554-23-109 Insulation Location Pictures.pdf
PDF 4 MB Posted
- Solicitation number
- 36C25922Q0833
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25922Q0833 0002.docx | DOCX document | |
| S04 -Site Visit Meeting Doc.docx | DOCX document | |
| 36C25922Q0833 0001.docx | DOCX document | |
| Site visit sign-in.pdf | ||
| 36C25922Q0833.docx | DOCX document | |
| 554-23-109 Insulation Location List.pdf | ||
| 554-23-109 Specs.pdf | ||
| 06_MH_401 - As-built Boiler Room HPS Piping.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pictures for 554-23-109 Install New Jackets on Valves and Traps
Figure 1: PRV Station 6-PRV-1
Figure 2: PRV Station 6-PRV-2
Figure 3: Steam Header Left Side
Figure 4: Steam Header Right Side
Figure 5: Boiler Blowdown Valves
Figure 6: Boiler Flanged Port and Hand Access Port
Figure 7: Boiler Rear Sight Glass Port
Figure 8: Boiler Discharge Valves and Startup Bypass
Figure 9: Boiler Top Access Port
Figure 10: 6-DHX-3 Control Valves and Trap
Figure 11: 6-DHX-3 Steam Isolation Gate Valve and Y-Strainer
Figure 12: 6-DHX-2 Steam Isolation Gate Valve and Y-Strainer
Figure 13: 6-DHX-2 Control Valves and Trap
Figure 14: 6-DHX-1 Steam Isolation Gate Valve and Y-Strainer
Figure 15: 6-DHX-1 Control Valves and Trap
Figure 16: 6-DHX-1 Drip Leg Trap
Figure 17: 6-DHX-2 Drip Leg Trap
Figure 18: 6-DHX-3 Drip Leg Trap
Figure 19: 6-DHX-3 Water Heater Trap and Y-strainer
Figure 20: 6-DHX-2 Water Heater Trap and Y-Strainer
Figure 21: 6-DHX-1 Water Heater Trap and Y-strainer