6-5-DA27008-26190550 Approved COMcheck.pdf
PDF 1 MB Posted
- Solicitation number
- DA27008-Stage II
- Issued by
- Utah
About this file
This is an Approved COMcheck document related to a Stage II Invitation to Bid issued by the Utah Department of Public Safety for construction services on the Central Evidence Warehouse project. The project involves the design and construction of a new single-story facility with approximately 18,599 square feet located in Utah. Only contractors who were short-listed during the Stage I Request for Proposals process are eligible to submit bids for this multistage selection process. The document serves as an energy code compliance verification, confirming that the project design meets applicable energy efficiency standards and building code requirements necessary for bid submission and project advancement.
The construction cost estimate for the Central Evidence Warehouse project is $11,300,000.00. The COMcheck approval documented in this file is a prerequisite component for the Stage II bidding process, ensuring that all submissions meet the state's energy compliance requirements before contractors can proceed with their bid proposals. This compliance verification is essential to the competitive bidding phase and protects the integrity of the selection process by confirming that the project design adheres to established energy codes and standards prior to cost estimation and final bid evaluation by the Department of Public Safety.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 1 of 31
Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Project No:
Project Sub Type:
All Electric:
Is Renewable:
Has Battery:
Has Charger:
Has Heat Pump
2024 IECC
DPS Evidence Warehouse South Salt Lake, Utah 5b New Construction 155589 New Building/Complete false false false false true
Construction Site: Owner/Agent: Designer/Contractor:
4465 South 2600 West Taylorsville , Utah 84129
UTAH DEPARTMENT OF PUBLIC SAFETY
4501 South 2700 West Taylorsville , Utah 84129
GSBS Architects 375 W 200 S Salt Lake City , Utah 84101
Notes:
Energy Credits
Description Credit
E01 Improved envelope performance ASHRAE 90.1 Appendix C 0.0
L06 Reduced lighting power 32.0
H03 More efficiency HVAC cooling equipment and fan performance 4.0
H02 More efficient HVAC equipment heating performance 124.0
W02 Heat pump water heater 4.0
W08 Water-heating system submeters 0.0
P01 Energy monitoring 5.0
Credits: 82.0 Required 169.0 Proposed
Renewable energy
Number of Floors:
Area of Three Largest Floors:
Proposed Capacity:
Required Capacity:
Proposed Off-site Energy:
Required Off-site Energy:
Exception:
19753 14815 None
Renewables Pass
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 2 of 31
Building Area
Description Floor Area
1-Warehouse (Warehouse) : Nonresidential 19753
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 3 of 31
Envelope Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Vertical Glazing / Wall Area:
Project Sub Type:
2024 IECC
DPS Evidence Warehouse South Salt Lake, Utah 5b New Construction 0.129 New Building/Complete
Construction Site: Owner/Agent: Designer/Contractor:
4465 South 2600 West Taylorsville , Utah 84129
UTAH DEPARTMENT OF PUBLIC SAFETY
4501 South 2700 West Taylorsville , Utah 84129
GSBS Architects 375 W 200 S Salt Lake City , Utah 84101
Envelope Assemblies
Assembly Gross Area or Perimeter
Cavity R- Value
Cont.
R- Value
Proposed U-Factor
Budget U- Factor
Roof:Roof 10, Other, [Bldg. Use 1 - Warehouse] (b) 319 --- --- 0.033 0.035
Roof:Roof 09, Other, [Bldg. Use 1 - Warehouse] (b) 208 --- --- 0.033 0.035
Roof:Roof 08, Other, [Bldg. Use 1 - Warehouse] (b) 297 --- --- 0.033 0.035
Roof:Roof 07, Other, [Bldg. Use 1 - Warehouse] (b) 313 --- --- 0.033 0.035
Roof:Roof 06, Other, [Bldg. Use 1 - Warehouse] (b) 4868 --- --- 0.033 0.035
Roof:Roof 05, Other, [Bldg. Use 1 - Warehouse] (b) 1965 --- --- 0.033 0.035
Roof:Roof 04, Other, [Bldg. Use 1 - Warehouse] (b) 1631 --- --- 0.033 0.035
Roof:Roof 03, Other, [Bldg. Use 1 - Warehouse] (b) 2299 --- --- 0.033 0.035
Roof:Roof 02, Other, [Bldg. Use 1 - Warehouse] (b) 1235 --- --- 0.033 0.035
Roof:Roof 01, Other, [Bldg. Use 1 - Warehouse] (b) 6733 --- --- 0.033 0.035
Floor:Floor, Unheated Slab-On-Grade, Vertical 3 ft., [Bldg. Use 1 - Warehouse] (d)
19192 --- 15.00 0.480 0.520
NORTH
Ext Wall:N 04 Vehicle Storage, Masonry, Normal Density, Furring:
None, [Bldg. Use 1 - Warehouse]
156 --- 16.00 0.055 0.090
Window:Transom above 107B, Metal Frame with Thermal Break, Perf. Specs.: Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
13 --- --- 0.650 0.340
Door:Door 107B, Insulated Metal, Swinging, [Bldg. Use 1 - Warehouse]
24 --- --- 0.470 0.370
Ext Wall:N 03 Cooler, Masonry, Normal Density, Furring: None, [Bldg.
Use 1 - Warehouse]
320 --- 16.00 0.055 0.090
Ext Wall:N 02.2 Sallyport, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]
794 --- 16.00 0.055 0.090
Window:Transom above 116A, Metal Frame with Thermal Break, Perf. Specs.: Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
13 --- --- 0.650 0.340
Door:Door 116A, Insulated Metal, Swinging, [Bldg. Use 1 - Warehouse]
24 --- --- 0.470 0.370
Door:Door 116B, Other, Garage door < 14% glazing, [Bldg. Use 1 - Warehouse]
144 --- --- 0.125 0.310
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 4 of 31
Assembly Gross Area or Perimeter
Cavity R- Value
Cont.
R- Value
Proposed U-Factor
Budget U- Factor
Ext Wall:N 02.1 Hallway, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]
69 0.00 8.00 0.092 0.055
Window:CW 05, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 1.20, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
45 --- --- 0.340 0.340
Ext Wall:N 01.2 Workstation, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]
805 0.00 8.00 0.092 0.055
Window:CW 03, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
280 --- --- 0.340 0.340
Window:CW 02, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
59 --- --- 0.340 0.340
Window:CW 04A, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
64 --- --- 0.340 0.340
Ext Wall:N 01.1 Workstation, Masonry, Normal Density, Furring:
Metal, [Bldg. Use 1 - Warehouse]
512 0.00 16.00 0.053 0.090
Ext Wall:Clerestory N 04, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]
32 0.00 15.00 0.056 0.055
Window:CS01C, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 1.00, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
14 --- --- 0.340 0.340
Ext Wall:Clerestory N 01, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]
38 0.00 15.00 0.056 0.055
Window:CS02C-1, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 0.80, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
18 --- --- 0.340 0.340
Ext Wall:Clerestory N 02, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]
35 0.00 15.00 0.056 0.055
Window:CS02C-2, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 0.80, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
18 --- --- 0.340 0.340
Ext Wall:Clerestory N 03, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]
35 0.00 15.00 0.056 0.055
Window:CS02C-3, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 0.80, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
18 --- --- 0.340 0.340
EAST
Ext Wall:E 04 Vehicle Storage, Masonry, Normal Density, Furring:
None, [Bldg. Use 1 - Warehouse]
408 --- 16.00 0.055 0.090
Door:Door 107A, Other, Garage door < 14% glazing, [Bldg. Use 1 - Warehouse]
192 --- --- 0.125 0.310
Ext Wall:E 03 Vehicle bay, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]
900 --- 16.00 0.055 0.090
Window:Transom above 108B, Metal Frame with Thermal Break, Perf. Specs.: Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
13 --- --- 0.650 0.340
Window:CW 08, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 1.09, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
128 --- --- 0.340 0.340
Door:Door 108C, Other, Garage door < 14% glazing, [Bldg. Use 1 - Warehouse]
144 --- --- 0.125 0.310
Door:Door 108B, Insulated Metal, Swinging, [Bldg. Use 1 - Warehouse]
24 --- --- 0.470 0.370
Door:Door 110A, Perf. Specs.: Product ID , SHGC 0.29, PF 1.09, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
24 --- --- 0.340 0.630
Door:Door 109B, Other, Garage door < 14% glazing, [Bldg. Use 1 - Warehouse]
144 --- --- 0.125 0.310
Ext Wall:E 02 Sallyport, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]
1087 --- 16.00 0.055 0.090
Window:CW 06-1, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
48 --- --- 0.340 0.340
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 5 of 31
Gross Area or Perimeter
Cavity R- Value
Cont.
R- Value
Proposed U-Factor
Budget U- Factor
Window:CW 06-2, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
48 --- --- 0.340 0.340
Ext Wall:E 01 Break Room, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]
105 0.00 8.00 0.092 0.055
Window:CW 04B, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 3.40, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
73 --- --- 0.340 0.340
Ext Wall:Clerestory E 01, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]
60 --- 15.00 0.058 0.090
Ext Wall:Clerestory E 02, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]
100 --- 15.00 0.058 0.090
Ext Wall:Clerestory E 03, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]
102 --- 15.00 0.058 0.090
Ext Wall:Clerestory E 04, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]
126 --- 15.00 0.058 0.090
SOUTH
Ext Wall:S 03 Sallyport, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]
544 --- 16.00 0.055 0.090
Window:CW 07, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 1.04, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
136 --- --- 0.340 0.340
Door:Door 116C, Other, Garage door < 14% glazing, [Bldg. Use 1 - Warehouse]
144 --- --- 0.125 0.310
Door:Door 116D, Perf. Specs.: Product ID , SHGC 0.29, PF 1.04, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
24 --- --- 0.340 0.630
Ext Wall:S 02 Storage + Vehicle Storage, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]
2158 --- 16.00 0.055 0.090
Door:Door 106A, Insulated Metal, Swinging, [Bldg. Use 1 - Warehouse]
32 --- --- 0.470 0.370
Ext Wall:S 01 Manager Office, Masonry, Normal Density, Furring:
Metal, [Bldg. Use 1 - Warehouse]
131 0.00 16.00 0.053 0.090
Ext Wall:Clerestory S 01, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]
36 --- 15.00 0.058 0.090
Ext Wall:Clerestory S 02, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]
35 0.00 15.00 0.056 0.055
Window:CS02A-1, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 0.84, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
17 --- --- 0.340 0.340
Ext Wall:Clerestory S 03, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]
35 0.00 15.00 0.056 0.055
Window:CS02A-2, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 0.84, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
17 --- --- 0.340 0.340
Ext Wall:Clerestory S 04, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]
34 0.00 15.00 0.056 0.055
Window:CS01A, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 0.88, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
14 --- --- 0.340 0.340
WEST
Ext Wall:W 03 Storage, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]
1864 --- 16.00 0.055 0.090
Ext Wall:W 02 Lobby, Masonry, Normal Density, Furring: Metal, [Bldg.
Use 1 - Warehouse]
280 0.00 16.00 0.053 0.090
Window:CW 01, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 0.75, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
160 --- --- 0.340 0.340
Door:Door 136A, Perf. Specs.: Product ID , SHGC 0.29, PF 0.75, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
24 --- --- 0.340 0.630
Ext Wall:W 01 Manager Office, Masonry, Normal Density, Furring:
Metal, [Bldg. Use 1 - Warehouse]
232 0.00 16.00 0.053 0.090
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 6 of 31
Gross Area or Perimeter
Cavity R- Value
Cont.
R- Value
Proposed U-Factor
Budget U- Factor
Ext Wall:Clerestory W 01, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]
56 0.00 15.00 0.056 0.055
Window:CS04, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 1.07, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
32 --- --- 0.340 0.340
Ext Wall:Clerestory W 02, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]
85 0.00 15.00 0.056 0.055
Window:CS03, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 1.07, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
49 --- --- 0.340 0.340
Ext Wall:Clerestory W 03, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]
91 0.00 15.00 0.056 0.055
Window:CS02B, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 1.07, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
53 --- --- 0.340 0.340
Ext Wall:Clerestory W 04, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]
109 0.00 15.00 0.056 0.055
Window:CS01B, Metal Frame with Thermal Break, Perf. Specs.:
Product ID , SHGC 0.29, PF 0.89, VT 0.64, [Bldg. Use 1 - Warehouse] (c)
63 --- --- 0.340 0.340
(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b) 'Other' components require supporting documentation for proposed U-factors.
(c) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(d) Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
Envelope PASSES: Design 10% better than code
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2024 IECC requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Architectural Chenbo Xing 08/28/2026
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 7 of 31
Interior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
2024 IECC
DPS Evidence Warehouse South Salt Lake, Utah 5b New Construction
Construction Site: Owner/Agent: Designer/Contractor:
4465 South 2600 West Taylorsville , Utah 84129
UTAH DEPARTMENT OF PUBLIC SAFETY
4501 South 2700 West Taylorsville , Utah 84129
GSBS Architects 375 W 200 S Salt Lake City , Utah 84101
Allowed Interior Lighting Power
A B C D
Area Category Floor Area (ft2) Allowed Watts / ft2 Allowed Watts
1-Whole Building (Warehouse Storage:Smaller, hand-carried items) 19753 0.69 13630
Total Allowed Watts: 13630
Proposed Interior Lighting Power
A B C D
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
# of Fixture Fixture Watt. (B X C)
1-Whole Building (Warehouse Storage:Smaller, hand-carried items)
DR6: DR6: LED: 22 15 330
DR6E: DR6E: LED: 5 15 75
DR6S: DR6S: LED: 1 15 15
DR6W: DR6W: LED: 3 15 45
HP4: HP4: LED: 26 42 1092
HP4E: HP4E: LED: 17 42 714
LP2A: LP2A: LED: 12 25 300
LP2AE: LP2AE: LED: 12 25 300
LP2S: LP2S: LED: 35 41 1435
LP2SE: LP2SE: LED: 11 41 451
LP4A: LP4A: LED: 2 45 90
LR2AE: LR2AE: LED: 5 16 80
LR2B: LR2B: LED: 8 25 200
LR2BE: LR2BE: LED: 6 25 150
LR2C: LR2C: LED: 26 34 884
LR2CE: LR2CE: LED: 6 34 204
LS1U: LS1U: LED: 2 5 10
LS2U: LS2U: LED: 1 10 10
LS3U: LS3U: LED: 2 15 30
LW2S: LW2S: LED: 22 41 902
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 8 of 31
A B C D
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
# of Fixture Fixture Watt. (B X C)
LW4E: LW4E: LED: 10 16 160
P3A: P3A: LED: 2 25 50
T2A: T2A: LED: 3 16 48
T2BE: T2BE: LED: 4 26 104
T2FB: T2FB: LED: 16 26 416
T2FBE: T2FBE: LED: 2 26 52
VM1: VM1: LED: 4 26 104
Total Proposed Watts: 8251
Proposed Interior Lighting Controls
Fixture Lighting Control
1-Whole Building (Warehouse Storage:Smaller, hand-carried items)
DR6: DR6: LED: Occupancy Sensor, Manual Control
DR6E: DR6E: LED: Occupancy Sensor, Manual Control
DR6S: DR6S: LED: Occupancy Sensor, Manual Control
DR6W: DR6W: LED: Occupancy Sensor, Manual Control
HP4: HP4: LED: Occupancy Sensor, Manual Control
HP4E: HP4E: LED: Occupancy Sensor, Manual Control
LP2A: LP2A: LED: Occupancy Sensor, Manual Control
LP2AE: LP2AE: LED: Occupancy Sensor, Manual Control
LP2S: LP2S: LED: Occupancy Sensor, Manual Control
LP2SE: LP2SE: LED: Occupancy Sensor, Manual Control
LP4A: LP4A: LED: Occupancy Sensor, Manual Control
LR2AE: LR2AE: LED: Occupancy Sensor, Manual Control
LR2B: LR2B: LED: Occupancy Sensor, Manual Control
LR2BE: LR2BE: LED: Occupancy Sensor, Manual Control
LR2C: LR2C: LED: Occupancy Sensor, Manual Control
LR2CE: LR2CE: LED: Occupancy Sensor, Manual Control
LS1U: LS1U: LED: Occupancy Sensor, Manual Control
LS2U: LS2U: LED: Occupancy Sensor, Manual Control
LS3U: LS3U: LED: Occupancy Sensor, Manual Control
LW2S: LW2S: LED: Occupancy Sensor, Manual Control
LW4E: LW4E: LED: Occupancy Sensor, Manual Control
P3A: P3A: LED: Occupancy Sensor, Manual Control
T2A: T2A: LED: Occupancy Sensor, Manual Control
T2BE: T2BE: LED: Occupancy Sensor, Manual Control
T2FB: T2FB: LED: Occupancy Sensor, Manual Control
T2FBE: T2FBE: LED: Occupancy Sensor, Manual Control
VM1: VM1: LED: Occupancy Sensor, Manual Control
Interior Lighting PASSES: Design 39% better than code
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2024 IECC
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 9 of 31 requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Associate Principal Lighting Designer Erik Yamashiro 08/28/2026
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 10 of 31
Exterior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Exterior Lighting Zone:
2024 IECC
DPS Evidence Warehouse South Salt Lake, Utah 5b New Construction Other (LZ3)
Construction Site: Owner/Agent: Designer/Contractor:
4465 South 2600 West Taylorsville , Utah 84129
UTAH DEPARTMENT OF PUBLIC SAFETY
4501 South 2700 West Taylorsville , Utah 84129
GSBS Architects 375 W 200 S Salt Lake City , Utah 84101
Allowed Exterior Lighting Power
A B C D E
Area/Surface Category Quantity Allowed Watts / ft2 Tradable Wattage
Allowed Watts (B X C)
PARKING (Parking area) 17879 ft2 0.04 No 715.16
Ext Area (Pedestrian and vehicular entrances and exits)
81 ft of door width
14.00 No 1134.0
Ext Area 1 (Entry canopy) 622 ft2 0.18 No 111.96
Total Tradable Watts (a): 1907.48
Base Site Allowance (b): 400
Total Allowed Watts: 2307.48
(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b) A base site allowance equal to 400 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
A B C D
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
# of Fixture Fixture Watt. (B X C)
PARKING (Parking area, 17879 ft2): Tradeable Wattage
OP4: OP4: LED: 9 121 1089
OP4-2: OP4-2: LED: 1 242 242
Ext Area (Pedestrian and vehicular entrances and exits, 81 ft of door width): Tradeable Wattage
OW3E: OW3E: LED: 5 34 170
OW4E: OW4E: LED: 6 66 396
Ext Area 1 (Entry canopy, 622 ft2): Tradeable Wattage
LR3SE: LR3SE: LED: 8 21 168
Total Tradable Proposed Watts: 2065
Proposed Exterior Lighting Controls
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 11 of 31
Fixture Lighting Control
PARKING (Parking area, 17879 ft2)
OP4: OP4: LED: Daylight Shutoff, Exterior Timeswitch
OP4-2: OP4-2: LED: Daylight Shutoff, Exterior Timeswitch
Ext Area (Pedestrian and vehicular entrances and exits, 81 ft of door width)
OW3E: OW3E: LED: Daylight Shutoff, Lighting Setback
OW4E: OW4E: LED: Daylight Shutoff, Lighting Setback
Ext Area 1 (Entry canopy, 622 ft2)
LR3SE: LR3SE: LED: Daylight Shutoff, Lighting Setback
Exterior Lighting PASSES: Design 11% better than code
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2024 IECC requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Associate Principal Lighting Designer Erik Yamashiro 08/28/2026
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 12 of 31
Mechanical Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
2024 IECC
DPS Evidence Warehouse South Salt Lake, Utah 5b New Construction
Construction Site: Owner/Agent: Designer/Contractor:
4465 South 2600 West Taylorsville , Utah 84129
UTAH DEPARTMENT OF PUBLIC SAFETY
4501 South 2700 West Taylorsville , Utah 84129
GSBS Architects 375 W 200 S Salt Lake City , Utah 84101
Mechanical Systems List
Quantity Component Description
HVAC Systems
1 RTU-1 (Single Zone): Heating: 1 each - Other (RTU-1), Gas, Capacity = 123 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit (RTU-1), Capacity = 102 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 0.00 , Required Efficiency = 0.00 Proposed Part Load Efficiency = 21.60 IEER, Required Part Load Efficiency = 14.60 IEER Fan System: Unspecified
1 RTU-2 (Single Zone): Heating: 1 each - Other (RTU-2), Gas, Capacity = 200 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit (RTU-2), Capacity = 33 kBtu/h, Air-Cooled Condenser, No Economizer, Economizer exception: None Proposed Efficiency = 0.00 , Required Efficiency = 0.00 Proposed Part Load Efficiency = 18.80 SEER2, Required Part Load Efficiency = 13.40 SEER2 Fan System: Unspecified
1 RTU-3.4 (Single Zone): Heating: 2 each - Other (RTU-3,4), Gas, Capacity = 66 kBtu/h No minimum efficiency requirement applies Cooling: 2 each - Single Package DX Unit (RTU-3,4), Capacity = 32 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 0.00 , Required Efficiency = 0.00 Proposed Part Load Efficiency = 18.80 SEER2, Required Part Load Efficiency = 13.40 SEER2 Fan System: Unspecified
1 RTU-5,6 (Single Zone): Heating: 2 each - Other (RTU-5,6), Gas, Capacity = 66 kBtu/h No minimum efficiency requirement applies Cooling: 2 each - Single Package DX Unit (RTU-5,6), Capacity = 54 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 0.00 , Required Efficiency = 0.00 Proposed Part Load Efficiency = 19.40 SEER2, Required Part Load Efficiency = 13.40 SEER2 Fan System: Unspecified
1 DACI-1, CU-1 (Single Zone):
Cooling: 1 each - Split System (DACI-1, CU-1), Capacity = 36 kBtu/h, Air-Cooled Condenser, No Economizer, Economizer exception: None Proposed Efficiency = 0.00 , Required Efficiency = 0.00 Proposed Part Load Efficiency = 18.50 SEER2, Required Part Load Efficiency = 13.40 SEER2 Fan System: Unspecified
1 DACI-2,3, CU-2,3 (Single Zone):
Cooling: 2 each - Split System (DACI-2,3, CU-2,3), Capacity = 24 kBtu/h, Air-Cooled Condenser, No Economizer, Economizer exception: None Proposed Efficiency = 0.00 , Required Efficiency = 0.00 Proposed Part Load Efficiency = 21.50 SEER2, Required Part Load Efficiency = 13.40 SEER2 Fan System: Unspecified
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 13 of 31
Quantity Component Description
1 DXFC-1, ACU-1 (Single Zone):
Split System Heat Pump Heating Mode: Capacity = 24 kBtu/h, Proposed Efficiency = 9.40 HSPF2, Required Efficiency = 7.50 HSPF2 Cooling Mode: Capacity = 22 kBtu/h, Proposed Efficiency = 22.10 SEER2, Required Efficiency = 14.30 SEER2 Proposed Part Load Efficiency = 0.00 , Required Part Load Efficiency = 0.00 Fan System: Unspecified
Water Heaters
1 HEWH-1: Electric Storage Water Heater, Capacity: 80 gallons w/ Circulation Pump No minimum efficiency requirement applies
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2024 IECC requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Senior Designer Glen B Morrell 08/28/2026
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 14 of 31
Inspection Checklist
Energy Code: 2024 IECC
Requirements: 32% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Plan Review
Section
& Req.ID Plan Review Complies? Comments/Assumptions
C105.2
[PR1]1
Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: ARCHITECTURAL SET
C105.2
[PR2]1
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical and service water heating systems and document where exceptions to the standard are claimed.
Load calculations per acceptable engineering standards and handbooks. Hot water system sized per manufacturer's sizing guide.
Complies
Does Not Comply
Not Observable
Not Applicable
C105.2
[PR3]1
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See EL Series Sheets
C105.2
[PR4]1
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: SEE ES SERIES SHEETS
C402.5.1
[PR5]1
The vertical fenestration area <= 30 percent of the gross above-grade wall area.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: ARCHITECTURAL SET
C402.5.1
[PR6]1
The skylight area <= 3 percent of the gross roof area.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: N/A
C402.5.2
[PR9]1
In enclosed spaces > 2,500 ft2 directly under a roof with ceiling heights >15 ft. and used as an office, lobby, atrium, concourse, corridor, storage, gymnasium/exercise center, convention center, automotive service, manufacturing, non-refrigerated warehouse, retail store, distribution/sorting area, transportation, or workshop, the following requirements apply: (a) the daylight zone under skylights is >= half the floor area; (b) the skylight area to daylight zone is >= 3 percent with a skylight VT >= 0.40; or a minimum skylight effective aperture >= 1 percent.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 15 of 31
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 16 of 31
Footing / Foundation Inspection
Section # & Req.ID Footing / Foundation Inspection Complies? Comments/Assumptions
C107 [FO1]2 Installed slab-on-grade insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C303.2
[FO3]2
Slab edge insulation installed per manufacturer’s instructions.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: ARCHITECTURAL SET
C303.2.1
[FO4]1
Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: ARCHITECTURAL SET
C402.2.4
[FO5]2
Slab edge insulation depth/length consistent with insulation specifications reported in plans and COMcheck reports. Slab insulation extending away from building is covered by pavement or >= 10 inches of soil.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C403.14.2, C403.14.3
[FO7]3
Snow/ice melting system and freeze protection systems have sensors and controls configured to limit service for pavement temperature above 50F and outdoor temperature above 40F.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 17 of 31
Framing / Rough-In Inspection
Section # & Req.ID Framing / Rough-In Inspection Complies? Comments/Assumptions
C303.1.3
[FR1]2
Fenestration products rated in accordance with NFRC certified and as to performance labels or certificates provided.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: ARCHITECTURAL SET
C402.6.3
[FR10]3
Factory-built fenestration and doors are labeled as meeting air leakage requirements.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.6.6
[FR11]3
Vestibules are installed on all building entrances. Doors have self-closing devices.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: ARCHITECTURAL SET
C402.5.3
[FR3]1
Vertical fenestration SHGC value. Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.5.3, C402.5.3.4
[FR5]1
Installed vertical fenestration U-factor and SHGC consistent with label specifications and as reported in plans and COMcheck reports.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.5.5
[FR7]2
U-factor of opaque swinging and nonswinging doors associated with the building thermal envelope meets requirements.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.6.2.3.1
[FR9]1
The building envelope contains a continuous air barrier that is sealed in an approved manner and material permeability <= 0.004 dfm/ft2. Air barrier penetrations are sealed in an approved manner.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: ARCHITECTURAL SET
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 18 of 31
Plumbing Rough-In Inspection
Section # & Req.ID Plumbing Rough-In Inspection Complies? Comments/Assumptions
C404.5, C404.5.1, C404.5.2
[PL1]3
Heated water supply piping conforms to pipe length and volume requirements. Refer to section details.
Complies
Does Not Comply
Not Observable
Not Applicable
C404.6.1, C404.6.1.1
[PL2]3
Demand recirculation water systems have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F.
Complies
Does Not Comply
Not Observable
Not Applicable
C404.6.1, C404.6.2
[PL3]1
Automatic time switches installed to automatically switch off the recirculating hot-water system or heat trace.
Complies
Does Not Comply
Not Observable
Not Applicable
C404.6.3
[PL4]3
Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle.
Complies
Does Not Comply
Not Observable
Not Applicable
C404.7 [PL5]3 Drain water heat recovery (DWHR) units comply with CSA B55.2 with pressure loss < 10 psi at maximum flow. Group R occupancies have DWHR efficiencies in accordance with CSA B55.1.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 19 of 31
Mechanical Rough-In Inspection
Section # & Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions
C403.3
[ME1]2
HVAC equipment efficiency verified. Complies
Does Not Comply
Not Observable
Not Applicable
See the Mechanical Systems list for values
C403.12.3, C403.12.3.1, C403.12.3.2
[ME13]3
Refrigerated display cases, walk-in coolers or walk-in freezers served by remote compressors and remote condensers not located in a condensing unit, have fan-powered condensers that comply with Sections C403.12.3.1 and refrigeration compressor systems that comply with C403.12.3.2..
Complies
Does Not Comply
Not Observable
Not Applicable
C403.14.1
[ME14]2
Systems that heat outside the building envelope are radiant heat systems controlled by an occupancy sensing device or timer switch.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.13.1, C403.13.2
[ME15]2
HVAC ducts and plenums insulated in accordance with C403.13.1 and constructed in accordance with C403.13.3, verification may need to occur during Foundation Inspection.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.13.3
[ME16]2
HVAC piping insulation insulated in accordance with Table C403.13.3.
Insulation exposed to weather is protected from damage and is provided with shielding from solar radiation.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.2.2
[ME18]1
Natural or mechanical ventilation is provided in accordance with International Mechanical Code Chapter 4. Mechanical ventilation has capability to reduce outdoor air supply to minimum per IMC Chapter 4.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.3.3
[ME20]1
Hot gas bypass limited to: <=240 kBtu/h – 50% >240 kBtu/h – 25%
Complies
Does Not Comply
Not Observable
Not Applicable
C403.4.1.3
[ME24]2
Where thermostatic control setpoints are adjustable by occupants or HVAC operators, the adjustments are independent for heating and cooling setpoint.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.4.1.5
[ME26]2
Heating for vestibules and air curtains with integral heating include automatic controls that shut off the heating system when outdoor air temperatures > 45F. Vestibule heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint <= 60F and cooling setpoint >= 80F.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.9
[ME3]2
Large diameter fans where installed shall be tested and labeled in accordance with AMCA 230 and meet efficacy requirements of Table C403.9.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 20 of 31
Section # & Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions
C403.4.3.3.2
[ME32]3
Closed-circuit cooling tower within heat pump loop have either automatic bypass valve or lower leakage positive closure dampers. Open-circuit tower within heat pump loop have automatic valve to bypass all heat pump water flow around the tower.
Open- or closed-circuit cooling towers used in conjunction with a separate heat exchanger have heat loss by shutting down the circulation pump on the cooling tower loop. Open- or closed circuit cooling towers have a separate heat exchanger to isolate the cooling tower from the heat pump loop, and heat loss is controlled by shutting down the circulation pump on the cooling tower loop.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.4.7
[ME35]3
Doors or operable openings from conditioned space to outdoors > 40 sq ft contain automatic controls interlocked with the heating and cooling system.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.4.8.1
[ME36]3
Dehumidification controls do not use mechanical cooling to reduce humidity < 60% or a dew point < 55F
Complies
Does Not Comply
Not Observable
Not Applicable
C403.4.8.2
[ME37]3
Humidity controls do not use fossil fuel or electricity for a humidity > 30% in warmest zone.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.4.8.3
[ME38]3
Zones served by systems with both humidification and dehumification prevent simultaneous operation.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.5, C403.5.1, C403.5.2
[ME39]1
Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.5.2
[ME40]1
Economizer operation will not increase heating energy use during normal operation.
Complies
Does Not Comply
Not Observable
Not Applicable
C404.2
[ME4]2
Service water heating equipment meets efficiency requirements.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.5.3.3
[ME41]1
Air economizers automatically reduce outdoor air intake to the design minimum outdoor air quantity when outdoor air intake will not reduce cooling energy usage. See Table C403.5.3.3 for applicable device types and climate zones.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.5.3.4
[ME42]1
System capable of relieving excess outdoor air during air economizer operation to prevent over pressurizing the building. The relief air outlet located to avoid recirculation into the building.
Complies
Does Not Comply
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 21 of 31
& Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions
C403.5.3.5
[ME43]1
Return, exhaust/relief and outdoor air dampers used in economizers have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Reference section C403.7.7 for details.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.5.5
[ME45]2
Fault detection and diagnostics installed with air-cooled unitary DX units or VRF units having economizers.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.7.1
[ME56]1
Demand control ventilation provided for spaces >250 ft2 and >15 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.7.2
[ME57]3
Enclosed parking garage ventilation has separate ventilation systems for each section, can reduce airflow < 0.05 cfm/sq ft of floor area and >20% of design capacity.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.7.4
[ME59]1
Exhaust air energy recovery on systems meeting Table C403.7.4(1) and C403.7.4(2).
Complies
Does Not Comply
Not Observable
Not Applicable
C403.7.5
[ME60]3
Kitchen exhaust systems comply with replacement air and conditioned supply air limitations, and satisfy hood rating requirements and maximum exhaust rate criteria. Type I exhaust hoods contain demand control kitchen ventilation with > 50% reduction in exhaust.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.7.6
[ME61]3
HVAC systems serving guestrooms in Group R-1 buildings with > 50 guestrooms:
Each guestroom is provided with controls that automatically manage temperature setpoint and ventilation (see sections C403.7.6.1 and C403.7.6.2).
Complies
Does Not Comply
Not Observable
Not Applicable
C403.7.7
[ME62]3
Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Reference section language for operational details.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: Mechanical set
C403.7.8, C403.7.8.1
[ME63]3
Classrooms, training rooms, conference and multipurpose rooms, lounges, enclosed offices, open office areas and corridors contain occupied standby ventilation controls.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.8.1
[ME64]3
HVAC fan systems at design conditions do not exceed allowable fan system motor nameplate hp or fan system bhp.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Mechanical Systems list for values
C403.8.3
[ME66]2
Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95.
Complies
Does Not Comply
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 22 of 31
& Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions
C403.8.3
[ME66]2
Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.8.3
[ME66]2
Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.8.3
[ME66]2
Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.8.3
[ME66]2
Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.8.3
[ME66]2
Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.8.3
[ME66]2
Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.15
[ME69]2
Dehumidification systems for plant growth and maintenance are tested in accordance with DOE 10 CFR 430, has on-site heat recovery > 75% of dehumidification energy or ha a solid or liquid desiccant.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.16
[ME70]2
Service water pressure boost systems contain pressure sensors for pump control, no devices used to reduce pressure and booster pumps do not operate when there is no service water flow.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.17
[ME71]2
Clean water pumps achieve a pump energy index (PEI) <= 1.0.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.2.1
[ME73]3
Air outlets and zone terminal devices have means for air balancing.
Complies
Does Not Comply
Not Observable
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 23 of 31
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 24 of 31
Rough-In Electrical Inspection
Section # & Req.ID Rough-In Electrical Inspection Complies? Comments/Assumptions
C405.2.1, C405.2.1.1
[EL7]1
Occupancy sensors installed in classrooms/lecture/training rooms, computer rooms/data center, conference/meeting/multipurpose rooms, copy/print rooms, lounges/breakrooms, medical supply rooms, enclosed offices, laundry areas, open plan office areas, restrooms, storage rooms, telemedicine rooms, locker rooms, corridors, warehouse storage areas, and other spaces <= 300 sqft that are enclosed by floor-to-ceiling height partitions.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See EL series sheets
C405.2.8.1
[EL16]1
Demand responsive lighting controls capable of reducing lighting load to <=80% of full load upon receipt of a demand reponse signal.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Storage or warehouse areas.
C405.2.9
[EL17]1
Interior parking area lighting controlled by occupancy sensors or time switch control.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.7
[EL3]2
Low-voltage dry-type distribution electric transformers meet the minimum efficiency requirements of Table C405.6.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.8
[EL4]2
Electric motors meet the minimum efficiency requirements of Tables C405.7(1) through C405.7(4). Efficiency verified through certification under an approved certification program or the equipment efficiency ratings shall be provided by motor manufacturer (where certification programs do not exist).
Complies
Does Not Comply
Not Observable
Not Applicable
C405.10
[EL1]2
Total voltage drop across the combination of feeders and branch circuits <= 5%.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.10.1, C405.10.2
[EL5]2
Escalators and moving walks comply with ASME A17.1/CSA B44 and have automatic controls configured to reduce speed to the minimum permitted speed in accordance with ASME A17.1/CSA B44 or applicable local code when not conveying passengers.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.13
[EL2]2
Buildings with gross conditioned floor area > 10,000 ft2 will be equipped with a energy monitoring system in compliance with C405.13.1 through C405.13.11.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.12, C405.12.1
[EL6]2
50% of 15/20 amp receptacles installed in enclosed offices, conference rooms, copy rooms, break rooms, classrooms and workstations and > 25% of branch circuit feeders for modular furniture will have automatic receptacle control in accordance with C405.12.1.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.2.1.2
[EL8]1
Occupancy sensors control function in warehouses: In warehouses, the lighting in aisleways and open areas is controlled with occupant sensors that automatically reduce lighting power by 50% or more within 20 minutes of when the areas are unoccupied.
The occupant sensors control lighting in each aisleway independently and do not control lighting beyond the aisleway being controlled by the sensor. Lights not turned off by occupant sensors is done so by time-switch.
Complies
Does Not Comply
Not Observable
Exception: Requirement does not apply.
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 25 of 31
& Req.ID Rough-In Electrical Inspection Complies? Comments/Assumptions
C405.2.1.3
[EL9]1
Occupant sensor control function in open plan office areas: Occupant sensor controls in open office spaces >= 300 sq.ft. have controls 1) configured so that general lighting can be controlled separately in control zones with floor areas <= 600 sq.ft. within the space, 2) general lighting in each zone permitted to turn on upon occupancy in control zone, 3) automatically turn off general lighting in all control zones within 20 minutes after all occupants have left the space, 4) are configured so that general lighting power in each control zone is reduced by >= 80% of the full zone general lighting power within 20 minutes of all occupants leaving that control zone.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See EL series sheets
C405.2.10, C405.2.10.1, C405.2.10.2
[EL10]1
Sleeping or dwelling units provided with lighting controls
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
C405.2.2, C405.2.2.1
[EL11]2
Each area not served by occupancy sensors (per C405.2.1.1) have time-switch controls and functions detailed in sections C405.2.2.1.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See EL series sheets
C405.2.3.1
[EL12]1
Spaces required to have dimming controls have a manual control that allows the occupant to reduce the connected lighting load to 10% of full power.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See EL series sheets
C405.2.4, C405.2.4.1, C405.2.4.2
[EL13]2
Daylight zones provided with individual controls that control the lights independent of general area lighting. See code section C405.2.3 Daylight-responsive controls for applicable spaces, C405.2.3.1 Daylight responsive control function and section C405.2.3.2 Sidelit zone.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See EL series sheets
C405.2.5
[EL14]1
Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: See EL series sheets
C405.2.7
[EL15]1
Automatic lighting controls for exterior lighting installed. Controls will be daylight controlled, set based on business operation time-of-day, or reduce connected lighting > 30%.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: SEE ES SERIES SHEETS
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 26 of 31
Insulation Inspection
Section # & Req.ID Insulation Inspection Complies? Comments/Assumptions
C402.2.6
[IN5]3
Thermally ineffective panel surfaces of sensible heating panels have insulation >= R- 3.5.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
C107 [IN1]1 Installed roof insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. For some ceiling systems, verification may need to occur during Framing Inspection.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.2.3
[IN11]2
Installed floor insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports.
Mass floors meet the weight requirements in C402.2.3.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.2.6
[IN12]3
Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: Mechanical set
C402.6.1.1
[IN14]1
The air barrier design is documented as required in Section C402.6.1.1
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: ARCHITECTURAL SET
C402.6.1.2
[IN15]1
All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor-permeable wrapping material to minimize air leakage.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: ARCHITECTURAL SET
C402.5.7, C403.7.7
[IN6]3
Stair and elevator shaft vents have motorized dampers that automatically close. Reference section C403.7.7 for operational details.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
C107 [IN2]1 Installed above-grade wall insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C303.2
[IN3]1
Above-grade wall insulation installed per manufacturer’s instructions.
Complies
Does Not Comply
Not Observable
Not Applicable
Location on plans/spec: ARCHITECTURAL SET
C303.1, C303.1.1, C303.1.2
[IN4]1
Roof insulation installed per manufacturer’s instructions and is labeled with R-value or insulation certificate providing R-value and other relevant data. Blown or poured loose-fill insulation, thickness, settled R-value, density, coverage area and number of bags listed on certification. Spray foam insulation lists installed thickness, R-value indicated on certification.
Complies
Does Not Comply
Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 27 of 31
& Req.ID Insulation Inspection Complies? Comments/Assumptions
C402.2.1
[IN8]1
Roof…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .