This technical specifications document describes the scope of work for the Middletown North Station Improvements project undertaken by the Township of Middletown in Langhorne, Pennsylvania, with engineering by Remington & Vernick Engineers. The base bid encompasses exterior improvements including removal and replacement of damaged stucco/dryvit areas and power washing with elastomeric paint application on specified building sections. Five alternates are included: Alternate No. 1 addresses comprehensive roof shingle replacement with equipment relocation, demolition, roof decking repairs, and new roofing installation; Alternate No. 2 covers gutter and downspout replacement with ridge vent installation; Alternate No. 3 specifies standing seam metal roof systems for six small porch roofs; Alternate No. 4 includes interior wall and ceiling repairs, ceiling hatch installation, and structural crack repairs using Sikadur-35 Hi-Mod LV epoxy; and Alternate No. 5 addresses tile flooring replacement in the men's bunk bathroom. Alternate No. 6 provides a $5,000 contingency allowance for owner-directed work. The project must be completed within 45 days of the Notice to Proceed, with work restricted to 8:00 AM to 6:00 PM, Monday through Friday. The site is an active facility for the fire department and emergency medical services requiring maintained access.

The Township of Middletown requires a minimum 50-year transferrable warranty on the roofing system. Payment is structured by specific bid items with quantities measured in square feet, linear feet, lump sum, and each units as appropriate. The contractor bears all costs for permits, site cleanup, dumpsters, pre-construction video documentation, as-built drawings, dust control, and restoration of disturbed areas. The project is partially funded by the Commonwealth Financing Authority Local Shared Account program administered by the Pennsylvania Department of Community & Economic Development. All work must comply with Pennsylvania Department of Transportation Standard Specifications and applicable building codes. The Township reserves discretionary authority to reject bids from contractors with histories of litigation, non-payment, delayed performance, or substandard work quality with the Township or other municipalities.

View the file

Other files

File Type Posted
1-01. Cover Sheet.pdf PDF
7-02. Notice To Bidders.pdf PDF
8-08. Project Plans (6 Sheets).pdf PDF
2-03. Proposal Section.pdf PDF
6-05. Prevailing Wage Determination.pdf PDF
5-06. General Conditions.pdf PDF
3-04. Information for Bidders.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents � Middletown North Station Improvements

Division Section Title Pages

000001 SCOPE OF WORK 11

DIVISION 01 � GENERAL REQUIREMENTS

010000 GENERAL REQUIREMENTS 2

010100 AS-BUILT DRAWINGS 1

012100 ALLOWANCES 2

017400 CLEANING AND RESTORATIONS 3

DIVISION 02 � EXISTING CONDITIONS

024100 BUILDING DEMOLITION 2

DIVISION 03 � CONCRETE

039300 EPOXY-INJECTED CRACK REPAIR 5

DIVISION 05 � METALS

055000 METAL FABRICATIONS 20

DIVISION 06 � WOOD, PLASTICS, AND COMPOSITES

061000 ROUGH CARPENTRY 9

061600 SHEATHING 7

DIVISION 07 � THERMAL AND MOISTURE PROTECTION

072400 EXTERIOR INSULATION AND FINISH SYSTEMS 8

073113 ASPHALT SHINGLES 5

074112 STANDING SEAM METAL PANEL ROOFING 9

076000 SHEET METAL FLASHING AND TRIM 8

077100 GUTTERS AND DOWNSPOUTS 4

079000 EIFS REPAIR AND RESURFACE 11

DIVISION 09 � THERMAL AND MOISTURE PROTECTION

099000 PAINTING 10

Other Documents:

Project Plans entitled �Middletown North Station Improvements� (6 Sheets), prepared by Remington and Vernick

Engineers of Yardley, PA.

SCOPE OF WORK 000001-1

SECTION 000001 � SCOPE OF WORK

PART 1 - GENERAL

1.01 DESCRIPTION

A. In general, the work on this project consists of the removal and replacement olf roof shingles, installing metal roofing above entryways, miscellaneous wall and ceiling repairs, and power washing the entire building and painting touch ups at the Middletown North Station. The scope of work is more fully described in the project specifications herein and on the project plan.

B. Project Location: Middletown North Station 1741 Langhorne-Yardley Rd Langhorne, PA 19047

C. This project is partially funded by the Commonwealth Financing Authority Local Shared Account program administered by the Pennsylvania Department of Community & Economic Development (PA DCED).

1.02 WORK COVERED BY CONTRACT DOCUMENTS

A. Owner Identification: Township of Middletown 3 Municipal Way, Langhorne, PA 19047

B. Engineer Identification: Remington & Vernick Engineers 1010 Stony Hill Road, Suite 175 Yardley, PA 19067

C. Contract Documents:

These Specifications and the Project Plans indicate the extent of the Contract. Contract Documents were prepared for the Project by Remington & Vernick Engineers, 1010 Stony Hill Road, Suite 175, Yardley, PA 19067.

D. General:

1. Review of all existing site conditions is strongly recommended to fully understand the Scope of Work.

2. This project includes a single prime contract.

3. The Contractor is responsible and obligated to successfully complete the entire project and to complete every necessary detail of every item specified and/or is required to complete the specified work regardless of whether a particular detail is specifically mentioned in these specifications or not.

4. The Contractor will be required to submit upon award a proposed work schedule that shall be finalized to reflect actual project milestones after contract award. The project schedule shall follow the requirements of these specifications. Strict adherence to the

SCOPE OF WORK 000001-2

agreed upon final work schedule will be required for this project. The schedule shall be generated by the Contractor in a Microsoft Project format and shall be updated weekly.

Progress reports including the updated schedule (Gantt Chart) will be submitted to the Engineer on a weekly basis.

5. A Pre-Construction Meeting between the Township of Middletown, the Engineer, and the Contractor will be required prior to start of construction at a site chosen by the Owner.

All allowances/costs for the pre-construction meeting must be included in the Contractor�s proposal pricing and submitted with the bid. No additional payments will be made by the Owner for the pre-construction meeting.

6. Contracts:

a. The Project will be constructed under a single Prime Contracting arrangement.

b. The contract will be awarded to one Contractor for the work required at the sites contained herein. Contract award will be based on the sum of a Contractor�s pricing for the roof replacement listed herein.

c. The Contractor�s completed Bid Form shall reflect the actual amount of work required at the sites. The amounts on the Contractor�s Bid Form as submitted with their bid will be used to generate the project schedule of values for payment purposes.

d. The Specifications and the Project Plans indicate the extent of the Contract Documents.

e. The quantities described in the specifications are for the convenience of the Contractor only. No additional payment will be made if as-built quantities exceed plan quantities, and/or unit prices as shown on the bid form.

f. Only major items of work are given in the Bid Form, but it is the intent of the Specifications to secure a completely interconnected and functioning system, and if any workmanship or materials be required which are obviously necessary to carry out the full intent and meaning of the plans and specifications or to be reasonably inferred there from, the cost of such workmanship or materials shall be included in the unit price bid for the major items of work.

g. Local custom and trade-union jurisdictional settlements do not control the Scope of Work included in the Prime Contract. When a potential jurisdictional dispute or similar interruption of work is first identified or threatened, the affected Prime Contractor shall promptly negotiate a reasonable settlement to avoid interruption and delays at no additional cost to the Owner.

7. This Scope of Work outlines the general items and distribution of work and shall not be construed as being all-inclusive.

8. The Contractor shall be responsible for applying for and obtaining any and all permits required to satisfactorily complete this construction project. Any costs related to obtaining permits shall be included in the proposal.

SCOPE OF WORK 000001-3

1.03 SCOPE OF WORK

A. The BASE BID work on this project is for exterior improvements on the building, and consists of the following:

1. Remove and replace all damaged Stucco/Dryvit areas within the RED portion of the building as called out on the project plans.

2. Power wash entire exterior and supply and apply elastomeric paint on the WHITE portions of the Stucco/Dryvit areas.

B. Alternate No.1 work on this project is for roof shingle replacement including incidentals at the Middletown North Station Building, and consists of the following:

1. Temporarily relocate existing roof top equipment, as required, for the duration required to complete the surrounding roof replacement work. This includes HVAC equipment, conduit, and antennas. All equipment shall be stored in a safe, dry area and reinstalled immediately upon completion of work in the respective area. All openings exposed during relocation shall be covered and sealed to ensure no moisture infiltration during construction.

2. Select Demolition

a. The contractor shall use proper containment to protect the adjacent areas from dust and construction debris.

b. At the Township's request, the contractor may be required to provide documentation showing that all materials have been properly disposed of.

c. Remove and properly dispose of the existing layer of roofing as indicated on the Contract Documents. For the existing roof areas, as indicated on the Contract Documents, this includes complete removal of existing shingles. All metal drip edge and flashing are to be removed and replaced. Any damage to existing framing experienced during removal of the materials mentioned prior to shall be the responsibility of the Contractor.

d. The contractor will not be paid for deteriorated sheathing and wood blocking demolition performed without prior authorization from the Engineer. Payment shall include the select demolition and disposal of existing deteriorated roof decking materials, including tar paper & ice and water shield. The cost of demolition shall include storage (i.e dumpster), transport and proper disposal of all rubbish and debris, including all disposal and testing fees required.

3. Roof Decking Repairs

a. Repair deteriorated portions of roof plywood substrate in kind.

b. After removing the existing roofing materials, the contractor shall identify and measure any areas of deteriorated roof decking substrate which must be replaced prior to the installation of new roofing materials. Once these areas have been identified and have been measured, then the contractor shall forward this information to the Engineer for their review and authorization. The contractor must receive authorization from the Engineer prior to beginning work replacing deteriorated roof decking.

c. Once substrate is removed and before it is replaced, an exterminator of the Township�s choice will come to inspect the area.

SCOPE OF WORK 000001-4

d. When installing new roof substrate, the contractor shall use materials which match the type and dimensions of the existing roof substrate materials.

e. The contractor will not be paid for roof decking repairs performed without prior authorization from the Engineer. Payment shall include the select demolition and disposal of existing deteriorated roof decking materials.

4. Inspect the condition of the existing roof deck in coordination with the Engineer. Repair all deteriorated areas identified by the Engineer prior to installation of the new roofing systems, if and where directed.

5. Inspect the condition of existing perimeter wood fascia boards in coordination with the Engineer. Remove and replace all deteriorated areas of fascia boards identified by the Engineer prior to installation of the new roofing system, if and where directed. Remove and Replace all aluminum covers associated with fascia board.

6. Furnish and install roofing shingles system as indicated on the Contract Documents.

a. Furnish and install asphalt shingled roofing system, complete and any existing underlayment as needed. This includes drip edges, underlayment, counter flashing, and roofing felt. Install system with proper sloping of the roof.

7. Furnish and install new flashing materials in accordance with manufacturer requirements for the designed roofing system. This includes edges as indicated on the Contract Documents and all roof penetrations, vent pipes, exhaust fans, roof drains, etc.

8. Raise all existing vents to a minimum projection of 18� above finished roof level.

9. Contractor shall remove and replace deteriorated wood blocking, if and where directed.

10. The Contractor is responsible for daily cleaning of the interior and exterior of the site and restoration of the site to the pre-construction conditions.

11. All work not specifically described or listed in the specifications that are incidental to work completion shall be considered as included within scope.

12. All work not specifically listed in a bid form pay item shall be incorporated into the lump sum/unit pay items listed.

C. Alternate No.2 work on this project is for multiple roof improvements at the Middletown North Station Building, and consists of the following:

1. Remove and replace existing metal gutters and downspouts as indicated on the Project Plans for the replacement of the existing facia boards and new metal flashing. Re-pitch gutters as required for positive slope.

2. Contractor to furnish and install new ridge vent.

3. Furnish and install all terminations and counterflashing as inducated in the contract documents

4. The Contractor is responsible for daily cleaning of the interior and exterior of the site and restoration of the site to the pre-construction conditions.

5. All work not specifically described or listed in the specifications that are incidental to work completion shall be considered as included within scope.

6. All work not specifically listed in a bid form pay item shall be incorporated into the lump sum/unit pay items listed.

SCOPE OF WORK 000001-5

D. Alternate No.3 work on this project is for standing seam metal roof systems at Middletown North Station Building, and consists of the following:

1. Furnish and install standing seam metal roof system at six (6) small porch roofs.

2. The Contractor is responsible for daily cleaning of the interior and exterior of the site and restoration of the site to the pre-construction conditions.

3. All work not specifically described or listed in the specifications that are incidental to work completion shall be considered as included within scope.

4. All work not specifically listed in a bid form pay item shall be incorporated into the lump sum/unit pay items listed.

E. Alternate No.4 work on this project is for multiple interior improvements throughout the Middletown North Station Building, and consists of the following:

1. Perform interior wall and ceiling repairs throughout the building.

2. Install ceiling hatch on second floor as shown on plans with trim and paint. Contractor shall be responsible for all additional framing and finishes required.

3. Perform structural cracking repairs on masonry walls as per manufacturer recommendations, utilizing Sikadur-35 Hi-Mod LV or approved equal.

4. The Contractor is responsible for daily cleaning of the interior and exterior of the site and restoration of the site to the pre-construction conditions.

5. All work not specifically described or listed in the specifications that are incidental to work completion shall be considered as included within scope.

6. All work not specifically listed in a bid form pay item shall be incorporated into the lump sum/unit pay items listed.

F. Alternate No.5 work on this project is flooring improvements throughout the Middletown North Station Building, and consists of the following:

1. Remove and replace cracked tile as needed in the Men�s bunk bathroom.

2. The Contractor is responsible for daily cleaning of the interior and exterior of the site and restoration of the site to the pre-construction conditions.

3. All work not specifically described or listed in the specifications that are incidental to work completion shall be considered as included within scope.

4. All work not specifically listed in a bid form pay item shall be incorporated into the lump sum/unit pay items listed.

G. Alternate No.6 work on this project is for Contingency Allowance, If & Where directed by the Township Engineer for Middletown North Station Building.

1. Contingency allowance shall be only as directed by the engineer for the owner�s purposes and only by a change order that indicates amounts to be changed by allowance. At the end of the project, any unused portion of the contingency allowance shall be returned to the owner.

SCOPE OF WORK 000001-6

1.04 SPECIAL CONDITIONS

A. The project site is an active facility for the Township of Middletown, Township Fire Department and local Emergency Medical Services. The contractor shall maintain access to the site at all times.

B. The Township of Middletown will require a minimum 50-year transferrable warranty on the roofing system.

C. The Contractor shall be responsible for coordinating all work with the Engineer and the Township of Middletown.

D. The Contractor shall be responsible for applying and obtaining the required building permits from the Township of Middletown for this work, including all permit fees.

E. Prior to bidding, the Contractor shall visit the site and include all costs for a complete roof repair, including review of the existing conditions. The Owner is not responsible for additional costs based on Contractor failure to properly inspect the existing conditions and include all costs in his bid.

F. The existing roof layout is provided in the project plans for the Contractor�s reference only.

These are based on the field inspection and may not reflect the exact as-built conditions. The Contractor is responsible for verifying all existing information.

G. All work not specifically described or listed in the specifications that are incidental to work completion shall be considered as included within the Scope.

H. Extra work allowance is only to be used at the Owner�s/Engineer�s discretion.

I. Contractor is responsible for clean-up of site and shall provide dumpsters as required.

Cleanup and dumpster costs shall be included in the various unit prices bid. These activities are not separate pay items.

1.05 GENERAL REQUIREMENTS

A. All work by the contractor, must be 100% complete within forty-five (45) days of the Notice to Proceed. The contract time limit shall begin once a written Notice to Proceed order has been issued to the contractor.

B. If the Contractor is contracted to perform other projects for the Owner, then the Notice to Proceed date for this project will be coordinated to be mutually acceptable to the Owner and the Contractor.

C. All work shall be performed between the hours of 8:00 AM and 6:00 PM, Monday through Friday. Work will not be performed on weekends or Township Holidays.

D. The Contractor is required to remove all excess material from the construction site, haul the material to an approved site, and shall be disposed of in a method acceptable by the Pennsylvania Department of Environmental Protection. Payment will not be made for the material transport, hauling and spreading, but shall be included in the various items of the proposal.

SCOPE OF WORK 000001-7

E. All materials, construction procedures, type and use of equipment, measurement and payment shall be in accordance with the Commonwealth of Pennsylvania Department of Transportation Specifications, Publication 408, unless otherwise noted and/or added into these specifications.

F. All Contractors and other persons utilizing this specification and the information contained herein are cautioned to comply with the requirements of Pennsylvania Act 172, Entitled �Excavation and Demolition Work Protection of Underground Utilities�. Each individual using this plan must verify location and depth of all underground utilities and facilities before starting work. Contractor shall notify �PA. ONE CALL� (1-800-242-1776) at least 48 hours prior to start of excavation.

G. Contractor shall establish contact with an individual from each local utility prior to commencement of excavation for the construction of proposed work. The Contractor shall notify the Engineer and the Utility Owner immediately should a conflict occur in the limits of construction. The Contractor shall be responsible for coordination of all work to be performed by the Utility Owner with regards to the work included in this contract.

Additional payment will not be made for delays incurred or additional work performed due to conflicts with existing utility mains or service lines.

H. The Contractor shall be responsible for the location and preservation of underground and surface utilities and structures at or adjacent to the site of construction and it shall be at his own expense to repair or replace anything that is damaged.

I. The cost of all related incidental work, as-built drawings, dust control, erosion control, cleaning and restorations shall be included in the various unit prices bid. These activities are not separate pay items.

J. Any damage to the building caused by the construction shall be restored by the contractor to a condition at least equal to that which existed prior to the start of construction.

K. Any building components or paved asphalt or concrete areas damaged by the contractor during construction shall be restored to a condition at least equal to that which existed prior to the start of construction.

L. Any grassed areas disturbed during construction shall be topsoiled, fertilized and seeded.

No additional payment will be made for restoration of grassed areas, but the cost shall be included in the various items of the proposal.

M. The Contractor shall make a complete record of existing conditions using a pre-construction video or pictures of the project areas. The video and pictures shall be saved to a compact disk (CD) and provided to the Owner & Engineer prior to beginning any demolition work.

N. The contractor shall either provide record of an existing Contractor License or shall obtain a new Contractor License from the Township. The contractor shall be responsible for paying any associated licensing fees.

O. All construction shall be in accordance with roofing manufacturer's installation instructions and applicable codes.

SCOPE OF WORK 000001-8

P. The strictest instructions between the manufacturer�s instructions, project plans and specifications shall be followed.

Q. The contractor shall use proper containment to protect the surrounded areas.

R. All construction details not shown shall be in accordance with PennDOT Standards as detailed in:

- Specifications, PUB. 408

- Standards for Roadway Construction, PUB. 72

Including all applicable A.D.U. Revisions and Appendices. These can be purchased at:

PA Department of Transportation, Sales Store P.O. Box 2028, Harrisburg, PA 17105-2028, (717) 787-6746

S. Middletown Township reserves the right, in its sole discretion, to determine if a Contractor is responsible. Factors that may be considered by the Township to determine whether a bidder is responsible are, but are not limited to, whether the Contractor:

i. Has been involved in previous litigation with the Township or another municipality.

ii. Has refused payments.

iii. Has delayed the performance of previous work.

iv. Has failed to complete projects in a timely fashion.

v. Has performed work for the Township or another municipality in an unworkmanlike manner.

If Middletown Township determines that a Contractor is not responsible, it may reject that Contractor�s Bid.

1.06 The above Scope of Work outlines the general items and distribution of work and shall not be construed as being all-inclusive.

PART 2 � PRODUCTS (Not Used)

PART 3 � EXECUTION Not Used)

PART 4 - QUANTITY AND PAYMENT

4.01 Removal and Replacement of All Roofing Shingles, Complete

A. Quantity of �Removal and Replacement of All Roofing Shingles, Complete� will be measured per Square Feet (SF) for the actual area of the roofing for this project.

B. Payment for �Removal and Replacement of All Roofing Shingles, Complete� will be made per Square Feet (SF) for the actual area of the roofing removal, disposal, and installation.

Payment shall include all equipment, disposal, labor and materials.

4.02 Remove and Replace Deteriorated Sheathing, If and Where Directed

SCOPE OF WORK 000001-9

A. Quantity of �Remove and Replace Deteriorated Sheathing, If and Where Directed� will be measured per Square Feet (SF) for the actual area of the roofing for this project.

B. Payment for �Remove and Replace Deteriorated Sheathing, If and Where Directed� will be made per Square Feet (SF) for the actual area of the roofing removal, disposal, and replacement. Payment shall include all equipment, disposal, labor and materials.

4.03 Install Metal Roofing, Complete

A. Quantity of �Install Metal Roofing, Complete� will be measured per Square Feet (SF) for the actual area of the replaced roofing for this project.

B. Payment for �Install Metal Roofing, Complete� will be made per Square Feet (SF) for the actual area of the replaced roofing for this project. Payment shall include all equipment, labor and materials.

4.04 Remove and Replace Siding at Stucco/Dryvit RED Colored Areas

A. Quantity of �Remove and Replace Siding at Stucco/Dryvit RED Colored Areas� will be measured per Square Feet (SF) for the actual area of the repaired siding for this project.

B. Payment for �Remove and Replace Siding at Stucco/Dryvit RED Colored Areas� will be made per Square Feet (SF) for the actual area of the repaired siding for this project.

Payment shall include all equipment, labor and materials.

4.05 Power Wash Entire Exterior & Supply and Apply Elastomeric Painting Over WHITE Colored Stucco/Dryvit Areas

A. Quantity of "Power Wash Entire Exterior & Supply and Apply Elastomeric Painting Over WHITE Colored Stucco/Dryvit Areas" will not be measured for this project but bid as a lump sum (LS) for work as shown on the project plans.

B. Payment for �Power Wash Entire Exterior & Supply and Apply Elastomeric Painting Over WHITE Colored Stucco/Dryvit Areas� will be made as a Lump Sum (LS). Payment shall include all equipment, labor and materials.

4.06 Miscellaneous Interior Wall and Ceiling Repairs

A. Quantity of "Miscellaneous Interior Wall and Ceiling Repairs" will be measured per Each (EA) for the actual quantity of wall and ceiling repairs made throughout the building.

B. Payment for �Miscellaneous Interior Wall and Ceiling Repairs� will be made as an Each (EA). Payment shall include all equipment, labor and materials necessary.

4.07 Install Ceiling Hatch and Trim, Complete

A. Quantity of "Install Ceiling Hatch and Trim, Complete" will be measured per Each (EA) for the actual quantity ceilings hatches installed throughout the building.

B. Payment for �Install Ceiling Hatch and Trim, Complete� will be made as an Each (EA).

Payment shall include all equipment, labor and materials necessary.

SCOPE OF WORK 000001-10

4.08 Remove & Replace Tile Flooring Men�s Bunk Bathroom, as needed

A. Quantity of �Remove & Replace Tile Flooring Men�s Bunk Bathroom, as needed� will be measured per Square Feet (SF) for the actual area of the repaired tile for this project

B. Payment for �Remove & Replace Tile Flooring Men�s Bunk Bathroom, as needed� will be made per Square Feet (SF) for the actual area of the repaired tile for this project. Payment shall include all disposal, equipment, labor and materials.

4.09 Remove & Replace Gutters and Downspouts

A. Quantity of "Remove & Replace Gutters and Downspouts" will not be measured for this project but bid as a lump sum (LS) for any gutter replacements and adjustments installed as shown on the project plans.

B. Payment for �Remove & Replace Gutters and Downspouts� will be made as a Lump Sum (LS). Payment shall include all equipment, labor and materials.

4.10 Remove & Replace Existing Fascia Board, If and Where Directed

A. Quantity of "Remove & Replace Existing Fascia Board, If and Where Directed" will be measured per Linear Foot (LF) of any Fascia Board installed.

B. Payment for �Remove & Replace Existing Fascia Board, If and Where Directed� will be made as a Linear Foot (LF). Payment shall include all equipment, labor and materials.

4.11 Structural Cracking Repairs

A. Quantity of "Structural Cracking Repairs" will be measured per Linear Foot (LF) for any structural cracking repairs made as shown on the project plans.

B. Payment for �Structural Cracking Repairs� will be made as a Linear Foot (LF). Payment shall include all equipment, labor and materials.

4.12 Remove and Replace Wood Blocking, If and Where Directed

A. Quantity of "Remove and Replace Wood Blocking, If and Where Directed" will be measured per Linear Foot (LF) for any structural cracking repairs made as shown on the project plans.

B. Payment for �Remove and Replace Wood Blocking, If and Where Directed� will be made as a Linear Foot (LF). Payment shall include all equipment, labor and materials.

4.13 Furnish and Install New Flashing

A. Quantity of "Furnish and Install New Flashing" will not be measured for this project but bid as a lump sum (LS) for any gutter replacements and adjustments installed as shown on the project plans.

B. Payment for �Furnish and Install New Flashing� will be made as a Lump Sum (LS).

Payment shall include all equipment, labor and materials.

SCOPE OF WORK 000001-11

4.14 Furnish and Install New Ridgevent

A. Quantity of "Furnish and Install New Ridgevent" will be measured per Linear Foot (LF) for any structural cracking repairs made as shown on the project plans.

B. Payment for �Furnish and Install New Ridgevent� will be made as a Linear Foot (LF).

Payment shall include all equipment, labor and materials.

4.15 Contingency Allowance (If & Where directed, Required Fixed Bid Amount of $5,000)

A. Quantity of �Contingency Allowance (If & Where directed, Required Fixed Bid Amount of $5,000)� will not be measured for this project.

B. Payment for �Contingency Allowance (If & Where directed, Required Fixed Bid Amount of $5,000)� will be made as an Allowance (AL). Payment for this contingency allowance has been included in this contract. The use of the contingency allowance shall be only as directed by the engineer for the owner�s purposes and only by a change order that indicates amounts to be changed by allowance. At the end of the project, any unused portion of the contingency allowance shall be returned to the owner.

END OF SECTION

GENERAL REQUIREMENTS 010000-1

SECTION 010000 � GENERAL REQUIREMENTS

1.01 GENERAL

A. Only major items of work are given in the Bid Form, but it is the intent of the specifications to secure a completely interconnected and functioning system, and if any workmanship or materials be required which are obviously necessary to carry out the full intent and meaning of the plans and specifications or to be reasonably inferred therefrom, the cost of such workmanship or materials shall be included in the unit price bid for the major items of work.

B. Reproducible As-built drawings must be furnished by the Contractor to the Engineer prior to final payment in accordance with Section 010100.

C. Contractor shall notify all utility companies prior to construction of utilities by contacting 1-800-

272-1000.

D. Prior to any excavation, the Contractor shall have all utilities marked and shall excavate or otherwise determine the exact location and elevations of said utilities. The Contractor shall notify the Engineer of any conflicts. The Contractor shall arrange for any necessary utility relocations or plan changes and shall reschedule his operations appropriately.

E. The Contractor, in the construction of any project, shall not stockpile materials or his equipment on any private property; except areas designated by the drawings as directed by the Engineer. If so required, the Engineer may direct the Contractor to have his equipment removed from any project during weekend hours.

F. All work of refilling sunken ditches, repaving over trenches and keeping streets and sidewalks in passable condition shall be done to the satisfaction of the Engineer during the construction of the above work as well as during the maintenance period. If any work is not done within five (5) days after written notice is given by the Engineer, the work may be done by the Owner and charged to the Contractor.

G. Special care shall be taken to prevent contamination, siltation, or interfering in any way with the stream flows or ponds along the line of work. No waste matter of any kind will be allowed to discharge into the stream flows or impounded water of any ponds or other bodies of water.

H. The Contractor shall apply and pay for all local permits that may be required for any of the work involved with this project.

I. All notes on drawings shall be made a part of the specifications.

J. The contractor may perform work on weekdays Monday through Friday, beginning at 8:00 am and concluding no later than 6:00 PM each day. There will be no work permitted on Saturday, Sundays, or holidays. This project will receive inspection and the normal working hours for the Inspector are from 7:30 AM to 4:00 PM, Monday through Friday. Any overtime inspection costs which are not specifically mentioned in the drawings and specifications will be reimbursed by the Contractor.

K. It shall be the Contractor's responsibility to keep the site, parking lot, adjacent roadways and properties clean.

GENERAL REQUIREMENTS 010000-2

1.02 PUBLIC UTILITIES

A. The contract drawings indicate the approximate location of existing overhead and subsurface utilities in the vicinity of the work. The bidder is advised to ascertain for himself all the facts concerning the location of these utilities.

B. The Contractor shall cooperate with the utility owners in the adjustment of their facilities and shall notify the utility owners not less than five (5) days in advance of the time he proposes to perform any work that will endanger or affect their facilities.

C. The Contractor shall permit the owners of utilities, or their agents, access to the site of the work at all times in order to relocate, construct or protect their lines and he shall cooperate with them in performing this work.

D. Separate payments will not be made for the coordination and cooperation of the Contractor with the utility companies, nor for the protection or replacement of utilities for the resequencing or delay of work due to a utility company and the bidder shall include all such costs in the prices bid for the various related items of work in the Bid Form.

E. The Contractor is responsible for repairing all located utilities (water, sewer, storm sewer, gas lines, etc.) which are broken or damaged during construction.

1.03 PHOTOGRAPHS & VIDEO TAPES

The Contractor shall video tape in digital format the construction site prior to the commencement of construction. Two copies of the digital recording shall be forwarded and kept by Remington and

Vernick Engineers to resolve any disputes arising over the restoration of all curbs, sidewalks, driveways, fences, lawns, landscaped areas, or any other items that may be disturbed during construction.

1.04 TESTING MATERIALS

A. Except as may be provided elsewhere, test or analysis of materials which are usually tested after delivery to the site, such as concrete aggregate, mixed and placed concrete, and similar materials;

will be performed by the Engineer or test laboratories which will be approved by the Engineer and selected and paid for by the Contractor. The preliminary testing of concrete mixtures and test or analysis of other materials, samples of which are to be submitted prior to delivery, will also be performed by the laboratory and paid for by the Contractor at the Engineer's request.

B. If the Engineer orders sampling and analysis or tests of materials which are usually accepted on

Certification of the manufacturer but which appear defective or not conforming to the requirements of the Specifications, the Contractor will bear the reasonable costs of sampling, transportation, test and analysis.

1.05 QUANTITY AND PAYMENT

A. No separate payment will be made for work performed under this section. Include all costs within the bid items as shown in the project Bid Form.

AS-BUILT DRAWINGS 010100-1

SECTION 010100 - AS-BUILT DRAWINGS

PART 1 � GENERAL

1.01 GENERAL

The Contractor shall provide a set of reproducible as-built drawings prior to final payment.

PART 2 � PRODUCTS

2.01 MATERIALS

A. As-builts shall be a reproducible of the original contract drawings including any additional sheets required. All deviations from the original contract drawings shall be on the as-builts. The drawings shall be legible, neat, and of a quality acceptable to the Engineer.

B. The Engineer shall provide a set of reproducibles at the beginning of the project.

PART 3 � EXECTUTION

3.01 EXECUTION

A. The Contractor shall be responsible for keeping the as-built up-to-date as the project progresses and present the as-built drawings for review at each Job Meeting. The as-built drawings shall clearly indicate all the fasteners and anchorage of all roofing components.

B. Building Construction: Actual installation with all items clearly identified shall be indicated.

Location of installed items and any deviations from Contract Documents shall be so shown with boxes around the as-built numbers or labels.

C. This section is intended to provide a minimum level of acceptance. Any section with more stringent requirements shall have precedence over this section.

D. Complete construction As-Built drawings certified by the Contractor as complete to the best of his knowledge, must be provided at the completion of the Project. This submission may be hardcopy in full size or PDF.

PART 4 � MEASUREMENT, QUANTITY, & PAYMENT

4.01 PAYMENT

No separate payment will be made for work performed under this section. Include all costs within

ALLOWANCES 012100 - 1

SECTION 012100 � ALLOWANCES

PART 1 � GENERAL

1.01 Description

A. Section includes administrative and procedural requirements governing allowances.

B. Types of allowances include the following:

1. Contingency Allowances.

1.02 Action Submittals

A. Submit proposals for purchase of products or systems included in allowances in the form specified for Change Orders.

1.03 Information Submittals

A. Submit invoices or delivery slips to show actual quantities of materials delivered to the site for use in fulfillment of each allowance.

B. Submit timesheets and other documentation to show labor time and cost for installation of allowance items that include installation as part of the allowance.

C. Coordinate and process submittals for allowance items in same manner as for other portions of the

Work.

1.04 Contingent Allowances

A. Use the contingency allowance only as directed by Engineer for Owner's purposes and only by

Change Orders that indicate amounts to be charged to the allowance.

B. Contractor's overhead, profit, and related costs for products and equipment ordered by Owner under the contingency allowance are included in the allowance and are not part of the Contract Sum.

These costs include delivery, installation, insurance, equipment rental, and similar costs.

C. Change Orders authorizing use of funds from the contingency allowance will include Contractor's related costs and reasonable overhead and profit.

D. At Project closeout, credit unused amounts remaining in the contingency allowance to Owner by

Change Order.

1.05 Adjustment of Allowances

A. Allowance Adjustment: To adjust allowance amounts, prepare a Change Order proposal based on the difference between purchase amount and the allowance, multiplied by final measurement of work-in-place where applicable. If applicable, include reasonable allowances for cutting losses, tolerances, mixing wastes, normal product imperfections, and similar margins.

1. Include installation costs in purchase amount only where indicated as part of the allowance.

ALLOWANCES 012100 - 2

2. If requested, prepare an explanation and documentation to substantiate distribution of overhead costs and other markups.

3. Submit substantiation of a change in scope of Work, if any, claimed in Change Orders related to unit-cost allowances.

4. Owner reserves the right to establish the quantity of work-in-place by independent quantity survey, measure, or count.

B. Submit claims for increased costs because of a change in scope or nature of the allowance described in the Contract Documents, whether for the purchase order amount or Contractor's handling, labor, installation, overhead, and profit.

1. Do not include Contractor's or subcontractor's indirect expense in the Change Order cost amount unless it is clearly shown that the nature or extent of Work has changed from what could have been foreseen from information in the Contract Documents.

2. No change to Contractor's indirect expense is permitted for selection of higher- or lower-priced materials or systems of the same scope and nature as originally indicated.

PART 2 � PRODUCTS (Not Used)

PART 3 � EXECUTION

3.01 Examination

A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged or defective products to manufacturer for replacement.

3.02 Preparation

A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.

CLEANING AND RESTORATIONS 017400-1

SECTION 017400 � CLEANING AND RESTORATIONS

PART 1 � GENERAL

1.01 DESCRIPTION

A. Contractor shall provide all equipment, labor & materials required to clear the site of all debris to match the natural grade conditions. Backfill shall be provided as required to provide positive drainage from any disturbed areas so that there is no ponding water on the site. All disturbed areas shall be seeded to establish vegetation and prevent erosion.

B. Maintain premises and public properties free from accumulations of waste, debris and rubbish caused by work operations.

C. At completion of work, remove waste materials, rubbish, tools, equipment, machinery and surplus materials; clean all sight exposed surfaces; leave project clean and ready for occupancy.

D. At completion of work, restore or replace, when and as directed by the Engineer, any public or private property disturbed or damaged by Contractor's work operations to a condition at least equal to that existing prior to beginning work, or as otherwise specified. Materials, equipment and methods shall be approved by the Engineer.

PART 2 - PRODUCTS

2.01 MATERIALS

A. For restorations all materials shall comply with the following Articles of the Pennsylvania

Department of Transportation Standard Specifications latest revision and these specifications.

B. Restoration of curbs and other concrete structures:

1. Concrete:

a. Shall conform to Section 630 for Curbs, Section 676 for sidewalks and driveways, and

Section 405 for concrete surface course.

b. Compressive Strength: 4,000 psi at 28 days.

c. Air-entrained.

2. Joint Fillers: Section 705, bituminous cellular type.

3. Curing Compound: Section 711.2, white-pigmented liquid.

C. Driveway Restoration: Driveway Aprons shall be replaced in kind with Portland Cement Concrete, Bituminous Concrete or 3/4 inch stone. Dirt driveway aprons are to be upgraded to stone.

D. All other Materials: As approved by the Engineer or authorities having jurisdiction.

CLEANING AND RESTORATIONS 017400-2

PART 3 - EXECUTION

3.01 METHODS OF CONDUCTING WORK � CLEANING

A. Requirements of regulatory agencies:

The Contractor shall comply with all Federal, State, and local anti-pollution laws, ordinances, codes and regulations when disposing of waste materials, debris and rubbish. All excess material shall be removed from the site and disposed of by the Contractor. Cost to be included in the unit price bid for all items.

The disposal site shall be in permanently established licensed OSWA (Office of Solid Waste

Administration, Pennsylvania Department of Environmental Protection) landfills or a PADEP certified recycling center if applicable.

B. Cleaning during construction:

Provide periodic cleaning to keep the work, the site, and adjacent properties free from accumulations of waste materials, rubbish and windblown debris resulting from construction operations.

The Contractor is responsible for street sweeping as directed by the Engineer or Owner. The

Contractor shall keep all public roadways free of dirt and debris from any trucks entering or leaving the demolition site.

Provide on-site containers for the collection of waste materials, debris and rubbish. Maintain containers as required.

C. Dust Control:

The Contractor will be required to maintain all excavations, embankments, stockpiles, haul roads, permanent access roads, plant sites, waste areas, borrow areas, and all other work areas within or without the project boundaries free from dust which would cause a hazard or nuisance to others.

Approved temporary methods of stabilization consisting of sprinkling, chemical treatment, light bituminous treatment or similar methods will be permitted to control dust. Sprinkling, to be approved, must be repeated at such intervals as to keep all parts of the disturbed area at least damp at all times, and the Contractor must have sufficient competent equipment on the job to accomplish this if sprinkling is used. Dust control shall be performed as the work proceeds and whenever a dust nuisance or hazard occurs. If any dust control is not done within twenty-four (24) hours after written notice is given by the Engineer, the work may be done by Owner and charged to the

Contractor.

3.02 METHODS OF CONDUCTING WORK - RESTORATIONS

A. General: All existing structures, unpaved areas and paved areas disturbed or damaged during the work under this contract shall be restored or replaced to a condition at least equal to that existing prior to beginning work, or as otherwise specified. The methods of conducting this work shall, as a minimum, conform to the Pennsylvania Department of Transportation Standard Specifications, latest revision.

B. Pavement Restorations:

CLEANING AND RESTORATIONS 017400-3

The methods of construction employed shall conform to the requirements set forth in PennDOT

Publication 408/latest edition Specifications of the Standard Specifications as applicable to the type of material being utilized.

Restoration type and thickness shall be as shown on the contract drawings.

C. Restorations of Curbs and Other Concrete Structures:

1. Curbs: Section 630

2. Other concrete structures: Restore in accordance with applicable Sections of the Standard

Specifications.

D. Fence Restorations:

Contractor shall remove all concrete from existing fence posts and appurtenances before reinstalling fence in kind.

E. All Other Restorations:

Restore in accordance with applicable Sections of the Standard Specifications, or as approved by the

Engineer or authorities having jurisdiction.

PART 4 � QUANTITY AND PAYMENT

A. No separate payment will be made for work performed under this section. Include all costs within

BUILDING DEMOLITION 024100-1

SECTION 024100 � BUILDING DEMOLITION

PART 1 � GENERAL

1.01 DESCRIPTION

A. The existing structures to be demolished, in general, consist of the following:

1. Removal of existing roofing system, including but not limited to roofing membrane, insulation, and flashing.

2. Interior walls and ceilings, including but not limited to drywall and lose material.

B. Adjacent areas required to remain shall be left in a safe condition, and shall not be defaced, marred, or jeopardized in any way and any damage done to them shall be repaired or restored to the satisfaction of the Engineer, without additional compensation.

C. Contractor shall remove all equipment and excess materials during the process of demolition.

This material shall be disposed of by the Contractor at his expense.

D. The Contractor shall employ all possible methods to minimize the noise. All construction equipment powered by internal combustion engines shall be equipped with a properly maintained muffler. Air powered equipment shall be fitted with pneumatic exhaust silencers.

Equipment powered by an internal combustion shall not be operated within 150 feet of residential properties without portable noise barriers placed between the equipment and the noise sensitive sites.

1.02 PERMITS

A. Contractor is responsible to complete and file all required Uniform Construction Code and

Township demolition permit applications, if required. No demolition work shall commence without a permit being issued.

PART 3 � EXECTUTION

3.01 EXECUTION

A. Inspection:

Verify that areas of demolition work are unoccupied.

3.02 PREPARATION

A. Prior to commencement of demolition operations, arrange for, and verify shut off of utility services, including electric, gas, telephone, water, and sewer, if required.

3.03 DEMOLITION

A. Demolition of structures shall be in accordance with the demolition procedures submitted to and accepted by the Engineer.

BUILDING DEMOLITION 024100-2

B. Suitable barriers shall be erected and maintained around all operations as long as such operations constitute a hazard or dangerous condition. "Keep Out" signs shall be maintained in places and locations where the placing of protective devices are warranted.

C. Only methods of demolition will be permitted which will ensure that all phases of demolition are confined within the limits of the demolition area and without hazard to adjacent areas or to the public.

D. Adjacent areas shall be left in a safe condition, and shall not be defaced, marred, or jeopardized in any way and any damage done to them shall be repaired or restored to the satisfaction of the

Engineer, without additional compensation.

E. Any additional materials required for repairs shall be furnished without any additional cost to the

Owner.

F. All materials, including fixtures and equipment, as well as debris and rubbish, except personal property belonging to Owners shall be removed as it accumulates and not stored on the Project.

Materials and debris shall not be placed or stored within the limits of any existing streets.

EPOXY-INJECTED CRACK REPAIR 03930 - 1

SECTION 03930 � EPOXY-INJECTED CRACK REPAIR

PART 1 � GENERAL

1.01 SUMMARY

A. This specification describes the pressure injection of cracks with an epoxy resin adhesive.

1.02 QUALITY ASSURANCE

A. Manufacturing qualifications: The manufacturer of the specified product shall be ISO

9001/9002 certified and have in existence a recognized ongoing quality assurance program independently audited on a regular basis.

B. Contractor qualifications: Contractor shall be qualified in the field of concrete repair and protection with a successful track record of 5 years or more. Contractor shall maintain qualified personnel who have received product training by a manufacturer's representative.

C. Install materials in accordance with all safety and weather conditions required by the manufacturer, or as modified by applicable rules and regulations of local, state and federal authorities having jurisdiction. Consult Material Safety Data Sheets for complete handling recommendations.

1.03 DELIVERY, STORAGE, AND HANDLING

A. All materials must be delivered in original, unopened containers with the manufacturer's name, labels, product identification, and batch numbers. Damaged material must be removed from the site immediately.

B. Store all materials off the ground and protect from rain, freezing or excessive heat until ready for use.

C. Condition the specified product as recommended by the manufacturer.

1.04 JOB CONDITIONS

A. Environmental Conditions: Do not apply material if it is raining or snowing or if such conditions appear to be imminent. Minimum application temperature 40ºF (5ºC) and rising.

B. Protection: Precautions should be taken to avoid damage to any surface near the work zone due to mixing and handling of the specified product.

1.05 SUBMITTALS

A. Submit two copies of manufacturer's literature, to include: Product Data Sheets, and appropriate Material Safety Data Sheets (MSDS).

1.06 WARRANTY

EPOXY-INJECTED CRACK REPAIR 03930 - 2

A. Provide a written warranty from the manufacturer against defects of materials for a period of one (1) years, beginning with date of substantial completion of the project.

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Sikadur 35 Hi-Mod LV, as manufactured by Sika Corporation, 1682 Marion Williamsport

Road, Marion, Ohio 43302 is considered to…