This is a Construction Manager-at-Risk (CM@R) Response Form submitted to the Texas Department of Criminal Justice (TDCJ) for the Memorial Unit Wastewater Treatment Plant project located in Rosharon, Texas. The project involves construction of a new 1.6 million-gallon-per-day wastewater treatment plant to replace the existing facility and accommodate an expansion dorm and new juvenile justice detention facility. The CM@R response is submitted at Step 2 of the procurement process by selected respondents only. The anticipated project timeline spans 25 months total, consisting of 6 months for pre-construction activities and 19 months for construction. The RFQ references project number 696-FD-26-Q035 and requires respondents to have thoroughly examined all RFQ documents, response attachments, premises, and conditions before submission.
Respondents are required to propose a pre-construction management fee as a not-to-exceed amount to be negotiated with TDCJ and the architect/engineer during design phases, and a construction management fee calculated as a percentage of the Cost of Work, with $40,000,000.00 used as the assumed total Cost of Work for RFQ purposes. General conditions fees must be submitted as not-to-exceed monthly costs and cover bonds, insurance, project management and supervisory personnel, temporary field facilities and storage, background checks, health and safety, documentation, transportation, parking, temporary barriers and signage, and cleaning and waste disposal. The response form requires detailed cost breakdowns including personnel counts and rates, monthly bonds, monthly insurance, temporary facilities costs, and all remaining costs. Respondents must include authorized signatures with appropriate corporate documentation demonstrating signatory authority.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B
696-FD-26-Q035 Page 1 of 2
CM@R RESPONSE FORM
(Submitted at Step 2 by Selected Respondents Only)
1. Proposing Firm's Name:
Address:
City, State, Zip:
2. Project Number: 696-FD-26-Q035 Project Title: CM@R for Memorial Unit – Construct Wastewater Treatment Plant Using Agency: Texas Department of Criminal Justice
Project Location: Memorial Unit, Rosharon, Texas
Having carefully examined the RFQ documents, response Attachments, as well as the premises and conditions affecting the work, as prepared by TDCJ, we hereby propose to complete the work for the following amounts:
Pre-Construction Management Fee for a Not-to-Exceed fee in collaborating with TDCJ and A/E during design phases
To be negotiated with the Respondent that is evaluated as the highest scoring firm
Construction Management Fee as a PERCENTAGE fee of the Cost of Work for construction (CM@R’s overhead and profit). For purposes of this RFQ only, use $40,000,000.00 as the total Cost of Work.
Not-to-Exceed fee for Construction General Conditions: General Conditions shall include the following for the duration of the project:
• Bonds and Insurance
• Project Management / Supervisory / Support / Administrative Personnel (both office and field)
• Temporary Field Offices / Facilities / Storage (including equipment, materials and temporary utilities)
• Background Checks / Employee I.D.s
• Health and Safety
• Construction Documentation
• Transportation
• Parking
• Temporary Barriers, Signage, and Controls
• Cleaning and Waste Disposal
Attachment B
696-FD-26-Q035 Page 2 of 2
Dollars $
Number of Personnel (Project Management / Supervisory/ Support / Administrative Personnel (both office and field)
Not to Exceed Monthly Personnel Rate Not to Exceed Monthly Bonds Not to Exceed Monthly Insurance Not to Exceed Monthly Temp Offices, Facilities Storage, etc.
Not to Exceed Monthly All Remaining Costs
Total Not to Exceed Monthly General Conditions Fee
Base Time: Anticipated construction time will be 25 months: 6 months for pre-construction and 19 months for Construction.
RESPECTFULLY SUBMITTED:
If a corporation, attach a corporation resolution or other official corporate documentation, which states that the person signing this response is an authorized person to sign for and legally bind the corporation
Authorized Signature:
Printed Name and Title:
Telephone:
Respondent's Corporate Charter No.:
| CM@R RESPONSE FORM |
| (Submitted at Step 2 by Selected Respondents Only) |
RESPECTFULLY SUBMITTED:
File details come from the government source that posted it. Updated .