6-EXHIBIT D - PROJECT LIST.pdf
PDF 40 KB Posted
- Attached to
- Design Services for Charlie J. Cole Building
- Solicitation number
- RFSQ #25-2849
- Issued by
- Denton County, Texas
About this file
Exhibit D is a project list detailing maintenance and infrastructure upgrades for a detention facility, covering fiscal years 2026-2030. The comprehensive project plan includes multiple critical infrastructure improvements, such as substructure concrete foundation repairs, detention door frame replacements, HVAC upgrades, ductwork cleaning, exterior woodwork staining, interior lighting fixture replacements in detention areas, security system access control design, and domestic water and fire suppression projects. The projects are strategically phased across multiple fiscal years, with significant focus on detention facility infrastructure renewal and safety systems.
The project list demonstrates a structured multi-year capital improvement approach, with recurring investments in lighting fixtures and progressive implementation of water and fire suppression system upgrades. The domestic water and fire suppression project is specifically planned in two phases (Phase I in FY2026 and Phase II in FY2027), indicating a methodical approach to complex infrastructure improvements. The security system access control system renewal and design costs are also integrated into the FY2026 planning, suggesting a comprehensive approach to facility modernization and safety enhancement. While specific budget allocations are not detailed in this exhibit, the systematic multi-year planning indicates a deliberate, long-term capital investment strategy for the detention facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT D
PROJECT LIST
EXHIBIT D – PROJECT LIST
FY2026
Substructure – Concrete Foundation Damaged
Detention Door Frames HVAC Upgrades/Replacement Ductwork Cleaning and Testing
Exterior Facia and Woodwork Staining Lighting Fixtures – Interior – Detention Fixtures
Security System – Access Control System Renewal – Design Costs Domestic Water and Fire Suppression Project – Phase I
Domestic Water and Fire Suppression Project – Design Costs
FY2027
Lighting Fixtures – Interior – Detention Fixtures Domestic Water and Fire Suppression Project – Phase II
FY2028
Lighting Fixtures – Interior – Detention Fixtures
FY2029
Lighting Fixtures – Interior – Detention Fixtures
FY2029
Lighting Fixtures – Interior – Detention Fixtures
FY2030
Lighting Fixtures – Interior – Detention Fixtures
| EXHIBIT D - PROJECT LIST |
| Cover Sheet |
| EXHIBIT D |
EXHIBIT D