This is a General Conditions Pricing Breakdown form (Attachment J) for the Texas Department of Criminal Justice (TDCJ) Memorial Construct Wastewater Treatment Plant Project, a construction initiative in Texas involving the solicitation number 696-FD-26-Q035. The project encompasses the construction of a new 1.6 million-gallon-per-day wastewater treatment plant designed to replace an existing facility and accommodate a new expansion dormitory and juvenile justice detention facility. The pricing breakdown form establishes the framework for contractors to submit detailed cost estimates across multiple project phases, including 65% Construction Documents (CD), 95% CD, and 100% CD milestones, as well as a pre-construction fee component.
The General Conditions Cost Breakdown section requires bidders to itemize costs for project management staff, bonds and insurance (including builder's risk, general liability, and payment and performance bonds), and site-specific expenses such as electricity, water, storage containers, office trailers, dumpsters, and cranes. Additional line items include testing and balancing, as-built drawings, fire protection systems, water supply and accessories, third-party commissioning services, construction materials testing, information technology, office supplies, safety equipment, and fuel. The form indicates a cost estimate total of $0.00, suggesting this is a template requiring completion by bidders. The document emphasizes that general conditions should encompass all items not incorporated into the completed work product and not trade-specific, with an average monthly job breakdown total cost calculation required for accurate project budgeting.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL CONDITIONS PRICING BREAKDOWN
Attachment J
SOLICITATION NO.
Cost
$0.00
CD Milestones Breakdown Criteria
CONSTRUCTION DOCUMENTS (CD) COST BREAKDOWN
65% CD
100% CD
Pre-Construction Fee Total
GENERAL CONDITIONS COST BREAKDOWN
COST ESTIMATE FORM
TDCJ UNIT:
CITY: COUNTY:
PROJECT NAME/DESC.: SCHEDULE (Calendar Days):
Project Management Staff Personnel (On-Site)
Bonds & Insurance
General Conditions
Builder's Risk Insurance General Liability Insurance (Auto, Umbrella, Products & Public Liability Insurance)
Payment and Performance Bonds
Electricity Water (Job)
95% CD
696-FD-26-Q035 Page 1 of 2
GENERAL CONDITIONS PRICING BREAKDOWN
Attachment J
$0.00
$0.00
***Please notice this this is not an exhaustive list. General conditions should include any item that is not incorporated in the completed work product and is not trade specific.
Information Technology
Third-Party Commissioning Services
AVERAGE MONTHLY JOB BREAKDOWN TOTAL COST
General Conditions Total
a. Testing and Balancing
As-Built Drawings Fire Protection
Water (Drinking) & Associated Accessories Storage Containers/Trailers Office Trailer (Monthly Rental Cost) Dumpsters Crane
b. Construction Materials Testing
Information Technology Office Supply - Monthly Safety Material Safety Equipment Fuel
Fire Protection