This is an Approved COMcheck document related to a Stage II Invitation to Bid issued by the Utah Department of Public Safety for construction services on the Central Evidence Warehouse project. The project involves the design and construction of a new single-story facility with approximately 18,599 square feet located in Utah. Only contractors who were short-listed during the Stage I Request for Proposals process are eligible to submit bids for this multistage selection process. The document serves as an energy code compliance verification, confirming that the project design meets applicable energy efficiency standards and building code requirements necessary for bid submission and project advancement.

The construction cost estimate for the Central Evidence Warehouse project is $11,300,000.00. The COMcheck approval documented in this file is a prerequisite component for the Stage II bidding process, ensuring that all submissions meet the state's energy compliance requirements before contractors can proceed with their bid proposals. This compliance verification is essential to the competitive bidding phase and protects the integrity of the selection process by confirming that the project design adheres to established energy codes and standards prior to cost estimation and final bid evaluation by the Department of Public Safety.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 1 of 31

Compliance Certificate

Project Information

Energy Code:

Project Title:

Location:

Climate Zone:

Project Type:

Project No:

Project Sub Type:

All Electric:

Is Renewable:

Has Battery:

Has Charger:

Has Heat Pump

2024 IECC

DPS Evidence Warehouse South Salt Lake, Utah 5b New Construction 155589 New Building/Complete false false false false true

Construction Site: Owner/Agent: Designer/Contractor:

4465 South 2600 West Taylorsville , Utah 84129

UTAH DEPARTMENT OF PUBLIC SAFETY

4501 South 2700 West Taylorsville , Utah 84129

GSBS Architects 375 W 200 S Salt Lake City , Utah 84101

Notes:

Energy Credits

Description Credit

E01 Improved envelope performance ASHRAE 90.1 Appendix C 0.0

L06 Reduced lighting power 32.0

H03 More efficiency HVAC cooling equipment and fan performance 4.0

H02 More efficient HVAC equipment heating performance 124.0

W02 Heat pump water heater 4.0

W08 Water-heating system submeters 0.0

P01 Energy monitoring 5.0

Credits: 82.0 Required 169.0 Proposed

Renewable energy

Number of Floors:

Area of Three Largest Floors:

Proposed Capacity:

Required Capacity:

Proposed Off-site Energy:

Required Off-site Energy:

Exception:

19753 14815 None

Renewables Pass

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 2 of 31

Building Area

Description Floor Area

1-Warehouse (Warehouse) : Nonresidential 19753

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 3 of 31

Envelope Compliance Certificate

Project Information

Energy Code:

Project Title:

Location:

Climate Zone:

Project Type:

Vertical Glazing / Wall Area:

Project Sub Type:

2024 IECC

DPS Evidence Warehouse South Salt Lake, Utah 5b New Construction 0.129 New Building/Complete

Construction Site: Owner/Agent: Designer/Contractor:

4465 South 2600 West Taylorsville , Utah 84129

UTAH DEPARTMENT OF PUBLIC SAFETY

4501 South 2700 West Taylorsville , Utah 84129

GSBS Architects 375 W 200 S Salt Lake City , Utah 84101

Envelope Assemblies

Assembly Gross Area or Perimeter

Cavity R- Value

Cont.

R- Value

Proposed U-Factor

Budget U- Factor

Roof:Roof 10, Other, [Bldg. Use 1 - Warehouse] (b) 319 --- --- 0.033 0.035

Roof:Roof 09, Other, [Bldg. Use 1 - Warehouse] (b) 208 --- --- 0.033 0.035

Roof:Roof 08, Other, [Bldg. Use 1 - Warehouse] (b) 297 --- --- 0.033 0.035

Roof:Roof 07, Other, [Bldg. Use 1 - Warehouse] (b) 313 --- --- 0.033 0.035

Roof:Roof 06, Other, [Bldg. Use 1 - Warehouse] (b) 4868 --- --- 0.033 0.035

Roof:Roof 05, Other, [Bldg. Use 1 - Warehouse] (b) 1965 --- --- 0.033 0.035

Roof:Roof 04, Other, [Bldg. Use 1 - Warehouse] (b) 1631 --- --- 0.033 0.035

Roof:Roof 03, Other, [Bldg. Use 1 - Warehouse] (b) 2299 --- --- 0.033 0.035

Roof:Roof 02, Other, [Bldg. Use 1 - Warehouse] (b) 1235 --- --- 0.033 0.035

Roof:Roof 01, Other, [Bldg. Use 1 - Warehouse] (b) 6733 --- --- 0.033 0.035

Floor:Floor, Unheated Slab-On-Grade, Vertical 3 ft., [Bldg. Use 1 - Warehouse] (d)

19192 --- 15.00 0.480 0.520

NORTH

Ext Wall:N 04 Vehicle Storage, Masonry, Normal Density, Furring:

None, [Bldg. Use 1 - Warehouse]

156 --- 16.00 0.055 0.090

Window:Transom above 107B, Metal Frame with Thermal Break, Perf. Specs.: Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

13 --- --- 0.650 0.340

Door:Door 107B, Insulated Metal, Swinging, [Bldg. Use 1 - Warehouse]

24 --- --- 0.470 0.370

Ext Wall:N 03 Cooler, Masonry, Normal Density, Furring: None, [Bldg.

Use 1 - Warehouse]

320 --- 16.00 0.055 0.090

Ext Wall:N 02.2 Sallyport, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]

794 --- 16.00 0.055 0.090

Window:Transom above 116A, Metal Frame with Thermal Break, Perf. Specs.: Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

13 --- --- 0.650 0.340

Door:Door 116A, Insulated Metal, Swinging, [Bldg. Use 1 - Warehouse]

24 --- --- 0.470 0.370

Door:Door 116B, Other, Garage door < 14% glazing, [Bldg. Use 1 - Warehouse]

144 --- --- 0.125 0.310

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 4 of 31

Assembly Gross Area or Perimeter

Cavity R- Value

Cont.

