6-2. FA Blr Rpmt Dwgs10-23-2026.pdf
PDF 3 MB Posted
- Solicitation number
- ECSU 2027-203
- Issued by
- Tolland County, Connecticut
About this file
This file consists of mechanical, electrical, and plumbing (MEP) design drawings and schedules for the Fine Arts Instructional Center Boiler Replacement project at Eastern Connecticut State University (ECSU) in Willimantic, Connecticut. The project involves the installation of three high-efficiency natural gas condensing hot water boilers (Lochinvar FBN2501 model, 2,400–2,500 MBH input rating) with associated boilers pumps, hydronic piping, combustion air systems, flue vent piping, natural gas piping, condensate drainage systems, and electrical power and control wiring. The scope of work includes removal and disposal of existing boiler(s), combustion air and flue vent piping, hydronic piping, and associated equipment; infilling of unused masonry wall penetrations; creation of new exterior wall penetrations; connection to existing natural gas and hydronic systems; installation of new piping, power wiring, and controls; and testing and startup of new equipment. The drawings are dated October 23, 2026, and include mechanical demolition plans, new work plans, equipment schedules, and detailed specifications for boiler installations, pump selection, pressure relief valves, filter feeders, electrical disconnect switches, and emergency shutdown circuits.
The boiler specifications indicate each unit operates at 208 volts, 3-phase, 60 Hz with a 4.5 ampere full load and a 15-ampere maximum overload protection rating. Each boiler shall be paired with a Bell & Gossett ECM XL pump (Model 40-275) rated at 2.0 horsepower, 208–230 volts, single-phase, 60 Hz, delivering 30 GPM at 120 feet of head. The project requires contractor site visits to verify existing conditions prior to bid submission, field verification of boiler sizes and clearances, pressure testing of all new piping to 1.5 times working pressure or 100 PSI, and coordination with ECSU Facilities Management & Planning with a minimum of two weeks' notice for utility shutdowns and 48 hours' notice prior to work commencement. The contractor must comply with OSHA lockout/tagout regulations, Connecticut Code requirements for inspections and testing, and environmental regulations for refrigeration system isolation and drainage. All work must be coordinated with the existing structural framing, and existing equipment including pumps, variable frequency drives, chillers, and heat exchangers are to remain in service. No specific contract award date, response deadline, or pricing information is provided in these design documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-ECSU Parking Building Map.pdf | ||
| 5-Bid cover sheet.pdf | ||
| 1-EXHIBIT B SAMPLE CONTRACT.docx | DOCX document | |
| 3-CSUTerms and Conditions.pdf | ||
| 7-1. FA Blr Rplmt Project Manual.pdf | ||
| 4-6. ADMINISTRATIVE OVERVIEW BID updated use this template.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FINE ARTS INSTRUCTIONAL CENTER
BOILER REPLACEMENT
PROJECT # ECSU 2026-10
Facilities Management & Planning
KARIM ISMAILI
PRESIDENT
DATE: 10-23-2026
EASTERN CONNECTICUT STATE UNIVERSITY
WILLIMANTIC, CONNECTICUT
PROJECT
LOCATION
LOCATION PLAN
LIST OF DRAWINGS
COVER
MED-1 MECHANICAL AND ELECTRICAL DEMOLITION PLAN
ME-1 MECHANICAL AND ELECTRICAL NEW WORK PLAN
ME-2 MECHANICAL AND ELECTRICAL SCHEDULES
ME-3 MECHANICAL AND ELECTRICAL DETAILS
M
AN
SF
IE
LD
C
IT
Y
RO
AD
x x x x x x x x x x x xx xx x x x xx x x x xxx x xx xx x x x x x x x x x x x x x x x x xxxxx x x x x x x x x x x x x x x x xxx x xxxx x x x x x xx x x x x x x x x xx x xx xx x x x x x x x x xxxx x x x x x x xx x x x x x xx x x x x x xxx x x x x x x x x x x x x x x
BA
N
K
ST
RE
ET
W
AL
N
UT
S
TR
EE
T
MAIN STREET
CL
O
CK
ROAD
TOWER
MAIN STREET
BR
ID
G E
ST
RE
ET
RO
UT
E
W
IN
D
HA
M S
TR
EE
T
C
LO
C K
TO
W
ER
R
O
AD
YO
UN
G R
O
AD
EXT.
VILLAGE ROAD
BI
RC
H
ST
RE
ET
CHARTER OAK ROAD
PIGEON ROAD
RIDGEWOOD ROAD
SERWAN AVE.
WINDHAM HIGH SCHOOL
HI
G
H
ST
RE
ET
WASHBURN STREET
EASTERN ROAD
LEWISTON AVE.
SUMMIT STREET
PROSPECT STREET
W
IN
D
HA
M S
TR
EE
T
VALLEY STREET
HI
G
H
ST
RE
ET
SCHOOL HOUSE LANE
W
ES
T
RO
AD
VILLAGE ROAD
CHA
RTE
R O
AK
RO
AD
O
AK RO
AD
EASTERN
RO
AD
CHARTER
OAK
RO
AD
CH
AR
TE
R
ROUTE 6 EASTBOUND
ROUTE 6 WESTBOUND
FA ANSI D COV.DWG
SITE PLAN
LOCATION OF SITE
x x xxxx
ECSU
ATHLETIC
COMPLEX
ECSU "NORTH" CAMPUS
ECSU "SOUTH" CAMPUS
CHARTER OAK ROAD
WINDHAM HIGH SCHOOL
HI
G
H
ST
RE
ET
EASTERN ROAD
CHA
RTE
R O
AK
RO
AD
O
AK RO
AD
EASTERN
RO
AD
CHARTER
AutoCAD SHX Text
SW
AutoCAD SHX Text W
AutoCAD SHX Text
NW
AutoCAD SHX Text
SE
AutoCAD SHX Text E
AutoCAD SHX Text
NE
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text Dr.
AutoCAD SHX Text Bit.
AutoCAD SHX Text Paved
AutoCAD SHX Text Paved
AutoCAD SHX Text Bit.
AutoCAD SHX Text
EXISTING CURB
AutoCAD SHX Text
SW
AutoCAD SHX Text W
AutoCAD SHX Text
NW
AutoCAD SHX Text
SE
AutoCAD SHX Text E
AutoCAD SHX Text
NE
AutoCAD SHX Text S
AutoCAD SHX Text N
Michael Williams
CT PE
REMOVE ALL EXISTING
COMBUSTION AIR INLET PIPING AND
AIR INLET TERMINATIONS SERVING
EACH BOILER.
EXISTING PENETRATION TO BE
RE-USED (TYP).
REMOVE EXISTING NAT GAS
BOILER(S) ONE AT A TIME
ACCORDING TO REPLACEMENT
SCHEDULE COORDINATED WITH NEW
WORK (TYP).
REMOVE ALL ASSOCIATED GAS
PIPING, CONDENSATE DRAIN
PIPING/TRIM, HYDRONIC PIPING,
VALVES & TRIM INCLUDING PIPE
SUPPORTS AND PIPE INSULATION,
POWER CONDUCTORS, RACEWAY,
AND CONTROLS (TYP).
REMOVE HYDRONIC PIPING RISERS
TO/FROM EACH BOILER ISOLATION
VALVES TO EACH BOILER
INLET/OUTLET INCLUDING FITTING,
VALVES, SUPPORTS AND TRIM.
COORDINATE WORK WITH EXISTING
CONDITIONS AND REPLACEMENT
SCHEDULE OF EACH BOILER (TYP).
TX-M-XF
B
B.8
C
D
D.2
2 3
C.5
MECHANICAL
FIRE
PROTECTION
003A
195 SF
ELECTRICAL
003B
827 SF
B.5
B-1
B-2
B-3
CWP-1
CWP-2
CWP-3
SHWP-1 SHWP-2 SHWP-3 SHWP-4 SGP-1 SGP-2
HX-1
CHP-1
CHP-2
CHP-3
ET-1
ET-2
ET-3
CH-1
CH-2
VF
D-
CW
P-
VF
D-
SH
W
P-
VF
D-
CW
P-
VF
D-
CW
P-
VF
D-
SH
W
P-
VF
D-
SH
W
P-
VF
D-
SH
W
P-
VF
D-
SG
P-
VF
D-
SG
P-
VF
D-
CH
P-
VF
D-
CH
P-
VF
D-
CH
P-
4" H
W R
4" H
W R
4" H
W R
6" HWR
AS-2
6" HWS TO SHWP-1,2
6" HWR
6" H
W R6"
H W
R 6"
H W
R
6" H
W S
FR
O
M B
LD
G
FR
O
M H
X-
7"Ø ID
10"Ø ID
7"Ø ID
12"Ø OD
10"Ø ID
12"Ø OD
10"Ø ID
12"Ø OD
6" HWS TO SHWP-3,4
FD
FD
FD
3" H
W S3" H
W R
3" H
W R 3"
H W
S
3" H
W R 3"
H W
S
EXISTING PUMPS TO REMAIN (TYP).
EXISTING VFD'S TO REMAIN (TYP).
EXISTING CHILLER TO REMAIN (TYP).
EXISTING CHILLER TO REMAIN (TYP).
EXISTING PUMPS AND HEAT EXCHANGER TO REMAIN (TYP).
REMOVE SECTION OF HYDRONIC
PIPING TO ACCOMMODATE THE
NEW WORK.
EXISTING 4.5" THK CONCRETE
HOUSEKEEPING PAD TO REMAIN.
CONFIRM DIMENSIONS WORK WITH
NEW BOILER SIZE & LAYOUT.
EXTEND IF NECESSARY.
(TYP FOR EACH BOILER).
REMOVE ALL FLUE VENT OUTLET
PIPING AND OUTLET TERMINATIONS
SERVING EACH BOILER.
EXISTING PENETRATION TO BE
RE-USED (TYP).
EXISTING FLOOR
DRAIN TO REMAIN
(TYP).
REMOVE TEE AND SECTION TO
PIPING TO BOILER HWR MAIN TO
BOILER(S).
M
PH
-G
M
PL
-G
M
PL
-G M
PL
(S ec -2
FILT
6" PVC VENT
FROM GAS HWH
REMOVE FLUE VENT OUTLET PIPING
AND OUTLET TERMINATIONS
SERVING HOT WATER HEATER.
REMOVE 6" PVC FLUE VENT PIPE TO
ACCOMMODATE NEW OUTLET
HEIGHT. COORDINATE W/NEW WORK.
EM-BLR
SHUTDOWN
EXISTING HYDRONIC HWS&R
ISOLATION VALVE SERVING EACH
BOILER TO REMAIN (TYP).
REMOVE EXISTING HOT WATER
SYSTEM SHOT-FEEDER INCLUDING
PIPING BACK TO PUMP RISER
SHUTOFF VALVE(S).
LINETYPE LEGEND
EXISTING TO BE REMOVED (DEMOLITION)
EXISTING TO REMAIN
BB.8CD C.5 B.5
MECH RM
FIN FLOOR: 0 FT - 0 IN
1ST - FLOOR
FIN FLOOR: 20 FT - 0 IN
REMOVE ALL EXISTING
COMBUSTION AIR INLET PIPING AND
AIR INLET TERMINATIONS SERVING
EACH BOILER.
EXISTING PENETRATION TO BE
RE-USED (TYP).
REMOVE ALL FLUE VENT OUTLET
PIPING AND OUTLET TERMINATIONS
SERVING EACH BOILER.
EXISTING PENETRATION TO BE
RE-USED (TYP).
REMOVE/RELOCATE FLUE VENT
OUTLET PIPING AND OUTLET
TERMINATION SERVING HOT
WATER HEATER.
AS NOTED
MECHANICAL
DEMOLITION PLAN
FA_MEP-1_8-19-2026_.DWG
1/4"=1'-0"
GRAPHIC SCALE
SCALE IN FEET
0 4 8
DEMOLITION NOTES
NOTES:
1. FOR DRAWING CLARITY NOT ALL EXISTING SYSTEMS ARE SHOWN OR NOTED ON THE DRAWINGS. CONTRACTOR SHALL VISIT THE SITE TO UNDERSTAND THE EXTENT OF EXISTING CONDITIONS, CONFIRM THE SCOPE OF WORK AND EXISTING CONDITIONS
PRIOR TO SUBMITTING BID.
2. ECSU MAY CHOOSE TO RETAIN ITEMS/DEVICES/EQUIPMENT INDICATED AS REMOVED OR AS DEMOLITION FOR THIS PROJECT.
CONTRACTOR SHALL CONFIRM WITH ECSU FACILITIES & PLANNING WHAT (IF ANY) MATERIALS ARE INTENDED TO BE RETAINED
BY ECSU PRIOR TO REMOVAL FROM SERVICE AND SITE.
3. MECHANICAL DRAWINGS AND INFORMATION SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
FIELD VERIFICATION OF EXISTING CONDITIONS PRIOR TO THE START OF WORK.
4. THE CONTRACTOR SHALL VERIFY THE EXTENT OF DEMOLITION AND CONFIRM CONNECTION POINTS OF EXISTING COMPONENTS TO REMAIN IN THE FIELD. BEGINNING OF DEMOLITION WORK MEANS CONTRACTOR ACCEPTS EXISTING CONDITIONS AND FULLY UNDERSTANDS SCOPE FOR CONNECTION TO EXISTING. PREMATURE OR EXCESSIVE DEMOLITION OR FAILURE TO RETAIN COMPONENTS OF THE SYSTEM SHALL RESULT IN THE CONTRACTOR PROVIDING REPLACEMENT AT NO
ADDITIONAL COST TO THE OWNER.
5. THE CONTRACTOR SHALL NOTIFY ECSU FACILITIES MANAGEMENT & PLANNING A MINIMUM OF 2 WEEKS PRIOR TO ANY UTILITY
SHUTDOWN AND A MINIMUM OF 48 HRS PRIOR TO START OF ANY WORK.
6. ALL EQUIPMENT, DEVICES, PIPING, WIRING AND CONTROLS SHALL BE ISOLATED AND BROUGHT TO A ZERO ENERGY STATE IN ACCORDANCE WITH OSHA REGULATIONS PRIOR TO THE START OF ANY WORK. ISOLATION AND DISCONNECTION OF ALL ELECTRICAL POWER & CONTROLS SHALL BE DONE BY A LICENSED ELECTRICIAN. ISOLATION, DRAINING OF PIPING AND REFRIGERATION SYSTEM SHALL BE BE DONE BY A LICENSED MECHANIC. FOLLOW ENVIRONMENTAL REGULATIONS.
7. CONTRACTOR SHALL CLEAN/REPAIR AND MAKE READY ANY EXISTING MATERIALS AND/OR EQUIPMENT THAT IS TO REMAIN IN
SERVICE AND REUSED AS A FUNCTIONING PART OF THIS PROJECT.
10/23/2026
ECSU-2026-10
Fa ci lit ie s M an ag em en t a nd P la nn in g
W in dh am S tre et
, W ill im an tic C
T
E A
ST
E
R N
C O
N N
E C
T
IC
U T
S T
A T
E U
N
IV
E R
SI
T
Y
INSTRUCTIONAL
BOILER
REPLACEMENT
FINE ARTS
CENTER
AND ELECTRICAL
AutoCAD SHX Text
COMB AIR INLET
AutoCAD SHX Text
FLUE GAS OUTLET
AutoCAD SHX Text
FLUE GAS OUTLET
AutoCAD SHX Text
COMB AIR INLET
AutoCAD SHX Text
FLUE GAS OUTLET
AutoCAD SHX Text
MED-1
AutoCAD SHX Text
AutoCAD SHX Text
FLUE GAS OUTLET
AutoCAD SHX Text
MED-1
AutoCAD SHX Text
AutoCAD SHX Text
MED-1
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
%%UMECHANICAL DEMOLITION PLAN
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text CAD File Name:
AutoCAD SHX Text Drawing No.:
AutoCAD SHX Text Date
AutoCAD SHX Text Revision/Issue
AutoCAD SHX Text No.
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Sheet No.:
AutoCAD SHX Text Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
AutoCAD SHX Text
SW
AutoCAD SHX Text W
AutoCAD SHX Text
NW
AutoCAD SHX Text
SE
AutoCAD SHX Text E
AutoCAD SHX Text
NE
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
MED-1
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
%%UEXTERIOR WALL ELEVATION VIEW
LINETYPE LEGEND
EXISTING TO BE REMOVED (DEMOLITION)
EXISTING TO REMAIN
PROVIDE WALL PENETRATION
KIT (MTL-FAB "WPK").
PROVIDE SEALANT & STAINLESS
STEEL FASTENERS
(TYP FOR EACH BOILER).
PROVIDE 8" SCH-40 PVC COMBUSTION AIR
INLET PIPE. TERMINATE W/ BIRD SCREEN.
PROVIDE FLEXIBLE WETHER-PROOF SEALANT
COLOR: MATCH MOTOR JOINTS.
(TYP FOR EACH BOILER).
PRIME & PAINT EXTERIOR PVC
COLOR: MATCH BRICK.
(TYP FOR EACH BOILER).
RE-USE EXISTING EXTERIOR WALL
PENETRATION(S) FOR
COMBUSTION AIR INLET.
(TYP FOR EACH BOILER).
B
B.8
C
D
D.2
2 3
C.5
MECHANICAL
FIRE
PROTECTION
003A
195 SF
ELECTRICAL
003B
827 SF
ELE.
MACHINE
ROOM
72 SF
ELEVATOR
10EL1
82 SF
ELEV.
LOBBY
MDF
003D
215 SF
B.5
B-1
B-2
B-3
CWP-1
CWP-2
CWP-3
SHWP-1 SHWP-2 SHWP-3 SHWP-4 SGP-1 SGP-2
HX-1
CHP-1
CHP-2
CHP-3
ET-1
ET-2
ET-3
CH-1
CH-2
VF
D-
CW
P-
VF
D-
SH
W
P-
VF
D-
CW
P-
VF
D-
CW
P-
VF
D-
SH
W
P-
VF
D-
SH
W
P-
VF
D-
SH
W
P-
VF
D-
SG
P-
VF
D-
SG
P-
VF
D-
CH
P-
VF
D-
CH
P-
VF
D-
CH
P-
4" H
W R
4" H
W R
4" H
W R
6" HWR
6" HWS TO SHWP-1,2
6" HWR
6" H
W R
6" H
W R
6" H
W R
6" H
W
S FR
O M
B
LD
G
FR
O
M H
X-
6" HWS TO SHWP-3,4
FD
FD
FD
3" H
W S
3" H
W R
6" HWR
10"Ø ID - 12" OD
8"Ø SCH-40 PVC
10"Ø ID - 12" OD
10"Ø ID - 12" OD
8"Ø SCH-40 PVC
8"Ø SCH-40 PVC
3" HWR
BP-3
3" HWR
BP-2
3" HWR
BP-1
3" HWS
3" HWS
3" HWS
CORE BORE EXTERIOR WALL FOR NEW
FLUE VENT PENETRATION(S).
CONFIRM QTY, SIZE AND NUMBER IN
FIELD PRIOR TO WORK
(TYP FOR EACH BOILER).
(C-LINE)
(C-LINE)
(C-LINE)
COORDINATE SUPPORT OF NEW WORK
WITH EXISTING STRUCTURAL LOCATIONS
& MISC STEEL SUPPORTS.
DO NOT CREATE NEW DECK SUPPORT
LOCATIONS OR ALTER SOUND PROOFING
MATERIAL AT DECK (TYP).
PROVIDE MITER CUT
HORIZONTAL TERMINATION
WITH STAINLESS STEEL BIRD
SCREEN (MTL-FAB "MCM").
(TYP FOR EACH BOILER).
PROVIDE FLANGED
CONNECTION SO CA PIPE CAN
EASILLY BE DISCONNECTED
FOR SERVICE (TYP).
EXISTING CONCRETE
HOUSEKEEPING PAD TO REMAIN.
CONFIRM DIMENSIONS WORK WITH
NEW BOILER SIZE & LAYOUT.
EXTEND IF NECESSARY.
(TYP FOR EACH BOILER).
MAINTAIN BOILER MANUFACTURER
INSTALL/SERVICE CLEARANCES.
CONFIRM SIZE PRIOR TO SETTING
AND INSTALLING BOILERS (TYP).
EXISTING PUMPS TO REMAIN (TYP).
EXISTING VFD'S TO REMAIN (TYP). EXISTING CHILLER TO REMAIN (TYP).
EXISTING CHILLER TO REMAIN (TYP).
EXISTING PUMPS AND HEAT EXCHANGER TO REMAIN (TYP).
2" Con d
2" C on d
2" C on d
PROVIDE 3" SCH-40 STEEL HYDRONIC HWS&R
PIPING TO/FROM EACH BOILER TO EXISTING
MAIN W/ISOLATION VALVE.
EXISTING ISOLATION VALVE(S) SERVING
EACH BOILER ARE TO REMAIN.
PROVIDE NEW HYDRONIC PIPING, VALVES &
TRIM PER BOILER MANUF
RECOMMENDATIONS AND DETAIL(S) 2/ME-1
AND 6/ME-3.
(TYPICAL FOR EACH BOILER).
PROVIDE 6" SCH-80 HWS & HWR
FLANGED SPOOL PIECE THRU WALL
W/CAPS (BOTH ENDS) SERVING AS
FUTURE TEMP HYDRONIC SYSTEM
CONNECTION POINTS TO MECH ROOM.
RE-USE EXISTING WALL OPENINGS
AND PROVIDE LIQUID-TIGHT SEALANT.
COLOR: MATCH MORTAR JOINTS.
PAINT EXTERIOR PIPING.
COLOR: MATCH FACE BRICK COLOR.
DSW
DSW
DSW
AS-2
PROVIDE NEW STRUT SUPPORT
WITH DISCONNECT SWITCHES
SERVING BOILER & BOILER PUMPS
(TYP).
REFER TO 1/ME-3 FOR ELECTRICAL
POWER DIAGRAM FOR BOILERS AND
PUMPS (TYP).
TX-M-XF
M
PH
-G
M
PL
-G
M
PL
-G M
PL
(S ec -2
FILT
6"Ø PVC
PROVIDE 6" SCH-40 PVC PIPE AND FITTINGS
SERVING HWHW EXHAUST VENT. TERMINATE
W/ 45° MITER CUT. PROVIDE FLEXIBLE
WETHER-PROOF SEALANT.
SEALANT COLOR: MATCH MOTOR JOINTS.
(TYP FOR EACH BOILER).
PRIME & PAINT EXTERIOR PVC
PIPE COLOR: MATCH BRICK.
CON-BLR
ETR CON-BP
PROVIDE NEW ROLLER TYPE PIPE HANGER
WITH THREADED ROD. CONNECT TO EXISTING
STRUCTURAL FRAMING. PROVIDE MISC MTL
SUPPORTS TO ACCOMMODATE NEW PIPE
HANGER LOCATIONS (TYP).
EM-BLR
SHUTDOWN
EM-BLR
SHUTDOWN
NEW GAS MONITOR FOR CARBON
MONOXIDE (CO) AND NAT GAS (CH4)
CONNECTED TO BMS SYSTEM PROVIDED
BY CONTROLS CONTRACTOR (TYP).
NEW EM-BLR SHUTDOWN
CONTACTOR. REFER TO 1/ME-3 FOR
DETAIL.
PROVIDE NEW FILTER FEEDER
WITH MAGNETIC INLINE FILTER
AND NEW PIPING TO/FROM
EXISTING HW PUMP RISERS.
REFER TO 5/ME-3 AND
SPECIFICATIONS FOR DETAILS.
FT-1
8"Ø SCH-40 PVC
10"Ø ID - 12" OD
"Ø
ID
" O
D
B-3
2" Nat Gas
EXISTING CONCRETE
HOUSEKEEPING PAD TO REMAIN.
CONFIRM DIMENSIONS WORK WITH
NEW BOILER SIZE & LAYOUT
(TYP FOR EACH BOILER).
MAINTAIN BOILER MANUFACTURER
INSTALL/SERVICE CLEARANCES.
CONFIRM SIZE PRIOR TO SETTING
CONCRETE PAD AND INSTALLING
BOILERS (TYP).
PROVIDE BOLTED PVC FLANGE
CONNECTION TO BOILER ALLOWING
PIPE TO BE DISCONNECTED FOR
SERVICE/TOP ACCESS
(TYP FOR EACH BOILER).
PROVIDE INSULATED DOUBLE WALL
SPECIAL GAS VENT EQUAL TO
METAL-FAB "CORR/GUARD" FCS-1.
STAINLESS STEEL INNER & OUTER
PIPE W/1" THICK INSULATION.
REFER TO SPECIFICATIONS FOR
DETAILS. (TYP FOR EACH BOILER).
2" NAT-GAS
(TYP FOR EACH BOILER)
PROVIDE FINAL GAS CONNECTION
TO EACH BOILER PER MANUF.
RECOMMENDATIONS.
SEDIMENT TRAP PROVIDED WITHIN
BOILER HOUSING REFER TO DETAIL
3/ME-3.
PROVIDE NEW GAS SHUTOFF VALVE
WITH UNION SERVING EACH BOILER.
PROVIDE CONDENSATE NEUTRALIZATION
KIT BY BOILER MANUF SIZED FOR BOILER
INPUT CAPACITY. PROVIDE WITH PH
NEUTRALIZATION MEDIA AND DRAIN
TRAP.
PROVIDE FINAL CONDENSATE DRAIN
CONNECTION TO EACH BOILER PER
MANUF. RECOMMENDATIONS.
REFER TO TO DETAIL 4/ME-3.
(TYP FOR EACH BOILER).
PROVIDE 2" SCH-40 CPVC CONDENSATE
DRAIN PIPE RUN ALONG FOUNDATION
WALL AND TERMINATING AT EXISTING
FLOOR DRAIN (TYP).
EXISTING 4" NAT GAS MAIN W/SUPPORT
FRAME TO REMAIN (TYP).
PAINT ALL EXISTING EXPOSED GAS
PIPING "SAFETY YELLOW" AND PROVIDE
PIPE LABLES (TYP).
PROVIDE MITER CUT
HORIZONTAL TERMINATION
WITH STAINLESS STEEL BIRD
SCREEN (MTL-FAB "MCM").
(TYP FOR EACH BOILER).
PROVIDE SEALANT MAKING
PENETRATION LIQUID-TIGHT
(TYP FOR EACH PENETRATION).
PROVIDE SEALANT MAKING
PENETRATION LIQUID-TIGHT.
COLOR: MATCH MORTAR JOINT
(TYP FOR EACH WALL PENETRATION).
PROVIDE 8" SCH-40 PVC COMBUSTION AIR
INLET PIPE. TERMINATE W/ BIRD SCREEN.
PROVIDE FLEXIBLE WETHER-PROOF SEALANT
COLOR: MATCH MOTOR JOINTS.
(TYP FOR EACH BOILER).
PRIME & PAINT EXTERIOR PVC
COLOR: MATCH BRICK.
(TYP FOR EACH BOILER).
PROVIDE STAINLESS STEEL VENT
ADAPTER (TYP EACH BOILER).
PROVIDE HYDRONIC PIPE
CONNECTION PER BOILER MANUF.
RECOMMENDATIONS
(TYP FOR EACH BOILER)
PROVIDE NEW RISER SUPPORT FOR
NEW VENT (TYP FOR EACH BOILER).
PROVIDE NEW UNI-STRUT SUPPORT
FRAME FOR MOUNTING NEW
DEVICES AND EQUIPMENT (TYP)
BB.8CD C.5 B.5
MECH RM
FIN FLOOR: 0 FT - 0 IN
1ST - FLOOR
FIN FLOOR: 20 FT - 0 IN
PROVIDE STAINLESS STEEL WALL
PENETRATION FLANGE W/PIPE
COLLAR.
PROVIDE SEALANT & STAINLESS STEEL
FASTENERS.
(TYP EXIST WATER HEATER VENT).
PROVIDE 8" SCH-40 PVC COMBUSTION AIR INLET PIPE.
TERMINATE W/ BIRD SCREEN. PROVIDE FLEXIBLE
WETHER-PROOF SEALANT
COLOR: MATCH MOTOR JOINTS.
(TYP FOR EACH BOILER).
RE-USE EXISTING EXTERIOR WALL PENETRATION(S)
FOR NEW COMBUSTION AIR INLET.
(TYP FOR EACH BOILER).
PRIME & PAINT EXTERIOR PVC
COLOR: MATCH FACE BRICK.
(TYP FOR EACH BOILER).
CORE BORE EXTERIOR WALL FOR NEW
FLUE VENT PENETRATION(S).
CONFIRM QTY, SIZE AND NUMBER IN
FIELD PRIOR TO WORK
(TYP FOR EACH BOILER).
PROVIDE 6" SCH-80 HWS & HWR
FLANGED SPOOL PIECE THRU WALL
W/CAPS (BOTH ENDS) SERVING AS
FUTURE TEMP BOILER CONNECTION
POINTS TO MECH ROOM.
RE-USE EXISTING WALL OPENINGS
AND PROVIDE LIQUID-TIGHT SEALANT.
COLOR: MATCH MORTAR JOINTS.
PAINT EXTERIOR PIPING.
COLOR: MATCH FACE BRICK COLOR.
CORE BORE EXTERIOR WALL FOR NEW
FLUE VENT PENETRATION SERVING
EXISTING WATER HEATER VENT.
CONFIRM SIZE IN FIELD PRIOR TO WORK.
PROVIDE WALL PENETRATION
KIT (MTL-FAB "WPK").
PROVIDE SEALANT & STAINLESS
STEEL FASTENERS
(TYP FOR EACH BOILER).
EXTEND/MODIFY EXISTING VENT PIPE TO
ACCOMMODATE NEW TERMINATION
LOCATION. PROVIDE NEW FIRRINGS.
TERMINATE W/45° MITER CUT WITH
STAINLESS STEEL BIRD SCREEN.
PAIN EXPOSED PIPE.
COLOR: MATCH FACE BRICK.
INFILL ABANDON PENETRATION WITH
FACE BRICK & MORTAR LIQUID-TIGHT.
MATCH EXISTING FACE BRICK & MORTAR
JOINT COLOR & TEXTURE (TYP).
PROVIDE WALL PENETRATING RADAR
SERVICES TO REVIEW EXTERIOR WALL
FOR HIDDEN OBSTACLES WITHIN WALL
CAVITY CONFIRMING LOCATIONS PRIOR
TO CORE BORE OF NEW PENETRATIONS
(TYP FOR ENTIRE AREA INDICATED).
AS NOTED
MECHANICAL
NEW WORK PLAN
FA_MEP-1_8-19-2026_.DWG
1/4"=1'-0"
GRAPHIC SCALE
SCALE IN FEET
0 4 8
10/23/2026
ECSU-2026-10
Fa ci lit ie s M an ag em en t a nd P la nn in g
W in dh am S tre et
, W ill im an tic C
T
E A
ST
E
R N
C O
N N
E C
T
IC
U T
S T
A T
E U
N
IV
E R
SI
T
Y
INSTRUCTIONAL
BOILER
REPLACEMENT
FINE ARTS
CENTER
AND ELECTRICAL
NEW WORK NOTES
NOTES:
1. FOR DRAWING CLARITY NOT ALL EXISTING SYSTEMS ARE SHOWN OR NOTED ON THE DRAWINGS.
CONTRACTOR SHALL VISIT THE SITE TO UNDERSTAND THE EXTENT OF EXISTING CONDITIONS,
CONFIRM THE SCOPE OF WORK AND EXISTING CONDITIONS PRIOR TO SUBMITTING BID.
2. DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD
VERIFICATION OF EXISTING CONDITIONS PRIOR TO THE START OF WORK.
3. THE CONTRACTOR SHALL NOTIFY ECSU FACILITIES MANAGEMENT & PLANNING A MINIMUM OF 2 WEEKS PRIOR TO ANY UTILITY SHUTDOWN AND A MINIMUM OF 48 HRS PRIOR TO START OF ANY
WORK.
4. PROVIDE INSPECTION & HYDROSTATIC PRESSURE TESTING IN ACCORDANCE WITH CT CODE OF
ALL NEW PIPING, VALVES AND ACCESSORIES. PRESSURE TEST TO THE GREATER OF 1.5 X
WORKING PRESSURE OR 100 PSI. TESTS AND INSPECTIONS SHALL BE CONFIRMED/WITNESSED BY
STATE OSBI AND ECSU STAFF.
5. CLEAN & PURGE ALL NEW & RE-USED PIPING, VALVES AND ACCESSORIES. CLEAN STRAINERS AND
FILTERS PRIOR TO SETTING INTO OPERATION.
6. ELECTRICAL CONTRACTOR SHALL FIELD VERIFY ALL CIRCUITS AND PROVIDE LOCK-OUT-TAG-OUT OF ALL EQUIPMENT & DEVICES PRIOR TO START OF ANY WORK. COORDINATE ELECTRICAL WORK
WITH REPLACEMENT SCHEDULE OF THE BOILERS INCLUDING NEW POWER WIRING AND
EM-SHUTDOWN CIRCUITS.
AutoCAD SHX Text
ME-1
AutoCAD SHX Text
AutoCAD SHX Text
COMB AIR INLET
AutoCAD SHX Text
FLUE GAS OUTLET
AutoCAD SHX Text 1'-8"
AutoCAD SHX Text
FLUE GAS OUTLET
AutoCAD SHX Text
FLUE GAS OUTLET
AutoCAD SHX Text
COMB AIR INLET
AutoCAD SHX Text
COMB AIR INLET
AutoCAD SHX Text
ME-1
AutoCAD SHX Text
AutoCAD SHX Text
FLUE GAS OUTLET
AutoCAD SHX Text
COMB AIR INLET
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text
FLUE GAS OUTLET
AutoCAD SHX Text 1'-8"
AutoCAD SHX Text 16'
AutoCAD SHX Text
COMB AIR INLET
AutoCAD SHX Text
COMB AIR INLET
AutoCAD SHX Text
COMB AIR INLET
AutoCAD SHX Text 8'
AutoCAD SHX Text
ME-1
AutoCAD SHX Text
AutoCAD SHX Text
ME-1
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
%%UMECHANICAL, ELECTRICAL & PLUMBING NEW WORK PLAN
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text CAD File Name:
AutoCAD SHX Text Drawing No.:
AutoCAD SHX Text Date
AutoCAD SHX Text Revision/Issue
AutoCAD SHX Text No.
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Sheet No.:
AutoCAD SHX Text Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
AutoCAD SHX Text
SW
AutoCAD SHX Text W
AutoCAD SHX Text
NW
AutoCAD SHX Text
SE
AutoCAD SHX Text E
AutoCAD SHX Text
NE
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
ME-1
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
%%UNEW BOILER LAYOUT SIDE ELEVATION VIEW
AutoCAD SHX Text
ME-1
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
%%UEXTERIOR WALL ELEVATION VIEW
AS NOTED
MECHANICAL
SCHEDULES
FA_MEP-1_8-19-2026_.DWG
ABBREVIATION DESCRIPTION
AFF ABOVE FINISHED FLOOR
CWS COLD WATER SUPPLY
FDC FIRE DEPARTMENT CONNECTION
WM WATER METER
TYP TYPICAL
EL ELEVATION
FF FINISHED FLOOR
C-LINE CENTER LINE
MECHANICAL SYMBOLS
ABBREVIATION DESCRIPTION
P
V
OUTSIDE SCREW & YOKE GATE VALVE (OS&Y)
BUTTERFLY VALVE
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
AIR VENT (MANUAL OR AUTO.)
PRESSURE GAUGE
Y TYPE STRAINER
CHECK VALVE
INLINE PUMP
GATE VALVE
THERMOMETER
BALL VALVE
DBL DOUBLE OR "TWICE"
ELL 90° ELBOW
MECHANICAL ABBREVIATIONS
PUMP SCHEDULE
MANUF. / MODEL / SIZESYMBOL / TAG
DPPE = DUTY POINT PUMP EFFICIENCY (SELECTION/DESIGN POINT).
FXF = FLANGE BY FLANGE CONNECTION TYPE.
TYPE
(GPM)
FLOW
(FT H2O)
HEAD
TYPE
FLUID TRIPLE DUTY VALVE
MODEL SIZE END PREP PD (FT H2O)
ELECTRICAL MOTOR DATA
VOLTS / PHASE / Hz HP FRAME ENCLOSURE CONTROLLER
NOTES:
1. ALL POWER WIRING AND RACEWAY BY DIVISION 26 (REFER TO ELECTRICAL DRAWINGS & SPECIFICATIONS).
2. ALL PUMPS SHALL BE BRONZE FITTED WITH STAINLESS STEEL SHAFT AND SLEEVE BEARING.
3. ALL MOTORS SHALL BE PREMIUM EFFICIENCY SUITABLE FOR USE WITH VARIABLE SPEED CONTROLLERS.
4. INSTALLING CONTRACTOR TO CONFIRM SERVICE CLEARANCES PRIOR TO INSTALLATION.
5. PROVIDE PUMP SUITABLE FOR INLINE MOUNTING.
6. TEMP CONTROLS CONTRACTOR TO PROVIDE CONTROL WIRING BETWEEN BOILER AND PUMP.
7. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
BP-1 BELL & GOSSETT / ECM XL / 40-275 120 30 WATER 3DS-SB 3" FXF 3.25 208-230 / 1 / 60 2.0 ECM ODP B-1
BP-2 208-230 / 1 / 60 2.0 ODP B-2
BP-3 208-230 / 1 / 60 2.0 ODP B-3
IN-LINE, WET ROTOR/ ECM
3" FXF 3.25
3" FXF 3.25
ECM
ECM
BELL & GOSSETT / ECM XL / 40-275 30 WATERIN-LINE, WET ROTOR/ ECM
BELL & GOSSETT / ECM XL / 40-275 30 WATERIN-LINE, WET ROTOR/ ECM
MANUFACTURERTAG
B-1,2,3
LOCATION
BOILER ROOM
INPUT RATING (MBH)
HIGH EFFICIENCY CONDENSING HEATING BOILER SCHEDULE
MODEL
LOCHINVAR FBN2501
(MIN)
2400125
(MAX)
TURN
DOWN
20:1
OUTPUT RATING (MBH)
(GROSS) (AHRI)
2087 96.1
EFFICIENCY RATING (%)
(COMB) (THERM)
96.0
(COMB) = COMBUSTION EFFICIENCY RATING
(THERM) = THERMAL EFFICIENCY RATING
PHYSICAL DATA
DIMENSIONS W X D X H (IN)
35.0 X 83.75 X 77.75
WEIGHT (LBS)
2577 - SHIPPING
GAS
2"
CONNECTIONS (NOMINAL)
HWS&R
4"
AIR (IN)
8"
VENT (OUT)
10"
FLOW (GPM)
25 - 120
WATER PERFORMANCE
TEMP RISE (°F)
ELECTRICAL DATA
VOLTS / PHASE / Hz
208 / 3 / 60
CONTROLLER
CASCADE
FLA
4.5
MOP
15 A
NOTES:
1. DISCONNECT, SAFETY SWITCH(S)/CKT, POWER WIRING AND RACEWAY BY DIVISION 26 (ELECTRICAL CONTRACTOR).
2. CONTROL WIRING AND INSTALLATION OF FIELD MOUNTED EQUIPMENT/DEVICES BY DIVISION 23.
3. BOILER MANUFACTURER SHALL SELECT & FURNISH CIRCULATING PUMP FOR EACH BOILER (BP-1,2,3). DATA WITHIN PUMP SCHEDULE PROVIDED FOR BIDDING & PLANNING
PURPOSES. INSTALL OF EQUIPMENT SHALL BE BASED PUMPS SUBMITTED WITH BOILER PACKAGE.
4. BOILER MANUFACTURER TO PROVIDE MODULATING GAS VALVE W/SAFETY CONTROLS, PRESSURE SWITCH, LOW WATER CUTOFF (MANUAL RESET), HIGH TEMP LIMIT (MANUAL
RESET) SAFETY CONTROLS FOR EACH BOILER.
5. BOILER MANUFACTURER SHALL SELECT AND FURNISH CONDENSATE NEUTRALIZATION KIT FOR EACH BOILER. INSTALLING CONTRACTOR SHALL PIPE TO FLOOR DRAIN.
6. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION/REQUIREMENTS.
HYDRONIC SPECIALTIES & EQUIPMENT SCHEDULE
DESCRIPTIONTAG
RV-1 PRESSURE RELIEF VALVE: HOT WATER BOILER PRESSURE RELIEF VALVE. PROVIDE ASME RATING, BRONZE BODY CONSTRUCTION, 65 PSI PRESSURE RELIEF SETTING. PRESSURE RELIEF VALVE SHALL BE EQUAL TO B&G MODEL 1170. (PRESSURE RELIEF VALVE SIZE SHALL DETERMINED BY THE MANUFACTURER AND SHALL BE BASED ON THE HEAT INPUT OF THE BOILER PROVIDED)
INSTALLING CONTRACTOR SHALL PIPE OUTLET/DRAIN TO WITHIN 6" OF FINISHED FLOOR.
10/23/2026
ECSU-2026-10
Fa ci lit ie s M an ag em en t a nd P la nn in g
W in dh am S tre et
, W ill im an tic C
T
E A
ST
E
R N
C O
N N
E C
T
IC
U T
S T
A T
E U
N
IV
E R
SI
T
Y
INSTRUCTIONAL
BOILER
REPLACEMENT
FINE ARTS
CENTER
3DS-SB
3DS-SB
RV-2
RV-3
AND ELECTRICAL
AutoCAD SHX Text
ME-2
AutoCAD SHX Text
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text CAD File Name:
AutoCAD SHX Text Drawing No.:
AutoCAD SHX Text Date
AutoCAD SHX Text Revision/Issue
AutoCAD SHX Text No.
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Sheet No.:
AutoCAD SHX Text Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
ALL CONDENSATE DRAIN PIPING SHALL BE SCH-40
CPVC AND RUN IN ACCORDANCE WITH BOILER
MANUFACTURERS RECOMMENDATIONS.
PROVIDE HIGH TEMP PLASTIC OR STAINLESS STEEL
TUBE FOR SMALL DIAMETER "BARB" TYPE DRAIN
CONNECTIONS.
MPL-G
LOCATION: INTERIOR (MECH ROOM)
NEMA-1 ENCLOSURE, CU BUS-BARS
VOLTAGE: 208/120, 3-PHASE, 4-WIRE
MAIN CB: 250 AMPS
MPL-G
MPL-G
(SEC-2)
70 CON-BLR
B-1 DSW-B-1
DSW-BP-1
BP-1
ETR CON-BP
TO MPL-G
PROVIDE NEW LIQUID TIGHT
"WHIP" FINAL CONNECTION TO
EACH PUMP MOTOR (TYP OF 3).
PROVIDE NON-FUSED DISCONNECT
SWITCH SERVING BOILER PUMPS
NEMA-1 ENCLOSURE
VOLTAGE: 208 V / 1-PHASE
30 AMP RATING
(TYP FOR EACH BOILER PUMP)
PROVIDE UNISTRUT FRAME
W/BACKBOARD FOR MOUNTING OF
ELECTRICAL EQUIPMENT SERVING
BOILERS AND BOILER PUMPS
(TYP FOR EACH BOILER UNIT).
EXISTING MULTI-POLE EM-SHUTDOWN
CONTACTOR SERVING EXISTING
BOILERS AND BOILER PUMPS.
MAINTAIN FOR USE SERVING BOILER
PUMPS.
EXTEND COIL CKT TO NEW BOILER
POWER CONTACTOR.
EXISTING RACEWAY & CONDUCTORS
SERVING BOILER PUMPS TO REMAIN
(208V/1-PHASE).
REMOVE 120V/1-PHASE CKT
(BOILER POWER) FROM EACH BOILER
BACK TO POWER PANEL MPL-G.
(TYP FOR EACH BOILER)
B-2 DSW-B-2
DSW-BP-2
BP-2B-3 DSW-B-3
DSW-BP-3
BP-3
NEW BOILER PUMP (TYP).
PROVIDE NON-FUSED DISCONNECT
SWITCH SERVING BOILER
NEMA-1 ENCLOSURE
VOLTAGE: 208 V / 3-PHASE
30 AMP RATING
(TYP FOR EACH BOILER)
PROVIDE J-BOX WITH
RELAY-IN-A-BOX (RIB) SERVING
EACH BOILER PUMP. CONTROL
POINT START/STOP OF FROM
EACH BOILER (TYP).
BRANCH CKT: TO EACH BOILER
CONDUCTORS: (3) #12 AWG CU +N +GND.
RACEWAY: 3/4" EMT.
PROVIDE NEW LIQUID TIGHT
"WHIP" FINAL CONNECTION TO
EACH BOILER (TYP OF 3).
BRANCH CKT: TO EACH BOILER PUMP
CONDUCTORS: (2) #12 AWG, CU + GND.
RACEWAY: 3/4" EMT.
BRANCH CKT: TO EACH BOILER
CONDUCTORS: (3) #12 AWG CU +N +GND.
RACEWAY: 3/4" EMT.
BRANCH CKT: TO EACH BOILER
CONDUCTORS: (3) #12 AWG CU +N +GND.
RACEWAY: 3/4" EMT.
PROVIDE ONE EM-STOP MULTI-POLE
CONTACTOR SERVING BOILER
POWER BRANCH CIRCUITS.
ENCLOSURE: NEMA-1
RATING: 208V/30 AMP/60Hz
POLES: 10 (MIN)
COORDINATE COIL VOLTAGE WITH
EXISTING EM-CKT.
EXTEND COIL CKT FROM EXISTING
EM-STOP CKT. BOTH CONTACTORS
SHALL SHUT DOWN WHEN EM-STOP
IS PRESSED.
SERVING
B-3
SERVING
B-2
SERVING
B-1
PROVIDE NEW CB FOR
EACH NEW BOILER.
RATING: 15 AMP
3-POLE (TYP).
BOILER PUMP CONTROL STOP/START
& PUMP SPEED ORIGINATED FROM
EACH BOILER (TYP).
CONTROL CONTRACTOR TO PROVIDE
CONDUCTORS, RACEWAY, RELAY AND
TO CONNECT EACH BOILER PUMP TO
RESPECTIVE BOILER (TYP).
AS NOTED
MECHANICAL
FA_MEP-1_8-19-2026_.DWG
DETAILS
10/23/2026
ECSU-2026-10
Fa ci lit ie s M an ag em en t a nd P la nn in g
W in dh am S tre et
, W ill im an tic C
T
E A
ST
E
R N
C O
N N
E C
T
IC
U T
S T
A T
E U
N
IV
E R
SI
T
Y
INSTRUCTIONAL
BOILER
REPLACEMENT
FINE ARTS
CENTER
STRUCTURAL
FLOOR FLOOR
STRUCTURAL
ELEC EQUIP.
SIDE VIEW FRONT VIEW
EXCLUSIVELY
DEDICATED
SPACE PER
NEC 110-26fNEC 110-26f
SPACE PER
DEDICATED
EXCLUSIVELY
NEC 110-26f
SPACE PER
DEDICATED
EXCLUSIVELYEXCLUSIVELY
DEDICATED
SPACE PER
NEC 110-26f
CEILING CEILING
WIDTH OF
EQUIPMENT
OR TO
STRUCTURAL
DECK
EQUIPMENT
WIDTH OF
SIDE VIEW
FLOOR
CEILING
110-26a
PER NEC
SPACE
WORKING
FRONT VIEW
FLOOR 110-26a
PER NEC
SPACE
WORKING
2'-6"
MIN.
CEILING
6' MAX.
EQUIPMENT
TOP OF
AS DEFINED
BY NEC
TABLE 110-26a
OF EQUIPMENT
OR HEIGHT
6'-6" MIN. ELEC EQUIP.ELEC EQUIP. ELEC EQUIP.
NOTES:
1. DETAIL IS PROVIDED AS AN EXAMPLE BASED ON NEC REQUIREMENTS. CONTRACTOR SHALL
VERIFY DETAILS BASED ON ADOPTED CODE REQUIREMENTS FOR THIS SPECIFIC PROJECT
AND APPLICATION.
2. COORDINATION OF ELECTRICAL SERVICE REQUIREMENTS WITH THE EXISTING CONDITIONS
AND THE WORK OF OTHER DIVISIONS IS THE RESPONSIBILITY OF DIV 26.
AND ELECTRICAL
AutoCAD SHX Text
TO RETURN MAIN
AutoCAD SHX Text
TO SUPPLY MAIN
AutoCAD SHX Text
FULL PORT SHUTOFF VALVE (TYP)
AutoCAD SHX Text
FILTER FEEDER (REFER TO SPECIFICATIONS)
AutoCAD SHX Text
PRESSURE GAUGE (TYP)
AutoCAD SHX Text
UNION (TYP)
AutoCAD SHX Text
FLOW INDICATOR
AutoCAD SHX Text
EXISTING CONC FLOOR
AutoCAD SHX Text
EXPANSION ANCHOR (TYP)
AutoCAD SHX Text
FLOW CONTROL VALVE W/SIGHT GLASS.
AutoCAD SHX Text
DRAIN VALVE AT LOW POINT (TYP).
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text PROVIDE NEODYMIUM MAGNETIC FILTER WITH SHUTOFF AND DRAIN VALVES EQUAL TO TOTAL FILTER 60003-TF1.
AutoCAD SHX Text
HWS
AutoCAD SHX Text T
AutoCAD SHX Text 3"
AutoCAD SHX Text
BOILER
AutoCAD SHX Text
CONCRETE HOUSEKEEPING PAD
AutoCAD SHX Text
REFER TO PLANS.
AutoCAD SHX Text RV-1,2,3 PRESSURE RELIEF VALVE FOR EACH BOILER BY DIV 23 (TYP). CONFIRM PRESSURE RATING & PIPE SIZE PRIOR TO ORDERING.
AutoCAD SHX Text
PRESSURE GAUGE W/SHUTOFF (TYP).
AutoCAD SHX Text
HWR
AutoCAD SHX Text T
AutoCAD SHX Text 3"
AutoCAD SHX Text
TEMPERATURE GAUGE (TYP).
AutoCAD SHX Text
TEMPERATURE SENSOR (TYP).
AutoCAD SHX Text
EXISTING BOILER RISER SHUT-OFF VALVE (TYP).
AutoCAD SHX Text
DRAIN WITH HOSE CONNECTION, CAP AND CHAIN (TYP).
AutoCAD SHX Text
CONNECT TO EXISTING (TYP).
AutoCAD SHX Text
TDV
AutoCAD SHX Text
TERMINATE 6" ABOVE FIN FLOOR (TYP).
AutoCAD SHX Text
PIPE SIZE SHALL BE RV OUTLET SIZE (TYP).
AutoCAD SHX Text
BOILER PUMP (TYP).
AutoCAD SHX Text
TRIPLE DUTY VALVE (TYP).
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text PROVIDE NEW 2" SCH-40 STEEL NAT GAS PIPING WITH NEW ISOLATION VALVE TO EACH BOILER IN ACCORDNACE WITH MANUF RECCOMENDATIONS (TYP).. PAINT ALL NAT GAS PIPING. ALL NAT GAS PIPING. NAT GAS PIPING. COLOR: SAFETY YELLOW.
AutoCAD SHX Text
REQUIRED
AutoCAD SHX Text
%%UELECTRICAL POWER DIAGRAM - BOILER POWER SUPPLY
AutoCAD SHX Text
ME-3
AutoCAD SHX Text
AutoCAD SHX Text
ME-3
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
%%UFILTER FEEDER DETAIL
AutoCAD SHX Text
ME-3
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
%%UBOILER HYDRONIC PIPING RISER DETAIL
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text CAD File Name:
AutoCAD SHX Text Drawing No.:
AutoCAD SHX Text Date
AutoCAD SHX Text Revision/Issue
AutoCAD SHX Text No.
AutoCAD SHX Text Project Name:
AutoCAD SHX Text Sheet No.:
AutoCAD SHX Text Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
AutoCAD SHX Text
ME-3
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
%%UBOILER NAT GAS PIPING DETAIL
AutoCAD SHX Text
ME-3
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
%%UBOILER CONDENSATE & NEUTRALIZER PIPING DETAIL
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
%%UTYPICAL NEC ELECTRICAL SERVICE CLEARANCES
AutoCAD SHX Text
ME-3
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
%%UELECTRICAL POWER DIAGRAM NEW BOILERS & PUMPS
AutoCAD SHX Text
AutoCAD SHX Text
ME-3
| Sheets and Views |
| FA_MEP-1_8-19-2026_-MED-1 |
| FA_MEP-1_8-19-2026_-ME-1 |
| FA_MEP-1_8-19-2026_-ME-2 |
| FA_MEP-1_8-19-2026_-ME-3 |
| FA ANSI D COV-Model.pdf |
| Sheets and Views |
| FA ANSI D COV-Model |
File details come from the government source that posted it. Updated .