6-Attachment C - Price Sheet.pdf
PDF 215 KB Posted
- Attached to
- Inspection and Materials Testing Services for the Detroit Water and Sewerage Department (DWSD)
- Solicitation number
- 547791
- Issued by
- Wayne County, Detroit City, Michigan
About this file
This pricing sheet attachment is part of a Request for Proposals issued by the City of Detroit Office of Contracting and Procurement on behalf of the Housing and Revitalization Department in conjunction with the Detroit Water and Sewerage Department (DWSD) for inspection and materials testing services for DWSD construction projects under the Alley Sewer Repair Program in Michigan. The RFP solicits proposals from qualified respondents to provide inspection field supervision, project engineering, surveying, and materials testing services. The pricing form requires respondents to submit detailed labor rates for both prime consultants and subconsultants, including individual team member names, job titles, direct hourly labor rates, and overhead rates including profit markups. Materials testing services are solicited for six specific test types including nuclear density testing, slump testing, air content testing, yield testing, compressive cylinder strength testing, and asphalt testing, with unit costs and markup multipliers to be provided for each test category.
The pricing terms prohibit any annual escalation for the entire duration of the contract, with no escalation allowed throughout the project's life. Prime consultants may propose a markup rate on subconsultants not to exceed five percent, while a separate markup rate on subconsultants is to be proposed on the pricing form. The pricing sheet requires respondents to provide costs for both payment and performance bonds. This is a grant-funded project, and Professional Engineers on team rosters must be identified with a P.E. designation. The document specifies that all costs, labor rates, and materials testing unit costs must be submitted in the designated format with calculations showing direct costs, overhead rates, and total hourly or unit rates for evaluation and contract pricing purposes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C
PRICE SHEET
Request for Proposals Contract No.
RFQ No. 547791
PRICING FORM
PRIME CONSULTANT: _____________________________________________
INSPECTION SERVICES:
For each project team member:
1. Show the individual name (column A) and job title (column B) of each person who may be charged directly to work under this contract and the corresponding hourly rate paid (column C).
2. Show the corresponding overhead rate including profit markup. (Column D).
3. No annual escalation allowed throughout the entire duration of this project.
4. Propose Engineer's mark-up rate on subconsultants shall not exceed five percent (5%). (see bottom row of this form). The Engineer's mark-up rate should be applied to the
A B C D E
(E = C + D)
Item No. NAME TITLE
HOURLY RATE
(Direct Labor)
OVERHEAD RATE
(Indirect Labor + Profit Mark-Up)
TOTAL HOURLY
RATE
1 $ $ $
2 $ $ $
3 $ $ $
4 $ $ $
5 $ $ $
6 $ $ $
7 $ $ $
8 $ $ $
9 $ $ $
10 $ $ $
PROPOSED ENGINEER'S MARK-UP ON SUBCONSULTANTS _______%
SUBCONSULTANT:_____________________________________________
INSPECTION SERVICES:
For each project team member:
1. Show the individual name (column A) and job title (column B) of each person who may be charged directly to work under this contract and the corresponding hourly rate paid (column C).
2. Show the corresponding overhead rate including profit markup (Column D).
3. No annual escalation allowed throughout the entire duration of this project.
4. If an individual team member is a Professional Engineer (P.E.), please add to their name in column A.
A B C D E
(E = C + D)
Item No. NAME TITLE
HOURLY RATE
(Direct Labor)
OVERHEAD
RATE (Indirect Labor + Profit
Mark-up)
TOTAL HOURLY
RATE
1 $ $ $
2 $ $ $
3 $ $ $
4 $ $ $
5 $ $ $
6 $ $ $
7 $ $ $
8 $ $ $
9 $ $ $
10 $ $ $
INSPECTION FIELD SUPERVISION AND PROJECT ENGINEERING FOR DWSD CONSTRUCTION PROJECTS
For each project team member:
1. Show the individual name (column A) and job title (column B) of each person who may be charged directly to work under this contract and the corresponding hourly rate paid (column C).
2. Show the corresponding overhead rate including profit markup (Column D).
3. No annual escalation allowed throughout the entire duration of this project.
4. If an individual team member is a Professional Engineer (P.E.), please add to their name in column A.
NO. A B C F E+F
NAME
CLASSIFICATIONS
HOURLY RATE
OVERHEAD
RATE (Indirect Labor + Profit
Mark-up)
TOTAL
HOURLY
RATE
1 NA
INSPECTION, SURVEYING AND MATERIALS TESTING SERVICES FOR DWSD
CONSTRUCTION PROJECTS
MATERIALS TESTING:
For Each project test unit:
State the direct unit cost and profit markups (column C, D and F, respectively) proposed to be applied to each test under this contract.
NO.
A B C D E
(E = C x D)
F G
(G = E + F)
NAME OF THE TESTING
MINIMUM
REQUIREMENTS UNIT COST MULTIPLIER MARK UP TOTAL COST
Nuclear Density Test (including all incidental and labor) ASTM D 2922 EA
Slump Test (including all incidental and labor)
ASTM C 143 EA
Air Content Test (including all incidental and labor)
ASTM C183 or
C231 EA
Yield Test (including all incidental and labor)
ASTM C31 EA
5 Compressive Cylinder Strength Test EA 6 Asphalt Test EA
DWSD PROHIBITS ANY ESCALATION FOR THE LIFE OF THIS CONTRACT
PROPOSED PRIME CONSULTANT MARK-UP RATE ON
SUBCONSULTANTS %
NO.
Type of Bond Total Cost
PAYMENT BOND
PERFORMANCE BOND
File details come from the government source that posted it. Updated .