R- Value

Proposed U-Factor

Budget U- Factor

Ext Wall:N 02.1 Hallway, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]

69 0.00 8.00 0.092 0.055

Window:CW 05, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 1.20, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

45 --- --- 0.340 0.340

Ext Wall:N 01.2 Workstation, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]

805 0.00 8.00 0.092 0.055

Window:CW 03, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

280 --- --- 0.340 0.340

Window:CW 02, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

59 --- --- 0.340 0.340

Window:CW 04A, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

64 --- --- 0.340 0.340

Ext Wall:N 01.1 Workstation, Masonry, Normal Density, Furring:

Metal, [Bldg. Use 1 - Warehouse]

512 0.00 16.00 0.053 0.090

Ext Wall:Clerestory N 04, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]

32 0.00 15.00 0.056 0.055

Window:CS01C, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 1.00, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

14 --- --- 0.340 0.340

Ext Wall:Clerestory N 01, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]

38 0.00 15.00 0.056 0.055

Window:CS02C-1, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 0.80, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

18 --- --- 0.340 0.340

Ext Wall:Clerestory N 02, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]

35 0.00 15.00 0.056 0.055

Window:CS02C-2, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 0.80, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

18 --- --- 0.340 0.340

Ext Wall:Clerestory N 03, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]

35 0.00 15.00 0.056 0.055

Window:CS02C-3, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 0.80, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

18 --- --- 0.340 0.340

EAST

Ext Wall:E 04 Vehicle Storage, Masonry, Normal Density, Furring:

None, [Bldg. Use 1 - Warehouse]

408 --- 16.00 0.055 0.090

Door:Door 107A, Other, Garage door < 14% glazing, [Bldg. Use 1 - Warehouse]

192 --- --- 0.125 0.310

Ext Wall:E 03 Vehicle bay, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]

900 --- 16.00 0.055 0.090

Window:Transom above 108B, Metal Frame with Thermal Break, Perf. Specs.: Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

13 --- --- 0.650 0.340

Window:CW 08, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 1.09, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

128 --- --- 0.340 0.340

Door:Door 108C, Other, Garage door < 14% glazing, [Bldg. Use 1 - Warehouse]

144 --- --- 0.125 0.310

Door:Door 108B, Insulated Metal, Swinging, [Bldg. Use 1 - Warehouse]

24 --- --- 0.470 0.370

Door:Door 110A, Perf. Specs.: Product ID , SHGC 0.29, PF 1.09, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

24 --- --- 0.340 0.630

Door:Door 109B, Other, Garage door < 14% glazing, [Bldg. Use 1 - Warehouse]

144 --- --- 0.125 0.310

Ext Wall:E 02 Sallyport, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]

1087 --- 16.00 0.055 0.090

Window:CW 06-1, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

48 --- --- 0.340 0.340

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 5 of 31

Gross Area or Perimeter

Cavity R- Value

Cont.

R- Value

Proposed U-Factor

Budget U- Factor

Window:CW 06-2, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

48 --- --- 0.340 0.340

Ext Wall:E 01 Break Room, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]

105 0.00 8.00 0.092 0.055

Window:CW 04B, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 3.40, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

73 --- --- 0.340 0.340

Ext Wall:Clerestory E 01, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]

60 --- 15.00 0.058 0.090

Ext Wall:Clerestory E 02, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]

100 --- 15.00 0.058 0.090

Ext Wall:Clerestory E 03, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]

102 --- 15.00 0.058 0.090

Ext Wall:Clerestory E 04, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]

126 --- 15.00 0.058 0.090

SOUTH

Ext Wall:S 03 Sallyport, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]

544 --- 16.00 0.055 0.090

Window:CW 07, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 1.04, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

136 --- --- 0.340 0.340

Door:Door 116C, Other, Garage door < 14% glazing, [Bldg. Use 1 - Warehouse]

144 --- --- 0.125 0.310

Door:Door 116D, Perf. Specs.: Product ID , SHGC 0.29, PF 1.04, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

24 --- --- 0.340 0.630

Ext Wall:S 02 Storage + Vehicle Storage, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]

2158 --- 16.00 0.055 0.090

Door:Door 106A, Insulated Metal, Swinging, [Bldg. Use 1 - Warehouse]

32 --- --- 0.470 0.370

Ext Wall:S 01 Manager Office, Masonry, Normal Density, Furring:

Metal, [Bldg. Use 1 - Warehouse]

131 0.00 16.00 0.053 0.090

Ext Wall:Clerestory S 01, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]

36 --- 15.00 0.058 0.090

Ext Wall:Clerestory S 02, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]

35 0.00 15.00 0.056 0.055

Window:CS02A-1, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 0.84, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

17 --- --- 0.340 0.340

Ext Wall:Clerestory S 03, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]

35 0.00 15.00 0.056 0.055

Window:CS02A-2, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 0.84, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

17 --- --- 0.340 0.340

Ext Wall:Clerestory S 04, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]

34 0.00 15.00 0.056 0.055

Window:CS01A, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 0.88, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

14 --- --- 0.340 0.340

WEST

Ext Wall:W 03 Storage, Masonry, Normal Density, Furring: None, [Bldg. Use 1 - Warehouse]

1864 --- 16.00 0.055 0.090

Ext Wall:W 02 Lobby, Masonry, Normal Density, Furring: Metal, [Bldg.

Use 1 - Warehouse]

280 0.00 16.00 0.053 0.090

Window:CW 01, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 0.75, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

160 --- --- 0.340 0.340

Door:Door 136A, Perf. Specs.: Product ID , SHGC 0.29, PF 0.75, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

24 --- --- 0.340 0.630

Ext Wall:W 01 Manager Office, Masonry, Normal Density, Furring:

Metal, [Bldg. Use 1 - Warehouse]

232 0.00 16.00 0.053 0.090

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 6 of 31

Gross Area or Perimeter

Cavity R- Value

Cont.

R- Value

Proposed U-Factor

Budget U- Factor

Ext Wall:Clerestory W 01, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]

56 0.00 15.00 0.056 0.055

Window:CS04, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 1.07, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

32 --- --- 0.340 0.340

Ext Wall:Clerestory W 02, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]

85 0.00 15.00 0.056 0.055

Window:CS03, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 1.07, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

49 --- --- 0.340 0.340

Ext Wall:Clerestory W 03, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]

91 0.00 15.00 0.056 0.055

Window:CS02B, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 1.07, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

53 --- --- 0.340 0.340

Ext Wall:Clerestory W 04, Metal Frame, 16" o.c., [Bldg. Use 1 - Warehouse]

109 0.00 15.00 0.056 0.055

Window:CS01B, Metal Frame with Thermal Break, Perf. Specs.:

Product ID , SHGC 0.29, PF 0.89, VT 0.64, [Bldg. Use 1 - Warehouse] (c)

63 --- --- 0.340 0.340

(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.

(b) 'Other' components require supporting documentation for proposed U-factors.

(c) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.

(d) Slab-On-Grade proposed and budget U-factors shown in table are F-factors.

Envelope PASSES: Design 10% better than code

Envelope Compliance Statement

Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2024 IECC requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.

Name - Title Signature Date

Architectural Chenbo Xing 08/28/2026

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 7 of 31

Interior Lighting Compliance Certificate

Project Information

Energy Code:

Project Title:

Location:

Climate Zone:

Project Type:

2024 IECC

DPS Evidence Warehouse South Salt Lake, Utah 5b New Construction

Construction Site: Owner/Agent: Designer/Contractor:

4465 South 2600 West Taylorsville , Utah 84129

UTAH DEPARTMENT OF PUBLIC SAFETY

4501 South 2700 West Taylorsville , Utah 84129

GSBS Architects 375 W 200 S Salt Lake City , Utah 84101

Allowed Interior Lighting Power

A B C D

Area Category Floor Area (ft2) Allowed Watts / ft2 Allowed Watts

1-Whole Building (Warehouse Storage:Smaller, hand-carried items) 19753 0.69 13630

Total Allowed Watts: 13630

Proposed Interior Lighting Power

A B C D

Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast

# of Fixture Fixture Watt. (B X C)

1-Whole Building (Warehouse Storage:Smaller, hand-carried items)

DR6: DR6: LED: 22 15 330

DR6E: DR6E: LED: 5 15 75

DR6S: DR6S: LED: 1 15 15

DR6W: DR6W: LED: 3 15 45

HP4: HP4: LED: 26 42 1092

HP4E: HP4E: LED: 17 42 714

LP2A: LP2A: LED: 12 25 300

LP2AE: LP2AE: LED: 12 25 300

LP2S: LP2S: LED: 35 41 1435

LP2SE: LP2SE: LED: 11 41 451

LP4A: LP4A: LED: 2 45 90

LR2AE: LR2AE: LED: 5 16 80

LR2B: LR2B: LED: 8 25 200

LR2BE: LR2BE: LED: 6 25 150

LR2C: LR2C: LED: 26 34 884

LR2CE: LR2CE: LED: 6 34 204

LS1U: LS1U: LED: 2 5 10

LS2U: LS2U: LED: 1 10 10

LS3U: LS3U: LED: 2 15 30

LW2S: LW2S: LED: 22 41 902

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 8 of 31

A B C D

Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast

# of Fixture Fixture Watt. (B X C)

LW4E: LW4E: LED: 10 16 160

P3A: P3A: LED: 2 25 50

T2A: T2A: LED: 3 16 48

T2BE: T2BE: LED: 4 26 104

T2FB: T2FB: LED: 16 26 416

T2FBE: T2FBE: LED: 2 26 52

VM1: VM1: LED: 4 26 104

Total Proposed Watts: 8251

Proposed Interior Lighting Controls

Fixture Lighting Control

1-Whole Building (Warehouse Storage:Smaller, hand-carried items)

DR6: DR6: LED: Occupancy Sensor, Manual Control

DR6E: DR6E: LED: Occupancy Sensor, Manual Control

DR6S: DR6S: LED: Occupancy Sensor, Manual Control

DR6W: DR6W: LED: Occupancy Sensor, Manual Control

HP4: HP4: LED: Occupancy Sensor, Manual Control

HP4E: HP4E: LED: Occupancy Sensor, Manual Control

LP2A: LP2A: LED: Occupancy Sensor, Manual Control

LP2AE: LP2AE: LED: Occupancy Sensor, Manual Control

LP2S: LP2S: LED: Occupancy Sensor, Manual Control

LP2SE: LP2SE: LED: Occupancy Sensor, Manual Control

LP4A: LP4A: LED: Occupancy Sensor, Manual Control

LR2AE: LR2AE: LED: Occupancy Sensor, Manual Control

LR2B: LR2B: LED: Occupancy Sensor, Manual Control

LR2BE: LR2BE: LED: Occupancy Sensor, Manual Control

LR2C: LR2C: LED: Occupancy Sensor, Manual Control

LR2CE: LR2CE: LED: Occupancy Sensor, Manual Control

LS1U: LS1U: LED: Occupancy Sensor, Manual Control

LS2U: LS2U: LED: Occupancy Sensor, Manual Control

LS3U: LS3U: LED: Occupancy Sensor, Manual Control

LW2S: LW2S: LED: Occupancy Sensor, Manual Control

LW4E: LW4E: LED: Occupancy Sensor, Manual Control

P3A: P3A: LED: Occupancy Sensor, Manual Control

T2A: T2A: LED: Occupancy Sensor, Manual Control

T2BE: T2BE: LED: Occupancy Sensor, Manual Control

T2FB: T2FB: LED: Occupancy Sensor, Manual Control

T2FBE: T2FBE: LED: Occupancy Sensor, Manual Control

VM1: VM1: LED: Occupancy Sensor, Manual Control

Interior Lighting PASSES: Design 39% better than code

Interior Lighting Compliance Statement

Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2024 IECC

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 9 of 31 requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.

Associate Principal Lighting Designer Erik Yamashiro 08/28/2026

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 10 of 31

Exterior Lighting Compliance Certificate

Project Information

Energy Code:

Project Title:

Location:

Climate Zone:

Project Type:

Exterior Lighting Zone:

2024 IECC

DPS Evidence Warehouse South Salt Lake, Utah 5b New Construction Other (LZ3)

Construction Site: Owner/Agent: Designer/Contractor:

4465 South 2600 West Taylorsville , Utah 84129

UTAH DEPARTMENT OF PUBLIC SAFETY

4501 South 2700 West Taylorsville , Utah 84129

GSBS Architects 375 W 200 S Salt Lake City , Utah 84101

Allowed Exterior Lighting Power

A B C D E

Area/Surface Category Quantity Allowed Watts / ft2 Tradable Wattage

Allowed Watts (B X C)

PARKING (Parking area) 17879 ft2 0.04 No 715.16

Ext Area (Pedestrian and vehicular entrances and exits)

81 ft of door width

14.00 No 1134.0

Ext Area 1 (Entry canopy) 622 ft2 0.18 No 111.96

Total Tradable Watts (a): 1907.48

Base Site Allowance (b): 400

Total Allowed Watts: 2307.48

(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.

(b) A base site allowance equal to 400 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.

Proposed Exterior Lighting Power

A B C D

Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast

# of Fixture Fixture Watt. (B X C)

PARKING (Parking area, 17879 ft2): Tradeable Wattage

OP4: OP4: LED: 9 121 1089

OP4-2: OP4-2: LED: 1 242 242

Ext Area (Pedestrian and vehicular entrances and exits, 81 ft of door width): Tradeable Wattage

OW3E: OW3E: LED: 5 34 170

OW4E: OW4E: LED: 6 66 396

Ext Area 1 (Entry canopy, 622 ft2): Tradeable Wattage

LR3SE: LR3SE: LED: 8 21 168

Total Tradable Proposed Watts: 2065

Proposed Exterior Lighting Controls

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 11 of 31

Fixture Lighting Control

PARKING (Parking area, 17879 ft2)

OP4: OP4: LED: Daylight Shutoff, Exterior Timeswitch

OP4-2: OP4-2: LED: Daylight Shutoff, Exterior Timeswitch

Ext Area (Pedestrian and vehicular entrances and exits, 81 ft of door width)

OW3E: OW3E: LED: Daylight Shutoff, Lighting Setback

OW4E: OW4E: LED: Daylight Shutoff, Lighting Setback

Ext Area 1 (Entry canopy, 622 ft2)

LR3SE: LR3SE: LED: Daylight Shutoff, Lighting Setback

Exterior Lighting PASSES: Design 11% better than code

Exterior Lighting Compliance Statement

Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2024 IECC requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.

Associate Principal Lighting Designer Erik Yamashiro 08/28/2026

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 12 of 31

Mechanical Compliance Certificate

Project Information

Energy Code:

Project Title:

Location:

Climate Zone:

Project Type:

2024 IECC

DPS Evidence Warehouse South Salt Lake, Utah 5b New Construction

Construction Site: Owner/Agent: Designer/Contractor:

4465 South 2600 West Taylorsville , Utah 84129

UTAH DEPARTMENT OF PUBLIC SAFETY

4501 South 2700 West Taylorsville , Utah 84129

GSBS Architects 375 W 200 S Salt Lake City , Utah 84101

Mechanical Systems List

Quantity Component Description

HVAC Systems

1 RTU-1 (Single Zone): Heating: 1 each - Other (RTU-1), Gas, Capacity = 123 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit (RTU-1), Capacity = 102 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 0.00 , Required Efficiency = 0.00 Proposed Part Load Efficiency = 21.60 IEER, Required Part Load Efficiency = 14.60 IEER Fan System: Unspecified

1 RTU-2 (Single Zone): Heating: 1 each - Other (RTU-2), Gas, Capacity = 200 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit (RTU-2), Capacity = 33 kBtu/h, Air-Cooled Condenser, No Economizer, Economizer exception: None Proposed Efficiency = 0.00 , Required Efficiency = 0.00 Proposed Part Load Efficiency = 18.80 SEER2, Required Part Load Efficiency = 13.40 SEER2 Fan System: Unspecified

1 RTU-3.4 (Single Zone): Heating: 2 each - Other (RTU-3,4), Gas, Capacity = 66 kBtu/h No minimum efficiency requirement applies Cooling: 2 each - Single Package DX Unit (RTU-3,4), Capacity = 32 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 0.00 , Required Efficiency = 0.00 Proposed Part Load Efficiency = 18.80 SEER2, Required Part Load Efficiency = 13.40 SEER2 Fan System: Unspecified

1 RTU-5,6 (Single Zone): Heating: 2 each - Other (RTU-5,6), Gas, Capacity = 66 kBtu/h No minimum efficiency requirement applies Cooling: 2 each - Single Package DX Unit (RTU-5,6), Capacity = 54 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 0.00 , Required Efficiency = 0.00 Proposed Part Load Efficiency = 19.40 SEER2, Required Part Load Efficiency = 13.40 SEER2 Fan System: Unspecified

1 DACI-1, CU-1 (Single Zone):

Cooling: 1 each - Split System (DACI-1, CU-1), Capacity = 36 kBtu/h, Air-Cooled Condenser, No Economizer, Economizer exception: None Proposed Efficiency = 0.00 , Required Efficiency = 0.00 Proposed Part Load Efficiency = 18.50 SEER2, Required Part Load Efficiency = 13.40 SEER2 Fan System: Unspecified

1 DACI-2,3, CU-2,3 (Single Zone):

Cooling: 2 each - Split System (DACI-2,3, CU-2,3), Capacity = 24 kBtu/h, Air-Cooled Condenser, No Economizer, Economizer exception: None Proposed Efficiency = 0.00 , Required Efficiency = 0.00 Proposed Part Load Efficiency = 21.50 SEER2, Required Part Load Efficiency = 13.40 SEER2 Fan System: Unspecified

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 13 of 31

Quantity Component Description

1 DXFC-1, ACU-1 (Single Zone):

Split System Heat Pump Heating Mode: Capacity = 24 kBtu/h, Proposed Efficiency = 9.40 HSPF2, Required Efficiency = 7.50 HSPF2 Cooling Mode: Capacity = 22 kBtu/h, Proposed Efficiency = 22.10 SEER2, Required Efficiency = 14.30 SEER2 Proposed Part Load Efficiency = 0.00 , Required Part Load Efficiency = 0.00 Fan System: Unspecified

Water Heaters

1 HEWH-1: Electric Storage Water Heater, Capacity: 80 gallons w/ Circulation Pump No minimum efficiency requirement applies

Mechanical Compliance Statement

Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2024 IECC requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.

Senior Designer Glen B Morrell 08/28/2026

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 14 of 31

Inspection Checklist

Energy Code: 2024 IECC

Requirements: 32% were addressed directly in the COMcheck software

Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.

Plan Review

Section

& Req.ID Plan Review Complies? Comments/Assumptions

C105.2

[PR1]1

Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: ARCHITECTURAL SET

C105.2

[PR2]1

Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical and service water heating systems and document where exceptions to the standard are claimed.

Load calculations per acceptable engineering standards and handbooks. Hot water system sized per manufacturer's sizing guide.

Complies

Does Not Comply

Not Observable

Not Applicable

C105.2

[PR3]1

Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: See EL Series Sheets

C105.2

[PR4]1

Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: SEE ES SERIES SHEETS

C402.5.1

[PR5]1

The vertical fenestration area <= 30 percent of the gross above-grade wall area.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: ARCHITECTURAL SET

C402.5.1

[PR6]1

The skylight area <= 3 percent of the gross roof area.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: N/A

C402.5.2

[PR9]1

In enclosed spaces > 2,500 ft2 directly under a roof with ceiling heights >15 ft. and used as an office, lobby, atrium, concourse, corridor, storage, gymnasium/exercise center, convention center, automotive service, manufacturing, non-refrigerated warehouse, retail store, distribution/sorting area, transportation, or workshop, the following requirements apply: (a) the daylight zone under skylights is >= half the floor area; (b) the skylight area to daylight zone is >= 3 percent with a skylight VT >= 0.40; or a minimum skylight effective aperture >= 1 percent.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

Additional Comments/Assumptions:

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 15 of 31

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 16 of 31

Footing / Foundation Inspection

Section # & Req.ID Footing / Foundation Inspection Complies? Comments/Assumptions

C107 [FO1]2 Installed slab-on-grade insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports.

Complies

Does Not Comply

Not Observable

Not Applicable

See the Envelope Assemblies table for values

C303.2

[FO3]2

Slab edge insulation installed per manufacturer’s instructions.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: ARCHITECTURAL SET

C303.2.1

[FO4]1

Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: ARCHITECTURAL SET

C402.2.4

[FO5]2

Slab edge insulation depth/length consistent with insulation specifications reported in plans and COMcheck reports. Slab insulation extending away from building is covered by pavement or >= 10 inches of soil.

Complies

Does Not Comply

Not Observable

Not Applicable

See the Envelope Assemblies table for values

C403.14.2, C403.14.3

[FO7]3

Snow/ice melting system and freeze protection systems have sensors and controls configured to limit service for pavement temperature above 50F and outdoor temperature above 40F.

Complies

Does Not Comply

Not Observable

Not Applicable

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 17 of 31

Framing / Rough-In Inspection

Section # & Req.ID Framing / Rough-In Inspection Complies? Comments/Assumptions

C303.1.3

[FR1]2

Fenestration products rated in accordance with NFRC certified and as to performance labels or certificates provided.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: ARCHITECTURAL SET

C402.6.3

[FR10]3

Factory-built fenestration and doors are labeled as meeting air leakage requirements.

Complies

Does Not Comply

Not Observable

Not Applicable

C402.6.6

[FR11]3

Vestibules are installed on all building entrances. Doors have self-closing devices.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: ARCHITECTURAL SET

C402.5.3

[FR3]1

Vertical fenestration SHGC value. Complies

Does Not Comply

Not Observable

Not Applicable

See the Envelope Assemblies table for values

C402.5.3, C402.5.3.4

[FR5]1

Installed vertical fenestration U-factor and SHGC consistent with label specifications and as reported in plans and COMcheck reports.

Complies

Does Not Comply

Not Observable

Not Applicable

See the Envelope Assemblies table for values

C402.5.5

[FR7]2

U-factor of opaque swinging and nonswinging doors associated with the building thermal envelope meets requirements.

Complies

Does Not Comply

Not Observable

Not Applicable

See the Envelope Assemblies table for values

C402.6.2.3.1

[FR9]1

The building envelope contains a continuous air barrier that is sealed in an approved manner and material permeability <= 0.004 dfm/ft2. Air barrier penetrations are sealed in an approved manner.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: ARCHITECTURAL SET

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 18 of 31

Plumbing Rough-In Inspection

Section # & Req.ID Plumbing Rough-In Inspection Complies? Comments/Assumptions

C404.5, C404.5.1, C404.5.2

[PL1]3

Heated water supply piping conforms to pipe length and volume requirements. Refer to section details.

Complies

Does Not Comply

Not Observable

Not Applicable

C404.6.1, C404.6.1.1

[PL2]3

Demand recirculation water systems have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F.

Complies

Does Not Comply

Not Observable

Not Applicable

C404.6.1, C404.6.2

[PL3]1

Automatic time switches installed to automatically switch off the recirculating hot-water system or heat trace.

Complies

Does Not Comply

Not Observable

Not Applicable

C404.6.3

[PL4]3

Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle.

Complies

Does Not Comply

Not Observable

Not Applicable

C404.7 [PL5]3 Drain water heat recovery (DWHR) units comply with CSA B55.2 with pressure loss < 10 psi at maximum flow. Group R occupancies have DWHR efficiencies in accordance with CSA B55.1.

Complies

Does Not Comply

Not Observable

Not Applicable

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 19 of 31

Mechanical Rough-In Inspection

Section # & Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions

C403.3

[ME1]2

HVAC equipment efficiency verified. Complies

Does Not Comply

Not Observable

Not Applicable

See the Mechanical Systems list for values

C403.12.3, C403.12.3.1, C403.12.3.2

[ME13]3

Refrigerated display cases, walk-in coolers or walk-in freezers served by remote compressors and remote condensers not located in a condensing unit, have fan-powered condensers that comply with Sections C403.12.3.1 and refrigeration compressor systems that comply with C403.12.3.2..

Complies

Does Not Comply

Not Observable

Not Applicable

C403.14.1

[ME14]2

Systems that heat outside the building envelope are radiant heat systems controlled by an occupancy sensing device or timer switch.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.13.1, C403.13.2

[ME15]2

HVAC ducts and plenums insulated in accordance with C403.13.1 and constructed in accordance with C403.13.3, verification may need to occur during Foundation Inspection.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.13.3

[ME16]2

HVAC piping insulation insulated in accordance with Table C403.13.3.

Insulation exposed to weather is protected from damage and is provided with shielding from solar radiation.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.2.2

[ME18]1

Natural or mechanical ventilation is provided in accordance with International Mechanical Code Chapter 4. Mechanical ventilation has capability to reduce outdoor air supply to minimum per IMC Chapter 4.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.3.3

[ME20]1

Hot gas bypass limited to: <=240 kBtu/h – 50% >240 kBtu/h – 25%

Complies

Does Not Comply

Not Observable

Not Applicable

C403.4.1.3

[ME24]2

Where thermostatic control setpoints are adjustable by occupants or HVAC operators, the adjustments are independent for heating and cooling setpoint.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.4.1.5

[ME26]2

Heating for vestibules and air curtains with integral heating include automatic controls that shut off the heating system when outdoor air temperatures > 45F. Vestibule heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint <= 60F and cooling setpoint >= 80F.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.9

[ME3]2

Large diameter fans where installed shall be tested and labeled in accordance with AMCA 230 and meet efficacy requirements of Table C403.9.

Complies

Does Not Comply

Not Observable

Not Applicable

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 20 of 31

Section # & Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions

C403.4.3.3.2

[ME32]3

Closed-circuit cooling tower within heat pump loop have either automatic bypass valve or lower leakage positive closure dampers. Open-circuit tower within heat pump loop have automatic valve to bypass all heat pump water flow around the tower.

Open- or closed-circuit cooling towers used in conjunction with a separate heat exchanger have heat loss by shutting down the circulation pump on the cooling tower loop. Open- or closed circuit cooling towers have a separate heat exchanger to isolate the cooling tower from the heat pump loop, and heat loss is controlled by shutting down the circulation pump on the cooling tower loop.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.4.7

[ME35]3

Doors or operable openings from conditioned space to outdoors > 40 sq ft contain automatic controls interlocked with the heating and cooling system.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.4.8.1

[ME36]3

Dehumidification controls do not use mechanical cooling to reduce humidity < 60% or a dew point < 55F

Complies

Does Not Comply

Not Observable

Not Applicable

C403.4.8.2

[ME37]3

Humidity controls do not use fossil fuel or electricity for a humidity > 30% in warmest zone.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.4.8.3

[ME38]3

Zones served by systems with both humidification and dehumification prevent simultaneous operation.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.5, C403.5.1, C403.5.2

[ME39]1

Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.5.2

[ME40]1

Economizer operation will not increase heating energy use during normal operation.

Complies

Does Not Comply

Not Observable

Not Applicable

C404.2

[ME4]2

Service water heating equipment meets efficiency requirements.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.5.3.3

[ME41]1

Air economizers automatically reduce outdoor air intake to the design minimum outdoor air quantity when outdoor air intake will not reduce cooling energy usage. See Table C403.5.3.3 for applicable device types and climate zones.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.5.3.4

[ME42]1

System capable of relieving excess outdoor air during air economizer operation to prevent over pressurizing the building. The relief air outlet located to avoid recirculation into the building.

Complies

Does Not Comply

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 21 of 31

& Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions

C403.5.3.5

[ME43]1

Return, exhaust/relief and outdoor air dampers used in economizers have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Reference section C403.7.7 for details.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.5.5

[ME45]2

Fault detection and diagnostics installed with air-cooled unitary DX units or VRF units having economizers.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.7.1

[ME56]1

Demand control ventilation provided for spaces >250 ft2 and >15 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.7.2

[ME57]3

Enclosed parking garage ventilation has separate ventilation systems for each section, can reduce airflow < 0.05 cfm/sq ft of floor area and >20% of design capacity.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.7.4

[ME59]1

Exhaust air energy recovery on systems meeting Table C403.7.4(1) and C403.7.4(2).

Complies

Does Not Comply

Not Observable

Not Applicable

C403.7.5

[ME60]3

Kitchen exhaust systems comply with replacement air and conditioned supply air limitations, and satisfy hood rating requirements and maximum exhaust rate criteria. Type I exhaust hoods contain demand control kitchen ventilation with > 50% reduction in exhaust.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.7.6

[ME61]3

HVAC systems serving guestrooms in Group R-1 buildings with > 50 guestrooms:

Each guestroom is provided with controls that automatically manage temperature setpoint and ventilation (see sections C403.7.6.1 and C403.7.6.2).

Complies

Does Not Comply

Not Observable

Not Applicable

C403.7.7

[ME62]3

Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Reference section language for operational details.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: Mechanical set

C403.7.8, C403.7.8.1

[ME63]3

Classrooms, training rooms, conference and multipurpose rooms, lounges, enclosed offices, open office areas and corridors contain occupied standby ventilation controls.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.8.1

[ME64]3

HVAC fan systems at design conditions do not exceed allowable fan system motor nameplate hp or fan system bhp.

Complies

Does Not Comply

Not Observable

Not Applicable

See the Mechanical Systems list for values

C403.8.3

[ME66]2

Fans have a fan energy index (FEI) >= 1.00.

Variable volume fans will have an FEI >= 0.95.

Complies

Does Not Comply

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 22 of 31

& Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions

C403.8.3

[ME66]2

Fans have a fan energy index (FEI) >= 1.00.

Variable volume fans will have an FEI >= 0.95.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.8.3

[ME66]2

Fans have a fan energy index (FEI) >= 1.00.

Variable volume fans will have an FEI >= 0.95.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.8.3

[ME66]2

Fans have a fan energy index (FEI) >= 1.00.

Variable volume fans will have an FEI >= 0.95.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.8.3

[ME66]2

Fans have a fan energy index (FEI) >= 1.00.

Variable volume fans will have an FEI >= 0.95.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.8.3

[ME66]2

Fans have a fan energy index (FEI) >= 1.00.

Variable volume fans will have an FEI >= 0.95.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.8.3

[ME66]2

Fans have a fan energy index (FEI) >= 1.00.

Variable volume fans will have an FEI >= 0.95.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.15

[ME69]2

Dehumidification systems for plant growth and maintenance are tested in accordance with DOE 10 CFR 430, has on-site heat recovery > 75% of dehumidification energy or ha a solid or liquid desiccant.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.16

[ME70]2

Service water pressure boost systems contain pressure sensors for pump control, no devices used to reduce pressure and booster pumps do not operate when there is no service water flow.

Complies

Does Not Comply

Not Observable

Not Applicable

C403.17

[ME71]2

Clean water pumps achieve a pump energy index (PEI) <= 1.0.

Complies

Does Not Comply

Not Observable

Not Applicable

C408.2.2.1

[ME73]3

Air outlets and zone terminal devices have means for air balancing.

Complies

Does Not Comply

Not Observable

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 23 of 31

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 24 of 31

Rough-In Electrical Inspection

Section # & Req.ID Rough-In Electrical Inspection Complies? Comments/Assumptions

C405.2.1, C405.2.1.1

[EL7]1

Occupancy sensors installed in classrooms/lecture/training rooms, computer rooms/data center, conference/meeting/multipurpose rooms, copy/print rooms, lounges/breakrooms, medical supply rooms, enclosed offices, laundry areas, open plan office areas, restrooms, storage rooms, telemedicine rooms, locker rooms, corridors, warehouse storage areas, and other spaces <= 300 sqft that are enclosed by floor-to-ceiling height partitions.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: See EL series sheets

C405.2.8.1

[EL16]1

Demand responsive lighting controls capable of reducing lighting load to <=80% of full load upon receipt of a demand reponse signal.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Storage or warehouse areas.

C405.2.9

[EL17]1

Interior parking area lighting controlled by occupancy sensors or time switch control.

Complies

Does Not Comply

Not Observable

Not Applicable

C405.7

[EL3]2

Low-voltage dry-type distribution electric transformers meet the minimum efficiency requirements of Table C405.6.

Complies

Does Not Comply

Not Observable

Not Applicable

C405.8

[EL4]2

Electric motors meet the minimum efficiency requirements of Tables C405.7(1) through C405.7(4). Efficiency verified through certification under an approved certification program or the equipment efficiency ratings shall be provided by motor manufacturer (where certification programs do not exist).

Complies

Does Not Comply

Not Observable

Not Applicable

C405.10

[EL1]2

Total voltage drop across the combination of feeders and branch circuits <= 5%.

Complies

Does Not Comply

Not Observable

Not Applicable

C405.10.1, C405.10.2

[EL5]2

Escalators and moving walks comply with ASME A17.1/CSA B44 and have automatic controls configured to reduce speed to the minimum permitted speed in accordance with ASME A17.1/CSA B44 or applicable local code when not conveying passengers.

Complies

Does Not Comply

Not Observable

Not Applicable

C405.13

[EL2]2

Buildings with gross conditioned floor area > 10,000 ft2 will be equipped with a energy monitoring system in compliance with C405.13.1 through C405.13.11.

Complies

Does Not Comply

Not Observable

Not Applicable

C405.12, C405.12.1

[EL6]2

50% of 15/20 amp receptacles installed in enclosed offices, conference rooms, copy rooms, break rooms, classrooms and workstations and > 25% of branch circuit feeders for modular furniture will have automatic receptacle control in accordance with C405.12.1.

Complies

Does Not Comply

Not Observable

Not Applicable

C405.2.1.2

[EL8]1

Occupancy sensors control function in warehouses: In warehouses, the lighting in aisleways and open areas is controlled with occupant sensors that automatically reduce lighting power by 50% or more within 20 minutes of when the areas are unoccupied.

The occupant sensors control lighting in each aisleway independently and do not control lighting beyond the aisleway being controlled by the sensor. Lights not turned off by occupant sensors is done so by time-switch.

Complies

Does Not Comply

Not Observable

Exception: Requirement does not apply.

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 25 of 31

& Req.ID Rough-In Electrical Inspection Complies? Comments/Assumptions

C405.2.1.3

[EL9]1

Occupant sensor control function in open plan office areas: Occupant sensor controls in open office spaces >= 300 sq.ft. have controls 1) configured so that general lighting can be controlled separately in control zones with floor areas <= 600 sq.ft. within the space, 2) general lighting in each zone permitted to turn on upon occupancy in control zone, 3) automatically turn off general lighting in all control zones within 20 minutes after all occupants have left the space, 4) are configured so that general lighting power in each control zone is reduced by >= 80% of the full zone general lighting power within 20 minutes of all occupants leaving that control zone.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: See EL series sheets

C405.2.10, C405.2.10.1, C405.2.10.2

[EL10]1

Sleeping or dwelling units provided with lighting controls

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

C405.2.2, C405.2.2.1

[EL11]2

Each area not served by occupancy sensors (per C405.2.1.1) have time-switch controls and functions detailed in sections C405.2.2.1.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: See EL series sheets

C405.2.3.1

[EL12]1

Spaces required to have dimming controls have a manual control that allows the occupant to reduce the connected lighting load to 10% of full power.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: See EL series sheets

C405.2.4, C405.2.4.1, C405.2.4.2

[EL13]2

Daylight zones provided with individual controls that control the lights independent of general area lighting. See code section C405.2.3 Daylight-responsive controls for applicable spaces, C405.2.3.1 Daylight responsive control function and section C405.2.3.2 Sidelit zone.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: See EL series sheets

C405.2.5

[EL14]1

Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: See EL series sheets

C405.2.7

[EL15]1

Automatic lighting controls for exterior lighting installed. Controls will be daylight controlled, set based on business operation time-of-day, or reduce connected lighting > 30%.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: SEE ES SERIES SHEETS

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 26 of 31

Insulation Inspection

Section # & Req.ID Insulation Inspection Complies? Comments/Assumptions

C402.2.6

[IN5]3

Thermally ineffective panel surfaces of sensible heating panels have insulation >= R- 3.5.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

C107 [IN1]1 Installed roof insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. For some ceiling systems, verification may need to occur during Framing Inspection.

Complies

Does Not Comply

Not Observable

Not Applicable

See the Envelope Assemblies table for values

C402.2.3

[IN11]2

Installed floor insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports.

Mass floors meet the weight requirements in C402.2.3.

Complies

Does Not Comply

Not Observable

Not Applicable

See the Envelope Assemblies table for values

C402.2.6

[IN12]3

Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: Mechanical set

C402.6.1.1

[IN14]1

The air barrier design is documented as required in Section C402.6.1.1

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: ARCHITECTURAL SET

C402.6.1.2

[IN15]1

All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor-permeable wrapping material to minimize air leakage.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: ARCHITECTURAL SET

C402.5.7, C403.7.7

[IN6]3

Stair and elevator shaft vents have motorized dampers that automatically close. Reference section C403.7.7 for operational details.

Complies

Does Not Comply

Not Observable

Not Applicable

Exception: Requirement does not apply.

C107 [IN2]1 Installed above-grade wall insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports.

Complies

Does Not Comply

Not Observable

Not Applicable

See the Envelope Assemblies table for values

C303.2

[IN3]1

Above-grade wall insulation installed per manufacturer’s instructions.

Complies

Does Not Comply

Not Observable

Not Applicable

Location on plans/spec: ARCHITECTURAL SET

C303.1, C303.1.1, C303.1.2

[IN4]1

Roof insulation installed per manufacturer’s instructions and is labeled with R-value or insulation certificate providing R-value and other relevant data. Blown or poured loose-fill insulation, thickness, settled R-value, density, coverage area and number of bags listed on certification. Spray foam insulation lists installed thickness, R-value indicated on certification.

Complies

Does Not Comply

Report Title: DPS Evidence Warehouse Report Date: Aug 28, 2026, 04:27 PM (PDT) 27 of 31

& Req.ID Insulation Inspection Complies? Comments/Assumptions

C402.2.1

[IN8]1

Roof…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .