROLE PROJECT RESPONSIBILITIES
State Water Board
Executive Sponsors
• Provide executive sponsorship and support for the Project.
• Establish Project goals and priorities.
• Support Project funding and resources, manage and address staffing and workload needs.
• Assume Project ownership of the CalWRAPP solution upon Full
System Acceptance and Transition to the State.
• Serve as key business decision-maker of the Project and provide decision-making authority.
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
PROJECT ROLE PROJECT RESPONSIBILITIES
• Provide the highest level of project review, policy leadership, and oversight as needed.
• Review and approve significant changes to project scope, budget, or schedule.
• Remove barriers, resolve and mediate issues, issue resolution,and scope changes that cannot be resolved by the
State Water Board’s Project Director.
• Participate in Steering Committee Meetings and other meetings as necessary.
• Inform/Engage control agencies and other stakeholders, as needed.
State Water Board
Project Director
• Ensure overall success of the Project by providing the requisite functionality, business value, and meeting the State Water
Board’s technical needs and environment.
• Communicate Project status to State Water Board’s
Management and State Water Board’s Executive Sponsors as needed.
• Provide a centralized structure to coordinate and manage the
Project, resources, activities, and communication using structured project management methodologies.
• Provide leadership to State staff assigned to manage Project teams.
• Determine if the CalWRAPP solution addresses the Project and associated program objectives.
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
PROJECT ROLE PROJECT RESPONSIBILITIES
• Monitor Project charter, plan, and performance.
• Resolve technical impediments or blockers.
• Monitor the planning, execution, and control of activities necessary to support the CalWRAPP solution.
• Participate in the identification, quantification, and mitigation of
Project risks.
• Participate in Steering Committee Meetings and other meetings as necessary.
• Act as liaison between the State Water Board and external stakeholders.
State Project
Management Contractor
• Coordinate and oversee day-to-day Project activities with the
Contractor and State Water Board’s Business Lead and serve as liaison to the Project teams.
• Conduct regular Project meetings to review Project status, performance indicators, changes, issues for resolution, bottlenecks, risk management activities, and assign and review action items for the Project team.
• Regularly communicate the Project status, issue status, and provide updates from the Contractor and Project team to the
State Water Board’s Executive Sponsors and the State Water
Board’s Project Director.
• Provide monthly and ad-hoc reporting to the State Water
Board’s Executive Sponsors and the State Water Board’s
Project Director regarding the following: deliverable status, (State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
PROJECT ROLE PROJECT RESPONSIBILITIES
Project work items, key performance schedule, bottlenecks, and resolution actions identified by the Project team and the
Contractor.
• Develop, update, and execute Project management plans and other project management-related deliverables. Facilitate, assign, and monitor actions assigned to the State Water Board’s
Special Projects Unit.
• Monitor the Contractor's performance to ensure compliance with the Agreement.
• Collaborate with the Contractor to maintain project management plans, institute governance controls, manage quality assurance to plans, schedules, deliverables, and participate in quality ad-hoc planning assurance and risk control.
• Collaborate with the Contractor to determine problems and issues, ensure changes are recorded, maintained, and tracked.
• Assist the State Water Board’s Project Director and State Water
Board’s Business Lead in resolving or escalating significant issues related to project management, communication, staffing, and scope.
• Assist with coordinating and leading recurring Steering
Committee Meetings and other meetings as necessary.
• Act as the liaison for communications with the CDT.
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
PROJECT ROLE PROJECT RESPONSIBILITIES
State Water Board
Business Lead
• Manage the Product Vision and Product Roadmap.
• Manage and prioritize the Product Backlog.
• Ensure the Development Team understands the items in the
Backlog.
• Make decisions on Sprint development, including defining the
Definition of Done for a Sprint and removing sprint impediments.
• Monitor and support the planning, execution, and control of program activities necessary to support the CalWRAPP solution.
• Determine and facilitate active and timely participation of business resources, including SME's (Subject-Matter Experts) and staff to participate in User Acceptance Testing.
• Manage scheduling, accountability, and transparency.
• Assist in resolving or escalating issues related to project management, communication, staffing, and scope.
• Provide guidance to the State Water Board’s Project Manager and the State Water Board’s Contract Manager.
• Identify and monitor the changes and impacts on existing and potentially new policies, standards, and procedures related to business needs.
• Manage stakeholder expectations and work with stakeholders through proper channels.
• Act as liaison between the State Water Board and its external stakeholders, manage the relationship with
Advisory Groups.
• Participate in DESC Meetings and other meetings as necessary.
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
PROJECT ROLE PROJECT RESPONSIBILITIES
State Water Board
Technical Lead(s)
• Manage the technical direction and vision for the CalWRAPP solution.
• Coordinate the State Water Board’s Infrastructure Team activities to determine whether Project infrastructure and infrastructure services are planned, acquired, and made available as needed in collaboration with the Contractor.
• Report to the State Water Board’s Project Manager the status of the State Water Board’s Infrastructure Team deliverables, performance indicators, bottlenecks, and bottleneck resolution actions.
• Coordinate the configuration of technical environments.
• Ensure compliance with development and engineering standards.
• Resolve technical impediments or blockers.
• Coordinate resolution of policy, standards, and procedural issues related to business needs.
• Manage the release process.
• Participate in meetings as necessary.
State Water Board
Training Lead(s)
• Translates DWQ needs and staff capabilities.
• Advises all training and knowledge transfer planning, training materials and delivery for both internal and external users.
• Reviews the master training plan and the overall training approach and verifies methodology for end user and technical training.
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
PROJECT ROLE PROJECT RESPONSIBILITIES
• Confirms the training schedule prior to each release.
• Finalizes all training supporting material generation, including training guides, Frequently Asked Questions (FAQs), training surveys, etc. and supports the methods of distribution of said materials.
• Reviews analytics from training surveys and collaborates on any course corrections needed.
State Water Board
Contract Manager
• Provide oversight and tracking of the Contract and other project-related contracts.
• Participate in procurement activities and processes related to the
Contract.
• Monitor the Agreement to confirm compliance with the provisions, including SLA's.
• Maintain and manage contract documentation, change requests, and amendments.
• Determine whether products and services are in accordance with the contract, State Water Board standards, and the Project
Schedule.
• Escalate issues and concerns to the State Water Board’s Project
Manager.
• Track, review, and approve WOAs, DEDs, DADs, detailed specifications and design, and Project deliverables created by the Contractor.
• Process WOAs, purchase orders, invoices, and payments.
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
PROJECT ROLE PROJECT RESPONSIBILITIES
• Confirm invoices reflect costs incurred to-date in the performance of the Contract and that costs are within applicable restrictions.
• Maintain information on contracted costs versus actual costs.
• Responsible for all interactions with the Contractors in the event of a contract or invoice dispute.
• Act as the liaison with CDT.
State Water Board
Infrastructure Team
• Assist the Project team as needed, including during planning, analysis, and development activities.
• Participate in technical architecture design with the Contractor.
• Coordinate implementation of technical architecture required for the CalWRAPP solution.
• Coordinate and oversee the setup and operation of the technical environment for the CalWRAPP solution.
• Oversee the configuration of the technical environments.
• Report to the State Water Board’s Technical Lead regarding the status of team deliverables, team performance indicators, bottlenecks, and bottleneck resolution actions, including the following:
o Unit, system, and integration tested network layer, o Support operational Project environment infrastructures
(servers, networks, software, etc.), o Confirm technical architecture meets State and State
Water Board’s standards, where applicable, and
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
PROJECT ROLE PROJECT RESPONSIBILITIES
o Participate in meetings as necessary.
California Department of
Technology (CDT)
• Approve agreements and agreement amendments for reportable information technology projects that exceed the Water Board’s delegated authority.
• Provide support and advice regarding project management activities and system development lifecycle best practices.
• Provide monthly project assessment to Steering Committee and other executive stakeholders.
• Identify project risks and mitigation strategies.
• Procure the Independent Verification and Validation (IV&V) ancillary procurement that is related to this Agreement.
Independent Verification
& Validation (IV&V)
Contractor
• Develop IV&V monthly activity reports.
• Conduct risk and issue list reviews.
• Perform traceability matrix analysis.
• Perform system requirements evaluation.
• Develop IV&V task reports.
11. CONTRACTOR’S ROLES AND RESPONSIBILITIES
1. The Contractor will provide its own equipment necessary to perform the required duties.
2. The Contractor will provide qualified Key Personnel and any auxiliary personnel necessary to complete the planning, design, development and implementation of deliverables outlined in the
Statement of Work.
3. The Contractor shall designate a primary contact person to whom all project communications may be addressed and who has the authority to act on all aspects of the services.
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
4. The Contractor has resources ready and available to engage in design, development and implementation services, beginning with the State Water Board's issuance of DED finalization and project planning immediately after the contract award.
5. The Contractor will maintain appropriate staffing levels during the planning, design, development, and implementation phases of the project.
6. Upon award, the Contractor will maintain appropriate staffing levels for the support of
Maintenance and Operations.
7. The Contractor's Key Personnel will attend and participate in Weekly Project Status meetings and provide written Weekly Project Status Reports.
8. The Contractor personnel shall perform their duties either onsite at State Water Board's
Headquarters or remotely, as directed by the State Water Board. Remote work is limited to within the boundaries of the United States, including Alaska and Hawaii.
9. When working remotely, the Contractor personnel should adhere to the State Water Board's
Telework Policies and Procedures and the Remote Access Procedures.
10. The Contractor will adhere to the State Water Board's departmental policies and procedures, guidelines and templates, including network and systems access and security requirements.
12. KEY STAFF QUALIFICATIONS AND SKILLS
Contractor is fully responsible for all necessary staffing resources to successfully implement the
CalWRAPP solution within the agreed upon schedule and to perform to the standards set forth in the
EXHIBIT A: STATEMENT OF WORK. As identified in this section, all proposed key staff must meet the minimum qualifications for the proposed classification throughout the term of this contract. The
Water Board reserves the right to request staff changes for staff assigned following the process defined in SECTION 13. KEY STAFF CHANGES.
1. Contractor Key Staff
The Contractor must provide the following fifteen (15) key staff, with requisite experience throughout the term of this Contract:
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
1. Engagement Director
2. Delivery Manager
3. Senior Project Manager
4. Technical Architect
5. Technical Lead
6. Senior Developer
7. Data Architect
8. Database Analyst
9. GIS Architect
10. GIS Developer
11. GIS System Administratoir
12. Testing Manager
13. Testing Engineer
14. Business Solutions Analyst
15. System Administrator
2. Key Staff Mandatory and Desirable Qualifications
KEY STAFF MANDATORY AND DESIRABLE QUALIFICATIONS AND EXPERIENCE
MANDATORY
QUALIFICATIONS
SCORING
BASIS
DESIRABLE
QUALIFICATIONS
SCORING BASIS
KEY STAFF #1 – ENGAGEMENT MANAGER/EXECUTIVE
1. EDUCATION
Bachelor’s degree in information technology, business administration, or related discipline from an accredited institution, PASS/FAIL 1. ADVANCED
EDUCATION
Masters or Doctorate degree in information technology, business administration, Five (5) Points per advanced degree.
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work or an equivalent combination of education and relevant experience.
The bidder shall submit a copy of the diploma with the proposal.
Four (4) years of experience can be substituted for a bachelor's degree. The substituted experience must be in addition to the required years of experience. Example: If the experience requirement is five (5) years, and the individual is substituting four (4) years of experience in lieu of a bachelor's degree, a total of nine (9) years of must be submitted to claim this qualification.
management, or related discipline from an accredited institution.
The bidder shall submit a copy of the diploma(s) with the proposal.
2. PROFESSIONAL
EXPERIENCE
Pass/Fail 2. PROFESSIONAL
EXPERIENCE
One (1) Point per year over five (5) years up to a
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
A minimum of five (5) years of direct project oversight and authority over ongoing relationships with clients where the firm has implemented enterprise solutions in excess of
$5,000,000.
One (1) or more additional years in direct project oversight and authority over ongoing relationships with clients where the firm has implemented enterprise solutions in excess of
$5,000,000.
Only include years beyond the Experience required under MQ #1.
maximum of five (5) points.
3. GOVERNANCE
AND EXECUTIVE
REPORTING
A minimum of five (5) years of experience establishing engagement governance, communicating project performance, facilitating management meetings, and escalating matters requiring executive decisions.
Pass/Fail 3. N/A N/A
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
MANDATORY
QUALIFICATIONS
SCORING
BASIS
DESIRABLE
QUALIFICATIONS
SCORING BASIS
KEY STAFF #2 - DELIVERY MANAGER
1. EDUCATION
Bachelor’s degree in information technology, business administration, or related discipline from an accredited institution, or an equivalent combination of education and relevant experience.
The bidder shall submit a copy of the diploma with the proposal.
Four (4) years of experience can be substituted for a bachelor's degree. The substituted experience must be in addition to the required years of experience. Example: If the experience requirement is five (5) years, and the individual is substituting four (4)
Pass/Fail 1. ADVANCED
EDUCATION
Masters or Doctorate degree in information technology, business administration, management, or related discipline from an accredited institution.
The bidder shall submit
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work years of experience in lieu of a bachelor's degree, a total of nine (9) years of must be submitted to claim this qualification.
2. PROFESSIONAL
CERTIFICATIONS
Certified as a Project
Manager Professional
(PMP) by the Project
Management Institute
(PMI).
Certifications must be active and not expire by the time of proposal submission.
The bidder shall submit a copy of the PMP certificate with the proposal.
Pass/Fail 2. PROFESSIONAL
CERTIFICATIONS
Certified as a Certified
Scrum Master (CSM) by the Scrum Alliance.
Certifications must be active and not expire by the time of proposal submission.
The bidder shall submit a copy of the CSM certificate with the proposal.
Five (5) Points for the certification
3. RELEVANT
EXPERIENCE
A minimum of five (5) years of experience in IT
Pass/Fail 3. RELEVANT
EXPERIENCE
Over five (5) years of experience in IT project
One (1) Point per year over five (5) years up to a
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work project delivery, including three (3) years managing implementation teams and delivery activities for complex IT projects with a minimum budget of
$5,000,000.
delivery, including three years managing implementation teams and delivery activities for complex IT projects.
Only include years beyond the experience required under MQ #3.
maximum of five (5) points.
4. PUBLIC SECTOR
EXPERIENCE
Number of years of experience in a Delivery
Manager role for a State of California Information
Technology Project.
One (1) Point per year up to a maximum of five (5) points
MANDATORY
QUALIFICATIONS
SCORING
BASIS
DESIRABLE
QUALIFICATIONS
SCORING BASIS
KEY STAFF #3 – SENIOR PROJECT MANAGER
1. EDUCATION
Bachelor’s degree in information technology, business administration, or related discipline from an accredited institution, or an equivalent
Pass/Fail 1. ADVANCED
EDUCATION
Masters or Doctorate degree in information technology, business administration, management, or related
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work combination of education and relevant experience.
The bidder shall submit a copy of the diploma with the proposal.
Four (4) years of experience can be substituted for a bachelor's degree. The substituted experience must be in addition to the required years of experience. Example: If the experience requirement is five (5) years, and the individual is substituting four (4) years of experience in lieu of a bachelor's degree, a total of nine (9) years of must be submitted to claim this qualification.
discipline from an accredited institution.
The bidder shall submit a copy of the diploma(s) with the proposal.
2. PROFESSIONAL
CERTIFICATIONS
Pass/Fail 2. N/A
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
Certified as a Project
Manager Professional
(PMP) by the Project
Management Institute
(PMI).
Certified as a Certified
Scrum Master (CSM) by the Scrum Alliance
Both certifications must be active and not expire by the time of proposal submission.
The bidder shall submit a copy of the PMP and
CSM certificates with the proposal.
3. RELEVANT
EXPERIENCE
A minimum of seven (7) years of Full-Time
Equivalent (FTE) experience as the Project
Manager on one (1) or more system integration project with a project
Pass/Fail 3. RELEVANT
EXPERIENCE
Over seven (7) FTE years of IT project experience as a Project
Manager on a system integration project with
One (1) Point per year over seven (7) years up to a points.
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work budget of $5,000,000 or more.
a project budget of
$5,000,000 or more.
Only include years beyond the experience required under MQ #3.
4. PUBLIC SECTOR
EXPERIENCE
N/A 4. PUBLIC SECTOR
EXPERIENCE
Number of years of experience in a Project
Manager role for a
State of California
Information Technology
Project.
One (1) Point per year up to a maximum of five (5) points
MANDATORY
QUALIFICATIONS
SCORING
BASIS
DESIRABLE
QUALIFICATIONS
SCORING BASIS
KEY STAFF #4 – TECHNICAL ARCHITECT
1. EDUCATION
Bachelor’s degree in information technology, business administration, or related discipline from an accredited institution, or an equivalent
Pass/Fail 1. ADVANCED
EDUCATION
Masters or Doctorate degree in information technology, business administration, management, or related
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work combination of education and relevant experience.
The bidder shall submit a copy of the diploma with the proposal.
Four (4) years of experience can be substituted for a bachelor's degree. The substituted experience must be in addition to the required years of experience. Example: If the experience requirement is five (5) years, and the individual is substituting four (4) years of experience in lieu of a bachelor's degree, a total of nine (9) years of must be submitted to claim this qualification.
discipline from an accredited institution.
The bidder shall submit a copy of the diploma(s) with the proposal.
2. PROFESSIONAL
CERTIFICATIONS
Pass/Fail 2. N/A N/A
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
Shall possess an
Enterprise Architecture
Certification in one or more industry-leading architecture frameworks, e.g. TOGAF, CISSP, CISM, CEAP Microsoft
Azure Solutions Architect
Expert.
Certifications must be active and not expire by the time of proposal submission.
The bidder shall submit a copy of the certification with the proposal.
3. RELEVANT
EXPERIENCE
A minimum of eight (8)
FTE years of experience in a lead role architecting enterprise solutions on IT project(s) with a project budget of $5,000,000 and one thousand
Pass/Fail 3. RELEVANT
EXPERIENCE
Over eight (8) FTE years of experience in a lead role architecting enterprise solutions on
IT project(s) with a project budget of
$5,000,000 and one
One (1) Point per year up to a points
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work
(1,000) or more end users.
thousand (1,000) or more end users.
Only include years beyond the experience required under MQ #3.
4. PUBLIC SECTOR
EXPERIENCE
N/A 4. PUBLIC SECTOR
EXPERIENCE
Number of FTE years as a Technical Architect working on a State of
California Information
Technology Project.
One (1) Point per year up to a maximum of five (5) points
MANDATORY
QUALIFICATIONS
SCORING
BASIS
DESIRABLE
QUALIFICATIONS
SCORING BASIS
KEY STAFF #5 – TECHNICAL LEAD
1. EDUCATION
N/A
Bachelor’s degree in information technology, business administration, or related discipline from an accredited institution, or an equivalent combination of education and relevant experience.
Five (5) Points for a
Bachelor's degree.
(State Water Board)
Pre-Solicitation Number: 0000040884 Statement of Work