6-Addendum 1.pdf

PDF 118 KB Posted

Attached to
Moshannon Community Center Paving Project 2025-5
Solicitation number
US.191880
Issued by
Centre County, South Pottstown CDP, Pennsylvania

About this file

Addendum 1 for the Snow Shoe Township Black Bear Road Rehabilitation Project, dated June 5, 2025, provides clarification and additional details for a road rehabilitation project. The addendum specifies that 2A aggregate shall be placed beginning at the intersection of Kato Road and Black Bear Road, proceeding south, with surface preparation performed by the Township. The project involves aggregate placement at an 8" depth at the roadway centerline, tapering toward the shoulders to maintain a 5% cross slope, and will create an 18' cartway width. The Township has provided an Access Map for material hauling and coordinated access to various roads.

The addendum includes an optional bid table with estimated quantities for additional services, including 24 hours of backhoe and operator time and 48 hours of general laborer time. These optional services may include re-grading shoulders/roadside ditches, seeding and mulching disturbed areas, placement of rip rap, excavation and re-setting of roadway cross pipes, installation of flared end sections, and removal/replacement of existing jersey barrier. All necessary materials will be furnished by Snow Shoe Township, and pricing should include mobilization and demobilization. The Township is requesting optional pricing for aggregate placement using a paver and hourly rates for equipment and labor.

View the file

Other files

File Type Posted
1-Black Bear Road Prevailing Wage Determination.pdf PDF
2-Black Bear Road Location Map.pdf PDF
3-Bidder Acknowledgements (Q-26PW) (6).xlsx XLSX spreadsheet
5-Black Bear Road Access Map.pdf PDF
4-MS-944 (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 1

BLACK BEAR ROAD REHABILITATION PROJECT

BID ADDENDUM 1

JUNE 5, 2025

Addendum 1 to the Snow Shoe Township Black Bear Road Rehabilitation Project consists of three (3) pages, pages 1 and 2 of 2 plus the provided Access Map.

Addendum 1 has been issued to clarify that the 2A aggregate shall be placed beginning at the intersection of Kato Road and Black Bear Roads, and proceeding south on Black Bear Road. Surface preparation shall be performed by the Township. A paving notch shall be installed at the beginning and end of aggregate placement according to Dirt and Gravel Road DSA application standards to ensure that aggregate remains in place. General Aggregate placement will be at an 8” depth at the centerline of the roadway, tapering toward the shoulder to maintain a 5% roadway cross slope/side slope or crown slope, as directed by the Township. Placement of the aggregate shall be as directed by the Township, with additional aggregate placed in selected areas such as pipe crossings. Placement shall maintain an 18’ cartway width, which is less than the existing cartway width. Placement of aggregate material for shoulders shall be as directed by the Township. Placement of aggregate will begin at the intersection described above, and progress south until the plan quantity has been reached.

Aggregate may be placed tailgating and grooming with a road grader or other method as approved by the Township. Material shall be placed in a single 6-8 inch loose lifts or layers. After placement, the material shall be compacted using a minimum ten-ton vibratory roller and be compacted to a minimum of 95% of the dry-mass (dry-weight) density according to ASTM D698, Procedure C, Standard as determined by pre-sampling (refer to Materials, Section III.D). The Township or its designated representative, reserves the right to determine the in-place moisture and density according to ASTM D6938.

The Access Map has been provided to illustrate the Township’s preferred route for hauling of materials to the project site. Snow Shoe Township has coordinated with the private owner of Water Trough Road, and will provide maintenance of that roadway as needed. The Contractor shall not need to coordinate for use of that roadway beyond notifying Snow Shoe Township 1-2 days prior to the start of hauling. Snow Shoe Township will not require bonding or a maintenance agreement for the use of either Rusnak Hill Road or Black Bear Road, both of which are dirt and gravel roads. Should the Contractor wish to use Pancake Road or other paved Township roadways, the Contractor shall coordinate with Snow Shoe Township.

An optional bid table has been provided below for optional items that may or may not be requested by the Contractor. Submission of pricing of these options is not mandatory. Snow Shoe Township is requesting prices for placement of 2A aggregate using a paver as an optional item. The Township is also requesting pricing for the use of a backhoe and operator and general laborer on an hourly basis. The equipment, operator, and laborer may be used for the following: re-grading of shoulders/roadside ditches/turnouts;

seeding, application of fertilizer, and mulching of disturbed areas; placement of rip rap; excavation and re-setting of three existing roadway cross pipes to meet shallow cross pipe requirements for dirt and gravel roads; installation of three flared end sections; and removal and replacement of existing jersey barrier on compacted aggregate base. All necessary materials will be furnished by Snow Shoe Township. All prices shall include mobilization and demobilization.

Addendum 1

ITEM ESTIMATED

QUANTITY

UNIT UNIT PRICE

Backhoe and Operator 24 Hours

General Laborer 48 Hours