This file consists of mechanical, electrical, and plumbing (MEP) design drawings and schedules for the Fine Arts Instructional Center Boiler Replacement project at Eastern Connecticut State University (ECSU) in Willimantic, Connecticut. The project involves the installation of three high-efficiency natural gas condensing hot water boilers (Lochinvar FBN2501 model, 2,400–2,500 MBH input rating) with associated boilers pumps, hydronic piping, combustion air systems, flue vent piping, natural gas piping, condensate drainage systems, and electrical power and control wiring. The scope of work includes removal and disposal of existing boiler(s), combustion air and flue vent piping, hydronic piping, and associated equipment; infilling of unused masonry wall penetrations; creation of new exterior wall penetrations; connection to existing natural gas and hydronic systems; installation of new piping, power wiring, and controls; and testing and startup of new equipment. The drawings are dated October 23, 2026, and include mechanical demolition plans, new work plans, equipment schedules, and detailed specifications for boiler installations, pump selection, pressure relief valves, filter feeders, electrical disconnect switches, and emergency shutdown circuits.

The boiler specifications indicate each unit operates at 208 volts, 3-phase, 60 Hz with a 4.5 ampere full load and a 15-ampere maximum overload protection rating. Each boiler shall be paired with a Bell & Gossett ECM XL pump (Model 40-275) rated at 2.0 horsepower, 208–230 volts, single-phase, 60 Hz, delivering 30 GPM at 120 feet of head. The project requires contractor site visits to verify existing conditions prior to bid submission, field verification of boiler sizes and clearances, pressure testing of all new piping to 1.5 times working pressure or 100 PSI, and coordination with ECSU Facilities Management & Planning with a minimum of two weeks' notice for utility shutdowns and 48 hours' notice prior to work commencement. The contractor must comply with OSHA lockout/tagout regulations, Connecticut Code requirements for inspections and testing, and environmental regulations for refrigeration system isolation and drainage. All work must be coordinated with the existing structural framing, and existing equipment including pumps, variable frequency drives, chillers, and heat exchangers are to remain in service. No specific contract award date, response deadline, or pricing information is provided in these design documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FINE ARTS INSTRUCTIONAL CENTER

BOILER REPLACEMENT

PROJECT # ECSU 2026-10

Facilities Management & Planning

KARIM ISMAILI

PRESIDENT

DATE: 10-23-2026

EASTERN CONNECTICUT STATE UNIVERSITY

WILLIMANTIC, CONNECTICUT

PROJECT

LOCATION

LOCATION PLAN

LIST OF DRAWINGS

COVER

MED-1 MECHANICAL AND ELECTRICAL DEMOLITION PLAN

ME-1 MECHANICAL AND ELECTRICAL NEW WORK PLAN

ME-2 MECHANICAL AND ELECTRICAL SCHEDULES

ME-3 MECHANICAL AND ELECTRICAL DETAILS

M

AN

SF

IE

LD

C

IT

Y

RO

AD

x x x x x x x x x x x xx xx x x x xx x x x xxx x xx xx x x x x x x x x x x x x x x x x xxxxx x x x x x x x x x x x x x x x xxx x xxxx x x x x x xx x x x x x x x x xx x xx xx x x x x x x x x xxxx x x x x x x xx x x x x x xx x x x x x xxx x x x x x x x x x x x x x x

BA

N

K

ST

RE

ET

W

AL

N

UT

S

TR

EE

T

MAIN STREET

CL

O

CK

ROAD

TOWER

MAIN STREET

BR

ID

G E

ST

RE

ET

RO

UT

E

W

IN

D

HA

M S

TR

EE

T

C

LO

C K

TO

W

ER

R

O

AD

YO

UN

G R

O

AD

EXT.

VILLAGE ROAD

BI

RC

H

ST

RE

ET

CHARTER OAK ROAD

PIGEON ROAD

RIDGEWOOD ROAD

SERWAN AVE.

WINDHAM HIGH SCHOOL

HI

G

H

ST

RE

ET

WASHBURN STREET

EASTERN ROAD

LEWISTON AVE.

SUMMIT STREET

PROSPECT STREET

W

IN

D

HA

M S

TR

EE

T

VALLEY STREET

HI

G

H

ST

RE

ET

SCHOOL HOUSE LANE

W

ES

T

RO

AD

VILLAGE ROAD

CHA

RTE

R O

AK

RO

AD

O

AK RO

AD

EASTERN

RO

AD

CHARTER

OAK

RO

AD

CH

AR

TE

R

ROUTE 6 EASTBOUND

ROUTE 6 WESTBOUND

FA ANSI D COV.DWG

SITE PLAN

LOCATION OF SITE

x x xxxx

ECSU

ATHLETIC

COMPLEX

ECSU "NORTH" CAMPUS

ECSU "SOUTH" CAMPUS

CHARTER OAK ROAD

WINDHAM HIGH SCHOOL

HI

G

H

ST

RE

ET

EASTERN ROAD

CHA

RTE

R O

AK

RO

AD

O

AK RO

AD

EASTERN

RO

AD

CHARTER

AutoCAD SHX Text

SW

AutoCAD SHX Text W

AutoCAD SHX Text

NW

AutoCAD SHX Text

SE

AutoCAD SHX Text E

AutoCAD SHX Text

NE

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text Dr.

AutoCAD SHX Text Bit.

AutoCAD SHX Text Paved

AutoCAD SHX Text Paved

AutoCAD SHX Text Bit.

AutoCAD SHX Text

EXISTING CURB

AutoCAD SHX Text

SW

AutoCAD SHX Text W

AutoCAD SHX Text

NW

AutoCAD SHX Text

SE

AutoCAD SHX Text E

AutoCAD SHX Text

NE

AutoCAD SHX Text S

AutoCAD SHX Text N

Michael Williams

CT PE

REMOVE ALL EXISTING

COMBUSTION AIR INLET PIPING AND

AIR INLET TERMINATIONS SERVING

EACH BOILER.

EXISTING PENETRATION TO BE

RE-USED (TYP).

REMOVE EXISTING NAT GAS

BOILER(S) ONE AT A TIME

ACCORDING TO REPLACEMENT

SCHEDULE COORDINATED WITH NEW

WORK (TYP).

REMOVE ALL ASSOCIATED GAS

PIPING, CONDENSATE DRAIN

PIPING/TRIM, HYDRONIC PIPING,

VALVES & TRIM INCLUDING PIPE

SUPPORTS AND PIPE INSULATION,

POWER CONDUCTORS, RACEWAY,

AND CONTROLS (TYP).

REMOVE HYDRONIC PIPING RISERS

TO/FROM EACH BOILER ISOLATION

VALVES TO EACH BOILER

INLET/OUTLET INCLUDING FITTING,

VALVES, SUPPORTS AND TRIM.

COORDINATE WORK WITH EXISTING

CONDITIONS AND REPLACEMENT

SCHEDULE OF EACH BOILER (TYP).

TX-M-XF

B

B.8

C

D

D.2

2 3

C.5

MECHANICAL

FIRE

PROTECTION

003A

195 SF

ELECTRICAL

003B

827 SF

B.5

B-1

B-2

B-3

CWP-1

CWP-2

CWP-3

SHWP-1 SHWP-2 SHWP-3 SHWP-4 SGP-1 SGP-2

HX-1

CHP-1

CHP-2

CHP-3

ET-1

ET-2

ET-3

CH-1

CH-2

VF

D-

CW

P-

VF

D-

SH

W

P-

VF

D-

CW

P-

VF

D-

CW

P-

VF

D-

SH

W

P-

VF

D-

SH

W

P-

VF

D-

SH

W

P-

VF

D-

SG

P-

VF

D-

SG

P-

VF

D-

CH

P-

VF

D-

CH

P-

VF

D-

CH

P-

4" H

W R

4" H

W R

4" H

W R

6" HWR

AS-2

6" HWS TO SHWP-1,2

6" HWR

6" H

W R6"

H W

R 6"

H W

R

6" H

W S

FR

O

M B

LD

G

FR

O

M H

X-

7"Ø ID

10"Ø ID

7"Ø ID

12"Ø OD

10"Ø ID

12"Ø OD

10"Ø ID

12"Ø OD

6" HWS TO SHWP-3,4

FD

FD

FD

3" H

W S3" H

W R

3" H

W R 3"

H W

S

3" H

W R 3"

H W

S

EXISTING PUMPS TO REMAIN (TYP).

EXISTING VFD'S TO REMAIN (TYP).

EXISTING CHILLER TO REMAIN (TYP).

EXISTING CHILLER TO REMAIN (TYP).

EXISTING PUMPS AND HEAT EXCHANGER TO REMAIN (TYP).

REMOVE SECTION OF HYDRONIC

PIPING TO ACCOMMODATE THE

NEW WORK.

EXISTING 4.5" THK CONCRETE

HOUSEKEEPING PAD TO REMAIN.

CONFIRM DIMENSIONS WORK WITH

NEW BOILER SIZE & LAYOUT.

EXTEND IF NECESSARY.

(TYP FOR EACH BOILER).

REMOVE ALL FLUE VENT OUTLET

PIPING AND OUTLET TERMINATIONS

SERVING EACH BOILER.

EXISTING PENETRATION TO BE

RE-USED (TYP).

EXISTING FLOOR

DRAIN TO REMAIN

(TYP).

REMOVE TEE AND SECTION TO

PIPING TO BOILER HWR MAIN TO

BOILER(S).

M

PH

-G

M

PL

-G

M

PL

-G M

PL

(S ec -2

FILT

6" PVC VENT

FROM GAS HWH

REMOVE FLUE VENT OUTLET PIPING

AND OUTLET TERMINATIONS

SERVING HOT WATER HEATER.

REMOVE 6" PVC FLUE VENT PIPE TO

ACCOMMODATE NEW OUTLET

HEIGHT. COORDINATE W/NEW WORK.

EM-BLR

SHUTDOWN

EXISTING HYDRONIC HWS&R

ISOLATION VALVE SERVING EACH

BOILER TO REMAIN (TYP).

REMOVE EXISTING HOT WATER

SYSTEM SHOT-FEEDER INCLUDING

PIPING BACK TO PUMP RISER

SHUTOFF VALVE(S).

LINETYPE LEGEND

EXISTING TO BE REMOVED (DEMOLITION)

EXISTING TO REMAIN

BB.8CD C.5 B.5

MECH RM

FIN FLOOR: 0 FT - 0 IN

1ST - FLOOR

FIN FLOOR: 20 FT - 0 IN

REMOVE ALL EXISTING

COMBUSTION AIR INLET PIPING AND

AIR INLET TERMINATIONS SERVING

EACH BOILER.

EXISTING PENETRATION TO BE

RE-USED (TYP).

REMOVE ALL FLUE VENT OUTLET

PIPING AND OUTLET TERMINATIONS

SERVING EACH BOILER.

EXISTING PENETRATION TO BE

RE-USED (TYP).

REMOVE/RELOCATE FLUE VENT

OUTLET PIPING AND OUTLET

TERMINATION SERVING HOT

WATER HEATER.

AS NOTED

MECHANICAL

DEMOLITION PLAN

FA_MEP-1_8-19-2026_.DWG

1/4"=1'-0"

GRAPHIC SCALE

SCALE IN FEET

0 4 8

DEMOLITION NOTES

NOTES:

1. FOR DRAWING CLARITY NOT ALL EXISTING SYSTEMS ARE SHOWN OR NOTED ON THE DRAWINGS. CONTRACTOR SHALL VISIT THE SITE TO UNDERSTAND THE EXTENT OF EXISTING CONDITIONS, CONFIRM THE SCOPE OF WORK AND EXISTING CONDITIONS

PRIOR TO SUBMITTING BID.

2. ECSU MAY CHOOSE TO RETAIN ITEMS/DEVICES/EQUIPMENT INDICATED AS REMOVED OR AS DEMOLITION FOR THIS PROJECT.

CONTRACTOR SHALL CONFIRM WITH ECSU FACILITIES & PLANNING WHAT (IF ANY) MATERIALS ARE INTENDED TO BE RETAINED

BY ECSU PRIOR TO REMOVAL FROM SERVICE AND SITE.

3. MECHANICAL DRAWINGS AND INFORMATION SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

FIELD VERIFICATION OF EXISTING CONDITIONS PRIOR TO THE START OF WORK.

4. THE CONTRACTOR SHALL VERIFY THE EXTENT OF DEMOLITION AND CONFIRM CONNECTION POINTS OF EXISTING COMPONENTS TO REMAIN IN THE FIELD. BEGINNING OF DEMOLITION WORK MEANS CONTRACTOR ACCEPTS EXISTING CONDITIONS AND FULLY UNDERSTANDS SCOPE FOR CONNECTION TO EXISTING. PREMATURE OR EXCESSIVE DEMOLITION OR FAILURE TO RETAIN COMPONENTS OF THE SYSTEM SHALL RESULT IN THE CONTRACTOR PROVIDING REPLACEMENT AT NO

ADDITIONAL COST TO THE OWNER.

5. THE CONTRACTOR SHALL NOTIFY ECSU FACILITIES MANAGEMENT & PLANNING A MINIMUM OF 2 WEEKS PRIOR TO ANY UTILITY

SHUTDOWN AND A MINIMUM OF 48 HRS PRIOR TO START OF ANY WORK.

6. ALL EQUIPMENT, DEVICES, PIPING, WIRING AND CONTROLS SHALL BE ISOLATED AND BROUGHT TO A ZERO ENERGY STATE IN ACCORDANCE WITH OSHA REGULATIONS PRIOR TO THE START OF ANY WORK. ISOLATION AND DISCONNECTION OF ALL ELECTRICAL POWER & CONTROLS SHALL BE DONE BY A LICENSED ELECTRICIAN. ISOLATION, DRAINING OF PIPING AND REFRIGERATION SYSTEM SHALL BE BE DONE BY A LICENSED MECHANIC. FOLLOW ENVIRONMENTAL REGULATIONS.

7. CONTRACTOR SHALL CLEAN/REPAIR AND MAKE READY ANY EXISTING MATERIALS AND/OR EQUIPMENT THAT IS TO REMAIN IN

SERVICE AND REUSED AS A FUNCTIONING PART OF THIS PROJECT.

10/23/2026

ECSU-2026-10

Fa ci lit ie s M an ag em en t a nd P la nn in g

W in dh am S tre et

, W ill im an tic C

T

E A

ST

E

R N

C O

N N

E C

T

IC

U T

S T

A T

E U

N

IV

E R

SI

T

Y

INSTRUCTIONAL

BOILER

REPLACEMENT

FINE ARTS

CENTER

AND ELECTRICAL

AutoCAD SHX Text

COMB AIR INLET

AutoCAD SHX Text

FLUE GAS OUTLET

AutoCAD SHX Text

FLUE GAS OUTLET

AutoCAD SHX Text

COMB AIR INLET

AutoCAD SHX Text

FLUE GAS OUTLET

AutoCAD SHX Text

MED-1

AutoCAD SHX Text

AutoCAD SHX Text

FLUE GAS OUTLET

AutoCAD SHX Text

MED-1

AutoCAD SHX Text

AutoCAD SHX Text

MED-1

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text

%%UMECHANICAL DEMOLITION PLAN

AutoCAD SHX Text Drawing Name:

AutoCAD SHX Text CAD File Name:

AutoCAD SHX Text Drawing No.:

AutoCAD SHX Text Date

AutoCAD SHX Text Revision/Issue

AutoCAD SHX Text No.

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Sheet No.:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text Date:

AutoCAD SHX Text Scale:

AutoCAD SHX Text

SW

AutoCAD SHX Text W

AutoCAD SHX Text

NW

AutoCAD SHX Text

SE

AutoCAD SHX Text E

AutoCAD SHX Text

NE

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text

MED-1

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text

%%UEXTERIOR WALL ELEVATION VIEW

LINETYPE LEGEND

EXISTING TO BE REMOVED (DEMOLITION)

EXISTING TO REMAIN

PROVIDE WALL PENETRATION

KIT (MTL-FAB "WPK").

PROVIDE SEALANT & STAINLESS

STEEL FASTENERS

(TYP FOR EACH BOILER).

PROVIDE 8" SCH-40 PVC COMBUSTION AIR

INLET PIPE. TERMINATE W/ BIRD SCREEN.

PROVIDE FLEXIBLE WETHER-PROOF SEALANT

COLOR: MATCH MOTOR JOINTS.

(TYP FOR EACH BOILER).

PRIME & PAINT EXTERIOR PVC

COLOR: MATCH BRICK.

(TYP FOR EACH BOILER).

RE-USE EXISTING EXTERIOR WALL

PENETRATION(S) FOR

COMBUSTION AIR INLET.

(TYP FOR EACH BOILER).

B

B.8

C

D

D.2

2 3

C.5

MECHANICAL

FIRE

PROTECTION

003A

195 SF

ELECTRICAL

003B

827 SF

ELE.

MACHINE

ROOM

72 SF

ELEVATOR

10EL1

82 SF

ELEV.

LOBBY

MDF

003D

215 SF

B.5

B-1

B-2

B-3

CWP-1

CWP-2

CWP-3

SHWP-1 SHWP-2 SHWP-3 SHWP-4 SGP-1 SGP-2

HX-1

CHP-1

CHP-2

CHP-3

ET-1

ET-2

ET-3

CH-1

CH-2

VF

D-

CW

P-

VF

D-

SH

W

P-

VF

D-

CW

P-

VF

D-

CW

P-

VF

D-

SH

W

P-

VF

D-

SH

W

P-

VF

D-

SH

W

P-

VF

D-

SG

P-

VF

D-

SG

P-

VF

D-

CH

P-

VF

D-

CH

P-

VF

D-

CH

P-

4" H

W R

4" H

W R

4" H

W R

6" HWR

6" HWS TO SHWP-1,2

6" HWR

6" H

W R

6" H

W R

6" H

W R

6" H

W

S FR

O M

B

LD

G

FR

O

M H

X-

6" HWS TO SHWP-3,4

FD

FD

FD

3" H

W S

3" H

W R

6" HWR

10"Ø ID - 12" OD

8"Ø SCH-40 PVC

10"Ø ID - 12" OD

10"Ø ID - 12" OD

8"Ø SCH-40 PVC

8"Ø SCH-40 PVC

3" HWR

BP-3

3" HWR

BP-2

3" HWR

BP-1

3" HWS

3" HWS

3" HWS

CORE BORE EXTERIOR WALL FOR NEW

FLUE VENT PENETRATION(S).

CONFIRM QTY, SIZE AND NUMBER IN

FIELD PRIOR TO WORK

(TYP FOR EACH BOILER).

(C-LINE)

(C-LINE)

(C-LINE)

COORDINATE SUPPORT OF NEW WORK

WITH EXISTING STRUCTURAL LOCATIONS

& MISC STEEL SUPPORTS.

DO NOT CREATE NEW DECK SUPPORT

LOCATIONS OR ALTER SOUND PROOFING

MATERIAL AT DECK (TYP).

PROVIDE MITER CUT

HORIZONTAL TERMINATION

WITH STAINLESS STEEL BIRD

SCREEN (MTL-FAB "MCM").

(TYP FOR EACH BOILER).

PROVIDE FLANGED

CONNECTION SO CA PIPE CAN

EASILLY BE DISCONNECTED

FOR SERVICE (TYP).

EXISTING CONCRETE

HOUSEKEEPING PAD TO REMAIN.

CONFIRM DIMENSIONS WORK WITH

NEW BOILER SIZE & LAYOUT.

EXTEND IF NECESSARY.

(TYP FOR EACH BOILER).

MAINTAIN BOILER MANUFACTURER

INSTALL/SERVICE CLEARANCES.

CONFIRM SIZE PRIOR TO SETTING

AND INSTALLING BOILERS (TYP).

EXISTING PUMPS TO REMAIN (TYP).

EXISTING VFD'S TO REMAIN (TYP). EXISTING CHILLER TO REMAIN (TYP).

EXISTING CHILLER TO REMAIN (TYP).

EXISTING PUMPS AND HEAT EXCHANGER TO REMAIN (TYP).

2" Con d

2" C on d

2" C on d

PROVIDE 3" SCH-40 STEEL HYDRONIC HWS&R

PIPING TO/FROM EACH BOILER TO EXISTING

MAIN W/ISOLATION VALVE.

EXISTING ISOLATION VALVE(S) SERVING

EACH BOILER ARE TO REMAIN.

PROVIDE NEW HYDRONIC PIPING, VALVES &

TRIM PER BOILER MANUF

RECOMMENDATIONS AND DETAIL(S) 2/ME-1

AND 6/ME-3.

(TYPICAL FOR EACH BOILER).

PROVIDE 6" SCH-80 HWS & HWR

FLANGED SPOOL PIECE THRU WALL

W/CAPS (BOTH ENDS) SERVING AS

FUTURE TEMP HYDRONIC SYSTEM

CONNECTION POINTS TO MECH ROOM.

RE-USE EXISTING WALL OPENINGS

AND PROVIDE LIQUID-TIGHT SEALANT.

COLOR: MATCH MORTAR JOINTS.

PAINT EXTERIOR PIPING.

COLOR: MATCH FACE BRICK COLOR.

DSW

DSW

DSW

AS-2

PROVIDE NEW STRUT SUPPORT

WITH DISCONNECT SWITCHES

SERVING BOILER & BOILER PUMPS

(TYP).

REFER TO 1/ME-3 FOR ELECTRICAL

POWER DIAGRAM FOR BOILERS AND

PUMPS (TYP).

TX-M-XF

M

PH

-G

M

PL

-G

M

PL

-G M

PL

(S ec -2

FILT

6"Ø PVC

PROVIDE 6" SCH-40 PVC PIPE AND FITTINGS

SERVING HWHW EXHAUST VENT. TERMINATE

W/ 45° MITER CUT. PROVIDE FLEXIBLE

WETHER-PROOF SEALANT.

SEALANT COLOR: MATCH MOTOR JOINTS.

(TYP FOR EACH BOILER).

PRIME & PAINT EXTERIOR PVC

PIPE COLOR: MATCH BRICK.

CON-BLR

ETR CON-BP

PROVIDE NEW ROLLER TYPE PIPE HANGER

WITH THREADED ROD. CONNECT TO EXISTING

STRUCTURAL FRAMING. PROVIDE MISC MTL

SUPPORTS TO ACCOMMODATE NEW PIPE

HANGER LOCATIONS (TYP).

EM-BLR

SHUTDOWN

EM-BLR

SHUTDOWN

NEW GAS MONITOR FOR CARBON

MONOXIDE (CO) AND NAT GAS (CH4)

CONNECTED TO BMS SYSTEM PROVIDED

BY CONTROLS CONTRACTOR (TYP).

NEW EM-BLR SHUTDOWN

CONTACTOR. REFER TO 1/ME-3 FOR

DETAIL.

PROVIDE NEW FILTER FEEDER

WITH MAGNETIC INLINE FILTER

AND NEW PIPING TO/FROM

EXISTING HW PUMP RISERS.

REFER TO 5/ME-3 AND

SPECIFICATIONS FOR DETAILS.

FT-1

8"Ø SCH-40 PVC

10"Ø ID - 12" OD

"Ø

ID

" O

D

B-3

2" Nat Gas

EXISTING CONCRETE

HOUSEKEEPING PAD TO REMAIN.

CONFIRM DIMENSIONS WORK WITH

NEW BOILER SIZE & LAYOUT

(TYP FOR EACH BOILER).

MAINTAIN BOILER MANUFACTURER

INSTALL/SERVICE CLEARANCES.

CONFIRM SIZE PRIOR TO SETTING

CONCRETE PAD AND INSTALLING

BOILERS (TYP).

PROVIDE BOLTED PVC FLANGE

CONNECTION TO BOILER ALLOWING

PIPE TO BE DISCONNECTED FOR

SERVICE/TOP ACCESS

(TYP FOR EACH BOILER).

PROVIDE INSULATED DOUBLE WALL

SPECIAL GAS VENT EQUAL TO

METAL-FAB "CORR/GUARD" FCS-1.

STAINLESS STEEL INNER & OUTER

PIPE W/1" THICK INSULATION.

REFER TO SPECIFICATIONS FOR

DETAILS. (TYP FOR EACH BOILER).

2" NAT-GAS

(TYP FOR EACH BOILER)

PROVIDE FINAL GAS CONNECTION

TO EACH BOILER PER MANUF.

RECOMMENDATIONS.

SEDIMENT TRAP PROVIDED WITHIN

BOILER HOUSING REFER TO DETAIL

3/ME-3.

PROVIDE NEW GAS SHUTOFF VALVE

WITH UNION SERVING EACH BOILER.

PROVIDE CONDENSATE NEUTRALIZATION

KIT BY BOILER MANUF SIZED FOR BOILER

INPUT CAPACITY. PROVIDE WITH PH

NEUTRALIZATION MEDIA AND DRAIN

TRAP.

PROVIDE FINAL CONDENSATE DRAIN

CONNECTION TO EACH BOILER PER

MANUF. RECOMMENDATIONS.

REFER TO TO DETAIL 4/ME-3.

(TYP FOR EACH BOILER).

PROVIDE 2" SCH-40 CPVC CONDENSATE

DRAIN PIPE RUN ALONG FOUNDATION

WALL AND TERMINATING AT EXISTING

FLOOR DRAIN (TYP).

EXISTING 4" NAT GAS MAIN W/SUPPORT

FRAME TO REMAIN (TYP).

PAINT ALL EXISTING EXPOSED GAS

PIPING "SAFETY YELLOW" AND PROVIDE

PIPE LABLES (TYP).

PROVIDE MITER CUT

HORIZONTAL TERMINATION

WITH STAINLESS STEEL BIRD

SCREEN (MTL-FAB "MCM").

(TYP FOR EACH BOILER).

PROVIDE SEALANT MAKING

PENETRATION LIQUID-TIGHT

(TYP FOR EACH PENETRATION).

PROVIDE SEALANT MAKING

PENETRATION LIQUID-TIGHT.

COLOR: MATCH MORTAR JOINT

(TYP FOR EACH WALL PENETRATION).

PROVIDE 8" SCH-40 PVC COMBUSTION AIR

INLET PIPE. TERMINATE W/ BIRD SCREEN.

PROVIDE FLEXIBLE WETHER-PROOF SEALANT

COLOR: MATCH MOTOR JOINTS.

(TYP FOR EACH BOILER).

PRIME & PAINT EXTERIOR PVC

COLOR: MATCH BRICK.

(TYP FOR EACH BOILER).

PROVIDE STAINLESS STEEL VENT

ADAPTER (TYP EACH BOILER).

PROVIDE HYDRONIC PIPE

CONNECTION PER BOILER MANUF.

RECOMMENDATIONS

(TYP FOR EACH BOILER)

PROVIDE NEW RISER SUPPORT FOR

NEW VENT (TYP FOR EACH BOILER).

PROVIDE NEW UNI-STRUT SUPPORT

FRAME FOR MOUNTING NEW

DEVICES AND EQUIPMENT (TYP)

BB.8CD C.5 B.5

MECH RM

FIN FLOOR: 0 FT - 0 IN

1ST - FLOOR

FIN FLOOR: 20 FT - 0 IN

PROVIDE STAINLESS STEEL WALL

PENETRATION FLANGE W/PIPE

COLLAR.

PROVIDE SEALANT & STAINLESS STEEL

FASTENERS.

(TYP EXIST WATER HEATER VENT).

PROVIDE 8" SCH-40 PVC COMBUSTION AIR INLET PIPE.

TERMINATE W/ BIRD SCREEN. PROVIDE FLEXIBLE

WETHER-PROOF SEALANT

COLOR: MATCH MOTOR JOINTS.

(TYP FOR EACH BOILER).

RE-USE EXISTING EXTERIOR WALL PENETRATION(S)

FOR NEW COMBUSTION AIR INLET.

(TYP FOR EACH BOILER).

PRIME & PAINT EXTERIOR PVC

COLOR: MATCH FACE BRICK.

(TYP FOR EACH BOILER).

CORE BORE EXTERIOR WALL FOR NEW

FLUE VENT PENETRATION(S).

CONFIRM QTY, SIZE AND NUMBER IN

FIELD PRIOR TO WORK

(TYP FOR EACH BOILER).

PROVIDE 6" SCH-80 HWS & HWR

FLANGED SPOOL PIECE THRU WALL

W/CAPS (BOTH ENDS) SERVING AS

FUTURE TEMP BOILER CONNECTION

POINTS TO MECH ROOM.

RE-USE EXISTING WALL OPENINGS

AND PROVIDE LIQUID-TIGHT SEALANT.

COLOR: MATCH MORTAR JOINTS.

PAINT EXTERIOR PIPING.

COLOR: MATCH FACE BRICK COLOR.

CORE BORE EXTERIOR WALL FOR NEW

FLUE VENT PENETRATION SERVING

EXISTING WATER HEATER VENT.

CONFIRM SIZE IN FIELD PRIOR TO WORK.

PROVIDE WALL PENETRATION

KIT (MTL-FAB "WPK").

PROVIDE SEALANT & STAINLESS

STEEL FASTENERS

(TYP FOR EACH BOILER).

EXTEND/MODIFY EXISTING VENT PIPE TO

ACCOMMODATE NEW TERMINATION

LOCATION. PROVIDE NEW FIRRINGS.

TERMINATE W/45° MITER CUT WITH

STAINLESS STEEL BIRD SCREEN.

PAIN EXPOSED PIPE.

COLOR: MATCH FACE BRICK.

INFILL ABANDON PENETRATION WITH

FACE BRICK & MORTAR LIQUID-TIGHT.

MATCH EXISTING FACE BRICK & MORTAR

JOINT COLOR & TEXTURE (TYP).

PROVIDE WALL PENETRATING RADAR

SERVICES TO REVIEW EXTERIOR WALL

FOR HIDDEN OBSTACLES WITHIN WALL

CAVITY CONFIRMING LOCATIONS PRIOR

TO CORE BORE OF NEW PENETRATIONS

(TYP FOR ENTIRE AREA INDICATED).

AS NOTED

MECHANICAL

NEW WORK PLAN

FA_MEP-1_8-19-2026_.DWG

1/4"=1'-0"

GRAPHIC SCALE

SCALE IN FEET

0 4 8

10/23/2026

ECSU-2026-10

Fa ci lit ie s M an ag em en t a nd P la nn in g

W in dh am S tre et

, W ill im an tic C

T

E A

ST

E

R N

C O

N N

E C

T

IC

U T

S T

A T

E U

N

IV

E R

SI

T

Y

INSTRUCTIONAL

BOILER

REPLACEMENT

FINE ARTS

CENTER

AND ELECTRICAL

NEW WORK NOTES

NOTES:

1. FOR DRAWING CLARITY NOT ALL EXISTING SYSTEMS ARE SHOWN OR NOTED ON THE DRAWINGS.

CONTRACTOR SHALL VISIT THE SITE TO UNDERSTAND THE EXTENT OF EXISTING CONDITIONS,

CONFIRM THE SCOPE OF WORK AND EXISTING CONDITIONS PRIOR TO SUBMITTING BID.

2. DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD

VERIFICATION OF EXISTING CONDITIONS PRIOR TO THE START OF WORK.

3. THE CONTRACTOR SHALL NOTIFY ECSU FACILITIES MANAGEMENT & PLANNING A MINIMUM OF 2 WEEKS PRIOR TO ANY UTILITY SHUTDOWN AND A MINIMUM OF 48 HRS PRIOR TO START OF ANY

WORK.

4. PROVIDE INSPECTION & HYDROSTATIC PRESSURE TESTING IN ACCORDANCE WITH CT CODE OF

ALL NEW PIPING, VALVES AND ACCESSORIES. PRESSURE TEST TO THE GREATER OF 1.5 X

WORKING PRESSURE OR 100 PSI. TESTS AND INSPECTIONS SHALL BE CONFIRMED/WITNESSED BY

STATE OSBI AND ECSU STAFF.

5. CLEAN & PURGE ALL NEW & RE-USED PIPING, VALVES AND ACCESSORIES. CLEAN STRAINERS AND

FILTERS PRIOR TO SETTING INTO OPERATION.

6. ELECTRICAL CONTRACTOR SHALL FIELD VERIFY ALL CIRCUITS AND PROVIDE LOCK-OUT-TAG-OUT OF ALL EQUIPMENT & DEVICES PRIOR TO START OF ANY WORK. COORDINATE ELECTRICAL WORK

WITH REPLACEMENT SCHEDULE OF THE BOILERS INCLUDING NEW POWER WIRING AND

EM-SHUTDOWN CIRCUITS.

AutoCAD SHX Text

ME-1

AutoCAD SHX Text

AutoCAD SHX Text

COMB AIR INLET

AutoCAD SHX Text

FLUE GAS OUTLET

AutoCAD SHX Text 1'-8"

AutoCAD SHX Text

FLUE GAS OUTLET

AutoCAD SHX Text

FLUE GAS OUTLET

AutoCAD SHX Text

COMB AIR INLET

AutoCAD SHX Text

COMB AIR INLET

AutoCAD SHX Text

ME-1

AutoCAD SHX Text

AutoCAD SHX Text

FLUE GAS OUTLET

AutoCAD SHX Text

COMB AIR INLET

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text

FLUE GAS OUTLET

AutoCAD SHX Text 1'-8"

AutoCAD SHX Text 16'

AutoCAD SHX Text

COMB AIR INLET

AutoCAD SHX Text

COMB AIR INLET

AutoCAD SHX Text

COMB AIR INLET

AutoCAD SHX Text 8'

AutoCAD SHX Text

ME-1

AutoCAD SHX Text

AutoCAD SHX Text

ME-1

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text

%%UMECHANICAL, ELECTRICAL & PLUMBING NEW WORK PLAN

AutoCAD SHX Text Drawing Name:

AutoCAD SHX Text CAD File Name:

AutoCAD SHX Text Drawing No.:

AutoCAD SHX Text Date

AutoCAD SHX Text Revision/Issue

AutoCAD SHX Text No.

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Sheet No.:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text Date:

AutoCAD SHX Text Scale:

AutoCAD SHX Text

SW

AutoCAD SHX Text W

AutoCAD SHX Text

NW

AutoCAD SHX Text

SE

AutoCAD SHX Text E

AutoCAD SHX Text

NE

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text

ME-1

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text

%%UNEW BOILER LAYOUT SIDE ELEVATION VIEW

AutoCAD SHX Text

ME-1

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text

%%UEXTERIOR WALL ELEVATION VIEW

AS NOTED

MECHANICAL

SCHEDULES

FA_MEP-1_8-19-2026_.DWG

ABBREVIATION DESCRIPTION

AFF ABOVE FINISHED FLOOR

CWS COLD WATER SUPPLY

FDC FIRE DEPARTMENT CONNECTION

WM WATER METER

TYP TYPICAL

EL ELEVATION

FF FINISHED FLOOR

C-LINE CENTER LINE

MECHANICAL SYMBOLS

ABBREVIATION DESCRIPTION

P

V

OUTSIDE SCREW & YOKE GATE VALVE (OS&Y)

BUTTERFLY VALVE

PRESSURE REDUCING VALVE

PRESSURE RELIEF VALVE

AIR VENT (MANUAL OR AUTO.)

PRESSURE GAUGE

Y TYPE STRAINER

CHECK VALVE

INLINE PUMP

GATE VALVE

THERMOMETER

BALL VALVE

DBL DOUBLE OR "TWICE"

ELL 90° ELBOW

MECHANICAL ABBREVIATIONS

PUMP SCHEDULE

MANUF. / MODEL / SIZESYMBOL / TAG

DPPE = DUTY POINT PUMP EFFICIENCY (SELECTION/DESIGN POINT).

FXF = FLANGE BY FLANGE CONNECTION TYPE.

TYPE

(GPM)

FLOW

(FT H2O)

HEAD

TYPE

FLUID TRIPLE DUTY VALVE

MODEL SIZE END PREP PD (FT H2O)

ELECTRICAL MOTOR DATA

VOLTS / PHASE / Hz HP FRAME ENCLOSURE CONTROLLER

NOTES:

1. ALL POWER WIRING AND RACEWAY BY DIVISION 26 (REFER TO ELECTRICAL DRAWINGS & SPECIFICATIONS).

2. ALL PUMPS SHALL BE BRONZE FITTED WITH STAINLESS STEEL SHAFT AND SLEEVE BEARING.

3. ALL MOTORS SHALL BE PREMIUM EFFICIENCY SUITABLE FOR USE WITH VARIABLE SPEED CONTROLLERS.

4. INSTALLING CONTRACTOR TO CONFIRM SERVICE CLEARANCES PRIOR TO INSTALLATION.

5. PROVIDE PUMP SUITABLE FOR INLINE MOUNTING.

6. TEMP CONTROLS CONTRACTOR TO PROVIDE CONTROL WIRING BETWEEN BOILER AND PUMP.

7. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

BP-1 BELL & GOSSETT / ECM XL / 40-275 120 30 WATER 3DS-SB 3" FXF 3.25 208-230 / 1 / 60 2.0 ECM ODP B-1

BP-2 208-230 / 1 / 60 2.0 ODP B-2

BP-3 208-230 / 1 / 60 2.0 ODP B-3

IN-LINE, WET ROTOR/ ECM

3" FXF 3.25

3" FXF 3.25

ECM

ECM

BELL & GOSSETT / ECM XL / 40-275 30 WATERIN-LINE, WET ROTOR/ ECM

BELL & GOSSETT / ECM XL / 40-275 30 WATERIN-LINE, WET ROTOR/ ECM

MANUFACTURERTAG

B-1,2,3

LOCATION

BOILER ROOM

INPUT RATING (MBH)

HIGH EFFICIENCY CONDENSING HEATING BOILER SCHEDULE

MODEL

LOCHINVAR FBN2501

(MIN)

2400125

(MAX)

TURN

DOWN

20:1

OUTPUT RATING (MBH)

(GROSS) (AHRI)

2087 96.1

EFFICIENCY RATING (%)

(COMB) (THERM)

96.0

(COMB) = COMBUSTION EFFICIENCY RATING

(THERM) = THERMAL EFFICIENCY RATING

PHYSICAL DATA

DIMENSIONS W X D X H (IN)

35.0 X 83.75 X 77.75

WEIGHT (LBS)

2577 - SHIPPING

GAS

2"

CONNECTIONS (NOMINAL)

HWS&R

4"

AIR (IN)

8"

VENT (OUT)

10"

FLOW (GPM)

25 - 120

WATER PERFORMANCE

TEMP RISE (°F)

ELECTRICAL DATA

VOLTS / PHASE / Hz

208 / 3 / 60

CONTROLLER

CASCADE

FLA

4.5

MOP

15 A

NOTES:

1. DISCONNECT, SAFETY SWITCH(S)/CKT, POWER WIRING AND RACEWAY BY DIVISION 26 (ELECTRICAL CONTRACTOR).

2. CONTROL WIRING AND INSTALLATION OF FIELD MOUNTED EQUIPMENT/DEVICES BY DIVISION 23.

3. BOILER MANUFACTURER SHALL SELECT & FURNISH CIRCULATING PUMP FOR EACH BOILER (BP-1,2,3). DATA WITHIN PUMP SCHEDULE PROVIDED FOR BIDDING & PLANNING

PURPOSES. INSTALL OF EQUIPMENT SHALL BE BASED PUMPS SUBMITTED WITH BOILER PACKAGE.

4. BOILER MANUFACTURER TO PROVIDE MODULATING GAS VALVE W/SAFETY CONTROLS, PRESSURE SWITCH, LOW WATER CUTOFF (MANUAL RESET), HIGH TEMP LIMIT (MANUAL

RESET) SAFETY CONTROLS FOR EACH BOILER.

5. BOILER MANUFACTURER SHALL SELECT AND FURNISH CONDENSATE NEUTRALIZATION KIT FOR EACH BOILER. INSTALLING CONTRACTOR SHALL PIPE TO FLOOR DRAIN.

6. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION/REQUIREMENTS.

HYDRONIC SPECIALTIES & EQUIPMENT SCHEDULE

DESCRIPTIONTAG

RV-1 PRESSURE RELIEF VALVE: HOT WATER BOILER PRESSURE RELIEF VALVE. PROVIDE ASME RATING, BRONZE BODY CONSTRUCTION, 65 PSI PRESSURE RELIEF SETTING. PRESSURE RELIEF VALVE SHALL BE EQUAL TO B&G MODEL 1170. (PRESSURE RELIEF VALVE SIZE SHALL DETERMINED BY THE MANUFACTURER AND SHALL BE BASED ON THE HEAT INPUT OF THE BOILER PROVIDED)

INSTALLING CONTRACTOR SHALL PIPE OUTLET/DRAIN TO WITHIN 6" OF FINISHED FLOOR.

10/23/2026

ECSU-2026-10

Fa ci lit ie s M an ag em en t a nd P la nn in g

W in dh am S tre et

, W ill im an tic C

T

E A

ST

E

R N

C O

N N

E C

T

IC

U T

S T

A T

E U

N

IV

E R

SI

T

Y

INSTRUCTIONAL

BOILER

REPLACEMENT

FINE ARTS

CENTER

3DS-SB

3DS-SB

RV-2

RV-3

AND ELECTRICAL

AutoCAD SHX Text

ME-2

AutoCAD SHX Text

AutoCAD SHX Text Drawing Name:

AutoCAD SHX Text CAD File Name:

AutoCAD SHX Text Drawing No.:

AutoCAD SHX Text Date

AutoCAD SHX Text Revision/Issue

AutoCAD SHX Text No.

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Sheet No.:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text Date:

AutoCAD SHX Text Scale:

ALL CONDENSATE DRAIN PIPING SHALL BE SCH-40

CPVC AND RUN IN ACCORDANCE WITH BOILER

MANUFACTURERS RECOMMENDATIONS.

PROVIDE HIGH TEMP PLASTIC OR STAINLESS STEEL

TUBE FOR SMALL DIAMETER "BARB" TYPE DRAIN

CONNECTIONS.

MPL-G

LOCATION: INTERIOR (MECH ROOM)

NEMA-1 ENCLOSURE, CU BUS-BARS

VOLTAGE: 208/120, 3-PHASE, 4-WIRE

MAIN CB: 250 AMPS

MPL-G

MPL-G

(SEC-2)

70 CON-BLR

B-1 DSW-B-1

DSW-BP-1

BP-1

ETR CON-BP

TO MPL-G

PROVIDE NEW LIQUID TIGHT

"WHIP" FINAL CONNECTION TO

EACH PUMP MOTOR (TYP OF 3).

PROVIDE NON-FUSED DISCONNECT

SWITCH SERVING BOILER PUMPS

NEMA-1 ENCLOSURE

VOLTAGE: 208 V / 1-PHASE

30 AMP RATING

(TYP FOR EACH BOILER PUMP)

PROVIDE UNISTRUT FRAME

W/BACKBOARD FOR MOUNTING OF

ELECTRICAL EQUIPMENT SERVING

BOILERS AND BOILER PUMPS

(TYP FOR EACH BOILER UNIT).

EXISTING MULTI-POLE EM-SHUTDOWN

CONTACTOR SERVING EXISTING

BOILERS AND BOILER PUMPS.

MAINTAIN FOR USE SERVING BOILER

PUMPS.

EXTEND COIL CKT TO NEW BOILER

POWER CONTACTOR.

EXISTING RACEWAY & CONDUCTORS

SERVING BOILER PUMPS TO REMAIN

(208V/1-PHASE).

REMOVE 120V/1-PHASE CKT

(BOILER POWER) FROM EACH BOILER

BACK TO POWER PANEL MPL-G.

(TYP FOR EACH BOILER)

B-2 DSW-B-2

DSW-BP-2

BP-2B-3 DSW-B-3

DSW-BP-3

BP-3

NEW BOILER PUMP (TYP).

PROVIDE NON-FUSED DISCONNECT

SWITCH SERVING BOILER

NEMA-1 ENCLOSURE

VOLTAGE: 208 V / 3-PHASE

30 AMP RATING

(TYP FOR EACH BOILER)

PROVIDE J-BOX WITH

RELAY-IN-A-BOX (RIB) SERVING

EACH BOILER PUMP. CONTROL

POINT START/STOP OF FROM

EACH BOILER (TYP).

BRANCH CKT: TO EACH BOILER

CONDUCTORS: (3) #12 AWG CU +N +GND.

RACEWAY: 3/4" EMT.

PROVIDE NEW LIQUID TIGHT

"WHIP" FINAL CONNECTION TO

EACH BOILER (TYP OF 3).

BRANCH CKT: TO EACH BOILER PUMP

CONDUCTORS: (2) #12 AWG, CU + GND.

RACEWAY: 3/4" EMT.

BRANCH CKT: TO EACH BOILER

CONDUCTORS: (3) #12 AWG CU +N +GND.

RACEWAY: 3/4" EMT.

BRANCH CKT: TO EACH BOILER

CONDUCTORS: (3) #12 AWG CU +N +GND.

RACEWAY: 3/4" EMT.

PROVIDE ONE EM-STOP MULTI-POLE

CONTACTOR SERVING BOILER

POWER BRANCH CIRCUITS.

ENCLOSURE: NEMA-1

RATING: 208V/30 AMP/60Hz

POLES: 10 (MIN)

COORDINATE COIL VOLTAGE WITH

EXISTING EM-CKT.

EXTEND COIL CKT FROM EXISTING

EM-STOP CKT. BOTH CONTACTORS

SHALL SHUT DOWN WHEN EM-STOP

IS PRESSED.

SERVING

B-3

SERVING

B-2

SERVING

B-1

PROVIDE NEW CB FOR

EACH NEW BOILER.

RATING: 15 AMP

3-POLE (TYP).

BOILER PUMP CONTROL STOP/START

& PUMP SPEED ORIGINATED FROM

EACH BOILER (TYP).

CONTROL CONTRACTOR TO PROVIDE

CONDUCTORS, RACEWAY, RELAY AND

TO CONNECT EACH BOILER PUMP TO

RESPECTIVE BOILER (TYP).

AS NOTED

MECHANICAL

FA_MEP-1_8-19-2026_.DWG

DETAILS

10/23/2026

ECSU-2026-10

Fa ci lit ie s M an ag em en t a nd P la nn in g

W in dh am S tre et

, W ill im an tic C

T

E A

ST

E

R N

C O

N N

E C

T

IC

U T

S T

A T

E U

N

IV

E R

SI

T

Y

INSTRUCTIONAL

BOILER

REPLACEMENT

FINE ARTS

CENTER

STRUCTURAL

FLOOR FLOOR

STRUCTURAL

ELEC EQUIP.

SIDE VIEW FRONT VIEW

EXCLUSIVELY

DEDICATED

SPACE PER

NEC 110-26fNEC 110-26f

SPACE PER

DEDICATED

EXCLUSIVELY

NEC 110-26f

SPACE PER

DEDICATED

EXCLUSIVELYEXCLUSIVELY

DEDICATED

SPACE PER

NEC 110-26f

CEILING CEILING

WIDTH OF

EQUIPMENT

OR TO

STRUCTURAL

DECK

EQUIPMENT

WIDTH OF

SIDE VIEW

FLOOR

CEILING

110-26a

PER NEC

SPACE

WORKING

FRONT VIEW

FLOOR 110-26a

PER NEC

SPACE

WORKING

2'-6"

MIN.

CEILING

6' MAX.

EQUIPMENT

TOP OF

AS DEFINED

BY NEC

TABLE 110-26a

OF EQUIPMENT

OR HEIGHT

6'-6" MIN. ELEC EQUIP.ELEC EQUIP. ELEC EQUIP.

NOTES:

1. DETAIL IS PROVIDED AS AN EXAMPLE BASED ON NEC REQUIREMENTS. CONTRACTOR SHALL

VERIFY DETAILS BASED ON ADOPTED CODE REQUIREMENTS FOR THIS SPECIFIC PROJECT

AND APPLICATION.

2. COORDINATION OF ELECTRICAL SERVICE REQUIREMENTS WITH THE EXISTING CONDITIONS

AND THE WORK OF OTHER DIVISIONS IS THE RESPONSIBILITY OF DIV 26.

AND ELECTRICAL

AutoCAD SHX Text

TO RETURN MAIN

AutoCAD SHX Text

TO SUPPLY MAIN

AutoCAD SHX Text

FULL PORT SHUTOFF VALVE (TYP)

AutoCAD SHX Text

FILTER FEEDER (REFER TO SPECIFICATIONS)

AutoCAD SHX Text

PRESSURE GAUGE (TYP)

AutoCAD SHX Text

UNION (TYP)

AutoCAD SHX Text

FLOW INDICATOR

AutoCAD SHX Text

EXISTING CONC FLOOR

AutoCAD SHX Text

EXPANSION ANCHOR (TYP)

AutoCAD SHX Text

FLOW CONTROL VALVE W/SIGHT GLASS.

AutoCAD SHX Text

DRAIN VALVE AT LOW POINT (TYP).

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text PROVIDE NEODYMIUM MAGNETIC FILTER WITH SHUTOFF AND DRAIN VALVES EQUAL TO TOTAL FILTER 60003-TF1.

AutoCAD SHX Text

HWS

AutoCAD SHX Text T

AutoCAD SHX Text 3"

AutoCAD SHX Text

BOILER

AutoCAD SHX Text

CONCRETE HOUSEKEEPING PAD

AutoCAD SHX Text

REFER TO PLANS.

AutoCAD SHX Text RV-1,2,3 PRESSURE RELIEF VALVE FOR EACH BOILER BY DIV 23 (TYP). CONFIRM PRESSURE RATING & PIPE SIZE PRIOR TO ORDERING.

AutoCAD SHX Text

PRESSURE GAUGE W/SHUTOFF (TYP).

AutoCAD SHX Text

HWR

AutoCAD SHX Text T

AutoCAD SHX Text 3"

AutoCAD SHX Text

TEMPERATURE GAUGE (TYP).

AutoCAD SHX Text

TEMPERATURE SENSOR (TYP).

AutoCAD SHX Text

EXISTING BOILER RISER SHUT-OFF VALVE (TYP).

AutoCAD SHX Text

DRAIN WITH HOSE CONNECTION, CAP AND CHAIN (TYP).

AutoCAD SHX Text

CONNECT TO EXISTING (TYP).

AutoCAD SHX Text

TDV

AutoCAD SHX Text

TERMINATE 6" ABOVE FIN FLOOR (TYP).

AutoCAD SHX Text

PIPE SIZE SHALL BE RV OUTLET SIZE (TYP).

AutoCAD SHX Text

BOILER PUMP (TYP).

AutoCAD SHX Text

TRIPLE DUTY VALVE (TYP).

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text PROVIDE NEW 2" SCH-40 STEEL NAT GAS PIPING WITH NEW ISOLATION VALVE TO EACH BOILER IN ACCORDNACE WITH MANUF RECCOMENDATIONS (TYP).. PAINT ALL NAT GAS PIPING. ALL NAT GAS PIPING. NAT GAS PIPING. COLOR: SAFETY YELLOW.

AutoCAD SHX Text

REQUIRED

AutoCAD SHX Text

%%UELECTRICAL POWER DIAGRAM - BOILER POWER SUPPLY

AutoCAD SHX Text

ME-3

AutoCAD SHX Text

AutoCAD SHX Text

ME-3

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text

%%UFILTER FEEDER DETAIL

AutoCAD SHX Text

ME-3

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text

%%UBOILER HYDRONIC PIPING RISER DETAIL

AutoCAD SHX Text Drawing Name:

AutoCAD SHX Text CAD File Name:

AutoCAD SHX Text Drawing No.:

AutoCAD SHX Text Date

AutoCAD SHX Text Revision/Issue

AutoCAD SHX Text No.

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Sheet No.:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text Date:

AutoCAD SHX Text Scale:

AutoCAD SHX Text

ME-3

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text

%%UBOILER NAT GAS PIPING DETAIL

AutoCAD SHX Text

ME-3

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text

%%UBOILER CONDENSATE & NEUTRALIZER PIPING DETAIL

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text

%%UTYPICAL NEC ELECTRICAL SERVICE CLEARANCES

AutoCAD SHX Text

ME-3

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text

%%UELECTRICAL POWER DIAGRAM NEW BOILERS & PUMPS

AutoCAD SHX Text

AutoCAD SHX Text

ME-3

Sheets and Views
FA_MEP-1_8-19-2026_-MED-1
FA_MEP-1_8-19-2026_-ME-1
FA_MEP-1_8-19-2026_-ME-2
FA_MEP-1_8-19-2026_-ME-3
FA ANSI D COV-Model.pdf
Sheets and Views
FA ANSI D COV-Model

File details come from the government source that posted it. Updated .