6-1. BID-254-26 LoBo Trail Jay Road Connection Project Plans.pdf
PDF 69 MB Posted
- Solicitation number
- BID-254-26
- Issued by
- Boulder County, Colorado
About this file
This file contains project plans for the Longmont-to-Boulder (LoBo) Trail Jay Road Connection Project, a collaborative effort between Boulder County and the City of Boulder, Colorado. The project involves trail extension construction beginning at the Cottonwood Trail at Jay Road, extending along the south side of Jay Road until turning north at the intersection of Jay Road and Spine Road. The scope of work includes concrete and soft surface trail construction, ditch lateral piping, fencing, tree removals, traffic and pedestrian signal installation, and erosion control measures. Boulder County issued a competitive bid solicitation (BID-254-26) for this project, with bidders required to review and comply with all project specifications and requirements outlined in the planning documents.
The project plans document serves as the technical specification guide for prospective bidders, containing detailed design information, construction standards, and project requirements necessary for accurate bid preparation. Interested contractors should direct procurement-related questions to procurement@bouldercounty.gov. All bidders must comply with Americans with Disabilities Act and Equal Opportunity requirements as established by Boulder County. The competitive bidding process allows qualified contractors to submit proposals based on the detailed project plans and specifications provided in this bid package.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .