This document is a Schedule of Values form from the Gila River Indian Community Department of Community Housing for ten residential construction projects located in Arizona. The projects involve lead, asbestos, and mold testing and abatement, partial demolition, and renovation of low-rental housing units across multiple sites in Laveen and Chandler, Arizona. The ten units consist of six four-bedroom homes and four three-bedroom homes, identified by HUD project numbers and bid numbers (#113, #114, #118, #217, #218, #230, #245, #246, #301, and #328). General contractors are required to complete the Schedule of Values by itemizing costs for all applicable work categories, including site preparation, architectural and engineering services, environmental services, construction, administration, insurance, and profit.

The Schedule of Values establishes a standardized bidding framework with predetermined allowances for specific line items and "no fee" designations for items to be provided at no cost by the Gila River Indian Community. Lead and asbestos testing, abatement, and reporting carry an $8,000 allowance for each unit. Many site preparation and architectural/engineering services are designated as "no fee," including mobilization, site setup, rock import, civil engineering, landscape design, and structural engineering. Contractors must populate blank dollar amount columns for all applicable work items within each of the seven major cost categories. The form reserves columns for Gila River Indian Community internal use only, indicating threshold dollar marks for evaluation purposes. The document does not specify bid deadlines, award dates, or contract terms within the provided schedules.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GILA RIVER INDIAN COMMUNITY

DEPARTMENT OF COMMUNITY HOUSING

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

Date:

Bid Number:

Company Name:

Company Address

Schedule of Values

AZ Number: HUD AZ 15-6 #113 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Three (3)

Physical Address:

4644 W. Sundust Circle Laveen, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services $ No fee noted at #8 site preparation $

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

2 Lead and Asbestos Testing $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No feee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet paper holders Mirrors and Hardware. $ $

27 Bathroom Handicap Grab Bars $ $

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

28 Washer $No fee $ 29 Dryer $No fee $ 30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

65 Final Cleaning of unit (Include pressure wash sidewalks, driveway, patio and carport) $ $

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

66 Stove $ $ 67 Refrigerator $ $ 68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $ $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

AZ Number: HUD AZ 15-6 #114 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Four (4)

Physical Address:

4631 W. Sundust Circle Laveen, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

2 Lead and Asbestos Testing $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No feee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

28 Washer $No fee $ 29 Dryer $No fee $ 30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

66 Stove $ $ 67 Refrigerator $ $ 68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $ $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

AZ Number: HUD AZ 15-6 #118 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Four (4)

Physical Address:

4641 W. Sundust Circle Laveen, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

2 Lead and Asbestos Testing $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No feee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

28 Washer $No fee $ 29 Dryer $No fee $ 30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

66 Stove $ $ 67 Refrigerator $ $ 68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $ $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

AZ Number: HUD AZ 15-33 #217 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Three (3)

Physical Address:

2332 N. Gila Butte Circle Chandler, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

2 Lead and Asbestos Testing $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No feee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

28 Washer $No fee $ 29 Dryer $No fee $ 30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

66 Stove $ $ 67 Refrigerator $ $ 68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $No fee $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

AZ Number: HUD AZ 15-33 #218 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Four (4)

Physical Address:

2481 W. Gila Butte Circle Chandler, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

2 Lead and Asbestos Testing $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No feee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

28 Washer $No fee $ 29 Dryer $No fee $ 30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $ $ 38 Roofing underlayment and Valley flashing $ $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $ $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

66 Stove $ $ 67 Refrigerator $ $ 68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $No fee $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

AZ Number: HUD AZ 15-33 #230 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Four (4)

Physical Address:

2431 W. Gila Butte Circle Chandler, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

2 Lead and Asbestos Testing $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No feee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

28 Washer $No fee $ 29 Dryer $No fee $ 30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

66 Stove $ $ 67 Refrigerator $ $ 68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $No fee $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

AZ Number: HUD AZ 15-33 #245 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Four (4)

Physical Address:

2428 W. Gila Butte Circle Chandler, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

2 Lead and Asbestos Testing $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No feee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

28 Washer $No fee $ 29 Dryer $No fee $ 30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

66 Stove $ $ 67 Refrigerator $ $ 68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $No fee $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

AZ Number: HUD AZ 15-33 #246 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Four (4)

Physical Address:

2420 W. Gila Butte Circle Chandler, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

2 Lead and Asbestos Testing $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No feee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

28 Washer $No fee $ 29 Dryer $No fee $ 30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

66 Stove $ $ 67 Refrigerator $ $ 68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $No fee $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

AZ Number: HUD AZ 15-16 #301 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Three (3)

Physical Address: 16630 S. Lewis Drive Laveen, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00 Allowance for testing, reporting and abatement. $

9 Other Service Charges $No fee $

Architectural and Engineering Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark 1 Architectural Services $No fee $ 2 Civil Engineering $ No fee $ 3 Landscape $ No fee $ 4 Structural Engineering $ No fee $ 5 Mechanical and Plumbing $ No fee $ 6 Electrical $ No fee $ 7 Other Service Charges $ No fee $

Environmental Services Gila River Indian Community use only Leave these columns blank

(Threshold dollar mark

1 Environmental Services

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

2 Lead and Asbestos Testing $ No fee noted at #8 site preparation $

3 Mold Testing $ No fee noted at #8 site preparation $

4 Field Reporting $ No fee noted at #8 site preparation $

5 Other Service Charges $ No fee $

Construction:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Demolition, Dumpsters and Port-a-Jons $No fee noted at #5 site preparation $

2 Earth Work/Soil Import $No fee $ 3 Termite Pre-Treatment $ $

4 Post Tension Slab, Slab on grade or Footer stem foundation $No fee $

5 Masonry/Stone Block Cost $ No fee $ 6 Masonry/Stone Installation w/all hardware $ No fee $

7 Lath, Stucco Netting, Corner Bead, weather barrier and fasteners $No fee $

8 Three (3) Coat Stucco Application (Brown, scratch and finish) $No fee $

9 Rough Frame Lumber Cost $ $ 10 Rough Frame $ $ 11 Trim Carpentry and Mill work $ $ 12 Doors $ $

13 Concrete driveway or ¾” Rock Delivery for driveway. $No fee $

14 Landscaping $ No fee $ 15 Post Physical Address $ $ 16 Mail Box Installation $ No fee $ 17 Driveway and Sidewalk Improvement $ $ 18 Survey $No feee $ 19 Testing, Certifications and Third Party $No fee $

20 Clothe Line installation and Chain link fence installation $ $

21 Back Splash $ $ 22 Bathroom Bathtub(s) w/curtain $ $ 23 Shower stall(s) w/curtain $ $ 24 Vanities w/sinks $ $ 25 Toilet Bowls $ $

26 Bathroom Accessories: Towel bars, Toilet

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

28 Washer $No fee $ 29 Dryer $No fee $ 30 Plumbing Sub Rough In w/ Rough In $ $ 31 Plumbing Trim out $ $ 32 Hot Water Heater $ $ 33 Septic Tank Cost $No fee $ 34 Septic Tank Installation $No fee $

35 New Water and Sewer Service Taps w/Laterals $No fee $

36 New Water Meter w/Box and cover $ $ 37 Roofing asphalt shingles $No fee $ 38 Roofing underlayment and Valley flashing $No fee $

39 Roofing drip edge, fasteners, roofing jacks and T-Tops $No fee $

40 Rain Gutters $No fee $ 41 Skylights/Solar Tubes $ No fee $ 42 Electrical Rough In $ $ 43 Electrical Trim Out $ $ 44 Electrical SES Panel $ $

45 New Electrical Service Overhead/Underground $ $

46 Rough In Low Voltage $ $ 47 Trim Out Low Voltage $ $ 48 Low Voltage Panel $ $ 49 Kitchen Countertops w/sink $ $ 50 Kitchen Cabinets and Hardware $ $ 51 Kitchen Range Hood $ $ 52 Batt Insulation $ $ 53 Blown Insulation $ $ 54 Poly foam Insulation $ No fee $ 55 Windows $ $ 56 Window Blinds/Curtain $ $ 57 Solar Window Screens $No fee $ 58 Drywall $ $ 59 Interior Painting $ $ 60 Exterior Painting $ $ 61 Flooring $ $ 62 Medicine Cabinets $ $ 63 Fire Extinguisher $ $ 64 As Built with O&M Manual(s) $ $

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

66 Stove $ $ 67 Refrigerator $ $ 68 Range Hood

$No fee noted at #51 Construction $

69 HVAC Rough In $ $ 70 HVAC Trim $ $ 71 HVAC Unit $ $ 72 Other Service Charges $No fee $

Administration and Insurance Cost:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Construction Personal, Administrative and General Conditions $ $

2 Bond $ $ 3 Liability Insurance $ $ 4 Builder Risk Insurance $ $ 5 Other Service Charges $ No fee $

Company Profit:

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 $ $

Total Cost for Construction and Profit:

Gila River Indian Community use only

Leave these columns blank

Main Office PO BOX 528 * Sacaton, AZ 85247 * (520) 562-3904 * Fax (520) 562-3927 * Maintenance Warehouse (520) 315-3450

Fax (520) 315-3453 * Construction Office (520) 315-3457 * Fax (520) 315-1354 * West End Office (520) 550-2648 * Fax (520) 550-3219

AZ Number: HUD AZ 15-16 #328 Scheduled of Values:

To be completed by General Contractor.

Note: All line items that apply must be completed within the Schedule.

Number of Bedrooms: Three (3)

Physical Address: 16697 S. Lewis Drive Laveen, AZ

Site Preparation:

Dollar amount must be completed that apply.

Gila River Indian Community use only

Leave these columns blank (Threshold dollar mark)

1 Draw Permit $ $ 2 Mobilization $ $

3 Site Setup Trailer(s) w/Temp Power and Construction Storage Unit(s) $No fee $

4 Security Fence $ $ 5 Port-a-Jon, Dumpsters, Handicap Parking $ $ 6 Construction Signage $ $ 7 Rock Import (Tracking) $No fee $

8 Lead & Asbestos Testing, Abatement and Reporting

$8,000.00…