539-21-113 Replace Roof Bid Drawings 2-18-2022.pdf
PDF 12 MB Posted
- Attached to
- Construction - Replace Roof (539-21-113)
- Solicitation number
- 36C25022B0029_1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 4 - Response 4-19-22.pdf | ||
| RFI 3 - Response 4-19-22.pdf | ||
| 36C25022B0029 0003.docx | DOCX document | |
| Asbestos Report - signed.pdf | ||
| 36C25022B0029 0002.pdf | ||
| Pre-Bid Site Visit Sign In Sheet (4-11-2022).pdf | ||
| 36C25022B0029 0001.docx | DOCX document | |
| RFI 1 - RESPONSE 4-14-22.pdf | ||
| Contractor EMR Certification Form.pdf | ||
| VHA Directive 1192_01_D_2020-08-10.pdf | ||
| 36C25022B0029_1.docx | DOCX document | |
| 539-21-113 Replace Roof Bid Specs 2-14-2022.pdf | ||
| Wage Determination 3-11-22 02.pdf | ||
| RFI Form.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V
IN
E S
T
SHIELD ST
BLDG 1
DASHED BOX INDICATES POTENTIAL
STAGING. ALL STORED MATERIALS
SHALL BE CONTAINED AND
CONTROLLED. SEE GENERAL
REQUIREMENTS SPECIFICATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
R e p la c e
R o o f_
B n a te
.m o u ld s .r v t
/1
/2
:3
:4
P
M
GI000
COVER SHEET
Veteran's Affairs Medical Center
02/11/2022 PQ NM
REPLACE ROOF
BUILDING ONE
539-21-113
CINCINNATI, OHIO
BID DOCUMENTS
Cincinnati VA
Medical Center
1. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES
TO THE IMMEDIATE ATTENTION OF THE ARCHITECT AND C.O.R.
2. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION.
3. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.
4. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO THEIR ORIGINAL
CONDITION AT THE END OF THE PROJECT.
5. MAINTAIN THE BUILDING IN A WEATHER TIGHT CONDITION AT ALL TIMES.
6. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE DISRUPTIONS OF NORMAL FUNCTIONS OF THE VA'S OCCUPIED AREAS.
7. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS SHALL BE PERMITTED AT ANY TIME IN WORK AREAS. IF WORK ACTIVITY WILL GENERATE NOISE OVER 85 DECIBELS OR IF THE WORK SCHEDULED IS LIKELY TO PRODUCE VIBRATIONS THROUGHOUT THE BUILDING STRUCTURE, THEN THE CONTRACTOR SHALL WORK WITH THE C.O.R. TO SCHEDULE THE MOST APPROPRIATE TIME TO PERFORM THE DISRUPTIVE WORK ACTIVITY.
8. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO ADJACENT DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES WITH C.O.R. NO LESS THAN 3 WEEKS PRIOR TO THE REQUIRED OUTAGE. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE C.O.R.
9. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE V.A.'S OCCUPIED AREAS ADJACENT TO NEW CONSTRUCTION OR OCCUPIED AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER INTRUSION.
10. THE GENERAL CONTRACTOR SHALL OBTAIN A SIGNED HOT WORKS PERMIT EACH WORKING DAY BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF THE EXISTING BUILDING AND FOR
OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.
11. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO PATCH ALL SPRAY-ON FIRE PROTECTION AT REMOVALS, AT ANY EXISTING LOCATIONS WHICH ARE VOID OF PROTECTION WITHIN THE AREA OF WORK AND AT NEW CONSTRUCTION WHICH DISTURBS EXISTING FIRE PROTECTION. FIREPROOFING MUST BE CONTINUOUS AND UNOBSTRUCTED.
12. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL STRUCTURAL FRAMING MEMBERS AT ALL TIMES.
13. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE ARCHITECT OR THE C.O.R. FOR RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE PROPERLY DISPOSED OF. NO DEBRIS RESULTING FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK.
14. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT
LIMITED TO MECHANICAL, ELECTRICAL AND PLUMBING.
15. WHERE CEILINGS ARE SHOWN TO BE REMOVED, ALL UNUSED SUSPENDED EQUIPMENT, WIRES, ANGLES, ETC. SHALL BE REMOVED. SEE DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION.
EXISTING LIGHTS MAY BE MAINTAINED AS TEMPORARY CONSTRUCTION LIGHTING.
16. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL CONSTRUCTION.
17. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE
NEW CONDITION TO MATCH THE EXISTING FINISH.
18. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE
EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.
19. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK. DETERMINE THE SIZE AND LOCATION OF PENETRATIONS FROM THE EXISTING UTILITIES WITHIN
THE NEW WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.
20. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE'D TO ACHIEVE THE PROPER FIRE RATING BY THE END OF CONSTRUCTION
OPERATIONS EACH DAY.
21. NEW HOLES IN EXISTING ELEVATED FLOOR AND ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE EXISTING STRUCTURE SO THAT CRITICAL STRUCTURAL MEMBERS ARE
NOT DAMAGED.
22. UNLESS OTHERWISE NOTED, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING SALVAGED STOCK BEFORE ORDERING NEW MATERIAL.
23. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT ANY POTENTIAL ODORS TO THE V.A.'S OCCUPIED AREAS ADJACENT TO NEW CONSTRUCTION OR OCCUPIED
AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED.
24. CONTRACTOR SHALL COORDINATE WORK WITH C.O.R. AS WELL AS TAKE ALL NECESSARY PRECAUTIONS AROUND HAZARDOUS EXHAUST VENTS SHOWN ON THE OVERALL PLAN.
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL AUTHORITIES, CODES, RULES AND REGULATIONS.
2. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM QUALITY OF WORK EXPECTED. MORE STRINGENT REQUIREMENTS STIPULATED WITHIN RELEVANT
MANUFACTURER’S INSTALLATION INSTRUCTIONS WILL SUPERSEDE.
3. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE ARCHITECT AND C.O.R. PRIOR TO PROCEEDING WITH WORK.
4. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR BETWEEN THE DRAWINGS AND THE ACTUAL CONDITIONS AT THE SITE, ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT AND C.O.R. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL WRITTEN CLARIFICATION FROM THE ARCHITECT IS RECEIVED.
5. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT ARE TO BE INSTALLED PER THE APPLICABLE PROVISIONS OF THESE DOCUMENTS AND THE MANUFACTURER’S INSTRUCTIONS.
6. ALL MATERIALS USED ARE REQUIRED TO BE NEW UNLESS OTHERWISE NOTED AND/OR OF A QUALITY TO MEET OR EXCEED ALL APPLICABLE INDUSTRY STANDARDS. WHERE SPECIFIED PRODUCTS OR MANUFACTURERS ARE NOT NOTED, THE CONTRACTOR IS REQUIRED TO NOTIFY THE ARCHITECT TO OBTAIN A MINIMUM STANDARD OF QUALITY.
7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR CONSTRUCTION.
8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING BUT NOT LIMITED TO THE ADHERENCE TO OSHA REGULATIONS.
9. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN THE STATE WHERE THIS PROJECT IS LOCATED.
10. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO TRUCKS OR INTO DUMPSTERS FOR REMOVAL. DISPOSE OF DEBRIS LEGALLY. DO NOT BURN DEBRIS ON THE SITE.
DO NOT ALLOW DEBRIS TO ENTER SEWERS. DO NOT ALLOW PILED DEBRIS TO ENDANGER STRUCTURES, BLOCK EXISTS OR ROADWAYS. COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE
HAZARD SHALL NOT BE PERMITTED TO ACCUMULATE IN OR AROUND THE CONSTRUCTION SITE..
11. COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES, INCLUDING, BUT NOT LIMITED TO MECHANICAL, ELECTRICAL, PLUMBING & SITE DRAWINGS. EXACT SIZE AND LOCATION OF ALL ROOF OPENINGS SHOWN ON DRAWINGS SHALL BE VERIFIED WITH THE ASSOCIATED SUB-CONTRACTORS PRIOR TO CONSTRUCTION.
12. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH FACE OF CONSTRUCTION.
13. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
14. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION MUST BE FIRE SAFE'D IN ACCORDANCE WITH THE SPECIFICATIONS.
15. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR HOSTING THE SUBMITTAL EXCHANGE FOR THE DURATION OF THE PROJECT.
16. CONTRACTOR SHALL COORDINATE WITH THE VA COR FOR SITE LOCATIONS DESIGNATED FOR CRANE USE. CONTRACTOR SHALL PROVIDE THE VA WITH THREE WEEKS NOTICE FOR USE AND PLACEMENT OF THE CRANE. CRANE USAGE WILL BE DISCUSSED AT EACH CONSTRUCTION PROGRESS MEETING TO CONFIRM USAGE AND LOCATIONS. ALL DISTURBED AREAS SHALL BE BROUGHT BACK TO ITS EXISTING CONDITIONS AT THE CONCLUSION OF THE CONSTRUCTION PROJECT.
17. ROOFING DETAILS ON SHEETS AE501 AND AE502 DEMONSTRATE DESIGN INTENT. VERIFY FLASHING REQUIREMENTS WITH SPECS AND PRODUCT MATERIAL REQUIREMENTS.
G E N E R A L N O T E S - E X I S T I N G F A C I L I T I E S :
G E N E R A L N O T E S - N E W W O R K :
REPLACE ROOF, BUILDING 1
DEPARTMENT OF VETERANS AFFAIRS
3200 VINE ST,
CINCINNATI, OH 45220
R E G I O N A L V I C I N I T Y M A P
D R A W I N G I N D E X
GENERAL
GI000 COVER SHEET
ARCHITECTURAL
1-AE001 OVERALL ROOF PLAN
1-AE131 ENLARGED ROOF PLANS
1-AE132 ENLARGED ROOF PLANS
1-AE133 ENLARGED ROOF PLANS
1-AE134 ENLARGED ROOF PLANS
1-AE135 ENLARGED ROOF PLANS
1-AE136 ENLARGED ROOF PLANS
1-AE137 ENLARGED ROOF PLANS
1-AE501 ROOFING DETAILS
1-AE502 ROOFING DETAILS
ELECTRICAL
EE001 LEGEND
1-ED101 NORTHWEST ROOF PLAN - REMOVALS
1-ED102 NORTHEAST ROOF PLAN - REMOVALS
1-ED103 SOUTHEAST ROOF PLAN - REMOVALS
1-ED104 SOUTHWEST ROOF PLAN - REMOVALS
1-EY101 NORTHWEST ROOF PLAN - LIGHTNING PROTECTION
1-EY102 NORTHEAST ROOF PLAN - LIGHTNING PROTECTION
1-EY103 SOUTHEAST ROOF PLAN - LIGHTNING PROTECTION
1-EY104 SOUTHWEST ROOF PLAN - LIGHTNING PROTECTION
CINCINNATI VA MEDICAL CENTER
S I T E P L A N
SCALE: 1" = 60'
N
12/31/2023
Revisions: Date:
BID DOCUMENTS 02/11/2022
UP
AHU 15
AHU 6
AHU 13
AHU 14
AHU 1
AHU 8
AHU 7
AHU 2AHU 3
#31
1ST FLOOR ROOF
EL 732' +/-
N.I.C.
#32 2ND FLOOR
ROOF
EL 751' +/-
#35
5TH FLOOR ROOF
EL 788' +/-
#28
4TH FL ROOF
EL 778' +/-
#28A
5TH FL ROOF
EL 787' +/-
#21
8TH FL ROOF
EL 821' +/-
#15A
2ND FLOOR
EL 740' +/-
#15
1ST FL ROOF
EL 728' +/-
#14 2ND FL ROOF
EL 762' +/-
#8
1ST FL ROOF
EL 743' +/-
#7
3RD FL ROOF
EL 762' +/-
#6
4TH FL ROOF
EL 786' +/-#9
3RD FL ROOF
EL 762' +/-
#13A 2ND FL ROOF
EL 740' +/-
#13 1ST FL ROOF
EL 728' +/-
#12
3RD FL ROOF
EL 762' +/-
#27
3RD FLOOR ROOF
EL 762' +/-
N.I.C.
#37
2ND FLOOR ROOF
EL 740' +/-
N.I.C.
#23
9TH FL ROOF
EL 832' +/-
#39
7TH FL ROOF
EL 809' +/-
#43
8TH FL ROOF
EL 821' +/-
#40
8TH FL ROOF
EL 821' +/-
#25
11TH FL ROOF
EL 857' +/-
#26
9TH FL ROOF
EL 835' +/-
#3A
3RD FL ROOF
EL 766' +/-
#3
3RD FL ROOF
EL 766' +/-
#5
4TH FL ROOF
EL 786' +/-
#10
3RD FL ROOF
EL 762' +/-
#4
4TH FL ROOF
EL 770' +/-
#1
3RD FL ROOF
EL 766' +/-
#4A
1ST FL ROOF
EL 742' +/-
#4B
1ST FL ROOF
EL 742' +/-
#11
3RD FL ROOF
EL 762' +/-
#4C
2ND FL ROOF
EL 753' +/-
#45
7TH FL ROOF
EL 809' +/-
#44
8TH FL ROOF
EL 821' +/-
#36 1ST FLOOR
ROOF
EL 728' +/-
#24
10TH FL ROOF
EL 846' +/-
N.I.C.
#17
3RD FL ROOF
EL 762' +/-
#16 7TH FL ROOF
EL 809' +/-
#19
8TH FL ROOF
EL 821' +/-
#22
9TH FL ROOF
EL 832' +/-
#18
ELEV ROOF
EL 857' +/-
#46 1ST FL ROOF
EL 739' +/-
#20 7TH FL ROOF
EL 809' +/-
#34 5TH FLOOR
ROOF
EL 787' +/-
#3C
3RD FL ROOF
EL 765' +/-
#33 3RD FLOOR
ROOF
EL 762' +/-
#2
2ND FL ROOF
EL 751' +/-
#8A
3RD FL ROOF
EL 770' +/-
#38
7TH FL ROOF
EL 809' +/-
N.I.C.
AHU PAD
AHU
AHU
AHU
AHU
AHU
AHU
#26
9TH FL ROOF
EL 835' +/-
#3B
2ND FL ROOF
EL 756' +/-
N.I.C.
AHU
#30
3RD FLOOR ROOF
EL 762' +/-
N.I.C.
AHU PAD
AHU PAD
BLDG 15
N.I.C.
BLDG 15
N.I.C.
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
R O O F L E G E N D
FOURTH FLOOR
FIFTH FLOOR
SEVENTH FLOOR
EIGHTH FLOOR
NINTH FLOOR
TENTH FLOOR
ELEVENTH FLOOR
NOT IN CONTRACT (N.I.C.)
ROOF ACCESS POINT
BIOHAZARDOUS
EXHAUST AREA
N Scale: 1/16" = 1'-0"
ROOF PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
R e p la c e
R o o f_
B n a te
.m o u ld s .r v t
/1
/2
:3
:4
P
M
1-AE001
OVERALL ROOF PLAN
Veteran's Affairs Medical Center
02/11/2022 PQ NM
REPLACE ROOF
BUILDING ONE
539-21-113
CINCINNATI, OHIO
BID DOCUMENTS
Cincinnati VA
Medical Center
ROOF NUMBER REPLACEMENT AREA RESTORATION AREA AREA OF BOTH
1 0 SF 12,148 SF 73 SF
2 0 SF 1,968 SF 0 SF
3 0 SF 5,520 SF 73 SF
3A 0 SF 2,919 SF 0 SF
3B 412 SF 0 SF 0 SF
3C 0 SF 388 SF 0 SF
4 543 SF 0 SF 0 SF
4A 527 SF 0 SF 0 SF
4B 531 SF 0 SF 0 SF
4C 201 SF 0 SF 0 SF
5 0 SF 4,330 SF 354 SF
6 0 SF 3,107 SF 163 SF
7 0 SF 4,314 SF 451 SF
8 0 SF 1,024 SF 0 SF
8A 253 SF 0 SF 0 SF
9 1,565 SF 0 SF 0 SF
10 0 SF 1,753 SF 0 SF
11 0 SF 794 SF 0 SF
12 0 SF 7,040 SF 1,003 SF
13 1,362 SF 0 SF 0 SF
13A 575 SF 0 SF 0 SF
14 0 SF 3,219 SF 972 SF
15 2,508 SF 0 SF 0 SF
15A 812 SF 0 SF 0 SF
16 0 SF 1,358 SF 0 SF
17 0 SF 1,089 SF 0 SF
18 0 SF 429 SF 0 SF
20 639 SF 0 SF 0 SF
21 1,169 SF 0 SF 0 SF
22 0 SF 1,247 SF 419 SF
23 1,299 SF 0 SF 0 SF
25 0 SF 2,418 SF 0 SF
26 6,847 SF 0 SF 0 SF
28 1,749 SF 0 SF 0 SF
28A 470 SF 0 SF 0 SF
28B 18 SF 0 SF 0 SF
32 0 SF 420 SF 0 SF
33 0 SF 169 SF 0 SF
34 0 SF 143 SF 0 SF
35 2,452 SF 0 SF 0 SF
36 3,307 SF 897 SF 0 SF
38 0 SF 641 SF 0 SF
39 0 SF 679 SF 0 SF
40 0 SF 1,694 SF 0 SF
43 1,692 SF 0 SF 0 SF
44 0 SF 642 SF 0 SF
45 0 SF 650 SF 0 SF
46 1,100 SF 0 SF 0 SF
Grand total 30,033 SF 61,000 SF 3,508 SF
NOTE:
QUANTITIES WITHIN THIS SCHEDULE ARE PROVIDED FOR GENERAL SCOPE
DEFINITION AND SHALL NOT BE SOLELY RELIED UPON FOR BIDDING PURPOSES. ALL
SQUARE FOOTAGES ARE TO BE VERIFIED BY THE CONTRACTOR PRIOR TO BID.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL QUANTITIES.
FD
G E N E R A L N O T E S
A. MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. MATCH ELEVATION
WHERE TYING INTO EXISTING.
B. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S CONSTRUCTION
ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS INSTALLED SHALL SERVE THE SAME
FUNCTION AS EXISTING MATERIALS AND WILL BE COMPATIBLE WITH EXISTING ROOF SYSTEM.
C. SEE ELECTRICAL DRAWINGS FOR EXTENT OF LIGHTNING PROTECTION WORK.
D. SEE ASBESTOS ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.
E. CONTRACTOR SHALL VERIFY EXTENT OF UNUSED CURBS IN PROJECT AT AREAS OF ROOF REPLACEMENT. ALL
UNUSED CURBS SHALL BE REMOVED INFILL AT OPENING WITH METAL DECKING OVER STEEL FRAMING.
F. EXISTING ROOF DRAINS SHALL REMAIN UNLESS NOTED OTHERWISE.
G. ALL EXISTING WALKPADS SHALL BE REMOVED AT LOCATIONS OF REPLACEMENT OR RESTORATION. EXISTING
WALKPADS SHOWN ARE REPRESENTATIONAL ONLY - CONTRACTOR SHALL BE RESPONSIBLE TO QUANTIFY
AMOUNT OF WALKPADS TO BE REMOVED PRIOR TO BID.
H. ALL ROOFS ARE CONCRETE DECK UNLESS NOTED OTHERWISE - SEE DRAWING NOTES FOR VARIATION.
I. ALL ROOFS ARE SLOPING STRUCTURE UNLESS NOTED OTHERWISE - SEE DRAWING NOTES FOR VARIATION.
J. REPLACE MISSING, BROKEN OR PLASTIC DRAIN BASKETS AND BROKEN CLAMP RINGS ON EXISTING ROOF DRAINS.
K. CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING."
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT
INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF
OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM."
L. ALTERNATE #1 INCLUDES ONLY RESTORATION SCOPE. ALTERNATE #2 AND #3 INCLUDES BOTH RESTORATION
SCOPE AND ROOF WALKPADS. ALL OTHER WORK IN THESE AREAS, INCLUDING REPLACEMENT SCOPE, SHALL
REMAIN IN PROJECT.
M. PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL
BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
RESTORATION SCOPE
REPLACEMENT SCOPE
L E G E N D
NOTES:
a. CONTRACTOR IS RESPONSIBLE FOR AND SHALL VERIFY ALL QUANTITIES.
b. 'RESTORATION' CONSISTS OF APPLICATION OF WET VACUUMING AND A FLUID APPLIED REHABILITATION SYSTEM -
SEE SPECIFICATIONS AND DETAILS.
c. 'REPLACEMENT' CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION OF SBS MODIFIED BITUMEN OVER COVERBOARD AND RIGID INSULATION - SEE SPECIFICATIONS AND DETAILS.
d. REMEDIATE SINGLE PLY MEMBRANE ON CONCRETE PAD
BOTH RESTORATION AND REPLACEMENT SCOPE
#2
2ND FL ROOF
EL 751' +/-
B
1-AE501
Sim
B
1-AE501
Sim
F
1-AE501
Sim
B
1-AE501
Sim
TYP.
#6
4TH FL ROOF
EL 786' +/-
#5
4TH FL ROOF
EL 786' +/-
F
1-AE501
Sim
F
1-AE501
Sim
F
1-AE501
Sim
F
1-AE501
Sim
F
1-AE501
Sim
TYP. 4
TYP.
#1
3RD FL ROOF
EL 766' +/-
#2
2ND FL ROOF
EL 751' +/-
F
1-AE501
Sim
F
1-AE501
Sim
F
1-AE501
Sim
F
1-AE501
Sim
F
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
B
1-AE501
Sim
B
1-AE501
Sim
F
1-AE501
Sim
TYP.
L
1-AE501
Sim
L
1-AE501
Sim
L
1-AE501
Sim
TYP.
TYP.
B
1-AE501
Sim
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
R e p la c e
R o o f_
B n a te
.m o u ld s .r v t
/1
/2
:3
:4
P
M
1-AE131
ENLARGED ROOF PLANS
Veteran's Affairs Medical Center
02/11/2022 PQ NM
REPLACE ROOF
BUILDING ONE
539-21-113
CINCINNATI, OHIO
BID DOCUMENTS
Cincinnati VA
Medical Center
D R A W I N G N O T E S
1 NEW CONTINUOUS FRP GRATED WALKWAY SYSTEM AT EXISTING LOCATION.
2 EXISTING PENETRATION TO REMAIN - SEE DETAILS FOR FLASHING CONDITIONS.
3 EXISTING ROOF LADDER TO REMAIN. REMOVE LOOSE RUST AND PAINT, MAKE SMOOTH AND APPLY RUST
INHIBITOR COATING.
4 EXISTING PIPING AND SUPPORTS TO REMAIN.
5 EXISTING ROOF DRAIN TO REMAIN.
6 EXISTING ROOF IS METAL DECK.
7 EXISTING EXPANSION JOINT TO REMAIN.
8 EXISTING STRUCTURE DOES NOT SLOPE - ALL SLOPE WILL BE WITH TAPERED INSULATION.
ROOF 1
ROOF 2
ROOF 5
ROOF 6
N Scale: 1/8" = 1'-0"
ROOF 2 PLAN
N Scale: 1/8" = 1'-0"
ROOF 5 & 6 PLAN
N Scale: 1/8" = 1'-0"
ROOF 1 PLAN
D R A W I N G N O T E S
ALTERNATE #2 - REFER TO GENERAL NOTE 'L' ALTERNATE #1 - REFER TO GENERAL
NOTE 'L'
#3A
3RD FL ROOF
EL 766' +/-
#3
3RD FL ROOF
EL 766' +/-
#3C
3RD FL ROOF
EL 765' +/-
#3B
2ND FL ROOF
EL 756' +/-
#26
9TH FL ROOF
EL 835' +/-
#45
7TH FL ROOF
EL 809' +/-
#44
8TH FL ROOF
EL 821' +/-
W
1-AE502
Sim
W
1-AE502
Sim
W
1-AE502
Sim
J
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
J
1-AE501
Sim
F
1-AE501
Sim F
1-AE501
Sim
W
1-AE502
Sim
F
1-AE501
Sim
J
1-AE501
Sim
W
1-AE502
Sim
TYP.
TYP.
H
1-AE501
Sim
J
1-AE501
Sim
TYP.
F
1-AE501
Sim
#3B
2ND FL ROOF
EL 756' +/-
Q
1-AE502
Sim
Q
1-AE502
Sim
A
1-AE501
Sim
A
1-AE501
Sim
TYP.
K
1-AE501
Sim
#4
4TH FL ROOF
EL 770' +/-
A
1-AE501
Sim
I
1-AE501
Sim
E
1-AE501
Sim
A
1-AE501
Sim
I
1-AE501
Sim
TYP.
#5
4TH FL ROOF
EL 786' +/- #4A
1ST FL ROOF
EL 742' +/-
#4B
1ST FL ROOF
EL 742' +/-
A
1-AE501
Sim
S
1-AE502
Sim
C
1-AE501
Sim
A
1-AE501
Sim
A
1-AE501
Sim
I
1-AE501
Sim
A
1-AE501
Sim
TYP.
H
1-AE501
Sim
V
1-AE502
Sim
I
1-AE501
Sim
TYP.
#4C
2ND FL ROOF
EL 753' +/-
S
1-AE502
Sim
I
1-AE501
Sim
A
1-AE501
Sim
I
1-AE501
Sim
101111
G E N E R A L N O T E S
A. MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. MATCH ELEVATION
WHERE TYING INTO EXISTING.
B. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S CONSTRUCTION
ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS INSTALLED SHALL SERVE THE SAME
FUNCTION AS EXISTING MATERIALS AND WILL BE COMPATIBLE WITH EXISTING ROOF SYSTEM.
C. SEE ELECTRICAL DRAWINGS FOR EXTENT OF LIGHTNING PROTECTION WORK.
D. SEE ASBESTOS ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.
E. CONTRACTOR SHALL VERIFY EXTENT OF UNUSED CURBS IN PROJECT AT AREAS OF ROOF REPLACEMENT. ALL
UNUSED CURBS SHALL BE REMOVED INFILL AT OPENING WITH METAL DECKING OVER STEEL FRAMING.
F. EXISTING ROOF DRAINS SHALL REMAIN UNLESS NOTED OTHERWISE.
G. ALL EXISTING WALKPADS SHALL BE REMOVED AT LOCATIONS OF REPLACEMENT OR RESTORATION. EXISTING
WALKPADS SHOWN ARE REPRESENTATIONAL ONLY - CONTRACTOR SHALL BE RESPONSIBLE TO QUANTIFY
AMOUNT OF WALKPADS TO BE REMOVED PRIOR TO BID.
H. ALL ROOFS ARE CONCRETE DECK UNLESS NOTED OTHERWISE - SEE DRAWING NOTES FOR VARIATION.
I. ALL ROOFS ARE SLOPING STRUCTURE UNLESS NOTED OTHERWISE - SEE DRAWING NOTES FOR VARIATION.
J. REPLACE MISSING, BROKEN OR PLASTIC DRAIN BASKETS AND BROKEN CLAMP RINGS ON EXISTING ROOF DRAINS.
K. CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING."
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT
INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF
OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM."
L. ALTERNATE #1 INCLUDES ONLY RESTORATION SCOPE. ALTERNATE #2 AND #3 INCLUDES BOTH RESTORATION
SCOPE AND ROOF WALKPADS. ALL OTHER WORK IN THESE AREAS, INCLUDING REPLACEMENT SCOPE, SHALL
REMAIN IN PROJECT.
M. PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL
BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
RESTORATION SCOPE
REPLACEMENT SCOPE
L E G E N D
NOTES:
a. CONTRACTOR IS RESPONSIBLE FOR AND SHALL VERIFY ALL QUANTITIES.
b. 'RESTORATION' CONSISTS OF APPLICATION OF WET VACUUMING AND A FLUID APPLIED REHABILITATION SYSTEM -
SEE SPECIFICATIONS AND DETAILS.
c. 'REPLACEMENT' CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION OF SBS MODIFIED BITUMEN OVER COVERBOARD AND RIGID INSULATION - SEE SPECIFICATIONS AND DETAILS.
d. REMEDIATE SINGLE PLY MEMBRANE ON CONCRETE PAD
BOTH RESTORATION AND REPLACEMENT SCOPE
N Scale: 1/8" = 1'-0"
ROOF 3, 3A & 3C PLAN
N Scale: 1/8" = 1'-0"
ROOF 3B PLAN
N Scale: 1/8" = 1'-0"
ROOF 4 PLAN
N Scale: 1/8" = 1'-0"
ROOF 4A & 4B PLAN
N
Scale: 1/8" = 1'-0"
ROOF 4C PLAN
D R A W I N G N O T E S
1 EXISTING ROOF SCUPPER TO REMAIN.
2 EXISTING ROOF LADDER TO REMAIN. REMOVE LOOSE RUST AND PAINT, MAKE SMOOTH AND APPLY RUST
INHIBITOR COATING.
3 NEW CONTINUOUS FRP GRATED WALKWAY SYSTEM AT EXISTING LOCATION.
4 EXISTING PENETRATION TO REMAIN - SEE DETAILS FOR FLASHING CONDITIONS.
5 PROVIDE SPLASH PAD FOR DOWNSPOUT.
6 EXISTING PIPING AND SUPPORTS TO REMAIN.
7 EXISTING ROOF DRAIN TO REMAIN.
8 EXISTING ROOF IS METAL DECK.
9 EXISTING EXPANSION JOINT TO REMAIN.
10 RIDGE OR VALLEY LINE OF NEW ROOF SLOPE - CONTRACTOR SHALL SUBMIT PROPOSED INSULATION LAYOUTS
WITH SHOP DRAWING REVIEW.
11 EXISTING STRUCTURE DOES NOT SLOPE - ALL SLOPE WILL BE WITH TAPERED INSULATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
R e p la c e
R o o f_
B n a te
.m o u ld s .r v t
/1
/2
:3
:5
P
M
1-AE132
ENLARGED ROOF PLANS
Veteran's Affairs Medical Center
02/11/2022 NM PQ
REPLACE ROOF
BUILDING ONE
539-21-113
CINCINNATI, OHIO
BID DOCUMENTS
Cincinnati VA
Medical Center
ROOF 4C
ROOF 4B
ROOF 3C
ROOF 3B
ROOF 4A
ROOF 4
ROOF 3A
ROOF 3
D R A W I N G N O T E S
ALTERNATE #3 - REFER TO GENERAL NOTE 'L'
#8
1ST FL ROOF
EL 743' +/-
#7
3RD FL ROOF
EL 762' +/-
#6
4TH FL ROOF
EL 786' +/-
#9
3RD FL ROOF
EL 762' +/-
#8A
3RD FL ROOF
EL 770' +/-
TYP.
F
1-AE501
Sim
F
1-AE501
Sim
B
1-AE501
Sim
F
1-AE501
Sim
B
1-AE501
Sim
A
1-AE501
Sim
E
1-AE501
Sim
E
1-AE501
Sim
E
1-AE501
Sim
E
1-AE501
Sim
G
1-AE501
Sim
G
1-AE501
Sim
TYP.
TYP.
G E N E R A L N O T E S
A. MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. MATCH ELEVATION
WHERE TYING INTO EXISTING.
B. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS INSTALLED SHALL SERVE THE SAME
FUNCTION AS EXISTING MATERIALS AND WILL BE COMPATIBLE WITH EXISTING ROOF SYSTEM.
C. SEE ELECTRICAL DRAWINGS FOR EXTENT OF LIGHTNING PROTECTION WORK.
D. SEE ASBESTOS ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.
E. CONTRACTOR SHALL VERIFY EXTENT OF UNUSED CURBS IN PROJECT AT AREAS OF ROOF REPLACEMENT. ALL UNUSED CURBS SHALL BE REMOVED INFILL AT OPENING WITH METAL DECKING OVER STEEL FRAMING.
F. EXISTING ROOF DRAINS SHALL REMAIN UNLESS NOTED OTHERWISE.
G. ALL EXISTING WALKPADS SHALL BE REMOVED AT LOCATIONS OF REPLACEMENT OR RESTORATION. EXISTING WALKPADS SHOWN ARE REPRESENTATIONAL ONLY - CONTRACTOR SHALL BE RESPONSIBLE TO QUANTIFY
AMOUNT OF WALKPADS TO BE REMOVED PRIOR TO BID.
H. ALL ROOFS ARE CONCRETE DECK UNLESS NOTED OTHERWISE - SEE DRAWING NOTES FOR VARIATION.
I. ALL ROOFS ARE SLOPING STRUCTURE UNLESS NOTED OTHERWISE - SEE DRAWING NOTES FOR VARIATION.
J. REPLACE MISSING, BROKEN OR PLASTIC DRAIN BASKETS AND BROKEN CLAMP RINGS ON EXISTING ROOF DRAINS.
K. CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING."
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM."
L. ALTERNATE #1 INCLUDES ONLY RESTORATION SCOPE. ALTERNATE #2 AND #3 INCLUDES BOTH RESTORATION SCOPE AND ROOF WALKPADS. ALL OTHER WORK IN THESE AREAS, INCLUDING REPLACEMENT SCOPE, SHALL
REMAIN IN PROJECT.
M. PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
RESTORATION SCOPE
REPLACEMENT SCOPE
L E G E N D
NOTES:
a. CONTRACTOR IS RESPONSIBLE FOR AND SHALL VERIFY ALL QUANTITIES.
b. 'RESTORATION' CONSISTS OF APPLICATION OF WET VACUUMING AND A FLUID APPLIED REHABILITATION SYSTEM -
SEE SPECIFICATIONS AND DETAILS.
c. 'REPLACEMENT' CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION OF SBS MODIFIED BITUMEN OVER COVERBOARD AND RIGID INSULATION - SEE SPECIFICATIONS AND DETAILS.
d. REMEDIATE SINGLE PLY MEMBRANE ON CONCRETE PAD
BOTH RESTORATION AND REPLACEMENT SCOPE
#8
1ST FL ROOF
EL 743' +/-
B
1-AE501
Sim
B
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
TYP.
TYP.
#13 1ST FL ROOF
EL 728' +/-
I
1-AE501
Sim
I
1-AE501
Sim
I
1-AE501
Sim
A
1-AE501
Sim
TYP.
#13A 2ND FL ROOF
EL 740' +/-
1 A
1-AE501
Sim
C
1-AE501
Sim
C
1-AE501
Sim
I
1-AE501
Sim
TYP.
#14 2ND FL ROOF
EL 762' +/-
D
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
I
1-AE501
Sim
C
1-AE501
Sim
K
1-AE501
Sim
TYP.
TYP.
TYP.
#15A
2ND FLOOR
EL 740' +/-
E
1-AE501
Sim
E
1-AE501
Sim
E
1-AE501
Sim
E
1-AE501
Sim
TYP.
TYP.
#15A
2ND FLOOR
EL 740' +/-
#15
1ST FL ROOF
EL 728' +/-
I
1-AE501
Sim
I
1-AE501
Sim A
1-AE501
Sim
A
1-AE501
Sim
E
1-AE501
Sim E
1-AE501
Sim
A
1-AE501
Sim
I
1-AE501
Sim
TYP.
#46 1ST FL ROOF
EL 739' +/-
S
1-AE502
Sim
S
1-AE502
Sim
A
1-AE501
Sim
S
1-AE502
Sim
TYP.
TYP.
N Scale: 1/8" = 1'-0"
ROOF 7 & 8A, 9 PLAN
D R A W I N G N O T E S
1 EXISTING ROOF LADDER TO REMAIN. REMOVE LOOSE RUST AND PAINT, MAKE SMOOTH AND APPLY RUST
INHIBITOR COATING.
2 NEW CONTINUOUS FRP GRATED WALKWAY SYSTEM AT EXISTING LOCATION.
3 EXISTING PENETRATION TO REMAIN - SEE DETAILS FOR FLASHING CONDITIONS.
4 EXISTING SURFACE-WEIGHTED SYSTEM (CMU AND STEEL-FRAMING) - RELOCATE AROUND RESTORATION AND REPLACEMENT WORK AND RETURN TO ITS ORIGINAL LOCATION AT THE CONCLUSION OF THE WORK IN THIS AREA.
5 PROVIDE SPLASH PAD FOR DOWNSPOUT.
6 EXISTING ROOF DRAIN TO REMAIN.
7 EXISTING PIPING AND SUPPORTS TO REMAIN.
8 EXISTING EXPANSION JOINT TO REMAIN.
9 ALL WORK ON THIS ROOF SECTION SHALL BE DONE DURING WEEKENDS.
10 REPLACE MISSING, BROKEN OR PLASTIC DRAIN BASKETS AND OR BROKEN CLAMP RING
11 EXISTING ROOF IS METAL DECK.
12 RIDGE OR VALLEY LINE OF NEW ROOF SLOPE - CONTRACTOR SHALL SUBMIT PROPOSED INSULATION LAYOUTS
WITH SHOP DRAWING REVIEW.
13 EXISTING STRUCTURE DOES NOT SLOPE - ALL SLOPE WILL BE WITH TAPERED INSULATION.
N Scale: 1/8" = 1'-0"
ROOF 8
N Scale: 1/8" = 1'-0"
ROOF 13 PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
R e p la c e
R o o f_
B n a te
.m o u ld s .r v t
/1
/2
:3
:0
P
M
1-AE133
ENLARGED ROOF PLANS
Veteran's Affairs Medical Center
02/11/2022 PQ NM
REPLACE ROOF
BUILDING ONE
539-21-113
CINCINNATI, OHIO
BID DOCUMENTS
Cincinnati VA
Medical Center
N Scale: 1/8" = 1'-0"
ROOF 13A PLAN
N Scale: 1/8" = 1'-0"
ROOF 14 PLANN
Scale: 1/8" = 1'-0"
ROOF 15A PLAN
N Scale: 1/8" = 1'-0"
ROOF 15 PLAN
N Scale: 1/8" = 1'-0"
ROOF 46 PLAN
ROOF 15
ROOF 46
ROOF 13
ROOF 13A
ROOF 8A
ROOF 8
ROOF 9
ROOF 7
ROOF 14
ROOF 15A
TYP.
D R A W I N G N O T E S
G E N E R A L N O T E S
A. MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. MATCH ELEVATION
WHERE TYING INTO EXISTING.
B. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S CONSTRUCTION
ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS INSTALLED SHALL SERVE THE SAME
FUNCTION AS EXISTING MATERIALS AND WILL BE COMPATIBLE WITH EXISTING ROOF SYSTEM.
C. SEE ELECTRICAL DRAWINGS FOR EXTENT OF LIGHTNING PROTECTION WORK.
D. SEE ASBESTOS ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.
E. CONTRACTOR SHALL VERIFY EXTENT OF UNUSED CURBS IN PROJECT AT AREAS OF ROOF REPLACEMENT. ALL
UNUSED CURBS SHALL BE REMOVED INFILL AT OPENING WITH METAL DECKING OVER STEEL FRAMING.
F. EXISTING ROOF DRAINS SHALL REMAIN UNLESS NOTED OTHERWISE.
G. ALL EXISTING WALKPADS SHALL BE REMOVED AT LOCATIONS OF REPLACEMENT OR RESTORATION. EXISTING
WALKPADS SHOWN ARE REPRESENTATIONAL ONLY - CONTRACTOR SHALL BE RESPONSIBLE TO QUANTIFY
AMOUNT OF WALKPADS TO BE REMOVED PRIOR TO BID.
H. ALL ROOFS ARE CONCRETE DECK UNLESS NOTED OTHERWISE - SEE DRAWING NOTES FOR VARIATION.
I. ALL ROOFS ARE SLOPING STRUCTURE UNLESS NOTED OTHERWISE - SEE DRAWING NOTES FOR VARIATION.
J. REPLACE MISSING, BROKEN OR PLASTIC DRAIN BASKETS AND BROKEN CLAMP RINGS ON EXISTING ROOF DRAINS.
K. CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING."
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT
INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF
OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM."
L. ALTERNATE #1 INCLUDES ONLY RESTORATION SCOPE. ALTERNATE #2 AND #3 INCLUDES BOTH RESTORATION
SCOPE AND ROOF WALKPADS. ALL OTHER WORK IN THESE AREAS, INCLUDING REPLACEMENT SCOPE, SHALL
REMAIN IN PROJECT.
M. PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL
BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
RESTORATION SCOPE
REPLACEMENT SCOPE
L E G E N D
NOTES:
a. CONTRACTOR IS RESPONSIBLE FOR AND SHALL VERIFY ALL QUANTITIES.
b. 'RESTORATION' CONSISTS OF APPLICATION OF WET VACUUMING AND A FLUID APPLIED REHABILITATION SYSTEM -
SEE SPECIFICATIONS AND DETAILS.
c. 'REPLACEMENT' CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION OF SBS MODIFIED BITUMEN OVER COVERBOARD AND RIGID INSULATION - SEE SPECIFICATIONS AND DETAILS.
d. REMEDIATE SINGLE PLY MEMBRANE ON CONCRETE PAD
BOTH RESTORATION AND REPLACEMENT SCOPE
#12
3RD FL ROOF
EL 762' +/-
#10
3RD FL ROOF
EL 762' +/-
#11
3RD FL ROOF
EL 762' +/-
#17
3RD FL ROOF
EL 762' +/-
TYP.
B
1-AE501
Sim
F
1-AE501
Sim
B
1-AE501
Sim
J
1-AE501
Sim
I
1-AE501
Sim
F
1-AE501
Sim
TYP.
H
1-AE501
Sim
L
1-AE501
Sim
TYP.
F
1-AE501
Sim
F
1-AE501
Sim
H
1-AE501
Sim
J
1-AE501
Sim
G
1-AE501
Sim
TYP.
TYP.
TYP.
TYP. TYP.
TYP.
TYP.
TYP.
TYP.
TYP. TYP.
TYP.
TYP.
TYP.
J
1-AE501
Sim
A
1-AE501
Sim G
1-AE501
Sim B
1-AE501
Sim
#16 7TH FL ROOF
EL 809' +/-
B
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
TYP.
#19
8TH FL ROOF
EL 821' +/-
D
1-AE501
Sim
J
1-AE501
Sim
B
1-AE501
Sim
D
1-AE501
Sim
TYP.
#45
7TH FL ROOF
EL 809' +/-
#45
7TH FL ROOF
EL 809' +/-
B
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
D R A W I N G N O T E S
1 EXISTING ROOF LADDER TO REMAIN. REMOVE LOOSE RUST AND PAINT, MAKE SMOOTH AND APPLY RUST
INHIBITOR COATING.
2 NEW CONTINUOUS FRP GRATED WALKWAY SYSTEM AT EXISTING LOCATION.
3 EXISTING PENETRATION TO REMAIN - SEE DETAILS FOR FLASHING CONDITIONS.
4 EXISTING PIPING AND SUPPORTS TO REMAIN.
5 EXISTING ROOF DRAIN TO REMAIN.
6 EXISTING ROOF IS METAL DECK.
7 EXISTING ROOF SCUPPER TO REMAIN.
8 ALL WORK ON THIS ROOF SECTION SHALL BE DONE DURING WEEKENDS.
N Scale: 1/8" = 1'-0"
ROOF 10, 11, 12 & 17 PLAN
N Scale: 1/8" = 1'-0"
ROOF 16 PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
R e p la c e
R o o f_
B n a te
.m o u ld s .r v t
/1
/2
:3
:1
P
M
1-AE134
ENLARGED ROOF PLANS
Veteran's Affairs Medical Center
02/11/2022 PQ NM
REPLACE ROOF
BUILDING ONE
539-21-113
CINCINNATI, OHIO
BID DOCUMENTS
Cincinnati VA
Medical Center
N Scale: 1/8" = 1'-0"
ROOF 19 PLAN
N Scale: 1/8" = 1'-0"
ROOF 45 PLAN
ROOF 19
ROOF 16
ROOF 12
ROOF 17
ROOF 10
ROOF 45
ROOF 11
D R A W I N G N O T E S
A. MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. MATCH ELEVATION
WHERE TYING INTO EXISTING.
B. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS INSTALLED SHALL SERVE THE SAME
FUNCTION AS EXISTING MATERIALS AND WILL BE COMPATIBLE WITH EXISTING ROOF SYSTEM.
C. SEE ELECTRICAL DRAWINGS FOR EXTENT OF LIGHTNING PROTECTION WORK.
D. SEE ASBESTOS ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.
E. CONTRACTOR SHALL VERIFY EXTENT OF UNUSED CURBS IN PROJECT AT AREAS OF ROOF REPLACEMENT. ALL UNUSED CURBS SHALL BE REMOVED INFILL AT OPENING WITH METAL DECKING OVER STEEL FRAMING.
F. EXISTING ROOF DRAINS SHALL REMAIN UNLESS NOTED OTHERWISE.
G. ALL EXISTING WALKPADS SHALL BE REMOVED AT LOCATIONS OF REPLACEMENT OR RESTORATION. EXISTING WALKPADS SHOWN ARE REPRESENTATIONAL ONLY - CONTRACTOR SHALL BE RESPONSIBLE TO QUANTIFY
AMOUNT OF WALKPADS TO BE REMOVED PRIOR TO BID.
H. ALL ROOFS ARE CONCRETE DECK UNLESS NOTED OTHERWISE - SEE DRAWING NOTES FOR VARIATION.
I. ALL ROOFS ARE SLOPING STRUCTURE UNLESS NOTED OTHERWISE - SEE DRAWING NOTES FOR VARIATION.
J. REPLACE MISSING, BROKEN OR PLASTIC DRAIN BASKETS AND BROKEN CLAMP RINGS ON EXISTING ROOF DRAINS.
K. CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING."
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM."
L. ALTERNATE #1 INCLUDES ONLY RESTORATION SCOPE. ALTERNATE #2 AND #3 INCLUDES BOTH RESTORATION SCOPE AND ROOF WALKPADS. ALL OTHER WORK IN THESE AREAS, INCLUDING REPLACEMENT SCOPE, SHALL
REMAIN IN PROJECT.
M. PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
RESTORATION SCOPE
REPLACEMENT SCOPE
L E G E N D
NOTES:
a. CONTRACTOR IS RESPONSIBLE FOR AND SHALL VERIFY ALL QUANTITIES.
b. 'RESTORATION' CONSISTS OF APPLICATION OF WET VACUUMING AND A FLUID APPLIED REHABILITATION SYSTEM -
SEE SPECIFICATIONS AND DETAILS.
c. 'REPLACEMENT' CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION OF SBS MODIFIED BITUMEN OVER COVERBOARD AND RIGID INSULATION - SEE SPECIFICATIONS AND DETAILS.
d. REMEDIATE SINGLE PLY MEMBRANE ON CONCRETE PAD
BOTH RESTORATION AND REPLACEMENT SCOPE
#18
ELEV ROOF
EL 857' +/-
F
1-AE501
Sim
F
1-AE501
Sim
F
1-AE501
Sim
F
1-AE501
Sim
AHU 1
#20 7TH FL ROOF
EL 809' +/-
C
1-AE501
Sim
A
1-AE501
Sim
C
1-AE501
SimC
1-AE501
Sim
TYP.
TYP.
K
1-AE501
Sim
TYP. 11
12 1313
#21
8TH FL ROOF
EL 821' +/-
C
1-AE501
Sim
A
1-AE501
Sim
C
1-AE501
Sim
C
1-AE501
Sim
TYP.
K
1-AE501
Sim
TYP.
#23
9TH FL ROOF
EL 832' +/-
#22
9TH FL ROOF
EL 832' +/-
C
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
A
1-AE501
Sim
A
1-AE501
Sim
G
1-AE501
Sim
TYP.
TYP.
11 TYP.
B
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
TYP.
9 9
D R A W I N G N O T E S
1 EXISTING ROOF LADDER TO REMAIN. REMOVE LOOSE RUST AND PAINT, MAKE SMOOTH AND APPLY RUST
INHIBITOR COATING.
2 EXISTING ROOF SCUPPER TO REMAIN.
3 PROVIDE SPLASH PAD FOR DOWNSPOUT.
4 EXISTING LIGHTING PROTECTION TOWER SUPPORT ANCHOR TO REMAIN.
5 EXISTING PENETRATION TO REMAIN - SEE DETAILS FOR FLASHING CONDITIONS.
6 NEW CONTINUOUS FRP GRATED WALKWAY SYSTEM AT EXISTING LOCATION.
7 EXISTING SURFACE-WEIGHTED SYSTEM (CMU AND STEEL-FRAMING) - RELOCATE AROUND RESTORATION AND REPLACEMENT WORK AND RETURN TO ITS ORIGINAL LOCATION AT THE CONCLUSION OF THE WORK IN THIS AREA.
8 EXISTING PIPING AND SUPPORTS TO REMAIN.
9 EXISTING ROOF DRAIN TO REMAIN.
10 EXISTING EQUIPMENT SUPPORT FOR FUTURE AIR HANDLER TO REMAIN - SEE FLASHING DETAILS. RESTORE
SINGLE PLY MEMBRANE
11 REPLACE MISSING, BROKEN OR PLASTIC DRAIN BASKETS AND OR BROKEN CLAMP RING
12 ALL WORK ON THIS ROOF SECTION SHALL BE DONE DURING WEEKENDS.
13 EXISTING STRUCTURE DOES NOT SLOPE - ALL SLOPE WILL BE WITH TAPERED INSULATION.
14 RIDGE OR VALLEY LINE OF NEW ROOF SLOPE - CONTRACTOR SHALL SUBMIT PROPOSED INSULATION LAYOUTS
WITH SHOP DRAWING REVIEW.
N Scale: 1/8" = 1'-0"
ROOF 18 PLAN
N Scale: 1/8" = 1'-0"
ROOF 20 PLAN
N Scale: 1/8" = 1'-0"
ROOF 21 PLAN
N Scale: 1/8" = 1'-0"
ROOF 22 & 23 PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
R e p la c e
R o o f_
B n a te
.m o u ld s .r v t
/1
/2
:3
:1
P
M
1-AE135
ENLARGED ROOF PLANS
Veteran's Affairs Medical Center
02/11/2022 NM PQ
REPLACE ROOF
BUILDING ONE
539-21-113
CINCINNATI, OHIO
BID DOCUMENTS
Cincinnati VA
Medical Center
N Scale: 1/8" = 1'-0"
ROOF 25 PLAN
ROOF 22
ROOF 20
ROOF 25
ROOF 21
ROOF 23
ROOF 18
D R A W I N G N O T E S
A. MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. MATCH ELEVATION
WHERE TYING INTO EXISTING.
B. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S CONSTRUCTION
ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS INSTALLED SHALL SERVE THE SAME
FUNCTION AS EXISTING MATERIALS AND WILL BE COMPATIBLE WITH EXISTING ROOF SYSTEM.
C. SEE ELECTRICAL DRAWINGS FOR EXTENT OF LIGHTNING PROTECTION WORK.
D. SEE ASBESTOS ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.
E. CONTRACTOR SHALL VERIFY EXTENT OF UNUSED CURBS IN PROJECT AT AREAS OF ROOF REPLACEMENT. ALL
UNUSED CURBS SHALL BE REMOVED INFILL AT OPENING WITH METAL DECKING OVER STEEL FRAMING.
F. EXISTING ROOF DRAINS SHALL REMAIN UNLESS NOTED OTHERWISE.
G. ALL EXISTING WALKPADS SHALL BE REMOVED AT LOCATIONS OF REPLACEMENT OR RESTORATION. EXISTING
WALKPADS SHOWN ARE REPRESENTATIONAL ONLY - CONTRACTOR SHALL BE RESPONSIBLE TO QUANTIFY
AMOUNT OF WALKPADS TO BE REMOVED PRIOR TO BID.
H. ALL ROOFS ARE CONCRETE DECK UNLESS NOTED OTHERWISE - SEE DRAWING NOTES FOR VARIATION.
I. ALL ROOFS ARE SLOPING STRUCTURE UNLESS NOTED OTHERWISE - SEE DRAWING NOTES FOR VARIATION.
J. REPLACE MISSING, BROKEN OR PLASTIC DRAIN BASKETS AND BROKEN CLAMP RINGS ON EXISTING ROOF DRAINS.
K. CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING."
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT
INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF
OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM."
L. ALTERNATE #1 INCLUDES ONLY RESTORATION SCOPE. ALTERNATE #2 AND #3 INCLUDES BOTH RESTORATION
SCOPE AND ROOF WALKPADS. ALL OTHER WORK IN THESE AREAS, INCLUDING REPLACEMENT SCOPE, SHALL
REMAIN IN PROJECT.
M. PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL
BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
RESTORATION SCOPE
REPLACEMENT SCOPE
L E G E N D
NOTES:
a. CONTRACTOR IS RESPONSIBLE FOR AND SHALL VERIFY ALL QUANTITIES.
b. 'RESTORATION' CONSISTS OF APPLICATION OF WET VACUUMING AND A FLUID APPLIED REHABILITATION SYSTEM -
SEE SPECIFICATIONS AND DETAILS.
c. 'REPLACEMENT' CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION OF SBS MODIFIED BITUMEN OVER COVERBOARD AND RIGID INSULATION - SEE SPECIFICATIONS AND DETAILS.
d. REMEDIATE SINGLE PLY MEMBRANE ON CONCRETE PAD
BOTH RESTORATION AND REPLACEMENT SCOPE
AHU 13
AHU 14
AHU 2AHU 3
2 2
#26
9TH FL ROOF
EL 835' +/-
TYP.#26
9TH FL ROOF
EL 835' +/-
TYP.
A
1-AE501
Sim
A
1-AE501
Sim
A
1-AE501
Sim
C
1-AE501
Sim
C
1-AE501
Sim C
1-AE501
Sim
G
1-AE501
Sim
C
1-AE501
Sim
C
1-AE501
Sim
4K
1-AE501
Sim K
1-AE501
Sim
K
1-AE501
Sim
AHU PAD
AHU PAD
TYP.
TYP.
9 K
1-AE501
Sim
AHU 8
#40
8TH FL ROOF
EL 821' +/-
TYP.
B
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
TYP.
H
1-AE501
Sim H
1-AE501
Sim
L
1-AE501
Sim
TYP.
AHU 7
#43
8TH FL ROOF
EL 821' +/-
A
1-AE501
Sim
C
1-AE501
Sim C
1-AE501
Sim
C
1-AE501
Sim
TYP.
K
1-AE501
Sim
TYP.
1 1
#44
9TH FL ROOF
EL 835' +/-
D
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
TYP.
D R A W I N G N O T E S
1 EXISTING ROOF SCUPPER TO REMAIN.
2 EXISTING ROOF LADDER TO REMAIN. REMOVE LOOSE RUST AND PAINT, MAKE SMOOTH AND APPLY RUST
INHIBITOR COATING.
3 EXISTING PENETRATION TO REMAIN - SEE DETAILS FOR FLASHING CONDITIONS.
4 NEW CONTINUOUS FRP GRATED WALKWAY SYSTEM AT EXISTING LOCATION.
5 EXISTING LIGHTING PROTECTION TOWER SUPPORT ANCHOR TO REMAIN.
6 EXISTING ROOF DRAIN TO REMAIN.
7 EXISTING PIPING AND SUPPORTS TO REMAIN.
8 ALL WORK ON THIS ROOF SECTION SHALL BE DONE DURING WEEKENDS.
9 EXISTING EQUIPMENT SUPPORT FOR FUTURE AIR HANDLER TO REMAIN - SEE FLASHING DETAILS. RESTORE
SINGLE PLY MEMBRANE
10 EXISTING ROOF IS METAL DECK.
11 EXISTING PARAPET MOUNTED GUARDRAIL TO REMAIN.
N Scale: 1/8" = 1'-0"
ROOF 26 PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
R e p la c e
R o o f_
B n a te
.m o u ld s .r v t
/1
/2
:3
:2
P
M
1-AE136
ENLARGED ROOF PLANS
Veteran's Affairs Medical Center
02/11/2022 PQ NM
REPLACE ROOF
BUILDING ONE
539-21-113
CINCINNATI, OHIO
BID DOCUMENTS
Cincinnati VA
Medical Center
N Scale: 1/8" = 1'-0"
ROOF 40 PLAN
N
Scale: 1/8" = 1'-0"
ROOF 43 PLAN
ROOF 40
ROOF 26
ROOF 43
N Scale: 1/8" = 1'-0"
ROOF 44 PLAN
ROOF 44
D R A W I N G N O T E S
A. MAINTAIN AVERAGE R-VALUE OF R-33, MINIMUM, AND 2.5" MINIMUM AT TAPERED INSULATION. MATCH ELEVATION
WHERE TYING INTO EXISTING.
B. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS INSTALLED SHALL SERVE THE SAME
FUNCTION AS EXISTING MATERIALS AND WILL BE COMPATIBLE WITH EXISTING ROOF SYSTEM.
C. SEE ELECTRICAL DRAWINGS FOR EXTENT OF LIGHTNING PROTECTION WORK.
D. SEE ASBESTOS ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.
E. CONTRACTOR SHALL VERIFY EXTENT OF UNUSED CURBS IN PROJECT AT AREAS OF ROOF REPLACEMENT. ALL UNUSED CURBS SHALL BE REMOVED INFILL AT OPENING WITH METAL DECKING OVER STEEL FRAMING.
F. EXISTING ROOF DRAINS SHALL REMAIN UNLESS NOTED OTHERWISE.
G. ALL EXISTING WALKPADS SHALL BE REMOVED AT LOCATIONS OF REPLACEMENT OR RESTORATION. EXISTING WALKPADS SHOWN ARE REPRESENTATIONAL ONLY - CONTRACTOR SHALL BE RESPONSIBLE TO QUANTIFY
AMOUNT OF WALKPADS TO BE REMOVED PRIOR TO BID.
H. ALL ROOFS ARE CONCRETE DECK UNLESS NOTED OTHERWISE - SEE DRAWING NOTES FOR VARIATION.
I. ALL ROOFS ARE SLOPING STRUCTURE UNLESS NOTED OTHERWISE - SEE DRAWING NOTES FOR VARIATION.
J. REPLACE MISSING, BROKEN OR PLASTIC DRAIN BASKETS AND BROKEN CLAMP RINGS ON EXISTING ROOF DRAINS.
K. CONTRACTOR SHALL USE CHARCOAL FILTRATION ON ALL AIR INTAKES TO MASK ODORS INTO THE BUILDING."
PROVIDE CARBON ACTIVATED FILTER MEDIA ROLLS OR BLANKETS TO COVER THE ENTIRE AIR HANDLING UNIT INTAKE. BLANKET OR ROLL SHALL BE A MINIMUM OF 3/8 INCH THICK AND CONTAIN A MINIMUM OF 90 GRAMS/SF OF GRANULAR ACTIVATED CARBON WITH AN INITIAL RESISTANCE OF 0.35 IN. WC. AT 150 FPM."
L. ALTERNATE #1 INCLUDES ONLY RESTORATION SCOPE. ALTERNATE #2 AND #3 INCLUDES BOTH RESTORATION SCOPE AND ROOF WALKPADS. ALL OTHER WORK IN THESE AREAS, INCLUDING REPLACEMENT SCOPE, SHALL
REMAIN IN PROJECT.
M. PERMANENT FALL PROTECTION IS NOT INCLUDED IN THIS CONTRACT. ALL PERMANENT FALL PROTECTION WILL BE ADDRESSED IN A SEPARATE VA PROJECT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MEETING OSHA
REGULATIONS FOR JOB-SITE SAFETY DURING THE CONSTRUCTION PROJECT.
RESTORATION SCOPE
REPLACEMENT SCOPE
L E G E N D
NOTES:
a. CONTRACTOR IS RESPONSIBLE FOR AND SHALL VERIFY ALL QUANTITIES.
b. 'RESTORATION' CONSISTS OF APPLICATION OF WET VACUUMING AND A FLUID APPLIED REHABILITATION SYSTEM -
SEE SPECIFICATIONS AND DETAILS.
c. 'REPLACEMENT' CONSISTS OF REMOVAL OF EXISTING ROOFING SYSTEM DOWN TO THE DECK AND INSTALLATION OF SBS MODIFIED BITUMEN OVER COVERBOARD AND RIGID INSULATION - SEE SPECIFICATIONS AND DETAILS.
d. REMEDIATE SINGLE PLY MEMBRANE ON CONCRETE PAD
BOTH RESTORATION AND REPLACEMENT SCOPE
#28A
5TH FL ROOF
EL 787' +/-
E
1-AE501
Sim
A
1-AE501
Sim
E
1-AE501
Sim
E
1-AE501
Sim
Q
1-AE502
Sim
TYP.
A
1-AE501
Sim
#32 2ND FLOOR
ROOF
EL 751' +/-
#33 3RD FLOOR
ROOF
EL 762' +/-
B
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
B
1-AE501
Sim
TYP.
R
1-AE502
Sim
R
1-AE502
Sim
#33 3RD FLOOR
ROOF
EL 762' +/-
D
1-AE501
Sim
B
1-AE501
Sim
D
1-AE501
Sim
R
1-AE502
Sim D
1-AE501
Sim
#34 5TH FLOOR
ROOF
EL 787' +/-
#35 5TH FLOOR
ROOF
EL 788' +/-
F
1-AE501
Sim
F
1-AE501
Sim
F
1-AE501
Sim
C
1-AE501
Sim
C
1-AE501
Sim
C
1-AE501
Sim
C
1-AE501
Sim
TYP.
TYP.G
1-AE501
Sim
TYP.
#39
7TH FL ROOF
EL 809' +/-
#38
7TH FL ROOF
EL 809' +/-
B
1-AE501
Sim
H
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
D
1-AE501
Sim
TYP.
AHU 14
#37
2ND FLOOR ROOF
EL 740' +/-
N.I.C.
#36 1ST FLOOR ROOF
EL 728' +/-
B
1-AE501
Sim
S
1-AE502
Sim
S
1-AE502
Sim
C
1-AE501
Sim
T
1-AE502
Sim B
1-AE501
Sim
A
1-AE501
Sim
A
1-AE501
Sim
A
1-AE501
Sim
TYP.
TYP.
#28
4TH FL ROOF
EL 778' +/-
#28A
5TH FL ROOF
EL 787' +/-
A
1-AE501
Sim
C
1-AE501
Sim
C
1-AE501
Sim
Q
1-AE502
Sim
Q
1-AE502
Sim
Q
1-AE502
Sim
TYP.
TYP.
A
1-AE501
Sim
#28B
5TH FL ROOF
EL 787' +/-
E
1-AE501
Sim
E
1-AE501
Sim
A
1-AE501
Sim
A
1-AE501
Sim
D R A W I N G N O T E S
1 EXISTING ROOF LADDER TO REMAIN. REMOVE LOOSE RUST AND PAINT, MAKE SMOOTH AND APPLY RUST
INHIBITOR COATING.
2 EXISTING SURFACE-WEIGHTED SYSTEM (CMU AND STEEL-FRAMING) - RELOCATE AROUND RESTORATION AND REPLACEMENT WORK AND RETURN TO ITS ORIGINAL LOCATION AT THE CONCLUSION OF THE WORK IN THIS AREA.
3 PROVIDE SPLASH PAD FOR DOWNSPOUT.
4 NEW CONTINUOUS FRP GRATED WALKWAY SYSTEM AT EXISTING LOCATION.
5 EXISTING PENETRATION TO REMAIN - SEE DETAILS FOR FLASHING CONDITIONS.
6 EXISTING ROOF SCUPPER TO REMAIN.
7 EXISTING SKYLIGHT TO REMAIN.
8 EXISTING ROOF DRAIN TO REMAIN.
9 EXISTING ROOF IS METAL DECK.
10 EXISTING PIPING AND SUPPORTS TO REMAIN.
11 EXISTING EXPANSION JOINT TO REMAIN.
12 REPLACE MISSING, BROKEN OR PLASTIC DRAIN BASKETS AND OR BROKEN CLAMP RING
13 EXISTING GUTTER AND DOWNSPOUT TO REMAIN.
14 EXISTING STRUCTURE DOES NOT SLOPE - ALL SLOPE WILL BE WITH TAPERED INSULATION.
N Scale: 1/8" = 1'-0"
ROOF 28A PLAN
N Scale: 1/8" = 1'-0"
ROOF 32 PLAN
N Scale: 1/8" = 1'-0"
ROOF 33 PLAN
N Scale: 1/8" = 1'-0"
ROOF 34 & 35 PLAN
N Scale: 1/8" = 1'-0"
ROOF 38 & 39 PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN
C U s e rs
\n a te m \O n e
D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
R e p la c e
R o o f_
B n a te
.m o u ld s .r v t
/1
/2
:3
:3
P
M
1-AE137
ENLARGED ROOF PLANS
Veteran's Affairs Medical Center
02/11/2022 PQ NM
REPLACE ROOF
BUILDING ONE
539-21-113
CINCINNATI, OHIO
BID DOCUMENTS
Cincinnati VA
Medical Center
N Scale: 1/8" = 1'-0"
ROOF 36 PLAN
N Scale: 1/8" = 1'-0"
ROOF 28 PLAN
ROOF 32
ROOF 39
ROOF 38
ROOF 28
ROOF 33
ROOF 28A
ROOF 34
ROOF 36
D R A W I N G N O T E S
N Scale: 1/8" = 1'-0"
ROOF 28B PLAN
EXISTING CONCRETE ROOF DECK TO REMAIN
EXISTING CONCRETE CANT TO REMAIN
CUT AND REPLACE EXISTING STAINLESS
STEEL FLASHING TO PROVIDE FLASHING
SBS MODIFIED BITUMEN ROOFING MEMBRANE
1/4" GYPSUM COVERBOARD
ISOCYANURATE INSULATION
VAPOR RETARDER
TERMINATION BAR - CONTINOUS SEALANT AT TOP AND BOTTOM
COUNTER FLASHING
FLASHING
EXISTING CONCRETE ROOF DECK TO REMAIN
EXISTING CONCRETE CANT TO REMAIN
EXISTING INSULATION TO REMAIN
FLUID APPLIED REHABILITATION SYSTEM
OVER EXISTING MODIFIED
CUT FLASHING TO RECIEVE FLUID APPLIED
SYSTEM - NEW COUNTER FLASHING BIB
EXISTING CONCRETE ROOF DECK TO REMAIN
SBS MODIFIED BITUMEN ROOFING MEMBRANE
STAINLESS STEEL BIB FLASHING
EXISTING STAINLESS STEEL OR LIMESTONE COPING TO REMAIN
1/4" GYPSUM COVERBOARD
ISOCYANURATE INSULATION
CANT
VAPOR RETARDER
FLASHING
COUNTER FLASHING
EXISTING PARAPET, CANT AND STRUCTURE
TO REMAIN.
EXISTING INSULATION TO REMAIN.
FLUID APPLIED REHABILITATION SYSTEM OVER
EXISTING MODIFIED
STAINLESS STEEL FLASHING
EXISTING COPING TO REMAIN
EXISTING CONCRETE ROOF
DECK TO REMAIN.
SBS MODIFIED BITUMEN ROOFING MEMBRANE
STAINLESS STEEL FLASHING
1/4" GYPSUM COVERBOARD
ISOCYANURATE INSULATION
VAPOR RETARDER
EXISTING CONCRETE ROOF DECK
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .