6-05. Prevailing Wage Determination.pdf
PDF 2 MB Posted
- Attached to
- Middletown North Station Improvements
- Solicitation number
- US.261351
- Issued by
- Pennsylvania
About this file
This is a Prevailing Wage Determination document (IFB-29 Section 9.0) for the Middletown North Station Improvements project in Pennsylvania. The project encompasses removal and replacement of old roof shingles, installation of metal roofing above entryways, miscellaneous wall and ceiling repairs, power washing of the entire building, and painting touch-ups at the Middletown Township North Station facility.
The prevailing wage determination establishes the minimum wage rates and fringe benefits that contractors and subcontractors must pay workers on this public works project in accordance with applicable prevailing wage laws. This requirement applies to all workers engaged in the construction and renovation activities specified for the North Station improvements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-01. Cover Sheet.pdf | ||
| 7-02. Notice To Bidders.pdf | ||
| 8-08. Project Plans (6 Sheets).pdf | ||
| 2-03. Proposal Section.pdf | ||
| 5-06. General Conditions.pdf | ||
| 4-07. Technical Specifications.pdf | ||
| 3-04. Information for Bidders.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB-29
9.0 PREVAILING WAGE DETERMINATION.
File details come from the government source that posted it. Updated .