This document provides details on a federal solicitation and related site utility file. The solicitation number 36C25523R0118 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is for repairs to site utilities under the opportunity named Z2DA--589A7-22-208 Repair Site Utility Phase I. The attached file 589A7-22-208 Site Utility Drawings.pdf contains plans and drawings related to the site utility repair work and has a file size of 15MB. The solicitation is for phase one of repairs to site utilities according to the specifications in the attached file. The work involves the Department of Veterans Affairs facility and is seeking vendor responses for the defined repairs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 589A7-22-208 Pre-Bid Attendance Roster.pdf | ||
| 36C25523R0118 0001.docx | DOCX document | |
| 589A7-22-208 PGS 278 Site Utility Specifications-.pdf | ||
| 36C25523R0118_1.docx | DOCX document | |
| 589A7-22-208 CONSTRUCTION SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA
PLAN
U.S. ROUTE 400
PROJECT LOCATION
S E
D G
E M
O O
R S
T
E KELLOGG DR N
E WATERMAN ST
S B
LE
C
K
LE
Y D
R
LOCATION
PLAN
U.S. ROUTE 400
PROJECT LOCATION
H
IG
H W
A Y th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
KS ARCH REG. NO. A-930, EXP. 12/31/2023
KS ENGR REG. NO. E-2586, EXP. 12/31/2023
CIVIL ENGINEER
H2B ENGINEERS, INC.
1225 NORTH LOOP WEST, #800
HOUSTON, TEXAS 77008
(713) 864-2900
COMMISSIONING
ES2, INC.
13401 N. SANTA FE AVE.
OKLAHOMA CITY, OK. 73114
(405) 233-3105
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:2
:4
P
M
COVER SHEET
CAB 1 OF 11BKM
ISSUED FOR CONSTRUCTION
SITE UTILITY REPAIRS PHASE 1
VA PROJECT NUMBER: 589A7-22-208
SITE UTILITY REPAIRS
PHASE 1
11/23/2022
589A7-22-208
ROBERT J. DOLE VAMC
5500 EAST KELLOGG DRIVE
WICHITA, KANSAS
ROBERT J. DOLE VA MEDICAL CENTER
5500 EAST KELLOGG DRIVE
WICHITA, KANSAS
ISSUED FOR CONSTRUCTION
GI000
ROBERT J. DOLE VAMC
SPUR #: 1794.19
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[01] GENERAL
1 GI000 COVER SHEET
2 GI001 GENERAL INFORMATION
[02] CIVIL
3 CU000 GENERAL NOTES
4 CU100 OVERALL SITE UTILITY PLAN
5 CU101 DETAILED SITE UTILITY PLAN
6 CU102 DETAILED SITE UTILITY PLAN
7 CU103 DETAILED SITE UTILITY PLAN
8 CU104 ENLARGED SITE UTILITY PLAN
9 CU105 PLAN & PROFILE
10 CU106 PLAN & PROFILE
11 CU107 TCP PHASE I
12 CU108 TCP PHASE II
13 CU200 DETAILS
14 CU201 DETAILS
TOTAL SHEETS: 14
N N
No. REVISION DESCRIPTION DATE
ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERSMATERIALS LEGEND
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS
SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• 2021 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• 2021 NATIONAL FIRE CODES (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• 2020 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2021 INTERNATIONAL MECHANICAL CODE
• 2020 NATIONAL ELECTRICAL CODE (NEC), NFPA 70
• 2021 INTERNATIONAL PLUMBING CODE (IPC)
• 2016 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• 2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2017 ANSI ICC A117.1 ACCESIBLE AND USABLE BUILDINGS AND FACILITIES
• 2019 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)
• 2017 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• 2019 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1
• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT
NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
ASHRAE 90.1 - 2019 EDITION
BUILDING LOCATION: WITCHITA, KS
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 4A
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM
AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5 )
BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)
ROOFS REQUIRED DESIGNED
INSULATION: R-30 c.i. N/A METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls N/A
ATTIC AND OTHER: R-49 N/A
WALLS, ABOVE GRADE
MASS: R-9.5 c.i. N/A METAL BUILDING: R-0 + R-15.8 c.i. N/A STEEL-FRAMED: R-13 + R-7.5 c.i. N/A WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 N/A
WALL, BELOW GRADE
BELOW-GRADE WALL: R-7.5 c.i. N/A
FLOORS
MASS: R-14.6 c.i. N/A
STEEL-FRAMED: R-30 N/A
WOOD-FRAMED AND OTHER: R-30 N/A
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: R-15 for 24 in. N/A HEATED SLABS: R-20 for 24 in. N/A
OPAQUE DOORS
SWINGING: U-0.370 N/A
NONSWINGING: U-0.310 N/A
FENESTRATION (TABLE 5.5-4):
VERTICAL FENESTRATION, U-FACTOR
FIXED: U-0.36 N/A
OPERABLE: U-0.45 N/A
ENTRANCE DOOR: U-0.63 N/A
DEFINITIONS
c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM
NR = NO (INSULATION) REQUIREMENT
ENERGY REQUIREMENTS
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL
CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE
ENTIRE DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY
WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY
ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE
CONSTRUCTION WORK.
5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND
REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO ANY BUILDING, EXISTING SITE UTILITIES, SITE FURNISHINGS,
LANDSCAPING, OR OWNER EQUIPMENT SHALL BE REPAIRED OR REPLACED BACK TO
ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
8. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE
AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND
ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,
BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL
DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE
OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION
DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND
OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND
SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL
SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE
DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO
THE GOVERNMENT.
9. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH
SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN
ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE,
EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR
INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60
CALENDAR DAYS PRIOR TO THE DESIRED TIME AND SHALL BE PERFORMED AS
DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER
MAJOR INTERRUPTIONS AND MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE
THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION SCHEDULE UNLESS
REQUESTED IN WRITING AND APPROVED BY THE COR. CONTRACTOR WILL BE ADVISED,
IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME
SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF
THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY
OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE
INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT BE AN
ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY
AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING
THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
10. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR
DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING
BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE
DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION
DOCUMENTS.
GENERAL NOTES
FIBERGLASS BATT
INSULATION
RIGID INSULATION
CONCRETE / PRECAST
CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR
PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY
UNIT
STONE / CAST STONE
GYPSUM BOARD SECTION
EXTERIOR SHEATHING
BOARD SECTION
PLYWOOD SECTION
A
ACB ACOUSTIC CEILING BAFFLE
ACP ACOUSTIC CEILING PANEL
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINIUM (TRIM)
AMT AMOUNT
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AT ACOUSTIC CEILING TILE
AVG AVERAGE
B
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CBB CONCRETE BACKER BOARD
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CH BD CHALK BOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONTRACTOR PROVIDED
CP/CI CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CPT CAROET/CARPET TILE
CS CONCRETE SEALED
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWP DIMENSIONAL WALL PANEL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPY EPXOY FLOORING
EQ EQUAL
ETR EXISTING TO REMAIN
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FAB FABRIC
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROTECTION
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GDR GUARDRAIL
GL GLASS/GLAZING
GRAN GRANITE
GR FL GROUND FLOOR
GT GROUT
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J
J-BOX JUNCTION BOX
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LN LINOLEUM
LOC LOCATION
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT CARPET MAT / WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P
P PAINT
PA PUBLIC ADDRESS
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRB PROFILE BASE
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
NOTE: NOT ALL ABBREVIATIONS WILL BE UTILIZED FOR THIS PROJECT.
R
RAF RESILIENT ATHETIC FLOORING
RB RUBBER BASE/RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RES-W RESINOUS / EPOXY WALL / CEILING
RF RUBBER FLOORING
RFG ROOFING
RM ROOM
RO ROUGH OPENING
RP RESIN PANEL
RSF RESILIENT SHEET FLOORING
RV ROOF VENT
RWC RIGID VINYL WALLCOVERING
S
SC SPECIALTY COATING
SD STATIC DISSIPATIVE FLOORING/TILE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SOLID SURFACE
ST STONE
STD STANDARD
STOR STORAGE
SV SHEET VINYL (ROLLED OR TILE)
T
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZO
TOF TOP OF FOOTING/ FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF SLAB/ STEEL
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
VC VA PROVIDED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VFAT VINYL FACED ACOUSTICLAL TILE
VP VENEERED PLASTER
VT VINYL TILE
VV VA PROVIDED / VA INSTALLED
VWC VINYL WALLCOVERING
VWF VINYL WALL FABRIC
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
WD WOOD
WFAB WALL FABRIC
WPM WATERPROOF MEMBRANE
WSF WELDED SHEET FLOOR
X
X BRACE CROSS BRACE
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
KS ARCH REG. NO. A-930, EXP. 12/31/2023
KS ENGR REG. NO. E-2586, EXP. 12/31/2023
CIVIL ENGINEER
H2B ENGINEERS, INC.
1225 NORTH LOOP WEST, #800
HOUSTON, TEXAS 77008
(713) 864-2900
COMMISSIONING
ES2, INC.
13401 N. SANTA FE AVE.
OKLAHOMA CITY, OK. 73114
(405) 233-3105
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:1
:1
P
M
GENERAL INFORMATION
CAB 2 OF 11BKM
ISSUED FOR CONSTRUCTION
SITE UTILITY REPAIRS
PHASE 1
11/23/2022
589A7-22-208
ROBERT J. DOLE VAMC
5500 EAST KELLOGG DRIVE
WICHITA, KANSAS
GI001
ROBERT J. DOLE VAMC
SPUR #: 1794.19No. REVISION DESCRIPTION DATE th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
KS ARCH REG. NO. A-930, EXP. 12/31/2023
KS ENGR REG. NO. E-2586, EXP. 12/31/2023
CIVIL ENGINEER
H2B ENGINEERS, INC.
1225 NORTH LOOP WEST, #800
HOUSTON, TEXAS 77008
(713) 864-2900
COMMISSIONING
ES2, INC.
13401 N. SANTA FE AVE.
OKLAHOMA CITY, OK. 73114
(405) 233-3105
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
8/ 9/
:1
7:
P M
DMHFAE
ISSUED FOR CONSTRUCTION
SITE UTILITY REPAIRS
PHASE 1
11/23/2022
589A7-22-208
ROBERT J. DOLE VAMC
5500 EAST KELLOGG DRIVE
WICHITA, KANSAS
ROBERT J. DOLE VAMC
SPUR #: 1794.19No. REVISION DESCRIPTION DATE
OF 14
11/23/202
Kansas Firm Registration No. E-3405
72 19 6
AL
AN LANE LACKEY
GENERAL NOTES
CU000
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
SITEWORK GENERAL NOTES
AutoCAD SHX Text
STORM SEWER CONSTRUCTION NOTES
AutoCAD SHX Text
SANITARY SEWER NOTES
AutoCAD SHX Text
SWPPP CONSTRUCTION NOTES
AutoCAD SHX Text
TRAFFIC NOTES
AutoCAD SHX Text
1. CONTRACTOR SHALL FIELD VERIFY ALL SIZES, LOCATIONS, AND ELEVATIONS CONTRACTOR SHALL FIELD VERIFY ALL SIZES, LOCATIONS, AND ELEVATIONS NECESSARY TO COMPLETE THE WORK SHOWN ON THE DRAWINGS PRIOR TO SUBMITTING PROPOSAL. FAILURE TO DO SO SHALL NOT RELIEVE THIS CONTRACTOR FROM PERFORMING THE WORK REQUIRED UNDER THIS CONTRACT. CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE OWNER / ENGINEER. 2. SOME UTILITIES MAY NOT BE SHOWN ON THE PLANS. FIELD VERIFY AND IDENTIFY SOME UTILITIES MAY NOT BE SHOWN ON THE PLANS. FIELD VERIFY AND IDENTIFY LOCATIONS OF PIPING AND ALL UTILITIES NOT NOTED ON THE PLANS. NOTIFY THE OWNER / ENGINEER OF ANY POTENTIAL CONFLICTS PRIOR TO STARTING CONSTRUCTION. 3. ALL GENERAL AND SUB-CONTRACTORS ARE ENCOURAGED TO VISIT AND INSPECT THE ALL GENERAL AND SUB-CONTRACTORS ARE ENCOURAGED TO VISIT AND INSPECT THE SITE PRIOR TO SUBMITTING A PROPOSAL TO COMPLETE. 4. UTILITIES PRESENTED ON THESE DRAWINGS ARE SHOWN BASED ON THE BEST UTILITIES PRESENTED ON THESE DRAWINGS ARE SHOWN BASED ON THE BEST AVAILABLE INFORMATION. CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS IN THE FIELD PRIOR TO COMMENCING CONSTRUCTION. CONTRACTOR SHALL NOTIFY KANSAS ONE CALL AT 800-245-4545 AND AT LEAST 48 HOURS BEFORE PROCEEDING WITH ANY WORK ON SITE. 5. CONSTRUCT WASTEWATER COLLECTION SYSTEMS, WATER LINES, STORM DRAINAGE AND CONSTRUCT WASTEWATER COLLECTION SYSTEMS, WATER LINES, STORM DRAINAGE AND STREET PAVING IN ACCORDANCE WITH THE LATEST EDITION OF THE PUBLICATIONS STANDARD CONSTRUCTION SPECIFICATIONS FOR WASTEWATER COLLECTION SYSTEMS, WATER LINES, STORM DRAINAGE, AND STREET PAVING PUBLISHED BY THE LOCAL GOVERNING ENTITY. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGES TO EXISTING WATER, CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGES TO EXISTING WATER, WASTEWATER, STORM WATER LINES, TRAFFIC CONTROL DEVICES AND PAVING. DAMAGES SHALL BE REPAIRED IN ACCORDANCE WITH THE LOCAL GOVERNING ENTITY'S ENGINEERING STANDARD CONSTRUCTION SPECIFICATIONS FOR WASTEWATER COLLECTION SYSTEMS, WATER LINES, STORM DRAINAGE, AND STREET PAVING AND STANDARD CONSTRUCTION DETAILS FOR WASTEWATER COLLECTION SYSTEMS, WATER LINES, STORM DRAINAGE, AND STREET PAVING, REFERENCED ABOVE, AT NO ADDITIONAL COST. 7. ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION, ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION, AND ANY DRAINAGE DITCH OR STRUCTURE DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO EXISTING CONDITIONS OR BETTER. 8. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT ROOT SYSTEMS OF CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT ROOT SYSTEMS OF SHRUBS, PLANTS AND TREES ALONG THE AREA OF EXCAVATION. 9. CONTRACTOR SHALL COMPLY WITH THE LATEST EDITION OF OSHA REGULATIONS AND CONTRACTOR SHALL COMPLY WITH THE LATEST EDITION OF OSHA REGULATIONS AND THE STATE OF KANSAS LAWS CONCERNING EXCAVATION. 10. CONTRACTOR SHALL MAINTAIN A SET OF REDLINE DRAWINGS RECORDING AS-BUILT CONTRACTOR SHALL MAINTAIN A SET OF REDLINE DRAWINGS RECORDING AS-BUILT CONDITIONS DURING CONSTRUCTION. THESE REDLINE MARKED DRAWINGS WILL BE SUBMITTED TO THE DESIGN CONSULTANT WHO WILL MAKE THE CHANGES ON THE ORIGINAL DRAWINGS, LABELING EACH SHEET IN THE SET AS "RECORD DRAWINGS". 11. ALL "ACCESSIBLE" ROUTS, SIDEWALKS, RAMPS, ETC SHALL BE CONSTRUCTED IN ALL "ACCESSIBLE" ROUTS, SIDEWALKS, RAMPS, ETC SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE LATEST KANSAS ACCESSIBILITY STANDARDS.
AutoCAD SHX Text
1. CONTRACTOR SHALL IMPLEMENT INLET PROTECTION DEVICES AND REINFORCED FILTER CONTRACTOR SHALL IMPLEMENT INLET PROTECTION DEVICES AND REINFORCED FILTER FABRIC BARRIER ALONG THE ROAD AND SIDE DITCHES AT LOCATIONS SHOWN ON THE TYPICAL STORM WATER POLLUTION PREVENTION (SWPPP) PLANS TO KEEP SILT AND/OR EXCAVATIONS FROM ENTERING INTO THE STORM WATER INLETS AND DITCHES EVENTUALLY POLLUTING THE RECEIVING STORM SEWER. 2. DURING THE EXCAVATION PHASE OF THE PROJECT CONTRACTOR SHALL SCHEDULE DURING THE EXCAVATION PHASE OF THE PROJECT CONTRACTOR SHALL SCHEDULE THE WORK IN SHORT SEGMENTS SO THAT EXCAVATED MATERIAL CAN BE QUICKLY HAULED AWAY FROM THE SITE AND TO PREVENT IT FROM STAYING UNCOLLECTED ON THE EXISTING PAVEMENT. ANY LOOSE EXCAVATED MATERIAL WHICH FALLS ON PAVEMENTS OR DRIVEWAYS SHALL BE SWEPT BACK INTO THE EXCAVATED AREA. 3. CONTRACTOR SHALL CLEAN UP THE EXISTING STREET INTERSECTIONS AND DRIVEWAYS CONTRACTOR SHALL CLEAN UP THE EXISTING STREET INTERSECTIONS AND DRIVEWAYS DAILY, AS NECESSARY TO REMOVE ANY EXCESS MUD, SILT OR ROCK, TRACKED FROM THE EXCAVATED AREA. 4. CONTRACTOR SHALL FOLLOW GOOD HOUSE KEEPING PRACTICES DURING THE CONTRACTOR SHALL FOLLOW GOOD HOUSE KEEPING PRACTICES DURING THE CONSTRUCTION PHASE OF THE PROJECT ALWAYS CLEANING UP DIRT AND LOOSE MATERIAL AS CONSTRUCTION PROGRESSES. 5. CONTRACTOR IS TO INSPECT AND MAINTAIN THE AREAS LISTED BELOW AT LEAST CONTRACTOR IS TO INSPECT AND MAINTAIN THE AREAS LISTED BELOW AT LEAST ONCE EVERY 14 FOURTEEN CALENDAR DAYS AND WITHIN 24 HOURS OF A STORM EVENT OF 0.5-INCHES OR GREATER. -DISTURBED AREAS OF THE CONSTRUCTION SITE THAT HAVE NOT BEEN FINALLY STABILIZED. -AREAS USED FOR STORAGE THAT ARE EXPOSED TO PRECIPITATION. -STRUCTURAL CONTROL MEASURES. -LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE. 6. CONTRACTOR TO BE RESPONSIBLE TO MAINTAIN EXISTING DITCHES AND/OR CONTRACTOR TO BE RESPONSIBLE TO MAINTAIN EXISTING DITCHES AND/OR CULVERTS FOR UNOBSTRUCTED DRAINAGE AT ALL TIMES WHERE SODDING IS DISTURBED BY EXCAVATION OR BACKFILL OPERATIONS. SUCH AREAS SHALL BE REPLACED BY SEEDING OR SODDING. SLOPES 4:1 OR STEEPER SHALL BE REPLACED BY BLOCK SODDING.
AutoCAD SHX Text
1. CLEAR AND GRUB WITHIN THE GRADING LIMITS SHOWN IN THE CIVIL DRAWINGS. CLEAR AND GRUB WITHIN THE GRADING LIMITS SHOWN IN THE CIVIL DRAWINGS. REMOVE STUMPS AND ROOTS 3 INCHES IN DIAMETER AND LARGER AND NON-PERISHABLE SOLID OBJECTS A MINIMUM 3 FEET BELOW SUBGRADE OR FINISHED EMBANKMENT. 2. STRIP AND STOCKPILE TOPSOIL TO A MINIMUM DEPTH OF 6" WITHIN THE LIMITS OF STRIP AND STOCKPILE TOPSOIL TO A MINIMUM DEPTH OF 6" WITHIN THE LIMITS OF EARTHWORK OPERATIONS. 3. STRUCTURAL EXCAVATION: EXCAVATE TO INDICATED ELEVATIONS WITHIN A TOLERANCE STRUCTURAL EXCAVATION: EXCAVATE TO INDICATED ELEVATIONS WITHIN A TOLERANCE OF 1 INCH. EXTEND EXCAVATIONS A SUFFICIENT DISTANCE FROM STRUCTURES FOR PLACING AND REMOVING CONCRETE FORM WORK AND FOR INSPECTIONS. 4. SIDEWALK AND PAVEMENT EXCAVATION: EXCAVATE SURFACES UNDER WALKS AND SIDEWALK AND PAVEMENT EXCAVATION: EXCAVATE SURFACES UNDER WALKS AND PAVEMENTS TO THE INDICATED LINES, CROSS SECTIONS, ELEVATIONS AND SUBGRADES. 5. PROOF-ROLL SUBGRADE BELOW THE BUILDING SLABS AND PAVEMENTS WITH A PROOF-ROLL SUBGRADE BELOW THE BUILDING SLABS AND PAVEMENTS WITH A PNEUMATIC-TIRED FULLY LOADED DUMP TRUCK TO IDENTIFY SOFT POCKETS AND AREAS OF EXCESS YIELDING. DO NOT PROOF-ROLL WET OR SATURATED SUBGRADES. 6. FILL MATERIAL APPROVED FROM ON SITE AND OFF SITE SOURCES SHALL HAVE BE FILL MATERIAL APPROVED FROM ON SITE AND OFF SITE SOURCES SHALL HAVE BE GW, GP, GM SE, SP, AND SM ACCORDING TO ASTM D2487 OR A COMBINATION OF THESE GROUPS. FILL MATERIAL SHALL BE FREE OF ROCK OR GRAVEL LARGER THAN 3 INCHES IN ANY DIMENSIONS, DEBRIS, WASTE FROZEN MATERIALS, VEGETATION AND OTHER DELETERIOUS MATTER. FILL MATERIAL SHALL HAVE A MAXIMUM PLASTICITY INDEX OF 6, AND A MAXIMUM LIQUID LIMIT OF 30 OR AS APPROVED BY THE ENGINEER. 7. PLACE BACKFILL AND FILL SOIL MATERIALS IN LAYERS NOT MORE THAN 8 INCHES IN PLACE BACKFILL AND FILL SOIL MATERIALS IN LAYERS NOT MORE THAN 8 INCHES IN LOOSE DEPTH. PLACE BACKFILL AND FILL SOIL MATERIALS EVENLY ON ALL SIDES OF STRUCTURES TO REQUIRED ELEVATIONS AND UNIFORMLY ALONG THE FULL LENGTH OF EACH STRUCTURE. COMPACT SOIL MATERIALS TO NOT LESS THAN THE FOLLOWING PERCENTAGES OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO ASTM D698: A. UNDER STRUCTURES: SCARIFY AND RE COMPACT TOP 12 INCHES OF EXISTING UNDER STRUCTURES: SCARIFY AND RE COMPACT TOP 12 INCHES OF EXISTING SUBGRADE AND EACH LAYER OF BACKFILL MATERIAL TO 95% SPD. B. UNDER WALKWAYS: SCARIFY AND RE-COMPACT TOP 6 INCHES BELOW SUBGRADE UNDER WALKWAYS: SCARIFY AND RE-COMPACT TOP 6 INCHES BELOW SUBGRADE AND COMPACT EACH LAYER OF BACKFILL MATERIAL TO 95% SPD. C. UNDER TURF OR UNPAVED AREAS: SCARIFY AND RE COMPACT TOP 6" BELOW UNDER TURF OR UNPAVED AREAS: SCARIFY AND RE COMPACT TOP 6" BELOW SUBGRADE AND COMPACT EACH LAYER OF BACKFILL MATERIAL TO 90% SPD. D. UTILITY TRENCHES: BACKFILL SHALL BE IN 8" LIFTS, WITH TESTS TAKEN AT 100 UTILITY TRENCHES: BACKFILL SHALL BE IN 8" LIFTS, WITH TESTS TAKEN AT 100 FOOT INTERVALS ON EACH LIFT, AND MECHANICALLY COMPACTED TO A DENSITY OF NOT LESS THAN 95% SPD IN PAVED AREAS AND 90% SPD IN UNPAVED AREAS OR AS INDICATED IN THE DRAWINGS. 8. UNIFORMLY GRADE AREAS TO A SMOOTH SURFACE, FREE OF IRREGULAR SURFACE UNIFORMLY GRADE AREAS TO A SMOOTH SURFACE, FREE OF IRREGULAR SURFACE CHANGES. COMPLY WITH COMPACTION REQUIREMENTS AND GRADE TO CROSS SECTIONS, LINES AND ELEVATIONS INDICATED. FINISH SUBGRADES TO ELEVATIONS REQUIRED TO ACHIEVE INDICATED FINISH ELEVATIONS, WITHIN THE FOLLOWING SUBGRADE TOLERANCES: A. TURF OR UNPAVED AREAS: ±1 INCH. TURF OR UNPAVED AREAS: ±1 INCH. B. WALKS:±1/2 INCH. WALKS:±1/2 INCH. C. PAVEMENTS:±1/2 INCH. PAVEMENTS:±1/2 INCH. 9. PLACE SUBGRADE COURSE UNDER PAVEMENTS AND WALKS AS INDICATED IN THE PLACE SUBGRADE COURSE UNDER PAVEMENTS AND WALKS AS INDICATED IN THE DRAWINGS.
AutoCAD SHX Text
1. STORM SEWERS LOCATED ON PRIVATE PROPERTY SHALL BE AS CALLED OUT IN THE STORM SEWERS LOCATED ON PRIVATE PROPERTY SHALL BE AS CALLED OUT IN THE DRAWINGS AND SHALL BE INSTALLED, BEDDED, AND BACKFILLED IN ACCORDANCE WITH DRAWINGS AND SPECIFICATIONS. 2. STORM SEWERS LOCATED WITHIN PUBLIC R.O.W. OR SIDE LOT EASEMENTS SHALL BE STORM SEWERS LOCATED WITHIN PUBLIC R.O.W. OR SIDE LOT EASEMENTS SHALL BE REINFORCED CONCRETE PIPE (24-INCH AND LARGER) (C-76, CLASS III). AND SHALL BE INSTALLED, BEDDED, AND BACKFILLED IN ACCORDANCE WITH THE GOVERNING ENTITIES STANDARD DETAILS AND SPECIFICATIONS. UNLESS OTHERWISE SHOWN ON THE DRAWINGS. 3. ALL SEWER UNDER PROPOSED OR FUTURE PAVEMENT AND TO A POINT ONE FOOT ALL SEWER UNDER PROPOSED OR FUTURE PAVEMENT AND TO A POINT ONE FOOT BACK OF ALL PROPOSED OR FUTURE CURBS SHALL BE BACKFILLED WITH 1-1/2 SACK CEMENT/C.Y. STABILIZED SAND TO WITHIN ONE (1) FOOT OF SUBGRADE. THE REMAINING DEPTH OF TRENCH SHALL BE BACKFILLED WITH SUITABLE EARTH MATERIAL. 4. CIRCULAR AND ELLIPTICAL REINFORCED CONCRETE PIPE SHALL BE INSTALLED USING CIRCULAR AND ELLIPTICAL REINFORCED CONCRETE PIPE SHALL BE INSTALLED USING RUBBER GASKET JOINTS CONFORMING TO ASTM C443 AND ASTM C877 RESPECTIVELY. 5. ALL PROPOSED PIPE STUB-OUTS FROM MANHOLES AND INLETS ARE TO BE ALL PROPOSED PIPE STUB-OUTS FROM MANHOLES AND INLETS ARE TO BE PLUGGED WITH 8" BRICK WALLS UNLESS OTHERWISE NOTED. 6. CONTRACTOR SHALL PROVIDE 18" MINIMUM CLEARANCE AT STORM SEWER AND CONTRACTOR SHALL PROVIDE 18" MINIMUM CLEARANCE AT STORM SEWER AND WATER LINE CROSSINGS. 7. ADJUST MANHOLE COVERS TO GRADE CONFORMING TO REQUIREMENTS OF LOCAL ADJUST MANHOLE COVERS TO GRADE CONFORMING TO REQUIREMENTS OF LOCAL GOVERNING ENTITY STANDARDS AND SPECIFICATIONS FOR ADJUSTING MANHOLES, INLETS AND VALVE BOXES TO GRADE. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, MAINTAINING, AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, MAINTAINING, AND RESTORING ANY BACK SLOPE DRAINAGE SYSTEM DISTURBED AS A RESULT OF HIS WORK. 9. ALL DITCHES SHALL BE REGRADED TO PROPOSED ELEVATIONS TO INSURE PROPER ALL DITCHES SHALL BE REGRADED TO PROPOSED ELEVATIONS TO INSURE PROPER DRAINAGE. ALL OUTFALLS SHALL BE PROPERLY BACKFILLED AND COMPACTED. ALL DISTURBED AREAS SHALL BE REGRADED, SEEDED, AND FERTILIZED.
AutoCAD SHX Text
1. ALL SEWERS SHALL BE TESTED FOR EXCESS DEFLECTION IN PIPE CROSS SECTION, ALL SEWERS SHALL BE TESTED FOR EXCESS DEFLECTION IN PIPE CROSS SECTION, FOR LATERAL AND VERTICAL PIPE OBSTRUCTION, AND FOR JOINT OFFSETS, BY PULLING A MANDREL THROUGH THE PIPE BY HAND. THE MANDREL SHALL HAVE A DIAMETER EQUAL TO 95% OF THE INSIDE DIAMETER OF THE PIPE. THE TEST SHALL BE CONDUCTED AFTER THE FINAL BACKFILLING HAS BEEN IN PLACE AT LEAST 30 DAYS NO PIPE SHALL EXCEED A DEFLECTION OF 5%. OBSTRUCTIONS ENCOUNTERED SHALL BE REPAIRED AT NO ADDITIONAL COST TO OWNER. MANDREL AND TEST EQUIPMENT SHALL BE APPROVED BY THE ENGINEER PRIOR TO CONDUCTING THE TEST. 2. USE BEDDING AND BACKFILL PER DETAILS PROVIDED IN THE CONTRACT DRAWINGS USE BEDDING AND BACKFILL PER DETAILS PROVIDED IN THE CONTRACT DRAWINGS UNLESS FIELD CONDITIONS DICTATE OTHERWISE. CONTRACTOR TO NOTIFY ENGINEER OF WET TRENCH CONDITIONS PRIOR TO LAYING PIPE. USE CEMENT STABILIZED SAND AND BACKFILL TO WITHIN 1 FOOT OF PROPOSED OR EXISTING PAVEMENT. SUBGRADE, BEDDING, CEMENT STABILIZED SAND AND/OR BACKFILL SHALL BE CONSIDERED SUBSIDIARY TO THE PAY ITEM FOR PIPE AND SHALL NOT BE PAID FOR DIRECTLY. 3. UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF 24 UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF 24 INCHES OF VERTICAL CLEARANCE AND 9 FEET HORIZONTAL CLEARANCE BETWEEN SANITARY SEWER AND WATER LINES. THE CONTRACTOR SHALL MAINTAIN A MINIMUM 12 INCHES OF VERTICAL AND HORIZONTAL CLEARANCE BETWEEN SANITARY SEWER AND STORM SEWER LINES. 4. SANITARY SEWER MANHOLE RIMS OUTSIDE OF PROPOSED PAVING WILL BE SET 3" TO SANITARY SEWER MANHOLE RIMS OUTSIDE OF PROPOSED PAVING WILL BE SET 3" TO 6" ABOVE THE SURROUNDING LEVEL FINISHED GRADE AFTER PAVING WITH SLOPED BACKFILL ADDED FOR STORM WATER DRAINAGE AWAY FROM THE MANHOLE RIM PER ASTM F477. 5. UNLESS OTHERWISE NOTED, ALL SANITARY SEWERS SHALL BE CONSTRUCTED OF UNLESS OTHERWISE NOTED, ALL SANITARY SEWERS SHALL BE CONSTRUCTED OF POLYVINYL CHLORIDE PIPE (PVC) SCH 40, CONFORMING TO ASTM D1785, OR APPROVED EQUAL. ALL SANITARY SEWERS SHALL HAVE RUBBER GASKET BELL AND SPIGOT CONNECTIONS. 6. UNLESS OTHERWISE NOTED, ALL SANITARY SEWER MANHOLES SHALL BE PRECAST UNLESS OTHERWISE NOTED, ALL SANITARY SEWER MANHOLES SHALL BE PRECAST CONCRETE MANHOLES. 7. NO CONNECTIONS SHALL BE MADE TO EXISTING SANITARY SEWER LINES UNTIL ALL NO CONNECTIONS SHALL BE MADE TO EXISTING SANITARY SEWER LINES UNTIL ALL PROPOSED SEWER LINES HAVE BEEN THOROUGHLY CLEANED, TESTED AND APPROVED BY THE LOCAL GOVERNING ENTITY. 8. WHENEVER THE MANHOLE COVERS ARE LOCATED BELOW THE 100 YEAR FLOOD PLAIN WHENEVER THE MANHOLE COVERS ARE LOCATED BELOW THE 100 YEAR FLOOD PLAIN ELEVATION THEY SHALL BE GASKETED AND BOLTED AS DESCRIBED IN 3172.2 OF THE TEXAS NATURAL RESOURCE CONSERVATION COMMISSION RULES. 9. LOW-PRESSURE AIR TEST. THIS TEST SHALL CONFORM TO THE PROCEDURE LOW-PRESSURE AIR TEST. THIS TEST SHALL CONFORM TO THE PROCEDURE DESCRIBED IN ASTM C-828, ASTM C-924 OR OTHER APPROPRIATE PROCEDURES. FOR SAFETY REASONS, AIR TESTING OF SECTIONS OF PIPE SHALL BE LIMITED TO LINES LESS THAN 36-INCH AVERAGE INSIDE DIAMETER. LINES 36-INCH AVERAGE INSIDE DIAMETER AND LARGER MAY BE AIR TESTED AT EACH JOINT. THE MINIMUM TIME ALLOWABLE FOR THE PRESSURE TO DROP FROM 3.5 POUNDS PER SQUARE INCH GAUGE TO 2.5 POUNDS PER SQUARE INCH GAUGE DURING A JOINT TEST, REGARDLESS OF PIPE SIZE, SHALL BE 20 SECONDS. FOR SECTION OF PIPE LESS THAN 36-INCH AVERAGE INSIDE DIAMETER, THE MINIMUM TIME ALLOWABLE FOR THE PRESSURE TO DROP FROM 3.5 POUNDS PER SQUARE INCH GAUGE TO 2.5 POUNDS PER SQUARE INCH GAUGE SHALL BE COMPUTED BY THE FOLLOWING EQUATIONS: T = 0.0850(D)(K)/(Q) WHERE T = TIME FOR PRESSURE TO DROP 1.0 POUNDS PER SQUARE INCH GAUGE IN SECONDS K = 0.000419(D)(L), BUT NOT LESS THAN 1.0 D = AVERAGE INSIDE DIAMETER IN INCHES L = LENGTH OF LINE OF SAME PIPE SIZE IN FEET Q = RATE OF LOSS, ASSUME 0.0015 CU FT/MIN/SQ FT INTERNAL SURFACE 10. SDR-26 PVC PIPE TO USE "FULL BODIED" SDR-26 FITTINGS. SDR-26 PVC PIPE TO USE "FULL BODIED" SDR-26 FITTINGS. 11. ALL PVC PIPE TO HAVE CELL CLASS 12454 A OR B AS PER ASTM D1784. ALL PVC PIPE TO HAVE CELL CLASS 12454 A OR B AS PER ASTM D1784. 12. NO MORE THAN 2 HOURS SHALL ELAPSE BETWEEN MIXING AND PLACEMENT OF NO MORE THAN 2 HOURS SHALL ELAPSE BETWEEN MIXING AND PLACEMENT OF CEMENT STABILIZED SAND. 13. ALL BACKFILL SHALL BE COMPACTED TO A MINIMUM 95% SPD, ±2% OF OPTIMUM ALL BACKFILL SHALL BE COMPACTED TO A MINIMUM 95% SPD, ±2% OF OPTIMUM MOISTURE CONTENT, IN MAXIMUM 8-INCH LIFTS.
AutoCAD SHX Text
1. CONTRACTOR SHALL PROVIDE AND INSTALL TRAFFIC CONTROL DEVICES IN CONTRACTOR SHALL PROVIDE AND INSTALL TRAFFIC CONTROL DEVICES IN CONFORMANCE WITH OF THE KANSAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (KANSAS MUTCD, MOST RECENT EDITION WITH REVISIONS) DURING CONSTRUCTION. 2. ALL TRAFFIC CLOSURES SHALL BE SCHEDULED IN ACCORDANCE WITH THE LOCAL ALL TRAFFIC CLOSURES SHALL BE SCHEDULED IN ACCORDANCE WITH THE LOCAL GOVERNING ENTITIES APPROPRIATE HOURS. 3. NO LANES ON MAJOR THOROUGHFARES MAY BE BLOCKED FROM 6:00 AM TO 9:00 NO LANES ON MAJOR THOROUGHFARES MAY BE BLOCKED FROM 6:00 AM TO 9:00 AM AND 4:00 PM TO 7:00 PM UNLESS APPROVED BY THE LOCAL GOVERNING ENTITY. 4. NO TRAFFIC LANES SHALL BE CLOSED IN ALL RESIDENTIAL AREAS FROM 7:00 PM NO TRAFFIC LANES SHALL BE CLOSED IN ALL RESIDENTIAL AREAS FROM 7:00 PM TO 7:00 AM. 5. CONTRACTOR SHALL MAINTAIN ONE LANE OF TRAFFIC IN EACH DIRECTION DURING CONTRACTOR SHALL MAINTAIN ONE LANE OF TRAFFIC IN EACH DIRECTION DURING WORKING HOURS. 6. CONTRACTOR SHALL COVER OPEN EXCAVATIONS WITH STEEL PLATES ANCHORED CONTRACTOR SHALL COVER OPEN EXCAVATIONS WITH STEEL PLATES ANCHORED PROPERLY DURING NON-WORKING HOURS AND OPEN THE LANES FOR NORMAL TRAFFIC FLOW. 7. OFF-DUTY UNIFORMED POLICE OFFICER(S)/FLAGGER(S) ARE REQUIRED TO DIRECT OFF-DUTY UNIFORMED POLICE OFFICER(S)/FLAGGER(S) ARE REQUIRED TO DIRECT TRAFFIC WHEN THE LANES ARE BLOCKED. 8. IN THE EVEN THAT NO "TRAFFIC CONTROL PLANS" EXIST AS PART OF CONTRACT IN THE EVEN THAT NO "TRAFFIC CONTROL PLANS" EXIST AS PART OF CONTRACT DRAWINGS. CONTRACTOR SHALL PREPARE PLANS AND SUBMIT TO THE LOCAL GOVERNING ENTITY FOR APPROVAL TEN DAYS PRIOR TO IMPLEMENTATION. 9. IF THE CONTRACTOR CHOOSES TO USE A DIFFERENT METHOD OF "TRAFFIC CONTROL IF THE CONTRACTOR CHOOSES TO USE A DIFFERENT METHOD OF "TRAFFIC CONTROL PLANS" DURING THE CONSTRUCTION THAN WHAT IS OUTLINED IN THE CONTRACT DRAWINGS. HE/SHE SHALL BE RESPONSIBLE FOR PREPARING AND SUBMITTING AN ALTERNATE SET OF PLANS* TO THE LOCAL GOVERNING ENTITY FOR APPROVAL TEN WORKING DAYS PRIOR TO IMPLEMENTATION. 10. APPROVED COPIES OF THE TRAFFIC CONTROL PLANS AND REQUIRED PERMITS SHALL APPROVED COPIES OF THE TRAFFIC CONTROL PLANS AND REQUIRED PERMITS SHALL BE MADE AVAILABLE FOR INSPECTION AT THE JOB SITE AT ALL TIMES. CONTRACTORS MUST SECURE REQUIRED PERMITS FROM THE LOCAL GOVERNING ENTITY'S TRAFFIC MANAGEMENT AND MAINTENANCE BRANCH BEFORE CLOSING A LANE/SIDEWALK. THE REQUEST MUST BE MADE AT LEAST 10 DAYS IN ADVANCE OF THE CLOSURE. NOTE THAT WORKING HOURS MAY BE RESTRICTED OR THE REQUEST MAY BE DENIED. * THESE PLANS SHALL BE DRAWN TO SCALE ON REPRODUCIBLE MYLAR AND SEALED THESE PLANS SHALL BE DRAWN TO SCALE ON REPRODUCIBLE MYLAR AND SEALED BY A LICENSED ENGINEER IN THE STATE OF KANSAS. PLANS WILL BECOME PART OF THE CONTRACT DRAWINGS.
ØØ
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø Ø th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
KS ARCH REG. NO. A-930, EXP. 12/31/2023
KS ENGR REG. NO. E-2586, EXP. 12/31/2023
CIVIL ENGINEER
H2B ENGINEERS, INC.
1225 NORTH LOOP WEST, #800
HOUSTON, TEXAS 77008
(713) 864-2900
COMMISSIONING
ES2, INC.
13401 N. SANTA FE AVE.
OKLAHOMA CITY, OK. 73114
(405) 233-3105
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
8/ 9/
:1
7:
P M
DMHFAE
ISSUED FOR CONSTRUCTION
SITE UTILITY REPAIRS
PHASE 1
11/23/2022
589A7-22-208
ROBERT J. DOLE VAMC
5500 EAST KELLOGG DRIVE
WICHITA, KANSAS
ROBERT J. DOLE VAMC
SPUR #: 1794.19No. REVISION DESCRIPTION DATE
OF 14
11/23/202
Kansas Firm Registration No. E-3405
KEY PLAN
N
KELLOGG
WATERMAN
BU
CK
LE
Y
ED
G
EM
O
O R23
SCALE: 1/128" = 1'-0" SCALE: 1/128" = 1'-0"
72 19 6
AL
AN LANE LACKEY
OVERALL SITE UTILITY PLAN
CU100
AutoCAD SHX Text
SW
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text 2" Pipe (Top) (Collapsed)
AutoCAD SHX Text 4" CIP (Bottom)
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text 4" PVC Wye
AutoCAD SHX Text 6" SNS. (Record)
AutoCAD SHX Text
8" VCP
AutoCAD SHX Text
8" PVC
AutoCAD SHX Text
8" PVC
AutoCAD SHX Text 4" PVC (unknown origin)
AutoCAD SHX Text
SW
AutoCAD SHX Text
8" CIP
AutoCAD SHX Text
8" CIP/VCP
AutoCAD SHX Text
8" CIP/VCP
AutoCAD SHX Text
8" VCP
AutoCAD SHX Text
8" VCP
AutoCAD SHX Text
6" CIP
AutoCAD SHX Text
8" VCP/CIP
AutoCAD SHX Text
6" VCP/CIP
AutoCAD SHX Text 4" PVC/CIP (Alignment Uncertain)
AutoCAD SHX Text 6" CIP/VCP (Alignment Uncertain)
AutoCAD SHX Text
8" VCP
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
8" VCP/CIP
AutoCAD SHX Text
8" VCP/CIP
AutoCAD SHX Text
8" VCP (COW GIS)
AutoCAD SHX Text
8" VCP/CIP
AutoCAD SHX Text
6" VCP/CIP
AutoCAD SHX Text
8" CIP/VCP
AutoCAD SHX Text
6" VCP
AutoCAD SHX Text
8" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" VCP & CIP
AutoCAD SHX Text 6" SNS Unkn
AutoCAD SHX Text
6" VCP/CIP
AutoCAD SHX Text Unknown SNS
AutoCAD SHX Text
4" CIP
AutoCAD SHX Text
6" CIP/VCP
AutoCAD SHX Text 4" CIP/PVC (Uncertain alignment)
AutoCAD SHX Text Uncertain align/size/type
AutoCAD SHX Text Uncertain Origin
AutoCAD SHX Text
8" CIP/VCP
AutoCAD SHX Text
8" PVC/CIP
AutoCAD SHX Text
12" PVC
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
6" VCP/CIP
AutoCAD SHX Text
6" VCP/CIP
AutoCAD SHX Text
6" VCP
AutoCAD SHX Text
6" CIP
AutoCAD SHX Text
S BLECKLEY DR
AutoCAD SHX Text
E KELLOGG DR
AutoCAD SHX Text
E WATERMAN ST
AutoCAD SHX Text
S EDGEMOOR ST
AutoCAD SHX Text
EXIST 6" 151 LF CAST IRON SAN SWR @ 0.96% SLOPE
AutoCAD SHX Text #13 NE (Origin Location Uncertain)
AutoCAD SHX Text #13 N Top & Bottom (Origin Location Uncertain)
AutoCAD SHX Text Approx location of Pipe transition from 4" to 6"
AutoCAD SHX Text (Origin Location Uncertain)
AutoCAD SHX Text #14A (Origin Location Uncertain)
AutoCAD SHX Text SSMH #03 (MS #09) Rim=1348.00 = 1346.00 (2" N) = 1341.80 (4" N) = 1344.67 (3" NW) = 1341.94 (8" CIP E) = 1341.87 (ESE) = 1341.79 (8" CIP/VCP SSW)
AutoCAD SHX Text SSMH #02 (MS #08) Rim=1346.69 (N)= 1343.91 (S)= 1342.66 (W)= 1342.54 (8" CIP)
AutoCAD SHX Text SSMH #01 (MS #07) Rim=1346.87 = 1343.13 (NW) = 1343.17 (SE) = 1342.89 (N)
AutoCAD SHX Text SSMH #04 (MS #10) Rim=1348.88 (NNE)= 1340.28 (8" CIP/VCP) (SW)= 1340.15 (8" VCP)
AutoCAD SHX Text SSMH #05 (MS #11) Rim=1348.79 (NE)= 1339.74 (8" VCP) (W)= 1339.67 (6" CIP) (S)= 1339.66 (8" VCP)
AutoCAD SHX Text SSMH #06 (MS #12) Rim=1348.34 (E)= 1340.78 (6" VCP, not scoped) (6" VCP, not scoped) (N)= 1339.33 (8" VCP) (SSW)= 1339.24 (8" VCP)
AutoCAD SHX Text SSMH #07 (MS #13) Rim=1348.16 (NNE)= 1338.97 (8" VCP) (SSW)= 1338.87 (8" PVC)
AutoCAD SHX Text SSMH #08 (MS #14) Rim=1349.71 (E)= 1344.33 (4" PVC Drop) (NNE)= 1338.46 (8" PVC) (W)= 1338.46 (8" PVC)
AutoCAD SHX Text SSMH #09 (MS #15) Rim=1350.48 (E)= 1338.43 (8" PVC) (SW)= 1338.38 (8" VCP)
AutoCAD SHX Text SSMH #10 (MS #16) Rim=1349.67 (NE)= 1338.37 (8" VCP) (SW)= 1338.22 (8" VCP/CIP)
AutoCAD SHX Text SSMH #11 (MS #17) Rim=1353.38 (W)= 1350.04 (6" CIP) (E)= 1345.91 (4" PVC) (S)= -7.61 (6" VCP/CIP)
AutoCAD SHX Text SSMH #12 (MS #18) Rim=1349.97 (N)= 1343.52 (6" VCP/CIP) (NE)= 1336.47 (8" VCP/CIP) (SW)= 1336.45 (8" VCP/CIP)
AutoCAD SHX Text SSMH #22 (MS #19, COW #5847-459) Rim=1348.16 (NW)= 1341.06 (8" VCP/CIP) (NE)= 1334.60 (8" VCP/CIP) (SW)= 1334.56 (12" VCP, not scoped) (12" VCP, not scoped)
AutoCAD SHX Text SSMH #20 (MS #20) Rim=1352.14 (WNW)= 1345.64 (2" unable to TV) (2" unable to TV) (2" unable to TV) (N)= 1343.88 (8" VCP/CIP) (NE)= 1345.03 (6" VCP/CIP) (SE)= 1343.88 (8" VCP/CIP)
AutoCAD SHX Text SSMH #21 (MS #21) Rim=1355.67 (NE/N)= 1346.56 (8" CIP) (SW)= 1346.47 (6" CIP)
AutoCAD SHX Text SSMH #19 (MS #22) Rim=1354.71 (NW)= 1345.00 (2" unable to TV) (2" unable to TV) (2" unable to TV) (N)= 1344.76 (8" CIP) (E)= 1344.89 (2" unable to TV) (2" unable to TV) (2" unable to TV) (S)= 1344.60 (8" VCP)
AutoCAD SHX Text SSMH #16 (MS #23) Rim=1353.52 (W)= 1347.32 (6" PVC,) (S)= 1346.79 (8" PVC)
AutoCAD SHX Text SSMH 17 (MS #24 (plywood lid) Rim=1353.90 (NW)= 1348.76 (unable to TV) (N)= 1345.95 (8" PVC) (NE)= 1345.89 (6" VCP) (W)= 1345.86 (6" CIP) (S)= 1345.72 (6" VCP)
AutoCAD SHX Text SSMH #18 (MS #25) Rim=1353.84 (NE)= 1346.20 (2" unable to TV) (N)= 1345.54 (6" VCP) (E)= 1345.48 (8" PVC) (S)= 1345.50 (8" CIP/VCP)
AutoCAD SHX Text SSMH #13 (MS #26) Rim=1354.93 (N Bottom)= 1349.83 (4" CIP) (N Top)= 1350.93 (2" Pipe) (NE)= 1347.34 (4" PVC) (E)= 1347.34 (6" VCP) (S)= 1347.16 (6" VCP/CIP)
AutoCAD SHX Text SSMH #14 (MS #27) Rim=1355.03 (E)= 1347.09 (6" PVC) (N)= 1346.81 (6" CIP) (SSW)= 1346.33 (12" PVC)
AutoCAD SHX Text SSMH (MS #29, COW #5847-457) Rim=1342.67 (NE)= 1332.43 (12" PVC?) (12" PVC?) (N)= 1331.31 (10" PVC?) (10" PVC?) (E)= 1331.19 (15" PVC) (15" PVC) (W)= 1327.44 (21" PVC) (21" PVC)
AutoCAD SHX Text Could not locate SSMH #XX (COW 5847-458) Rim=1342.XX = -11.36 (10" PVC N) = -10.24 (12" PVC NE) = -11.48 (15" PVC E) = -15.23 (21" PVC W)
AutoCAD SHX Text SSMH #23 (MS #01) Rim=1347.80 = 1340.28 (4" CIP/PVC N) = 1342.50 (4" PVC E) = 1340.14 (6" CIP/VCP SSW)
AutoCAD SHX Text SSMH #24 (MS #02) Rim=1347.36 = 1339.20 (6" CIP/VCP NNE) = 1339.21 (4" CIP E) = 1339.18 (6" CIP/VCP SSW)
AutoCAD SHX Text SSMH #26A (MS #03) Rim=1349.53 = 1345.42 (N) = 1343.85 (6" PVC SW)
AutoCAD SHX Text SSMH #26 (MS #04) Rim=1347.62 = 1341.41 (6" PVC NE) = 1340.22 (4" VCP NE, abandoned capped at 13') = 1340.25 (6" CIP/VCP SW)
AutoCAD SHX Text SSMH #25 (MS #05) Rim=1345.56 = 1337.99 (6" VCP/CIP NNE) = 1338.56 (6" CIP/VCP NE) = 1338.60 (Unknown SE) = 1337.98 (Unknown SW)
AutoCAD SHX Text SSMH #06 Rim=1344.66 = 1337.01 (NE) = 1337.03 (SE) = 1337.09 (SSE) = 1336.85 (W)
AutoCAD SHX Text MS-NORTH (BM #202) Elev=1350.56 (NAVD88, GEOID18)
AutoCAD SHX Text TBM-01 (Pnt #3371 Elev=1357.70
AutoCAD SHX Text MS-SOUTH (BM #203) Elev=1347.91 (NAVD88, GEOID18)
AutoCAD SHX Text Uncertain align/size/type
AutoCAD SHX Text Uncertain align/size/type
AutoCAD SHX Text 05A As far as they could TV.
AutoCAD SHX Text #11B (Location Uncertain)
AutoCAD SHX Text #11A (Location Uncertain)
AutoCAD SHX Text #13A (Location Uncertain)
AutoCAD SHX Text #21A (Location Uncertain)
AutoCAD SHX Text #17A (Location Uncertain)
AutoCAD SHX Text #17B (Location Uncertain)
AutoCAD SHX Text 50'
AutoCAD SHX Text 100'
AutoCAD SHX Text
SCALE: 1" = 50'
AutoCAD SHX Text
AutoCAD SHX Text
LEGEND: .
AutoCAD SHX Text
EXIST SAN SWR STR RATING 5
AutoCAD SHX Text
EXISTING SANITARY SEWER MANHOLE
AutoCAD SHX Text
EXIST SAN SWR STR RATING 4
AutoCAD SHX Text
EXIST SAN SWR STR RATING 3
AutoCAD SHX Text
EXIST SAN SWR STR RATING 0
AutoCAD SHX Text
LONG TERM
AutoCAD SHX Text
ADMINISTRATION/SUPPORT
AutoCAD SHX Text
PROCEDUAL/ANCILLARY / DIAGNOSTIC
AutoCAD SHX Text
ACUTE INPATIENT
AutoCAD SHX Text
AMBULATORY
AutoCAD SHX Text
FUTURE SITE PLAN
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
LONG TERM
AutoCAD SHX Text
ADMINISTRATION/SUPPORT
AutoCAD SHX Text
PROCEDUAL/ANCILLARY / DIAGNOSTIC
AutoCAD SHX Text
MENTAL HEALTH
AutoCAD SHX Text
ACUTE INPATIENT
AutoCAD SHX Text
AMBULATORY
AutoCAD SHX Text
FUTURE SITE PLAN
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
MENTAL HEALTH
AutoCAD SHX Text
PROPOSED SANITARY SEWER
AutoCAD SHX Text
PROPOSED SANITARY SEWER MANHOLE
AutoCAD SHX Text
PROPOSED SAN SWR PVC LINING (TOP 10 PRIORITY)
AutoCAD SHX Text
ABANDON EXISTING FEATURE IN PLACE
AutoCAD SHX Text A
AutoCAD SHX Text
ABANDON EXISTING UTILITY
AutoCAD SHX Text
NOTES: .
AutoCAD SHX Text
1. UTILITIES PRESENTED ON THESE DRAWINGS ARE UTILITIES PRESENTED ON THESE DRAWINGS ARE SHOWN BASED ON THE BEST AVAILABLE INFORMATION. CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS IN THE FIELD PRIOR TO COMMENCING CONSTRUCTION. CONTRACTOR SHALL NOTIFY LOCAL UTILITY LOCATING SERVICES AT LEAST 48 HOURS BEFORE PROCEEDING WITH ANY EXCAVATION. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGES CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGES TO EXISTING WATER, WASTEWATER, STORMWATER LINES, AND TRAFFIC CONTROL DEVICES. DAMAGES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. 3. ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION AND ANY DRAINAGE DITCH OR STRUCTURE DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO EXISTING CONDITIONS OR BETTER. 4. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT ROOT SYSTEMS OF SHRUBS, PLANTS, AND TREES ALONG THE AREA OF EXCAVATION. 5. CONTRACTOR SHALL COMPLY WITH THE LATEST CONTRACTOR SHALL COMPLY WITH THE LATEST EDITION OF OSHA REGULATIONS AND THE STATE OF KANSAS LAWS CONCERNING EXCAVATION. 6. PVC LINER SHALL BE NOVAFORM PVC LINER, OR PVC LINER SHALL BE NOVAFORM PVC LINER, OR PRE-APPROVED EQUAL. 7. REFER TO NOVAFORM PVC LINER INSTALLATION REFER TO NOVAFORM PVC LINER INSTALLATION MANUAL & PRODUCT DATA SHEET.
AutoCAD SHX Text
PROPOSED SAN SWR PVC LINING
AutoCAD SHX Text CONTRACTOR SHALL ENSURE CONTINUOUS SANITARY SEWER SERVICE IS MAINTAINED DURING CONSTRUCTION. TEMPORARY BYPASS PUMPS SHALL BE USED WHERE FLOW WILL BE BLOCKED DURING PVC LINING PROGRESS
AutoCAD SHX Text
SEE SHEET CU102 FOR DETAILED VIEW
AutoCAD SHX Text
SEE SHEET CU103 FOR DETAILED VIEW
SEE SHEET CU101 FOR DETAILED VIEW
e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
KS ARCH REG. NO. A-930, EXP. 12/31/2023
KS ENGR REG. NO. E-2586, EXP. 12/31/2023
CIVIL ENGINEER
H2B ENGINEERS, INC.
1225 NORTH LOOP WEST, #800
HOUSTON, TEXAS 77008
(713) 864-2900
COMMISSIONING
ES2, INC.
13401 N. SANTA FE AVE.
OKLAHOMA CITY, OK. 73114
(405) 233-3105
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
8/ 9/
:1
7:
P M
DMHFAE
ISSUED FOR CONSTRUCTION
SITE UTILITY REPAIRS
PHASE 1
11/23/2022
589A7-22-208
ROBERT J. DOLE VAMC
5500 EAST KELLOGG DRIVE
WICHITA, KANSAS
ROBERT J. DOLE VAMC
SPUR #: 1794.19No. REVISION DESCRIPTION DATE
OF 14
11/23/202
Kansas Firm Registration No. E-3405
KEY PLAN
N
KELLOGG
WATERMAN
BU
CK
LE
Y
ED
G
EM
O
O R23
SCALE: 1/128" = 1'-0" SCALE: 1/128" = 1'-0"
72 19 6
AL
AN LANE LACKEY
DETAILED SITE UTILITY PLAN
CU101
AutoCAD SHX Text
EXIST 8" 76 LF CAST IRON SAN SWR @ 0.3% SLOPE
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .