This document is a collection of construction and administration forms for Bid No. 25-14, a nutrient reduction wetland project (Flo971523B) in Floyd County administered by the Iowa Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality. The project encompasses site stripping, mobilization, drain tile investigation, excavation, earthfill, steel sheet piling, pipe installation, water control structure construction, and erosion mitigation, with deliverables including approximately 16,036 cubic yards of earthwork, 1,063 square feet of steel sheetpile, 1,985 linear feet of tile installation, 28.5 cubic yards of drainfill, 840 tons of riprap and erosion stone, 90 cubic yards of concrete grout, a culvert crossing, and 13.3 acres of seeding. The bid solicitation period ran from October 3, 2025, to October 28, 2025, with a pre-bid conference held on October 14, 2025. Construction completion is required by November 15, 2026, with seeding completion by December 15, 2026. The notice of award template indicates a fourteen-day timeline from award notification for the successful bidder to obtain a Performance Bond, submit a Construction Progress Schedule, and execute the contract.
The estimated construction cost ranges between $350,000 and $450,000, with bidders required to submit a bid bond for 10 percent of the bid amount. Successful contractors must provide a Performance/Payment Bond for 100 percent of the contract price and maintain proof of registration with the Iowa Department of Inspections, Appeals & Licensing. The contract includes provisions for Change Order Requests and Construction Contract Amendments, with cost adjustments subject to Division approval. Contractors are eligible to purchase construction materials tax-free under Iowa Code Sections 422.42 and 422.47 through the Sales Tax Exemption Certificate, provided materials are used on the project. The Division's Project Representative and Director of the Division of Soil Conservation and Water Quality maintain approval authority over contract modifications and cost adjustments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX I
CONSTRUCTION & ADMINISTRATION FORMS
Flo971523B Nutrient Reduction Wetland Project DOCUMENT LL
Bid No. 25-14 NOTICE-OF-AWARD
LL-1
October 1, 2025
Contractor name and address
Delivery via email: Contractor Email
RE: NOTICE-OF-AWARD – Flo971523B Nutrient Reduction Wetland Project, Contract 25-14
Dear _______________________________, This is to notify you that the Division of Soil Conservation and Water Quality has determined __________________ is the successful bidder for the Flo971523B Nutrient Reduction Wetland Project.
Award is being made for the base bid of $____________.
In accordance with Item #9 of the Instructions to Bidders, Document BB, you have fourteen (14) calendar days from the date of receipt of this notice to obtain the Performance Bond (Document NN), submit your Construction Progress Schedule (Document JJ) for review, and execute the Contract (Document DD). In addition, the Division must be provided with a Certificate of Insurance pursuant to the General Conditions, Insurance and Related Provisions (Document FF, Part 6-01).
Please note that Iowa Code Section 91C.7, requires that all construction contractors awarded a contract to perform work for the state or an agency of the state must be registered with the Iowa Department of Inspections, Appeals & Licensing. The Division of Soil Conservation and Water Quality cannot execute a contract with your firm unless you provide proof of this registration. Be sure to fill in the Department of Inspections, Appeals & Licensing registration number blank on the Contract (Document DD).
Enclosed are the Contract (Document DD), Construction Progress Schedule form (Document JJ), and the Performance Bond (Document NN). Please complete, sign and return scanned electronic copies along with completed Performance Bond. In addition, we must have the Certificate of Insurance pursuant to the General Conditions and/or Special Conditions.
Congratulations on being the successful bidder. We look forward to working with your company on this project. If you have any questions, please contact Tracy Bruun, (515) 344-6279.
Sincerely, Jake Hansen, Chief Water Resources Bureau Division of Soil Conservation and Water Quality
JH/tab Enclosures
CC:
Flo971523B Nutrient Reduction Wetland Project DOCUMENT JJ
Bid No. 25-14 CONSTRUCTION PROGRESS SCHEDULE
JJ-1
STATE OF IOWA
DIVISION OF SOIL CONSERVATION AND WATER QUALITY
CONSTRUCTION PROGRESS SCHEDULE
Project ID: Flo971523B Date: _______________________________
Contractor: ___________________________________________________________________________________
Contract End Dates:
All Construction Work Except Seeding: November 15, 2026
Seeding: December 15, 2026
Scheduled Dates:
Anticipated Construction Start Date:
Preconstruction Conference Date Range*:
*Preconstruction Conference must be held prior to Construction Start Date, by no more than seven (7) days
Estimated Completion Date of All Work Except Seeding:
Final Walkthrough should be held prior to Contract End Date for all construction work except seeding
Major Construction Work Item(s) Order of Work Estimated Duration of
Work
(Items to be established/grouped by Division on an individual project basis)
Dates established in this schedule may be adjusted as described in Document FF, Paragraph 3-21.
Flo971523B Nutrient Reduction Wetland Project DOCUMENT JJ
Bid No. 25-14 CONSTRUCTION PROGRESS SCHEDULE
JJ-2
FOR THE CONTRACTOR
(Company Representative)
(Date)
(Name of Company)
(Address of Company)
(City, State, Zip code
FOR THE DIVISION
Mike Bourland, Water Resources Bureau
Accepted
Adjustment Requested
If adjustment is requested, describe below:
END OF DOCUMENT JJ
Flo971523B Nutrient Reduction Wetland Project DOCUMENT SS
Bid No. 25-14 APPLICATION AND CERTIFICATE FOR PAYMENT
SS-1
Flo971523B Nutrient Reduction Wetland Project DOCUMENT SS
Bid No. 25-14 APPLICATION AND CERTIFICATE FOR PAYMENT
SS-2
Flo971523B Nutrient Reduction Wetland Project DOCUMENT HH
Bid No. 25-14 CHANGE ORDER REQUEST
HH-1
STATE OF IOWA
CHANGE ORDER REQUEST
Change Order Request No.
Project ID: Flo971523B Date:
Name of Project: Flo971523B
Location of Project: Floyd County
Name of Contractor:
Architect/Engineer: Bolton & Menk, Brandon Short P.E.
Contract Plan and
Detail Reference:
Change Order Request
Drawing No. and Date:
Contract Specification
Reference:
Description of Change:
BREAKDOWN OF CONTRACT COST:
Original Project Contract Amount: $
Approved Change Orders No. thru : $
Pending Recommended Change Order Requests Nos. : $
This Change Order Request: $
Resulting Total Recommended Amount: $
Flo971523B Nutrient Reduction Wetland Project DOCUMENT HH
Bid No. 25-14 CHANGE ORDER REQUEST
HH-2
Reason for Contract Change:
Change Requested by:
(Signature) (Date)
CONTRACTOR APPROVAL
By:
(Company) (Signature)
(Address) (Date)
IDALS PROJECT REPRESENTATIVE RECOMMENDATIONS
Concur Recommend Rejection (Attach Explanation)
IDALS Project Representative:
(Signature) (Date)
DIVISION OF SOIL CONSERVATION AND WATER QUALITY AUTHORIZATION
Change Order required due to:
Immediate authorization to proceed granted: Yes No
APPROVED: DENIED:
Susan Kozak, Director Susan Kozak, Director
Division of Soil Conservation and Water Quality Division of Soil Conservation and Water Quality
Iowa Department of Agriculture Iowa Department of Agriculture and Land Stewardship and Land Stewardship
(Date) (Date)
END OF DOCUMENT HH
Flo971523B Nutrient Reduction Wetland Project DOCUMENT II
Bid No. 25-14 CONSTRUCTION CONTRACT AMENDMENT
II-1
State of Iowa
Iowa Department of Agriculture and Land Stewardship
Flo971523B Nutrient Reduction Wetland Project Construction Contract Amendment
THIS AMENDMENT, made this ______ day of ___________________________, 20____, by and between the State of Iowa, acting through:
hereinafter called the DIVISION, and
(Name of Company)
(Address)
(City, State, Zip) hereinafter called the CONTRACTOR.
WITNESSETH: That the DIVISION and the CONTRACTOR mutually agree to amend the agreement made the
_____day of __________, 20_____, for the Floyd County Nutrient Reduction Wetland Project (Flo971523B – Bid
No. 25-14) in this Amendment Number _________ as described below:
Description of Amendment:
Contract Plan Sheet(s) and Detail Reference(s):
Amendment No. _____
Drawing No. and Date:
Contract Specification
Reference(s):
Reason for Revision of
Contract Completion Date(s):
Original Contract Completion Date for All Work Except Seeding: November 15, 2026
Original Contract Completion Date for Seeding: December 15, 2026
Current Completion Date for All Work Except Seeding:
Current Completion Date for Seeding:
Revised Completion Date for All Work Except Seeding, This Amendment:
Revised Completion Date for Seeding, This Amendment:
Flo971523B Nutrient Reduction Wetland Project DOCUMENT II
Bid No. 25-14 CONSTRUCTION CONTRACT AMENDMENT
II-2
BREAKDOWN OF AMENDMENT CONTRACT COST BY BID ITEM:
Item # Description
Adjustment
Quantity Unit Cost
Total Cost
Adjustment
TOTAL $
Original Project Contract Amount: $ 0.00
Approved Contract Amendments No. ____ through ____: $ 0.00
Pending Recommended Change Order Requests No. ____ through ____: $ 0.00
Approved Change Order Requests No. ____ through ____: $ 0.00
This Amendment Request: $ 0.00
Resulting Total Recommended Amount: $ 0.00
IN WITNESS WHEREOF, the parties hereto have executed this Amendment, in the day and year first above mentioned.
FOR THE DIVISION FOR THE CONTRACTOR
Grant D. Menke, Deputy Secretary
(Company Representative)
(Date) (Date)
(Name of Company)
(Address of Company)
(City, State, Zip Code)
CONSENT FROM SURETY
Seal if by a corporation
(Surety Representative)
(Name of Surety)
END OF DOCUMENT II
Flo971523B Nutrient Reduction Wetland Project DOCUMENT QQ
Bid No. 25-14 SALES TAX EXEMPTION CERTIFICATE
IOWA
Department of Revenue www.state.ia.us/tax
Designated Exempt Entity Iowa Construction Sales Tax Exemption Certificate
This document may be completed by a designated exempt entity and given to their contractor and/or subcontractor along with an authorization letter. Seller: Keep this certificate in your files. Contractor/Exempt Entity: Keep a copy of this certificate for your records. Do not send this to the Department of Revenue
Designated Exempt Entity Division of Soil Conservation and Water Quality Iowa Department of Agriculture and Land Stewardship
Address 1 1305 East Walnut Street
Address 2
City Des Moines
State
IA
Zip Code 50319
Construction Project Name Flo971523B Nutrient Reduction Wetland Project
Construction Project Number (if used) Job No. 25-14
General Contractor or Subcontractor Name Sample
Address 1 123 Construction Ave
Address 2
City Dig City
State
IA
Zip Code 55555
Description of contract/subcontract (please print/type clearly)
Construction of Nutrient Reduction Wetland.
The named contractor may purchase building materials used in the contract, exempt from sales tax. This exemption does NOT apply to materials, equipment and supplies consumed by the contractor or subcontractor.
Designated Exempt Entity Authorized Agent ._____________________________________ Date: _____________
Authorization Letter From Division of Soil Conservation and Water Quality - Agriculture and Land Stewardship
Pursuant to Iowa Code Sections: 422.42 (16) & (17), and 422.47 (5), you are authorized to purchase construction materials tax free for the contract specified above.
The exemption certificate (or a copy of the certificate) may be provided to the suppliers of your construction materials and will authorize them to sell you the materials exempt from Iowa sales tax and any applicable local option sales tax and school infrastructure local option sales tax. Complete information on qualifying materials can be found at www.state.ia.us/tax, the Department of Revenue (IDR) website.
It is your responsibility to have records identifying the materials purchased and verifying they were used on this contract. Any materials purchased tax-free and not used on the construction project are subject to sales and applicable local option taxes. Should this occur, the tax must be paid directly by you to IDR in the same calendar quarter the project is completed. E-mail the department at: idrf@idrf.state.ia.us if you have questions on this requirement.
Contractors should be aware that use of the certificate to claim exemption from tax for items not used on this project or that do not qualify for exemption could result in civil or criminal penalties.
31-013 (12/10/02)
END OF DOCUMENT QQ