5978_ConstructionPlans.pdf

PDF 3 MB Posted

Attached to
Guardrail Program - 2025 CRP 5978
Solicitation number
2026-MPW-212
Issued by
Pierce County, Washington

About this file

This construction plans document is prepared by Pierce County Office of the County Engineer in Washington and provides detailed specifications for the Guardrail Program - 2025 project (CRP 5978). The project involves the improvement of Bridge #28173-D on 8th Avenue South at Horn Creek by installing beam guardrail systems, transitions, and terminals. Key work items include the removal of 50 linear feet of existing guardrail, installation of 250 linear feet of Beam Guardrail Type 31, 50 linear feet of Beam Guardrail Type 10, four Beam Guardrail Transition Sections (Type 23), two non-flared terminals, and two buried terminals (Type 2). Additional project components include installation of approximately 67 linear feet of 18-inch diameter Schedule A culvert pipe for drainage, 120 tons of crushed surfacing top course, 70 square yards of seeding and fertilizing, 18 guardrail reflectors, and 50 square feet of construction signs. The project also encompasses erosion control estimated at $3,000, utility coordination estimated at $5,000, roadside cleanup, trimming, and a contingency allocation of $10,000 for reimbursement for third-party damage.

The plans establish specific technical requirements for guardrail installation, including bridge guardrail posts to be offset 1 foot north of existing post locations, with voids filled with grout per Standard Specification 9-20.3(2). Horizontal clearance marker signs at all four bridge corners are to be removed and relocated. Bridge guardrail details specify the use of 3/4-inch diameter resin-bonded anchors with 10-inch minimum embedment and 7/8-inch holes for 3/4-inch button head bolts. The project includes provisions for relocating LightCurve buried lines prior to construction and managing Astound buried conduits during construction, with contractor liability for conduit damage waived. Crushed surfacing top course must be placed before guardrail installation, with additional surfacing placed after installation as needed. The plans reference WSDOT Standard Plans and Special Provisions 8-11 and 8-21 for guardrail reflector spacing and clearance marker sign relocation procedures.

View the file

Other files

File Type Posted
5978_Proposal.pdf PDF
5978_Contract.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dr aw in g:

P

-G U

AR

DR

AI

LP

RO

G

RA

M

-2

5\

BR

ID

G

E\

DR

AW

IN

G S\

CO

N

ST

RU

CT

IO

N \5

8_

CO

VE

R_

SH

EE

T.

DW

G

L ay ou t T ab : C

O

VE

R_

SH

EE

T

Xr ef s:

Pl ot D at e:

9/

/2

T im e:

7:

:2

AM

B y:

A

ED

W

AR

GUARDRAIL PROGRAM - 2025

AT HORN CREEK, 200' N/O AND S/O BR #28173-D

CRP 5978

PROJECT PLANS

LOCATION MAP

VICINITY MAP

T.

N.

R.

E.

W.

M.

8T H

AV

E

S

364TH ST S

INDEX

1 COVER SHEET

2 LEGEND AND SUMMARY OF QUANTITIES

3 PLAN

4 DETAILS

END PROJECT

BEGIN PROJECT

Pierce County Office of the County Engineer

Know what's below.

before you dig.Call

R

NOTE: THIS PLAN SET WAS DEVELOPED ELECTRONICALLY UNDER THE DIRECT SUPERVISION OF THE LICENSED PROFESSIONALS THAT HAVE AFFIXED THEIR SIGNATURE TO THIS PAGE. THIS SHEET SERVES AS THE CERTIFICATION BY THE ABOVE LICENSED PROFESSIONALS OF ALL SHEETS IN THIS

PLAN SET WHERE THEIR STAMPS AND SIGNATURES APPEAR.

AS A LICENSED PROFESSIONAL IN DIRECT RESPONSIBLE

CHARGE OF DEVELOPING THIS CONTRACT, I CERTIFY

THAT ALL PLANS THAT CONTAIN MY STAMP HAVE BEEN

DEVELOPED UNDER MY SUPERVISION.

AS A LICENSED PROFESSIONAL IN DIRECT RESPONSIBLE

CHARGE OF DEVELOPING THIS CONTRACT, I CERTIFY

THAT ALL PLANS THAT CONTAIN MY STAMP HAVE BEEN

DEVELOPED UNDER MY SUPERVISION.

AS A LICENSED PROFESSIONAL IN DIRECT RESPONSIBLE

CHARGE OF DEVELOPING THIS CONTRACT, I CERTIFY

THAT ALL PLANS THAT CONTAIN MY STAMP HAVE BEEN

DEVELOPED UNDER MY SUPERVISION.

PROJECT LICENSED PROFESSIONAL CERTIFICATES

APPROVED BY:

LETTICIA M. NEAL, P.E.

COUNTY ENGINEER

PROJECT LOCATION

SR 702

HORN CREEK

6T H

AV

E

S

368TH ST S

TH

A

VE C

T S

SURFACE FEATURES

CREEK / DITCH

ASPHALT

GRAVEL

GUARDRAIL

TOP OF BANK

TB

TRAFFIC SIGNS/SIGNALIZATION

TRAFFIC SIGN SINGLE POST

POWER (ELECTRICAL)

UTILITY GUY POLE

UTILITY POLE

TELEPHONE/COMMUNICATIONS

CABINETT

RIGHT-OF-WAY/SURVEY

CENTERLINE / CONTROL

PROPERTY LINE

RIGHT-OF-WAY

UTILITIES

CABLE TELEVISION (BURIED)

TELEPHONE (BURIED)

POWER (AERIAL)

STORM DRAINAGE (SIZE & TYPE AS NOTED)

BTV

BT

P

UTILITY SYMBOLS

EXISTING PROPOSED DESCRIPTION

SURFACE FEATURE SYMBOLS

EXISTING PROPOSED DESCRIPTION

LINETYPES

EXSTISTING PROPOSED DESCRIPTION

TOPOGRAPHY SYMBOLS

QUARRY SPALLS

Dr aw in g:

P

-G U

AR

DR

AI

LP

RO

G

RA

M

-2

5\

BR

ID

G

E\

DR

AW

IN

G S\

CO

N

ST

RU

CT

IO

N \5

8_

LE

G

EN

D.

DW

G

L ay ou t T ab : L

EG

EN

D Xr ef s:

Pl ot

D at e:

9/

/2

T im e:

7:

:0

AM

B y:

A

ED

W

AR

Pierce County Office of the County Engineer Tacoma Mall Plaza 2702 South 42nd Street, Suite 109 Tacoma, Washington 98409

An APWA Accredited Agency

DATE APPROVEDBYREVISIONNO.

SHEET

OF

FOR DATE

SEE COVER SHEET

WILLIAM J. FRARE, P.E.

FIELD ENGINEERING SECTION MANAGER

GUARDRAIL PROGRAM - 2025

AT HORN CREEK, 200' N/O AND S/O BR #28173-D

LEGEND AND SUMMARY OF QUANTITIES

CRP 5978

DRAWN BY:

DESIGNED BY:

CHECKED BY:

REVIEWED BY:

T. OLSON, P.E.

T. OLSON, P.E.

A. EDWARDS, P.E.

B. NORTON, P.E.

ST

ATE OF WASHINGTON

P R

O

F E S S I ONA L ENG I NE

E R

REG I STERED

36289

W

IL

L IAM J . FRARE

ITEM

NO.

TOTAL

QUANTITY

SUB-TOTAL

SECTION

1-07.2(1)

OF

STANDARD

SPECS

SUB-TOTAL

SECTION

1-07.2(2)

OF

STANDARD

SPECS

UNIT ITEM

PREPARATION

1 LUMP SUM LUMP SUM L.S. MOBILIZATION

2 50 50 L.F. REMOVING GUARDRAIL

DRAINAGE

3 2 2 TON QUARRY SPALLS

4 67 67 L.F. SCHEDULE A CULV. PIPE 18 IN. DIAM.

SURFACING

5 120 120 TON CRUSHED SURFACING TOP COURSE

EROSION CONTROL AND ROADSIDE PLANTING

6 EST. 3,000 EST. 3,000 DOLLAR EROSION/WATER POLLUTION CONTROL

7 70 70 S.Y. SEEDING AND FERTILIZING BY HAND

TRAFFIC

8 50 50 L.F. BEAM GUARDRAIL TYPE 10

9 250 250 L.F. BEAM GUARDRAIL TYPE 31

10 4 4 EACH BEAM GUARDRAIL TRANSITION SECTION TYPE 23

11 2 2 EACH BEAM GUARDRAIL TYPE 31 NON-FLARED TERMINAL

12 175 175 L.F. BEAM GUARDRAIL TYPE 31 BURIED TERMINAL TYPE 2

13 18 18 EACH GUARDRAIL REFLECTOR

14 LUMP SUM LUMP SUM L.S. PERMANENT SIGNING

15 LUMP SUM LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

16 LUMP SUM LUMP SUM L.S. WORK ZONE SAFETY CONTINGENCY

17 50 50 S.F. CONSTRUCTION SIGNS CLASS A

OTHER ITEMS

18 LUMP SUM LUMP SUM L.S. UTILITY COORDINATION

19 EST. 5,000 EST. 5,000 DOLLAR ROADSIDE CLEANUP

20 LUMP SUM LUMP SUM L.S. TRIMMING AND CLEANUP

21 EST. 5,000 EST. 5,000 DOLLAR REIMBURSEMENT FOR THIRD PARTY DAMAGE

22 EST. 10,000 EST. 10,000 DOLLAR MINOR CHANGE

23 LUMP SUM LUMP SUM L.S. SPCC PLAN

BTVBTVBTVBTVBTVBTVBTV

BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT

P P P P P P P P P P P P P

P P P P P P P P P P P P PPPPP

PPPPP

P

P

T

P

BTBTVBTVBTVBTVBTVBTVBTVBTVT

TB

TB

TB

TBTBTBTBTBTB

TB TB TB TB TB

TB

TB

TB

TBTBTBTBTBTBTB

TB

TB

TB TB TB TB TB

TB

TB

HO

RN

CR

EE

K

BRIDGE #28173-D8TH AVENUE SOUTH

POLE #: TP54976

POLE #:558737-151505

POLE #: TP54975

POLE #: 558776-151505

SCHEDULE A CULVERT PIPE 18 IN. DIAM.,

APPROXIMATELY 67 LF.

PROVIDE POSITIVE DRAINAGE TO THE SOUTH

SEE NOTE 4

REMOVE GUARDRAIL, 25 LF

BEAM GUARDRAIL TYPE 10, 25 LF

SEE NOTE 3

REMOVE GUARDRAIL, 25 LF

BEAM GUARDRAIL TYPE 10, 25 LF

SEE NOTE 3

BEAM GUARDRAIL

TRANSITION

SECTION TYPE 23

BEAM GUARDRAIL

TRANSITION

SECTION TYPE 23

BEAM GUARDRAIL

TYPE 31 NON-FLARED

TERMINAL

BEAM GUARDRAIL

TRANSITION

SECTION TYPE 23

BEAM GUARDRAIL

TYPE 31 NON-FLARED

TERMINAL

BEAM GUARDRAIL

TRANSITION

SECTION TYPE 23

BEAM GUARDRAIL TYPE 31 - BURIED TERMINAL

TYPE 2, 87.5 LF

BEAM GUARDRAIL

TYPE 31, 50 LF

BEAM GUARDRAIL

TYPE 31, 50 LF

BEAM GUARDRAIL TYPE 31 - BURIED TERMINAL

TYPE 2, 87.5 LF

BEAM GUARDRAIL

TYPE 31, 75 LF

BEAM GUARDRAIL

TYPE 31, 75 LF

Dr aw in g:

P

-G U

AR

DR

AI

LP

RO

G

RA

M

-2

5\

BR

ID

G

E\

DR

AW

IN

G S\

CO

N

ST

RU

CT

IO

N \5

8_

PL

AN

DE

TA

IL

S.

DW

G L ay ou t T ab

: P

LA

N Xr ef s:

Pl ot

D at e:

9/

/2

T im e:

7:

:0

AM

B y:

A

ED

W

AR

GENERAL NOTES:

1. SEE WSDOT STANDARD PLANS FOR:

- BEAM GUARDRAIL TYPE 31

- BEAM GUARDRAIL TYPE 31 - BURIED TERMINAL TYPE 2

- BEAM GUARDRAIL TYPE 31 NON-FLARED

TERMINAL (POSTED SPEED 45 MPH AND BELOW)

- BEAM GUARDRAIL (TYPE 31) TRANSITION SECTION TYPE 23

2. SEE SPECIAL PROVISION 8-11 FOR GUARDRAIL REFLECTOR SPACING AND LOCATION.

3. BRIDGE GUARDRAIL POSTS SHALL BE OFFSET 1' NORTH OF EXISTING GUARDRAIL POST

LOCATIONS. VOIDS IN BRIDGE FROM EXISTING GUARDRAIL POSTS SHALL BE FILLED

WITH GROUT CONFORMING TO STANDARD SPECIFICATION 9-20.3(2).

4. EXISTING HORIZONTAL CLEARANCE MARKER SIGNS LOCATED AT ALL FOUR CORNERS

OF THE BRIDGE ARE TO BE REMOVED AND RELOCATED. SEE SPECIAL PROVISION 8-21.

Pierce County Office of the County Engineer Tacoma Mall Plaza 2702 South 42nd Street, Suite 109 Tacoma, Washington 98409

An APWA Accredited Agency

SHEET

OF

FOR DATE

SEE COVER SHEET

WILLIAM J. FRARE, P.E.

FIELD ENGINEERING SECTION MANAGER

GUARDRAIL PROGRAM - 2025

AT HORN CREEK, 200' N/O AND S/O BR #28173-D

PLAN

CRP 5978

DATE APPROVEDBYREVISIONNO.

DRAWN BY:

DESIGNED BY:

CHECKED BY:

REVIEWED BY:

T. OLSON, P.E.

T. OLSON, P.E.

A. EDWARDS, P.E.

B. NORTON, P.E.

ST

ATE OF WASHINGTON

P R

O

F E S S I ONA L ENG I NE

E R

REG I STERED

36289

W

IL

L IAM J . FRARE

PLAN VIEW

NOT TO SCALE

NORTH NON-FLARED TERMINAL SECTION

LOOKING NORTH

NOT TO SCALE

EDGE OF PAVEMENT

10H:1V OR FLATTER SLOPE

FROM EDGE OF PAVEMENT

TO SLOPE BREAKPOINT

EXISTING

GROUND

CRUSHED SURFACING

TOP COURSE, SEE NOTE 3. SCHEDULE A CULVERT PIPE 18 IN. DIAM.

WITH 6" MINIMUM COVER

20H:1V OR FLATTER SLOPE

FROM EDGE OF PAVEMENT

TO SLOPE BREAKPOINT

SEE NOTE 1 SEE NOTE 2

4' OR WHEN CUT SLOPE

MEETS FILL SLOPE

4' OR WHEN CUT SLOPE

MEETS FILL SLOPE

LIGHTCURVE AND ASTOUND

CONDUITS, SEE NOTE 8.

ROADWAY

STEEL POST (TYP.)

BEAM GUARDRAIL

TYPE 10 (TYP.)

EXISTING

CURB (TYP.)

EXISTING BRIDGE

DECK (TYP.)

LIGHTCURVE CONDUIT, SEE NOTE 8.

DRILL 7 8" Ø HOLES FOR 3 4" Ø BUTTON

HEAD BOLT WITH STANDARD NUT,

STANDARD WASHER AND BEVELED

WASHER (TYP.).

CONTRACTOR SHALL VERIFY OVERALL

LENGTH OF BOLT/ANCHOR PRIOR TO

INSTALLATION.

BRIDGE GUARDRAIL DETAIL

LOOKING NORTH

NOT TO SCALE

4" Ø RESIN BONDED ANCHOR WITH 10"

MIN. EMBEDMENT (TYP.)

GUARDRAIL FLUSH

WITH CURB (TYP.)

POST FLUSH WITH

BOTTOM OF DECK

4" (T

YP

.) 5.

5" (T

YP

SOUTH BURIED TERMINAL SECTION

LOOKING NORTH

NOT TO SCALE

EDGE OF PAVEMENT

BEAM GUARDRAIL TYPE 31 -

BURIED END TERMINAL TYPE 2 BEAM GUARDRAIL TYPE 31 -

BURIED END TERMINAL TYPE 2

SEEDING AND FERTILIZING

BY HAND (TYP.)

SEE NOTE 5

LIGHTCURVE AND ASTOUND

CONDUITS, SEE NOTE 8.

ROADWAY

TYPICAL GUARDRAIL SECTION

LOOKING NORTH

NOT TO SCALE

EDGE OF PAVEMENT

CRUSHED SURFACING

TOP COURSE, SEE NOTE 3.

10:1V OR FLATTER SLOPE FROM EDGE

OF PAVEMENT TO SLOPE BREAKPOINT

2' MIN.

SEE NOTE 4 2' MIN.

LIGHTCURVE AND ASTOUND

CONDUITS, SEE NOTE 8.

ROADWAY

PIPE END DETAIL

NOT TO SCALE

CULVERT BEVEL TO MATCH

SLOPE OF FILL

QUARRY SPALLS

PLAN VIEWSECTION VIEW

3' -6

2'-0" 3'-0"

1' -0

2'-0"

Dr aw in g:

P

-G U

AR

DR

AI

LP

RO

G

RA

M

-2

5\

BR

ID

G

E\

DR

AW

IN

G S\

CO

N

ST

RU

CT

IO

N \5

8_

PL

AN

DE

TA

IL

S.

DW

G L ay ou t T ab

: D

ET

AI

LS

Xr ef s:

Pl ot D at e:

9/

/2

T im e:

7:

:1

AM

B y:

A

ED

W

AR

GENERAL NOTES:

1. THE NORTHWEST BEAM GUARDRAIL TYPE 31 NON-FLARED TERMINAL SHALL BE FLARED AT THE MAXIMUM FLARE RATE.

2. THE NORTHEAST BEAM GUARDRAIL TYPE 31 NON-FLARED TERMINAL SHALL BE NOT BE FLARED.

3. CRUSHED SURFACING TOP COURSE SHALL BE PLACED BEFORE GUARDRAIL INSTALLATION. ADDITIONAL CRUSHED SURFACING

TOP COURSE SHALL BE PLACED AFTER GUARDRAIL INSTALLATION AS NEEDED.

4. ON THE WEST SIDE, THE FACE OF GUARDRAIL OFFSET SHALL TAPER FROM THE FACE OF CURB ON THE BRIDGE TO 3' OFF THE

EDGE OF PAVEMENT AT THE BEGINNING OF THE TERMINAL SECTIONS.

5. ALL AREAS DISTURBED BY INSTALLED BURIED END TERMINALS SHALL BE SEEDED AND FERTILIZED BY HAND AS DIRECTED BY THE

ENGINEER.

6. RESIN BONDED ANCHORS SHALL CONFORM TO STANDARD SPECIFICATIONS 6-02.3(18)A AND 9-06.4.

7. BOLTS AND ANCHORS FOR GUARDRAIL POST ATTACHMENT TO BRIDGE SHALL BE INSTALLED ON THE TRAFFIC SIDE OF THE STEEL

POST WEB.

8. LIGHTCURVE BURIED LINES WILL BE RELOCATED PRIOR TO CONSTRUCTION. ASTOUND BURIED CONDUITS WILL BE EMPTY DURING CONSTRUCTION. THE CONTRACTOR IS PERMITTED TO INSTALL GUARDRAIL POSTS AS SHOWN ON THE PLANS, EVEN IF IT CONFLICTS WITH THE ASTOUND BURIED CONDUIT. THE CONTRACTOR IS NOT LIABLE FOR DAMAGE TO THE CONDUIT.

Pierce County Office of the County Engineer Tacoma Mall Plaza 2702 South 42nd Street, Suite 109 Tacoma, Washington 98409

An APWA Accredited Agency

SHEET

OF

FOR DATE

SEE COVER SHEET

WILLIAM J. FRARE, P.E.

FIELD ENGINEERING SECTION MANAGER

GUARDRAIL PROGRAM - 2025

AT HORN CREEK, 200' N/O AND S/O BR #28173-D

DETAILS

CRP 5978

DATE APPROVEDBYREVISIONNO.

DRAWN BY:

DESIGNED BY:

CHECKED BY:

REVIEWED BY:

T. OLSON, P.E.

T. OLSON, P.E.

A. EDWARDS, P.E.

B. NORTON, P.E.

ST

ATE OF WASHINGTON

P R

O

F E S S I ONA L ENG I NE

E R

REG I STERED

36289

W

IL

L IAM J . FRARE

01-5978_CoverSheet
02-5978_BridgeSheets
2 Legend and Summary of Quantities
3 Plan
4 Details

File details come from the government source that posted it. Updated .