This document is Addendum #3 to Invitation for Bid (IFB) #54317 for the SE Water Infrastructure Improvements-16" Water Main and Booster Pumping Station project issued by the City of Petersburg, Virginia. The project consists of the construction of a 16-inch water main and a booster pumping station. The addendum extends the bid receipt date to Tuesday, February 27, 2024 at 2:30 PM EST and the bid opening date to Wednesday, February 28, 2024 at 2:30 PM EST. It also provides responses to questions regarding the project, including clarification that the bore under the railroad will not require a 24-hour operation, the correct length of the bore being 170 LF, and the use of cold patch for temporary paving purposes. The addendum further clarifies that no specific manufacturer has been specified for the Variable Frequency Drives (VFDs), and that a complete spare pump, including the motor, couplings, and base plate, is required. Additionally, it allows for the use of aluminum bronze impellers instead of the specified silicone bronze.
The project is funded by the City of Petersburg, Virginia, and no set-asides or other special funding requirements are mentioned. Bidders are responsible for ensuring their proposed alternates meet the contract requirements, and the City reserves the right to evaluate and approve or reject any proposed alternates.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #3 IFB #54317 SE Water Infrastructure Improvements-16” Water Main and Booster Pumping Station 3
CITY OF PETERSBURG
PROCUREMENT OFFICE
125 N. UNION STREET
PETERSBURG, VIRGINIA 23803
(804) 733-2345 www.petersburg-va.org
ADDENDUM #3
DATE: February 13, 2024
INVITATION FOR BID: 54317
TITLE: SE Water Infrastructure Improvements-16” Water Main & Booster Pumping Station DATED: December 26, 2023 DUE DATE: Tuesday, February 27, 2024 @ 2:30 p.m., EST (changed) OPENING DATE: Wednesday, February 28, 2024 @ 2:30 p.m., EST (changed) SUBJECT: Extended Bid Receipt and Opening Date; Questions and Answers
This Addendum supplements, modifies, deletes from or adds to the original Invitation For Bid noted above in response to a question(s) received to date, and is made a part of the Invitation For Bid and resulting contract documents.
I. Extended Bid Receipt Date and Bid Opening Date
The bid receipt date for bid submission has been extended to Tuesday, February 27, 2024, no later than 2:30 p.m. The bid opening date has been extended to Wednesday, February 28, 2024 at 2:30 p.m.
• To join the meeting and view the video from your computer. Please click the following link:
Click here to join the meeting
Meeting ID: 221 805 867 502
Passcode: KyGBUq
• To join the meeting via phone, please see the following dial-in info:
Dial In #+1 804-215-0096,,398729987# United States, Richmond
Meting Conference ID: 398 729 987#
II. Questions and Answers
1. The bore under the railroad, Will the operation be required to be a 24 hr around the clock operation.
Response: The operation will not be required to be 24-hour around the clock.
https://teams.microsoft.com/l/meetup-join/19%3ameeting_NzhhYWEzZTEtMDM1YS00NDI2LTkzODYtYTM2MmNiNDg2NWIw%40thread.v2/0?context=%7b%22Tid%22%3a%22915d4a77-8211-456a-97a4-3135fb39c42a%22%2c%22Oid%22%3a%22481c413a-babb-4a5c-a88d-53416c774169%22%7d tel:+18042150096,,398729987#
IFB #54317 SE Water Infrastructure Improvements-16” Water Main and Booster Pumping Station 4
2. The bore is showing 2 different lengths, what is correct the 132 lf or the 170 lf?
Response: The correct length is 170 LF. The callouts on Sheets C-101 and Sheet C-201 should read 170 LF. New sheets will not be issued for this change.
3. Will there be a copy of what was stated at the pre-bid meeting? As the virtual meeting was not activated?
Response: A summary of the minutes was posted on January 12, 2024.
4. I wanted to inquire whether or not equivalent alternated were being accepted for the supply of the horizontal split case pumps specified?
Response: Proposed alternates will be considered for acceptance only when submitted with the proper documentation and procedures as called for in the Contract Documents. Contractors are responsible for ensuring that the performance of any proposed alternate meets the requirements of the Contract Documents. Contractors submit proposed alternates at their own risk and will not be entitled to pricing or schedule adjustments should Contractor’s proposed alternate be deemed unacceptable.
5. Will the trench need to be paved with hot mix asphalt daily using Base Course and Intermediate Curse as described on the plans?
Response: The Contractor is allowed to only have specific amount of trench opened at a time. The contractor is responsible for ensuring that trench(es) are safe at the end of the work day. There is no requirement for paving at the end of each day, and Contractors are reminded that means and methods are the responsibility of the Contractor. Prior to the resumption of traffic on a trench in a paved area, the trench will need to be brought to the surface in accordance with the Contract Documents.
6. Will cold patch be allowed for temporary purposes?
Response: The Contractor will need to submit a paving plan for approval once determined how the they will complete the work. Use of cold patch, if desired, will be evaluated in conjunction with the paving plan.
7. At tie end points where work finishes one day and will be resumed the next will a certain amount of trench be allowed to have cold patch?
Response: The Contractor is responsible for ensuring that trench(es) are safe at the end of the work day. There is no requirement for paving at the end of each day, and means and methods are the responsibility of the Contractor. Prior to the resumption of traffic on a trench in a paved area, the trench will need to be brought to the surface in accordance with the Contract Documents.
IFB #54317 SE Water Infrastructure Improvements-16” Water Main and Booster Pumping Station 5
8. Would we be able to cold patch any length of the trench to reduce the amount of days were paving occurs? Tolerances for paving can vary, and therefore reduce the number of workable days due solely to asphalt availability and weather conditions.
Response: The Contractor will need to submit a paving plan for approval once he has determined how he will complete the work. Use of cold patch, if desired, will be evaluated in conjunction with the paving plan.
9. We could not locate any specs for the VFD’s. The pump spec requires the pump supplier to furnish the VFD’s which is no issue. We work with ABB for VFDs and would provide them with our pumps if acceptable. If another supplier is preferred, could we please get their information?
Response: No specific manufacturer has been specified for VFDs. The Contractor is responsible for providing VFDs that are compatible with the pumps that are submitted and approved. The Contractor is responsible for ensuring that the cabinets/containers for the VFDs will fit within the allotted space in the pump station.
10. The specs are requiring a spare pump. Should we provide a complete pump or just the pump assembly without motor, couplings and base plate.
Response: A complete pump shall be provided.
11. For spars is one (1) set of spare parts or two (2) sets – (1) for each pump?
Response: Two sets, one for each pump, are required.
12. Section 11197, Para. 2.1.A & 2.3.F & 2.3.N: Impeller is specified to be silicone bronze...but application is for chlorinated potable water. We usually recommend aluminum bronze (Aluminum Bronze ASTM B148 UNS C95400 (B22) for chlorinated water to avoid pitting of the impeller.
Response: Aluminum bronze impellers, per the referenced ASTM specification, will be allowed.
13. Specification 16000 1.8 B. defines area classifications. Please advise if the area inside of the water booster pump station is considered Corrosive Process / Wet or Non-Corrosive Process and Mechanical / Dry.
IFB #54317 SE Water Infrastructure Improvements-16” Water Main and Booster Pumping Station 6
14. Section 11197 Para. 2.1.E indicates 60 HP motor...but E-601 indicates 50 HP motors. The pump requires a 50 HP motor for non-overloading operation. Do we supply with 50 or 60 HP motors and VFDs?
Response: If the pump specified in the Contract Documents is submitted, 50 HP motors and VFDs will be required.
The bidder must take due notice and be governed accordingly. This Addendum must be acknowledged, or your bid may not be considered.
__Lisa M. Scott________ Lisa M. Scott Purchasing Agent