6-11. Attachment J General Conditions Pricing Breakdown.pdf

PDF 96 KB Posted

Attached to
Memorial Construct Wastewater Treatment Plant
Solicitation number
696-FD-26-Q035
Issued by
Texas

About this file

This is a General Conditions Pricing Breakdown form (Attachment J) for the Texas Department of Criminal Justice (TDCJ) Memorial Construct Wastewater Treatment Plant Project, a construction initiative in Texas involving the solicitation number 696-FD-26-Q035. The project encompasses the construction of a new 1.6 million-gallon-per-day wastewater treatment plant designed to replace an existing facility and accommodate a new expansion dormitory and juvenile justice detention facility. The pricing breakdown form establishes the framework for contractors to submit detailed cost estimates across multiple project phases, including 65% Construction Documents (CD), 95% CD, and 100% CD milestones, as well as a pre-construction fee component.

The General Conditions Cost Breakdown section requires bidders to itemize costs for project management staff, bonds and insurance (including builder's risk, general liability, and payment and performance bonds), and site-specific expenses such as electricity, water, storage containers, office trailers, dumpsters, and cranes. Additional line items include testing and balancing, as-built drawings, fire protection systems, water supply and accessories, third-party commissioning services, construction materials testing, information technology, office supplies, safety equipment, and fuel. The form indicates a cost estimate total of $0.00, suggesting this is a template requiring completion by bidders. The document emphasizes that general conditions should encompass all items not incorporated into the completed work product and not trade-specific, with an average monthly job breakdown total cost calculation required for accurate project budgeting.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL CONDITIONS PRICING BREAKDOWN

Attachment J

SOLICITATION NO.

Cost

$0.00

CD Milestones Breakdown Criteria

CONSTRUCTION DOCUMENTS (CD) COST BREAKDOWN

65% CD

100% CD

Pre-Construction Fee Total

GENERAL CONDITIONS COST BREAKDOWN

COST ESTIMATE FORM

TDCJ UNIT:

CITY: COUNTY:

PROJECT NAME/DESC.: SCHEDULE (Calendar Days):

Project Management Staff Personnel (On-Site)

Bonds & Insurance

General Conditions

Builder's Risk Insurance General Liability Insurance (Auto, Umbrella, Products & Public Liability Insurance)

Payment and Performance Bonds

Electricity Water (Job)

95% CD

696-FD-26-Q035 Page 1 of 2

GENERAL CONDITIONS PRICING BREAKDOWN

Attachment J

$0.00

$0.00

***Please notice this this is not an exhaustive list. General conditions should include any item that is not incorporated in the completed work product and is not trade specific.

Information Technology

Third-Party Commissioning Services

AVERAGE MONTHLY JOB BREAKDOWN TOTAL COST

General Conditions Total

a. Testing and Balancing

As-Built Drawings Fire Protection

Water (Drinking) & Associated Accessories Storage Containers/Trailers Office Trailer (Monthly Rental Cost) Dumpsters Crane

b. Construction Materials Testing

Information Technology Office Supply - Monthly Safety Material Safety Equipment Fuel

Fire Protection

696-FD-26-Q035 Page 2 of 2

Sheet1

File details come from the government source that posted it. Updated .