528A7-23-103_4Dec2025 DRAWINGS.pdf
PDF 5 MB Posted
- Attached to
- Z1DA--Project # 528A7-23-103 REPLACE SCI Steam Coils Federal contract opportunity
- Solicitation number
- 36C24226B0028
About this file
These documents are detailed design and engineering drawings for a federal contract to replace steam coils at the Syracuse VA Medical Center. The project, numbered 528A7-23-103, involves removing existing steam-powered systems and replacing them with glycol-based heating systems across multiple floors, including mechanical rooms on the 5th and 10th floors. Key scope of work includes:
The project requires removing existing medium pressure steam supply and return piping, steam coils, and condensate pumps, and installing new hot water heating (HWH) piping, pumps, heat exchangers, and glycol makeup systems. Electrical work involves installing new panels, circuits, and variable frequency drives (VFDs) to support the mechanical system upgrades. The work must be coordinated carefully with VA medical center operations, with shutdowns scheduled to minimize disruption and ensure continuous heating capabilities, particularly during colder months between October and May.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.pdf | ||
| SPECIFICATIONS 528A7-23-103.pdf | ||
| Wage Determination - Onondaga County.pdf | ||
| Buy American Certificate.pdf | ||
| 36C24226B0028_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWINGS INDEX
SHEET NO. DRAWING TITLE
GENERAL
1. GI-001 COVER SHEET
MECHANICAL
2. MG-001 MECHANICAL ABBREVIATIONS, SYMBOLS & NOTES
3. MD-101 MECHANICAL DEMOLITION PARTIAL PLAN - SOUTH
4. M-101 MECHANICAL NEW WORK PARTIAL PLAN - SOUTH
5. M-102 MECHANICAL NEW WORK PARTIAL PLAN - NORTH
6. M-103 MECHANICAL PLANS & DETAILS - 10TH FLOOR
7. MG-501 MECHANICAL DETAILS
8. MG-601 MECHANICAL SCHEDULES
9. MI-701 CONTROLS DIAGRAMS
ELECTRICAL
10. EG-001 ELECTRICAL ABBREVIATIONS, SYMBOLS & NOTES
11. EP-101 ELECTRICAL NEW WORK PARTIAL PLAN - 5TH FLOOR SCI
12. EP-102 ELECTRICAL NEW WORK PARTIAL PLAN - 10TH FLOOR
13. EG-501 ELECTRICAL PANEL SCHEDULES - 5TH FLOOR SCI & 10TH FLOOR
DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 528A7-23-103
VA MEDICAL CENTER
BUILDING NO. 1
800 IRVING AVENUE
SYRACUSE, NEW YORK 13210
SYRACUSE VAMC
REPLACE SCI STEAM COILS
AREA OF WORK:
5TH FLOOR SCI &
C-WING SHAFT 3
MECHANICAL
ROOMS
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
10/15/2025
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-103REPLACE SCI STEAM COILS
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
\52
8A 7-
-1
R ep lac e S
CI
S tea m Co ils \D es ign
C on tra ct\
Dr aw ing s\C
AD
\08
_M ec ha nic al\
8A 7-
-1
_A ll.d wg
1301 OF
GI-001
JDMA
COVER SHEET
N
KEY PLAN
SCALE: NONE2
N
SHAFT 1 SHAFT 2
SHAFT 3
SHAFT 4
SCI
SHAFT 5
CHILLER BLDG
BLDG 2
BLDG 19 - GARAGE
D-WING
A-WING B-WING
C-WING
AREA OF
WORK:
10TH FLOOR
MECHANICAL
ROOM
LOCATION PLAN
SCALE: NONE1
BLDG 16
1- REVISION TO NOTE 3-MG-601 12-4-2025
2- REVISION TO DETAIL 7/MG-501 12-4-2025
GENERAL PIPING SYMBOLS
@ AT
℄ CENTERLINE
° DEGREES
Δ DELTA
ɸ ELECTRICAL PHASE
∅ ROUND / DIAMETER
A/E ARCHITECT / ENGINEER
AAV AUTOMATIC AIR VENT
AD ACCESS DOOR
AF AFTER FILTER
AFF ABOVE FINISHED FLOOR
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
AS AIR SEPERATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
AW AIR WASHER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CO CLEAN OUT
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONDENSATE PUMP
CPT CONDENSATE PUMPED TRAP
CR CEILING REGISTER
CRAC COMPUTER ROOM AIR CONDITIONING
UNIT
CU CONDENSING UNIT
CW COLD WATER (POTABLE)
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO
COOLING TOWER)
CWS CONDENSER WATER SUPPLY
(FROM COOLING TOWER)
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
DB DECIBELS
Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DOM DOMESTIC
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DSS DUCTLESS SPLIT-SYSTEM (EVAPORATOR)
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EH EXHAUST HOOD
EJ EXPANSION JOINT
ENT ENTERING
ER EXHAUST REGISTER
(ER) EXISTING TO REMAIN
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
EXIST EXISTING
(E) EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FLOOR REGISTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLON(S)
GF/CI GOVERNMENT FURNISHED/CONTRACTOR
INSTALLED
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GRR GLYCOL-WATER RUN AROUND RETURN
GRS GLYCOL-WATER RUN AROUND SUPPLY
GS GALVANIZED STEEL
H HUMIDIFIER
H&CW HOT & COLD WATER
HC HEATING COIL
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HORSEPOWER
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IRH INFRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
J (INTENTIONALLY LEFT BLANK)
KPA KILOPASCAL
KW KILOWATT
L/S LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN
(CLEAN)
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MD MOTORIZED DAMPER
MIN MINIMUM
MM MILLIMETER
MOD MOTOR OPERATED DAMPER
MOV MOTOR OPERATED VALVE
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
(N) NEW
NA NOT APPLICABLE
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PG PRESSURE GAGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSV PRESSURE SAFETY VALVE
REL RELOCATE / RELOCATED
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RCP RADIANT CEILING PANEL
REA RELIEF AIR
RF RETURN FAN
RG RETURN AIR GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATOR DEVICE
SAT SUPPLY AIR TEMPERATURE
SCFM STANDARD CUBIC FEET PER MINUTE
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
ST STEAM TRAP
SVS STEAM VENT SILENCER
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TYP TYPICAL
UC or U/C UNDER CUT
UL UNDERWRITERS LABORATORY
V VALVE
VAMC SYRACUSE VA MEDICAL CENTER
VAV VARIABLE AIR VOLUME
VB VACUUM BREAKER
VD VOLUME DAMPER (MANUAL OPPOSED
BLADE)
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
W WATTS
WB WET-BULB (TEMPERATURE)
WC WATER COOLED
WCACU WATER-COOLED COMP RM A/C
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOW METER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WHA WATER HAMMER ARRESTOR
GENERAL NOTES AND CONDITIONS
1. THESE DRAWINGS WERE PREPARED FROM INFORMATION TAKEN FROM THE AVAILABLE
BUILDING DRAWINGS, ARCHITECTURAL BACKGROUNDS PROVIDED AND FIELD SURVEY
INFORMATION COMPILED BY THE VA ENGINEERING DESIGN TEAM FOR THE PURPOSE OF
ENGINEERING DESIGN. EXISTING CONDITIONS ARE SHOWN AS ACCURATELY AS
POSSIBLE. THERE IS THE POSSIBILITY THAT CONDITIONS SHOWN ARE NOT EXACTLY AS
EXISTING. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, LOCATIONS,
SIZES AND CONDITIONS AT THE SITE AND REPORT ANY DISCREPANCIES TO THE
ENGINEER PRIOR TO BEGINNING INSTALLATION OR FABRICATION WORK.
1.1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW THE PLANS AND
SPECIFICATIONS, AS WELL AS ALL RELATED PROJECT PLANS AND SPECIFICATIONS
FROM OTHER DISCIPLINES, TO BECOME FAMILIAR WITH THE FULL PROJECT SCOPE
AND COORDINATED RESPONSIBILITIES.
1.2. SHOULD IT APPEAR THAT THE WORK INTENDED TO BE DESCRIBED OR RELATED
WORK ARE NOT SUFFICIENTLY DETAILED OR EXPLAINED ON THE DRAWINGS, OR IN
THE SPECIFICATIONS, CONSULT THE COR FOR NECESSARY CLARIFICATIONS, AND
CONFORM TO THOSE CLARIFICATIONS INSOFAR AS THEY ARE CONSISTENT WITH
THE ORIGINAL DRAWINGS AND SPECIFICATIONS. IN NO CASE SHALL WORK
PROCEED IN UNCERTAINTY.
1.3. EQUIPMENT ARRANGEMENTS ARE DESIGNED TO SHOW PREFERRED
CONFIGURATIONS TO SUIT KNOWN CONDITIONS. ACTUAL INSTALLATION BY
CONTRACTOR MAY BE ALTERED AS REQUIRED TO SUIT FIELD CONDITIONS
ENCOUNTERED DURING CONSTRUCTION WITHOUT COMPROMISING THE INTENT OF
THE ORIGINAL DESIGN. COORDINATE ANY MODIFICATIONS WITH THE COR PRIOR
TO STARTING WORK IN AREAS AFFECTED.
1.4. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS
AT SITE PRIOR TO STARTING WORK.
1.5. DO NOT SCALE DRAWINGS.
2. THE CONTRACTOR WILL BE RESPONSIBLE FOR ENSURING THAT ALL RULES AND
REGULATIONS, INCLUDING THOSE WHICH MAY BE ISSUED BY THE OWNER, ARE BEING
OBSERVED, PARTICULARLY WORKPLACE SAFETY AND THE CONDUCT OF ALL THOSE
EMPLOYED DIRECTLY AND INDIRECTLY ON THE PREMISES, AND THE OWNER'S
EMPLOYEES WHO MAY BE IMPACTED OR AFFECTED BY CONSTRUCTION ACTIVITIES. THE
CONTRACTOR WILL INSTALL SIGNAGE, BARRIERS, AND OTHER MEANS TO PROVIDE
WARNING AND PERSONNEL SAFETY. PLACEMENT OF THESE ITEMS WILL BE
COORDINATED WITH THE OWNER AND HIS ONGOING OPERATIONS AND WILL PROMPTLY
BE REVISED WHEN WORK IN A PARTICULAR AREA HAS BEEN COMPLETED.
2.1. DURING PERFORMANCE OF WORK, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVISION AND MAINTENANCE OF WARNING SIGNS, LIGHT SIGNAL DEVICES,
GUARD LIGHTS, BARRICADES, GUARD RAILS, FENCES AND OTHER DEVICES,
APPROPRIATELY LOCATED ON AND AROUND THE JOB SITE WHICH GIVE PROPER
AND UNDERSTANDABLE WARNING TO PERSONS WITH REGARD TO HAZARDOUS
CONDITIONS, EQUIPMENT AND OPERATIONS BEING PERFORMED IN CONJUNCTION
WITH THE WORK.
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH OTHER TRADES FOR
ITEMS IN THEIR SCOPE OF WORK WHICH COULD REQUIRE ADDITIONAL
MECHANICAL/PLUMBING WORK, AND ITEMS THAT ARE NOT INDICATED ON THE
DRAWINGS.
4. THIS INSTALLATION WILL CONFORM TO ALL CODES AND THE REQUIREMENTS OF
FEDERAL, STATE, AND LOCAL REGULATORY AGENCIES HAVING JURISDICTION. IN
PARTICULAR, THE WORK WILL BE IN ACCORDANCE WITH THE CURRENT ADOPTED
EDITION OF THE NEW YORK STATE UNIFORM FIRE PROTECTION AND BUILDING CODE
AND ALL OF ITS APPLICABLE SUBCODES AND AMENDMENTS.
5. ALL WORK WILL BE LAWFULLY EXECUTED IN A NEAT AND WORKMANLIKE MANNER AND
WILL BE COMPLETED IN ACCORDANCE WITH THE GOVERNING CODES (ABOVE),
INDUSTRY STANDARDS, AND IN CONFORMANCE WITH THE MANUFACTURERS
RECOMMENDATIONS AND REQUIREMENTS.
6. WORK UNDER THIS CONTRACT SHALL CONSIST OF THE CONTRACTOR PROVIDING ALL
LABOR, MATERIALS, AND SERVICES, INCLUDING WORK NOT SPECIFICALLY SHOWN BUT
REASONABLY IMPLIED. THIS SHALL INCLUDE CUTTING, PATCHING AND RESTORATION OF
EXISTING SURFACES DAMAGED DURING THE CONSTRUCTION. CONTRACTOR SHALL
ALSO PROVIDE ALL EQUIPMENT SHOWN OR SPECIFIED OR AN APPROVED EQUIVALENT.
SUBSTITUTED EQUIPMENT OR MATERIALS SHALL NOT BE INSTALLED UNTIL GIVEN
WRITTEN APPROVAL BY THE OWNER.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR COSTS INCURRED FOR NONCOMPLIANCE
WITH THESE CONTRACT DOCUMENTS. CONTRACTOR WILL NOT BE ALLOWED CHANGE
ORDERS FOR PROBLEMS ARISING FROM NEGLECT OF PROVISIONS INCLUDED IN THESE
CONDITIONS.
8. MAINTAIN ORDERLY HOUSEKEEPING DURING CONSTRUCTION, AND UPON SUBSTANTIAL
COMPLETION PERFORM FINAL CLEANUP. REMOVE CONSTRUCTION RUBBISH,
SCAFFOLDING, EQUIPMENT, TEMPORARY PROTECTION, TEMPORARY FIELD
STRUCTURES, AND OTHER MATERIALS OR EQUIPMENT THAT WAS REQUIRED IN
CONNECTION WITH THE CONSTRUCTION, BUT NOT A PERMANENT PART THEREOF.
9. THOSE PERFORMING WORK AS A CONTRACTOR MUST EXAMINE SUBSTRATES AND
CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED AND NOTIFY THE
CONTRACTOR IN WRITING, OF CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY
COMPLETION OF THE WORK. COMMENCEMENT OF WORK BY A TRADE ON A SURFACE OR
CONSTRUCTION SHALL IMPLY ACCEPTANCE OF SUCH SURFACE OR CONSTRUCTION. DO
NOT PROCEED WITH INSTALLATION UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN
CORRECTED.
10. THE CONTRACTOR SHALL SECURE ALL PERMITS AND APPLICATIONS AND PAY ANY AND
ALL FEES AS REQUIRED. THE CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES AND
CERTIFICATES OF INSPECTION REQUIRED BY THE AUTHORITIES HAVING JURISDICTION.
DELIVER ALL PERMITS, CERTIFICATES AND APPROVALS TO THE OWNER AGENT PRIOR
TO FINAL ACCEPTANCE OF THE WORK. THE CONTRACTOR MUST FILE NECESSARY
DRAWINGS, PREPARE DOCUMENTS AND MAKE APPLICATIONS FOR EACH REQUIRED
PERMIT AND INSPECTION, PRIOR TO COMMENCING WORK TO AVOID DELAYS DURING
CONSTRUCTION.
11. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND MANUFACTURERS DATA SHEETS ON
ALL EQUIPMENT AND MATERIALS SPECIFIED ON DRAWINGS FOR APPROVAL BY OWNER.
THESE DRAWINGS OR SHEETS SHALL CONTAIN ALL NECESSARY DATA, I.E.,
MANUFACTURER, CATALOG NUMBER, SIZE, DIMENSIONS, CAPACITY, WIRING DETAILS
AND ALL OTHER ENGINEERING DATA AND DETAILS NECESSARY FOR COMPLETE CLARITY
AND INSTALLATION.
12. THE CONTRACTOR SHALL KEEP ONE SET OF THE LATEST ISSUE OF DRAWINGS WHICH
SHALL REFLECT THE ACTUAL INSTALLED CONDITIONS AND CONNECTIONS OF ALL
EQUIPMENT AND DEVICES. THE CONTRACTOR SHALL PROVIDE COPIES OF ALL
MAINTENANCE INFORMATION AND INSTRUCTIONS RECEIVED WITH EQUIPMENT AND
SYSTEMS. ALL "AS-BUILT" DRAWINGS AND MISCELLANEOUS INFORMATION SHALL BE
GIVEN TO THE OWNER AND ENGINEER AT COMPLETION OF WORK. THE CONTRACTOR
SHALL GUARANTEE ALL MATERIAL AND LABOR TO BE FREE FROM DEFECTS FOR A ONE
YEAR PERIOD FROM THE TIME OF OWNER ACCEPTANCE. ANY DEFECTS OCCURRING
DURING THIS PERIOD SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL
COST TO THE OWNER.
13. AS DIRECTED BY THE OWNER, ALL EXISTING EQUIPMENT AND MATERIAL IN USABLE
CONDITION THAT IS REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER, OR
HANDLED AS INSTRUCTED BY THE OWNER, BE DISPOSED OF BY THE CONTRACTOR. ALL
MATERIALS DEEMED FOR REMOVAL SHALL BE RECYCLED WHENEVER POSSIBLE, IN
ACCORDANCE WITH THE REQUIREMENTS SET FORTH WITHIN SPECIFICATION SECTION 01
74 19 (CONSTRUCTION WASTE MANAGEMENT).
14. CONTRACTOR IS TO PROVIDE ALL REQUIRED SCAFFOLDING, LADDERS, RIGGING,
HOISTING AND ALL OTHER EQUIPMENT REQUIRED FOR THE INSTALLATION OF THEIR
WORK.
15. ESTABLISH PASSAGE CLEARANCES REQUIRED TO DELIVER, INSTALL AND ERECT ALL
REQUIRE EQUIPMENT. IF STRUCTURES, EQUIPMENT AND SYSTEMS MUST BE ALTERED
TO PROVIDE PASSAGE OF EQUIPMENT, THE CONTRACTOR SHALL RESTORE
STRUCTURES, EQUIPMENT AND SYSTEMS TO THEIR ORIGINAL CONDITION AT THE
CONTRACTOR'S EXPENSE; INCLUDING REMOVING AND REPLACEMENT OF ALL CEILING
AS REQUIRED TO COMPLETE THE WORK.
HVAC NOTES AND CONDITIONS
1. ALL HVAC EQUIPMENT SHALL MEET THE REQUIREMENTS SET FORTH IN THE
ANSI/ASHRAE/IESNA STANDARD 90.1 ENTITLED "ENERGY STANDARDS FOR BUILDINGS
EXCEPT LOW-RISE RESIDENTIAL BUILDINGS".
2. ALL METALLIC DUCTWORK SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE
WITH SMACNA STANDARD "HVAC DUCT CONSTRUCTION STANDARDS-METAL AND
FLEXIBLE" AND NFPA STANDARD 90A TITLED "INSTALLATION OF AIR CONDITIONING AND
VENTILATION SYSTEMS". ALL DUCTWORK SHALL BE DESIGNED AND CONSTRUCTED IN
ACCORDANCE WITH SMACNA 2 IN WG PRESSURE CLASS, SEAL CLASS A, UNLESS
OTHERWISE NOTED.
3. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR
DIMENSIONS. CONTRACTOR SHALL INCREASE THE DUCT SIZE ACCORDINGLY TO
COMPENSATE FOR ACOUSTICAL DUCT LINING THICKNESS (UNLESS OTHERWISE NOTED).
CONTRACTOR MAY ADJUST DUCT SIZES ACCORDINGLY TO SUIT FIELD CONDITIONS AS
LONG AS THE DUCT FREE AREA AND STATIC PRESSURE DROP ARE EQUAL TO THE
PROJECT DOCUMENTS.
4. CONTRACTOR SHALL PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION,
ADJUSTMENT AND MAINTENANCE OF ALL FANS, VALVES, COILS AND MECHANICAL
EQUIPMENT.
5. ADEQUATELY SIZED ACCESS PANELS SHOULD BE PROVIDED ON BOTH SIDES OF THE
SMOKE DETECTORS, FIRE DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, HUMIDIFIERS,
COILS AND OTHER DEVICES LOCATED IN THE DUCTWORK WHICH REQUIRE INSPECTION
AND/OR MAINTENANCE.
6. CONTRACTOR SHALL PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCT WORK SYSTEMS
(SUPPLY, RETURN, VENTILATION AIR AND EXHAUST) CONNECTED TO ALL AIR HANDLING
UNITS, FANS AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION. FLEXIBLE
CONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE EQUIPMENT
(UNLESS NOTED OTHERWISE).
7. ALL AIR HANDLING SYSTEMS SHALL BE DESIGNED AND INSTALLED WITH BALANCE
DAMPERS LOCATED IN THE MAIN SUPPLY, EXHAUST AND OUTSIDE AIR DUCTS FOR
PROPER BALANCING OF EACH SYSTEM, AND FOR EACH SUPPLY, RETURN, OR EXHAUST
GRILLE, UNLESS OTHERWISE NOTED.
8. DUCTWORK WILL INCLUDE ALL DUCTS, FITTINGS, TURNING VANES, DAMPERS, SUPPORTS,
AND ALL ACCESSORIES, SUBASSEMBLIES, AND PARTS INCORPORATED THEREIN OR
REQUIRED FOR THE INSTALLATION AND COMPLETION OF SYSTEMS. ALL SUPPLY,
RETURN, AND EXHAUST DUCT BRANCHES SHALL BE DESIGNED AND INSTALLED WITH
BALANCE DAMPERS.
9. UNLESS NOTED OTHERWISE, DUCTWORK SHALL BE CONSTRUCTED TO 2" WG LEAKAGE
CLASS AND SEAL CLASS SHALL BE CLASS A IN ACCORDANCE WITH THE STANDARDS
DESCRIBED IN SMACNA "DUCT CONNECTION STANDARDS METAL AND FLEXIBLE" AND
"SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL".
10. SMOOTH TURN RADIUS DUCTWORK OR TURNING VANES AND 45 DEGREE ENTRY OR
CONICAL DUCT BRANCH CONNECTIONS SHALL BE USED THROUGHOUT.
11. ALL DAMPER SHAFTING, RODS AND LINKAGE WILL HAVE CORROSION RESISTANT FINISH.
ALL VOLUME DAMPERS WILL MOVE FREELY THROUGH FULL TRAVEL WITHOUT BINDINGS
AFTER INSTALLATION OF INSULATION.
12. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN
DUCTS, INCLUDING DIVING DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE
PROVIDED AT NO ADDITIONAL COST.
13. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL
REFLECTED CEILING PLANS, LIGHTING AND OTHER CEILING ITEMS AND MAKE MINOR DUCT
MODIFICATIONS TO SUIT.
14. INSTALL NEW THERMOSTATS FOR ALL NEW AND EXISTING ZONES UNLESS OTHERWISE
INDICATED.
15. CONTRACTOR SHALL PROPERLY SUPPORT & BRACE ALL DUCTWORK IN ACCORDANCE
WITH SMACNA STANDARDS FROM BUILDING STRUCTURE ONLY. DUCTWORK SUPPORT
MATERIALS, UNLESS OTHERWISE INDICATED, SUPPORTS, FASTENERS, ANCHORS,
STRAPS, TRIM AND ANGLES WILL GENERALLY BE THE SAME MATERIAL AS THE
DUCTWORK, HOT DIPPED GALVANIZED.
16. DUCT HANGERS, SUPPORTS AND METHODS OF INSTALLATION WILL CONFORM TO
SMACNA STANDARDS AND THE MANUFACTURERS' INSTALLATION REQUIREMENTS WHERE
NOT OTHERWISE SPECIFIED, INDICATED OR REQUIRED.
17. ALL INTERIOR AND EXTERIOR WALL, CEILING AND ROOF OPENINGS AND DUCT AND PIPE
THROUGH WALL PENETRATIONS, FRAMING, SLEEVES, WEATHERPROOFING AND FIRE
SEALING SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED
OTHERWISE.
18. CONTRACTOR SHALL PROVIDE AND INSTALL ALL FIRE DAMPERS IN ACCORDANCE WITH UL
555 AND MANUFACTURER'S REQUIREMENTS WHERE DUCTS PENETRATE FIRE RATED
WALLS OR FLOORS. ALL FIRE DAMPERS SHALL BE UL LISTED AND LABELED CONSISTENT
WITH THE WALLS OR FLOORS THAT ARE PENETRATED. PROVIDE ACCESS DOORS SIZED
AND LOCATED TO FACILITATE TESTING AND RESETTING OF ALL FIRE DAMPERS.
19. INSULATE PER SPECIFICATION SECTION 23 07 11.
20. THE NEW DUCT SYSTEM IS TO BE CLEANED THOROUGHLY OF ALL DEBRIS BEFORE
INSTALLING INLET/OUTLET DEVICES.
21. CONTRACTOR SHALL TEST ADJUST & BALANCE THE COMPLETED SYSTEM. ALL
BALANCING WORK SHALL BE DONE UNDER THE DIRECT SUPERVISION OF AN AABC OR
NEBB-QUALIFIED SUPERVISOR WHO SHALL CERTIFY THE RESULTS.
22. TEST, ADJUST AND BALANCE WORK WILL DEMONSTRATE THAT ALL SYSTEMS OPERATE AS
THEY WERE INTENDED TO. UPON COMPLETION OF THE WORK A WRITTEN TEST AND
BALANCE REPORT WILL BE SUBMITTED TO THE OWNER. FORMS AND PROCEDURES
UTILIZED FOR THIS WORK WILL BE AS PROPOSED BY THE AABC OR OTHER NATIONALLY
RECOGNIZED ORGANIZATION ACCEPTABLE TO THE OWNER.
23. ALL DUCTWORK,PIPING AND EQUIPMENT SHOWN ON NEW WORK PLANS AND DETAILS
SHALL BE CONSIDERED AS NEW UNLESS IDENTIFIED AS EXISTING TO REMAIN.
24. ALL DUCTWORK WITHOUT EXCEPTION, AND ALL PIPING 0" AND LARGER SHALL BE SHOWN
IN DOUBLE LINE.
25. ALL DUCT TO BE CONSTRUCTED TO SMACNA HVAC DUCT CONSTRUCTION STANDARDS,
METAL AND FLEXIBLE DUCT, THIRD EDITION - 2005.
26. ALL DUCTS SHALL BE SEALED PER SMACNA CLASS A REQUIREMENTS. ALL TRAVERSE
JOINTS, LONGITUDINAL SEAMS AND DUCT WALL PENETRATIONS SHALL BE SEALED.
27. ALL BRACING AND HANGING OF DUCTWORK SHALL BE PER SMACNA CHAPTER #5.
PIPING NOTES
1. ALL PIPING MATERIALS AND COMPONENTS INCLUDING FITTINGS, PIPE, FLANGES,
VALVES, ETC. SHALL BE DESIGNED, FABRICATED AND INSTALLED PER
APPROPRIATE SECTIONS OF THE LATEST ANSI AND ASTM CODES AND STANDARDS
AND THE MATERIAL SPECIFICATIONS FOUND IN THE PROJECT DOCUMENTS.
2. CONTRACTOR TO INSTALL HIGH POINT VENTS AT ALL SYSTEM HIGH POINTS AND
LOW POINT DRAINS AT SYSTEM LOW POINTS. VENTS AND DRAINS ARE REQUIRED
TO FACILITATE SYSTEM DRAINING AND VENTING DURING TESTING AND START-UP.
3. SURFACES TO BE SOLDERED SHALL BE CLEANED BRIGHT. THE JOINTS SHALL BE
PROPERLY FLUXED AND MADE WITH APPROVED SOLDER. SOLDER JOINTS FOR
POTABLE WATER SHALL BE MADE WITH A SOLDER CONTAINING NOT MORE THAN
0.2 PERCENT LEAD.
4. UNIONS SHALL BE INSTALLED AT ALL EQUIPMENT. THE USE OF DIELECTRIC
UNIONS MUST BE INSTALLED IN AREAS WHERE JOINING OF DISSIMILAR METALS (ie
CARBON STEEL TO COPPER OR BRONZE, ETC.). THIS IS TO FACILITATE PIPING
REMOVAL AND REASSEMBLY FOR FUTURE MAINTENANCE WORK AND/OR PREVENT
GALVANIC CORROSION.
5. CONTRACTOR SHALL PROPERLY BRACE, ANCHOR, AND SUPPORT ALL PIPING,
VALVES ETC. UNLESS SHOWN OTHERWISE, ALL PIPE HANGERS AND SUPPORTS
SHALL BE DESIGNED, MANUFACTURED AND INSTALLED PER MSS SP-58, MSS SP-69
AND MSS SP-89.
6. ALL ABOVEGROUND PIPING SHALL BE INSULATED AND JACKETED AS NOTED IN THE
SPECIFICATIONS.
7. ALL PIPES THAT PASS THROUGH EXTERIOR WALLS SHALL BE SLEEVED AND MADE
WEATHER TIGHT.
8. ALL PIPING AND VALVES MUST BE PROPERLY IDENTIFIED AND LABELED PER ANSI
13.1, ENTITLED "SCHEME FOR THE IDENTIFICATION OF PIPING SYSTEMS". ALL
VALVES MUST BE IDENTIFIED AND TAGGED WITH WEATHERPROOF TAGS.
9. ALL PIPES OR TUBING WHICH PASS THROUGH RATED AND NON-RATED WALLS,
FLOORS AND FOUNDATION WALLS, SHALL PASS THROUGH A SCHEDULE 40
CARBON STEEL PIPE SLEEVE. SLEEVES WHICH PASS THROUGH MASONRY SHALL
BE GALVANIZED COATED. ALL SLEEVES SHALL BE INSTALLED FLUSH ON BOTH
SIDES OF WALL PENETRATION.
NON-RATED WALL: THE SLEEVE SHALL BE SIZED TO ALLOW FREE PASSAGE OF
INSULATED AND NON-INSULATED PIPES AND TUBING.
RATED WALL: PIPES WHICH PASS THROUGH FIRE-RATED WALLS & FLOOR SHALL
USE THE APPROPRIATE CODE APPROVED, TESTED AND INSTALLATION METHOD
OF SEALING WHILE MAINTAINING THE INTEGRITY OF THE WALL'S FIRE RATING(S).
EXTENSION WALLS & FOUNDATION WALLS: PIPES WHICH PASS THROUGH
EXTENSION WALLS OR FOUNDATION WALLS SHALL BE SEALED AND MADE
WEATHER TIGHT.
10. INSULATE COLD AND HOT WATER PIPING WITH FIRE RETARDANT VAPOR BARRIER
JACKET. PIPE INSULATION SHALL BE SEALED WITH A FIRE RESISTIVE ADHESIVE.
SEE SPECIFICATIONS.
2 1
1/2 4
MECHANICAL ABBREVIATIONS DUCTWORK SYMBOLS
SYMBOL LIST SHOWN IS FOR GENERAL REFERENCE ONLY. THE PRESENCE OF A SYMBOL DOES NOT
IMPLY ITS USE ON THIS PROJECT. REFER TO THE DRAWINGS FOR SPECIFIC SYMBOLS USED.
(NOTE: NOT ALL ABBREVIATIONS MAY APPEAR ON DRAWINGS)
DRAWING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN); 18" PER FOOT
DIRECTION OF FLOW
PIPE ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
INVERTED BUCKET TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
THERMOSTATIC TRAP SET INCLUDING PIPING
ACCESSORIES SEE DETAIL
THERMOMETER
PRESSURE GAGE
FLOW ELEMENT
SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
QUICK-COUPLE HOSE CONNECTOR
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HIGH PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
CONDENSATE PUMP DISCHARGE
HOT WATER HEATING SUPPLY
HOT WATER HEATING RETURN
GLYCOL-WATER HEATING SUPPLY
GLYCOL-WATER HEATING RETURN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
CHILLED GLYCOL-WATER SUPPLY
MAKE-UP WATER
DRAIN LINE
VENT LINE
CHILLED GLYCOL-WATER RETURN
GLYCOL-WATER RUN AROUND SUPPLY
TUBE CLEANER WATER SUPPLY
CHEMICAL FEED
OVERFLOW
COMPRESSED AIR
COLD WATER (CITY WATER)
GLYCOL-WATER RUN AROUND RETURN
SOFTENED WATER
HOT WATER
REVERSE OSMOSIS
EXISTING DUCT OR EQUIPMENT TO BE REMOVED
GATE VALVE - THREADED / FLANGED
GLOBE VALVE - THREADED / FLANGED
GATE VALVE WITH 3 4" HOSE ADAPTER
CHECK VALVE
WYE STRAINER (WITH BALL VALVE &
HOSE CONNECTION)
WYE STRAINER WITH VALVED DRAIN AND
QUICK COUPLE HOSE CONNECTION
FLEXIBLE CONNECTION
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
PRESSURE SAFETY VALVE
PRESSURE REDUCING VALVE (PRV)
CONTROL VALVE (CV) - FLOAT-OPERATED
PLUG VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
CIRCUIT SETTER VALVE
WATER BALANCE DEVICE
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
ROUND AND SQUARE 4-WAY CEILING DIFFUSERS
SQUARE 3-WAY CEILING DIFFUSERS
SQUARE 2-WAY CEILING DIFFUSERS
SQUARE 1-WAY CEILING DIFFUSERS
SUPPLY TOP REGISTER OR GRILLE
(WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
(WALL TYPE)
EXHAUST OR RETURN REGISTER OR TOP GRILLE
(WALL TYPE)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
INCLINED RISE, IN DIRECTION OR AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
LIMIT OF DEMOTION
FLEXIBLE CONNECTION, EQUIPMENT VIBRATION, OR MIC
VANED ELBOW (PROVIDE ALL SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSION: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO REMOVE
FLEXIBLE DUCTWORK (INSULATED)
MANUAL VOLUME DAMPER
POINT OF CHANGE IN DUCT CONSTRUCTION BY STATIC
PRESSURE CLASS. THE NUMBER ASSIGNS PRESSURE
CLASS "(IN. OF WATER) WHICH WILL ACCOMMODATE
MAXIMUM OPERATING PRESSURE IN THE DUCT
SUBSECTION. THE SYMBOL CONTINUES THE ASSIGNMENT
UNTIL THE DUCT TERMINATES OR ANOTHER SYMBOL
APPEARS. A "N" SUPERSCRIPT INDICATED NEGATIVE
PRESSURE.
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
STANDARD BRANCH SUPPLY OR RETURN,
NO SPLITTER (45° TAP)
SMOKE DAMPER
1 HR FIRE RATED BARRIER
2 HR FIRE RATED BARRIER
SMOKE BARRIER
AREA OF WORK / CONTRACT LIMIT / MATCHLINE
SMOKE DETECTOR - DUCT MOUNTED
KEY NOTE SYMBOL
MULTIPLE KEY NOTES APPLYING TO THE SAME ITEM
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
SECTION NUMBER
DRAWING NUMBER WHERE DRAWN
AHU THAT SERVES THE EQUIPMENT
EQUIPMENT ABBREVIATION (SUPPLY FAN "SF" SHOWN)
EQUIPMENT NUMBER
PIPING SYMBOLS
VALVE SYMBOLS
AUTOMATIC BALANCING CONTROL VALVE
TYPICAL DRAWING
BLOCK OR DETAIL TITLE
FC
10x8
VD
SUPPLY
RETURN45°
45°
R
D
UP
UP
UP DN
DN
DN
FLOW SWITCH HIGH
FLOW SWITCH LOW
ROOM THERMOSTAT / TRANSMITTER - WALL MOUNT
ROOM HUMIDISTAT (MOISTURE) / TRANSMITTER - WALL MOUNT
TEMPERATURE TRANSMITTER
MOISTURE (HUMIDITY) TRANSMITTER
PRESSURE TRANSMITTER
STATIC PRESSURE SENSOR
FLOW TRANSMITTER
SMOKE DETECTOR
PRESSURE DIFFERENTIAL TRANSMITTER
PRESSURE DIFFERENTIAL SWITCH
HAND SWITCH (HAND-OFF-AUTO SWITCH)
TEMPERATURE SWITCH, LOW (FREEZESTAT)
TEMPERATURE SWITCH, HIGH (FREEZESTAT)
LEVEL CONTROLLER
LEVEL TRANSMITTER
VARIABLE SPEED MOTOR CONTROLLER
HVAC CONTROL PANEL
LOCAL TEMPERATURE CONTROL PANEL
OCCUPANCY SENSOR
CARBON MONOXIDE TRANSMITTER
CARBON DIOXIDE TRANSMITTER
PRESSURE SWITCH LOW
PRESSURE SWITCH HIGH
TEMPERATURE SENSING ELEMENT FOR TRANSMITTING
TEMPERATURE TO EMCS (PROVIDE 12 INCHES MINIMUM
LENGTH IN DUCT WHEN SPACE PERMITS.)
MOTOR STARTER
ELECTRIC OPERATED CONTROL DAMPER / OR
VALVE
CONTROLS SYMBOLS
MOTORIZED DAMPER
FIRE DAMPER
FIRE/SMOKE DAMPER
FIRE AND SMOKE DETECTOR
2x2 OR 2x4 RADIANT HEATING CEILING PANEL
PIPE CAP OR PLUG
HEATING / COOLING VALVE BOX ASSEMBLY
NOTE:
SYMBOL LIST SHOWN IS FOR GENERAL
REFERENCE ONLY. THE PRESENCE OF A
SYMBOL DOES NOT IMPLY ITS USE ON THIS
PROJECT. REFER TO THE DRAWINGS FOR
SPECIFIC SYMBOLS USED.
DUCT TERMINAL OUTLET INFO TAGDUCT SIZE
CFM TERMINAL TYPE MARK AND NUMBER
(SD-SUPPLY AIR DIFFUSER, RA-RETURN AIR DIFFUSER)
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
10/15/2025
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-103REPLACE SCI STEAM COILS
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
\52
8A 7-
-1
R ep lac e S
CI
S tea m Co ils \D es ign
C on tra ct\
Dr aw ing s\C
AD
\08
_M ec ha nic al\
8A 7-
-1
_A ll.d wg
1302 OF
MG-001
JDMA
MECHANICAL ABBREVIATIONS,
SYMBOLS & NOTES
FD
MD
SD
FSD
SD
10"Ø
SD1
SD
FSD
M
A M-101
M-501
1-SF-1
DRAWING TITLE
SCALE: NONE1
Rh M
T
TT
MT
PT
SPS
FT
PDT
PDS
HS
TSL
TSH
LC
LT
PSH
PSL
AT
OC
AT
CO
AT
CO2
FSH
FSL
HVAC
LTCP
VSMC
FE
AVAV
MV
FLEXIBLE HOSE CONNECTION
FLANGE
CHILLED WATER SUPPLY
CHILLED WATER RETURN
EXISTING PIPE TO BE REMOVED
HEAT RECOVERY PIPING
1- REVISION TO NOTE 3 COMPLETED 12-4-2025
STAIR
5S16
MECHANICAL
S510
SHAFT 7
S510A
STAIR
5S17
MECHANICAL
S510
S503
S500
SHAFT 6
AHU-107
(4TH FLOOR)
AHU-103
(1ST FLOOR)
AHU-102
(GROUND
FLOOR MAIN)
AHU106
(PACU)
AHU-101
(GROUND
FLOOR SPD)
AHU-104
(OR)
AHU-105
(OR)
CPT-06
3"
CPT-01
CPT-01A
2"
4"
1047 LBS/HR
2" TO
HUMIDIFIER
299.4 LBS/HR
CPT-06A
672 LBS/HR
2" TO
HUMIDIFIER
204 LBS/HR
4"
3"
3"
3"
4"
2"
1"
(3)-2" VENTS UP
THRU ROOF
10" VENT UP
THRU ROOF
8" VENT UP
THRU ROOF
1"
3" (7,137 LBS/HR)
PR
V
ST
AT
IO
N
/ 1
2"
4"
8"
2"
3"2"
CPT-02
CPT-02A
332 LBS/HR
4" TO
HUMIDIFIER
92.8 LBS/HR
3"
5"
6"
4"
4"
2"
1"
4" (13.5 GPM)
2"
CPT-05
CPT-05A
550 LBS/HR
2" TO
HUMIDIFIER
290 LBS/HR
UH-113
(7.0 GPM)
1" (7 GPM)
2" (18 GPM)
3"
4"
6"
2"
2"
2"
2"
4"
2"
2" TO
HUMIDIFIER
290 LBS/HR
550 LBS/HR
2"
CPT-03A
2" TO
HUMIDIFIER
207 LBS/HR
719 LBS/HR
2"
4"
3"
2"
2"
6"
CPT-07A
2" TO
HUMIDIFIER
279.2 LBS/HR
731 LBS/HR
4"
2" (7 GPM)
(BYPASS
18 GPM)
2"
2" (66.5 GPM)
2" (52 GPM) 4"
1"
5" (372.8 GPM)
6"
4"
5"
G W
P- 5-
AS
ET-5-05
AS
ET-5-02
AS
ET-5-04
ET-5-03
C P-
(E
FT
-1
GLYCOL
FEEDER
3" (87.5 GPM)
5" (285.2 GPM)
2" (20.5 GPM)
(BYPASS
18 GPM)
2"
2"
ET-5-07
AS
GWP-5-07
GWP-5-08
5" (264.7 GPM)
1"
P P P P
2"
2"
2"
H W
P-
G
W P-
5-
P
AS
HX-1 HX-2
P-3A P-4A
P-1A
P-2A
GLYCOL
FEEDER
P-5A P-6A
ET-1 GP-1
CP-1
5" 5"
5" HWHS & HWHR
UP THRU ROOF
2" HWHR & CR
UP THRU ROOF
FAN
RF-103
FAN
RF-107
FAN
RF-102
CPT-04A
(E) 6"
BOP ±104"
D8
8"
(30PSIG)
8" (10,934 LBS/HR)
4"
(E) 6"
BOP ±83"
3"
4"
3" 11 2"
6"
2"
2"
4"
CPT-07
4"
CPT-04
2"
2"
3"
CPT-03
4"
2"
4"
H W
P-
HPS PIPING2
4"
4"
5"
3 3
P P
G W
P- 5-
G W
P- 5-
MECHANICAL DEMOLITION PLAN - SOUTH
SCALE: 1/4" = 1'-0"1
RATED BARRIER LEGEND
SMOKE BARRIER
1 HR. FIRE RATED BARRIER
2 HR. FIRE RATED BARRIER
MECHANICAL DEMOLITION GENERAL NOTES:
1. REMOVE EVERYTHING WITHIN WORK AREA AS SHOWN AND INDICATED; TO INCLUDE
BUT NOT LIMITED TO: PIPING, VALVES, CONTROLS, INSULATION AND PIPE HANGERS.
2. SCHEDULE ALL SHUTDOWNS REQUIRED WITH VAMC COR AT LEAST 48 HOURS IN
ADVANCE. SHUTDOWNS SHALL NOT INTERFERE WITH ANY FACILITY OPERATIONS.
PROVIDE TEMPORARY SYSTEMS DURING SHUTDOWNS AS REQUIRED.
3. ALL SHUTDOWNS SHALL BE COORDINATED SO THERE IS NO LOSS OF HEATING WHEN
THE OUTDOOR AIR TEMPERATURE IS LESS THAN 45°F. COORDINATE WITH VAMC COR
PER NOTE 3.
4. COORDINATE SHUTDOWN OF AIR HANDLING UNIT FOR REMOVAL OF EXISTING STEAM
PREHEAT COIL AND INSTALLATION OF NEW GLYCOL PREHEAT COIL WITH VAMC COR.
WORK SHALL BE PERFORMED ON SATURDAYS, WITH AIR HANDLING UNIT OUT OF
SERVICE FOR NO MORE THAN FOUR (4) HOURS PER AIR HANDLING UNIT. PREHEAT
COILS SHALL BE FULLY OPERATIONAL BETWEEN OCTOBER 1ST AND APRIL 30TH.
MECHANICAL DEMOLITION KEYED NOTES:
REMOVE EXISTING MEDIUM PRESSURE STEAM RETURN AND SUPPLY (MPR AND MPS)
PIPING AS SHOWN, INCLUDING ALL ASSOCIATED FITTINGS, VALVES AND
CONDENSATE PUMPS.
REMOVE EXISTING CONDENSATE PUMP ASSEMBLY CP-103 AS SHOWN. 21
2" PUMPED
CONDENSATE PIPING TO REMAIN AND BE REUSED. REMOVE ASSOCIATED 4" HIGH
PRESSURE STEAM PIPING, CAP AT EXISTING MAIN AS SHOWN ON MD-102.
AT EACH AIR HANDLING UNIT: CONTRACTOR SHALL REMOVE EXISTING STEAM COIL
AND FACE/BYPASS DAMPERS. OWNER (VA) WILL DISCONNECT AND SECURE
CONTROL WIRING FOR REUSE
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
10/15/2025
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-103REPLACE SCI STEAM COILS
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
\52
8A 7-
-1
R ep lac e S
CI
S tea m Co ils \D es ign
C on tra ct\
Dr aw ing s\C
AD
\08
_M ec ha nic al\
8A 7-
-1
_A ll.d wg
1303 OF
MD-101
JDMA
MECHANICAL DEMOLITION
PLAN
N
M A
TC
H
LIN
E SEE SH
T M D
-102 M
A
TC
H
LIN
E SEE SH
T M
D -102
MECHANICAL
S510
SHAFT 7
S510A
STAIR
5S17
MECHANICAL
S510
S503
SHAFT 6
AHU-107
(4TH FLOOR)
AHU-103
(1ST FLOOR)
AHU-102
(GROUND
FLOOR MAIN)
AHU106
(PACU)
AHU-101
(GROUND
FLOOR SPD)
AHU-104
(OR)
AHU-105
(OR)
(3)-2" VENTS UP
THRU ROOF
10" VENT UP
THRU ROOF
8" VENT UP
THRU ROOF
1"
PR
V
ST
AT
IO
N
/ 1
2"
4"
2"
3"
5"
6"
4"21 2"
1"
4" (13.5 GPM)
2"
UH-113
(7.0 GPM)
1" (7 GPM)
2" (18 GPM)
3"
4"
6"
2"
4"
2"
2"
4"
2"
6"
2" (7 GPM)
(BYPASS
18 GPM)
2"
2" (66.5 GPM)
2" (52 GPM)
1"
5" (372.8 GPM)
6"
4"
5"
G W
P- 5-
AS
ET-5-05
AS
ET-5-02
AS
ET-5-04
ET-5-03
(E
FT
-1
GLYCOL
FEEDER
3" (87.5 GPM)
5" (285.2 GPM)
2" (20.5 GPM)
(BYPASS
18 GPM)
2"
2"
ET-5-07
AS
GWP-5-07
GWP-5-08
5" (264.7 GPM)
1"
P P P P
2"
2"
H W
P-
G
W P-
5-
P
AS
HX-1 HX-2
P-3A P-4A
P-1A
P-2A
GLYCOL
FEEDER
P-5A P-6A
ET-1 GP-1
CP-1
5" 5"
5" HWHS & HWHR
UP THRU ROOF
2" HWHR & CR
UP THRU ROOF
FAN
RF-103
FAN
RF-107
FAN
RF-102
(E) 6"
BOP ±104"
D8 4"
(E) 6"
BOP ±83"
DN
3"
2"
6"
2"
H W
P-
4"
COIL HGC-107
COIL HGC-103
COIL HGC-104
COIL HGC-105
COIL HGC-102
COIL HGC-101
COIL HGC-106
5"
(N ) C
P-
6"
6"
NEW 4"
(250 GPM)
4"
HWHS &HWHR
(250 GPM)
4"
3"
3" GHR
&GHS
3"
2"
2"
2 12"
GLYCOL5"
2"
2"
2"
2"
4"
1-WGHX1
HGP-1
HGP-2
P P
G W
P- 5-
G W
P- 5-
RATED BARRIER LEGEND
SMOKE BARRIER
1 HR. FIRE RATED BARRIER
2 HR. FIRE RATED BARRIER
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
10/15/2025
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-103REPLACE SCI STEAM COILS
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
\52
8A 7-
-1
R ep lac e S
CI
S tea m Co ils \D es ign
C on tra ct\
Dr aw ing s\C
AD
\08
_M ec ha nic al\
8A 7-
-1
_A ll.d wg
1304 OF
M-101
JDMA
MECHANICAL NEW WORK PARTIAL
PLAN - SOUTH
MECHANICAL NEW WORK PARTIAL PLAN - SOUTH
SCALE: 1/4" = 1'-0"1
N
MECHANICAL DRAWING GENERAL NOTES:
1. OWNER WILL PROVIDE CONTROLLERS, CONTROL WIRING, TEMPERATURE SENSOR, AND THE GLYCOL
LOOP DIFFERENTIAL PRESSURE TRANSDUCER. CONTRACTOR SHALL PROVIDE AMD INSTALL THE
CONTROL VALVES.
2. MAINTAIN THE INTEGRITY OF ALL EXISTING EQUIPMENT AND SYSTEMS LOCATED OUTSIDE THE
WORK AREA AND INTERRUPTED BY THE RENOVATION WORK. PROVIDE ALL ADDITIONAL PIPING,
FITTINGS, DUCTWORK, ACCESSORIES, ETC. REQUIRED TO EXTEND AND RECONNECT REMAINING
EQUIPMENT AND SYSTEMS.
3. SCHEDULE ALL SHUTDOWNS REQUIRED WITH VAMC COR AT LEAST 48 HOURS IN ADVANCE.
SHUTDOWNS SHALL NOT INTERFERE WITH ANY FACILITY OPERATIONS. AIR HANDLING UNIT
SHUTDOWNS FOR COIL INSTALLATION TO BE COORDINATED WITH THE OWNER'S REPRESENTATIVE
AND CONTRACTOR SHALL ASSUME SHUTDOWNS ON WEEKENDS OR EVENING HOURS.
4. ALL SHUTDOWNS SHALL BE COORDINATED SO THERE IS NO LOSS OF HEATING WHEN THE OUTDOOR
AIR TEMPERATURE IS LESS THAN 45°F.
5. SYSTEMS INDICATED ON DRAWINGS SHALL BE INSTALLED AS SHOWN. ADJUSTMENT TO LOCATIONS OF VARIOUS ITEMS MAY BE REQUIRED BY FIELD CONDITIONS. VERIFY AND COORDINATE WITH COR
PRIOR TO INSTALLATION.
6. PROVIDE SERVICE CLEARANCE FOR ALL HVAC EQUIPMENT AS RECOMMENDED BY MANUFACTURER.
7. INSULATE ALL HOT WATER HEATING SUPPLY AND RETURN LINES PER SPECIFICATION 230711.
8. NEW PIPING SHALL BE BRACED ACCORDING TO SEISMIC SPECIFICATION 130541 SEE ATTACHED
SCREENSHOT.
M A
TC
H
LIN
E
SEE SH
T. M
-102 M
A
TC
H
LIN
E
SEE SH
T. M -102
PENETRATE @ 7'-0" AFF
CONTINUATION FROM
ROOM C521
MECHANICAL DRAWING KEYED NOTES:
PROVIDE AND INSTALL NEW ELECTRIC CONDENSATE RETURN PUMP (CP-103) TO
REPLACE REMOVED STEAM POWERED CONDENSATE RETURN PUMP CP-103. RE-PIPE
AS REQUIRED. SEE DRAWING MD-101, M-101 AND M-501 AND SCHEDULE ON M-601.
COORDINATE WITH ELECTRICAL CONTRACTOR FOR NEW CIRCUIT.
PROVIDE AND INSTALL NEW PUMPS, HEAT EXCHANGER AND GLYCOL MAKE-UP SYSTEM,
INCLUDING NEW EXPANSION TANK 1-ET1, CHEMICAL POT FEEDER AND AIR SEPARATOR
1-AS1. SEE DRAWING DETAILS ON MG-501. COORDINATE WITH ELECTRICAL
CONTRACTOR FOR NEW CIRCUIT. BALANCER TO PROVIDE VFD SPEED AND DESIGN
FLOW WITH TDV AT MINIMUM PRESSURE DROP NEEDED.
INSTALL 4" BUTTERFLY VALVES ON HWHS AND HWHR.
SHUTDOWN OF HHW TO BE COORDINATED WITH THE OWNER'S REPRESENTATIVE FOR
A NIGHT OR WEEKEND.
INSTALL NEW PREHEAT COILS. REFER TO THE WATER COIL SCHEDULE ON MG-601.
CIRCUIT SETTER TO BE SET AND RECORDED BY A CERTIFIED HYDRONIC BALANCER.
V-HWHR PIPING
REFER TO 16/MG-501
SHAFT 3
C521A
5" HWHS &
HWHR DN
AHU-12
AC-11
AHU-13
EF-14
EF-12
EF-11
C-12
HCP-12
HRP-12
AHU-23
HRP-11
C-11
H C
P-
C-13
HCP-13
HCP-23
C-23
H X-
PR
V-
4" MPS DN
1"
4"
4"
3"
2"2"
4"
NO
NO
NC
1" GLYCOL DN
5" MPS DN
4" HWHS &
HWHR DN
4" HWHS &
HWHR DN
4" DN
UH-24
P
P
P
P
P
P
2"
5"
5"
4"
4"
4"
1"
4"
5"
5"
4"
6"
BOP 92"
6"
BOP 68"
6" BOP
±48" (E)
6" BOP 36"
6'
-6
6"
BOP 90"
C O
N V
FUTURE TO HX-13 2"
VALVE & CAP
TO 5R
HUMIDIFIER
RATED BARRIER LEGEND
SMOKE BARRIER
1 HR. FIRE RATED BARRIER
2 HR. FIRE RATED BARRIER
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
10/15/2025
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-103REPLACE SCI STEAM COILS
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
\52
8A 7-
-1
R ep lac e S
CI
S tea m Co ils \D es ign
C on tra ct\
Dr aw ing s\C
AD
\08
_M ec ha nic al\
8A 7-
-1
_A ll.d wg
1305 OF
M-102
JDMA
MECHANICAL NEW WORK PARTIAL
PLAN - NORTH
MECHANICAL DRAWING KEYED NOTES:
CONNECT NEW HWHS AND HWHR PIPING AT EXISTING 6" VALVED AND CAPPED
LOCATIONS AS SHOWN. FIELD VERIFY EXACT PATH OF PIPING AND ELEVATIONS.
RUN NEW 6" HWHS AND HWHR PIPING THROUGH WALL TIGHT TO BOTTOM OF
EXISTING 5" HWHR PIPING THROUGH WALL, APPROXIMATELY 84" TO BOTTOM OF
NEW PIPING. FIELD VERIFY EXACT PATH OF PIPING AND ELEVATIONS.
RUN NEW 6" HWHS AND HWHR PIPING TIGHT TO BOTTOM OF EXISTING 5" HWHR
PIPING, BOP APPROXIMATELY 48", FIELD VERIFY.
DROP NEW 6" HWHS AND HWHR TO BOP 68" AT APPROXIMATE LOCATION SHOWN
TO RUN BELOW EXISTING CHILLED WATER PIPING SERVING AHU-23. FIELD VERIFY
EXACT LOCATION.
RELOCATE 3/4" GLYCOL MAKEUP, AS NEEDED.
RELOCATE EXISTING 1-1/2" MPS, FOR NEW 5" HWH PIPING PATH.
MECHANICAL NEW WORK PARTIAL PLAN - NORTH
SCALE: 1/4" = 1'-0"1
N
M A
TC
H
LI
N
E
SE
E S
H T.
M -1
M
A
TC
H
LI
N E
SE
E
S H
T.
M
-1
MECHANICAL DRAWING GENERAL NOTES:
1. OWNER WILL PROVIDE ALL CONTROL COMPONENTS & CONTROL WIRING. CONTRACTOR SHALL
INSTALL THE GOVERNMENT PROVIDED CONTROL VALVES AS INDICATED.
2. MAINTAIN THE INTEGRITY OF ALL EXISTING EQUIPMENT AND SYSTEMS LOCATED OUTSIDE THE
WORK AREA AND INTERRUPTED BY THE RENOVATION WORK. PROVIDE ALL ADDITIONAL PIPING,
FITTINGS, DUCTWORK, ACCESSORIES, ETC. REQUIRED TO EXTEND AND RECONNECT REMAINING
EQUIPMENT AND SYSTEMS.
3. SCHEDULE ALL SHUTDOWNS REQUIRED WITH VAMC COR AT LEAST 48 HOURS IN ADVANCE.
SHUTDOWNS SHALL NOT INTERFERE WITH ANY FACILITY OPERATIONS. PROVIDE TEMPORARY
SYSTEMS DURING SHUTDOWNS AS REQUIRED.
4. ALL SHUTDOWNS SHALL BE COORDINATED SO THERE IS NO LOSS OF HEATING WHEN THE OUTDOOR
AIR TEMPERATURE IS LESS THAN 45°F.
5. SYSTEMS INDICATED ON DRAWINGS SHALL BE INSTALLED AS SHOWN. ADJUSTMENT TO LOCATIONS OF VARIOUS ITEMS MAY BE REQUIRED BY FIELD CONDITIONS. VERIFY AND COORDINATE WITH COR
PRIOR TO INSTALLATION.
6. PROVIDE SERVICE CLEARANCE FOR ALL HVAC EQUIPMENT AS RECOMMENDED BY MANUFACTURER.
7. INSULATE ALL HOT WATER HEATING SUPPLY AND RETURN LINES PER SPECIFICATION 230711.
8. PIPING SHALL BE BRACED ACCORDING TO SEISMIC SPECIFICATION 130541.
SHAFT 5
A1000A
MECHANICAL
A1000
EF-02
AC-02
AC-50
HWH-501
HWH-502
3" HWHS &
HWHR DN
2" HWHS
& HWHR
1" HWHS &
HWHR UP
HWP-505 &
HWP-506
8" HWHS & HWHR
RUN ABOVE 9TH
FLOOR CEILING
3" HWHS & HWHR
FUTURE CONN.
3" HWHS & HWHR
FUTURE CONN.
1" HWHS & HWHR
FROM BOILERS
3"
4"
2"
2" 4"
4"
4"
4"
4"
5"5"
6"
6" 6"
6"
6"6"
8" 8"
8" 8"
6" HWHS &
HWHR DN
HX-02
4"
4"
3"
3"
3"
6"
5" 6"
4"
6"
6"
6"
6" HWHS &
HWHR DN
P
P
PP
NEW PUMP HWP-507;
MATCH EXIST. PUMPS
(SEE PUMP SCHEDULE
& DETAIL 2/M-103)
6"
6"
EXTEND EXIST. CONC.
PAD APPROX. 30"
(SEE DETAIL 3/M-103)
RATED BARRIER LEGEND
SMOKE BARRIER
1 HR. FIRE RATED BARRIER
2 HR. FIRE RATED BARRIER
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
10/15/2025
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-103REPLACE SCI STEAM COILS
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
\52
8A 7-
-1
R ep lac e S
CI
S tea m Co ils \D es ign
C on tra ct\
Dr aw ing s\C
AD
\08
_M ec ha nic al\
8A 7-
-1
_A ll.d wg
1306 OF
M-103
JDMA
MECHANICAL PLANS & DETAILS - 10TH
FLOOR
MECHANICAL DRAWING KEYED NOTES:
PROVIDE AND INSTALL NEW PUMP HWP-507. MAINTAIN SPACING BETWEEN NEW PUMP
AND EXISTING PUMPS (APPROXIMATELY 28" O.C.). NEW PUMP SHALL BE IDENTICAL TO
EXISTING ADJACENT PUMPS HWP-505 AND HWP-506. COORDINATE WITH ELECTRICAL
CONTRACTOR AS REQUIRED FOR INSTALLATION OF NEW VARIABLE SPEED DRIVE AND
CONTROLS. SEE PUMP SCHEDULE ON M-601 AND FLOOR PLAN 1/M-103. BALANCER TO SET
TRIPLE DUTY VALVETO MINIMUM PRESSURE DROP NECESSARY AND RECORD PUMP SPEED
AT DESIGN FLOW RATE.
TIE-IN NEW PUMP 6" HWHS PIPING TO EXISTING PUMPS 6" AS SHOWN. SEE FLOOR
PLAN 1/M-103 AND DETAIL 2/M-103.
EXTEND EXISTING 30" x 48" CONCRETE HOUSEKEEPING PAD A MINIMUM OF 30" TO THE
WEST AS SHOWN FOR INSTALLATION OF NEW PUMP HWP-507. SEE DETAIL 3/M-103.
MECHANICAL PLAN - 10TH FLOOR
SCALE: 1/4" = 1'-0"1
N
MECHANICAL DEMOLITION GENERAL NOTES:
1. ALL ABANDONED PIPING & CONDUITS IN THE WORK AREA SHALL BE REMOVED.
COORDINATE WITH VAMC COR PRIOR TO REMOVAL.
2. SCHEDULE ALL SHUTDOWNS REQUIRED WITH VAMC COR AT LEAST 48 HOURS IN
ADVANCE. SHUTDOWNS SHALL NOT INTERFERE WITH ANY FACILITY OPERATIONS.
PROVIDE TEMPORARY SYSTEMS DURING SHUTDOWNS AS REQUIRED.
3. ALL SHUTDOWNS SHALL BE COORDINATED SO THERE IS NO LOSS OF HEATING WHEN THE
OUTDOOR AIR TEMPERATURE IS LESS THAN 45°F. COORDINATE WITH VAMC COR PER
NOTE 2.
INLINE PUMP CONNECTION DETAIL (1/M-103)
SCALE: NONE2
CONCRETE EQUIPMENT PAD
EXTENSION DETAIL
SCALE: NONE3
PIPE FLOOR SUPPORT DETAILS
SCALE: NONE4
MECHANICAL DRAWING GENERAL NOTES:
1. OWNER WILL PROVIDE ALL CONTROL COMPONENTS & CONTROL WIRING,
2. MAINTAIN THE INTEGRITY OF ALL EXISTING EQUIPMENT AND SYSTEMS LOCATED OUTSIDE
THE WORK AREA AND INTERRUPTED BY THE RENOVATION WORK. PROVIDE ALL ADDITIONAL
PIPING, FITTINGS, DUCTWORK, ACCESSORIES, ETC. REQUIRED TO EXTEND AND RECONNECT
REMAINING EQUIPMENT AND SYSTEMS.
3. SCHEDULE ALL SHUTDOWNS REQUIRED WITH VAMC COR AT LEAST 48 HOURS IN ADVANCE.
SHUTDOWNS SHALL NOT INTERFERE WITH ANY FACILITY OPERATIONS. PROVIDE
TEMPORARY SYSTEMS DURING SHUTDOWNS AS REQUIRED.
4. ALL SHUTDOWNS SHALL BE COORDINATED SO THERE IS NO LOSS OF HEATING WHEN THE
OUTDOOR AIR TEMPERATURE IS LESS THAN 45°F.
5. SYSTEMS INDICATED ON DRAWINGS SHALL BE INSTALLED AS SHOWN. ADJUSTMENT TO
LOCATIONS OF VARIOUS ITEMS MAY BE REQUIRED BY FIELD CONDITIONS. VERIFY AND
COORDINATE WITH COR PRIOR TO INSTALLATION.
6. PROVIDE SERVICE CLEARANCE FOR ALL HVAC EQUIPMENT AS RECOMMENDED BY
MANUFACTURER.
7. INSULATE ALL HOT WATER HEATING SUPPLY AND RETURN LINES PER SPECIFICATION
230711.
1- REVISION TO NOTE 3 COMPLETED 12-4-2025
2- REVISION TO DETAIL 7/MG-501 12-4-2025
AutoCAD SHX Text
PIPE HANGER (SPRING & NEOPRENE TYPE-TYP AS REQ'D)
AutoCAD SHX Text
STAINLESS STEEL BRAIDED CONNECTION (INCREASER WHERE REQUIRED)
AutoCAD SHX Text
MULTI-PORT PRESSURE INDICATOR (4-PORT)
AutoCAD SHX Text
TO EXIST. 6" HWHS ADJACENT PUMP OUTPUT TIE-IN (L.R. ELBOW)
AutoCAD SHX Text
PIPE SUPPORT; SEE DETAIL 4/M-103
AutoCAD SHX Text
FINISHED FLOOR
AutoCAD SHX Text
ISOLATION VALVE
AutoCAD SHX Text
8" INDUSTRIAL THERMOMETER W/ " NPT COPPER WELL34" NPT COPPER WELL
AutoCAD SHX Text
SUCTION DIFFUSER W/STRAINER
AutoCAD SHX Text
1" NEOPRENE VIBRATION PAD
AutoCAD SHX Text
EXTENDED CONCRETE HOUSEKEEPING PAD (SEE DETAIL)
AutoCAD SHX Text
STAINLESS STEEL BRAIDED CONNECTION
AutoCAD SHX Text
TO EXIST. 6" HWHS ADJACENT PUMP SUCTION TIE-IN (L.R. ELBOW)
AutoCAD SHX Text
(E) CONC. PAD
AutoCAD SHX Text
CONCRETE EQUIPMENT PAD EXTENSION; HEIGHT & SLOPE TO MATCH (E) PAD
AutoCAD SHX Text
PROVIDE URETHANE SEALANT OR EPOXY FILLER @ (E) CHAMFER
AutoCAD SHX Text #4 DOWEL x 1'-9" @ 12" O.C. MID-DEPTH EPOXY EMBED 4" INTO (E) PAD
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text
EMBED
AutoCAD SHX Text
#4 @ 12" AT BOTH DIRECTIONS
AutoCAD SHX Text
ROUGHEN & PREP SURFACE OF (E) FLOOR
AutoCAD SHX Text
(E) FLOOR SLAB
AutoCAD SHX Text #4 @ 12" DOWELS IN AUGER-DRILLED EPOXY GROUTED HOLES (DO NOT DRILL (E) REINFORCEMENT)
AutoCAD SHX Text
CHAMFER TO MATCH (E) PAD
AutoCAD SHX Text
EDGE OF NEW EQUIPMENT
AutoCAD SHX Text
±6" CLEARANCE
AutoCAD SHX Text
±30" TO SUIT NEW PUMP
AutoCAD SHX Text
48" MAX.
AutoCAD SHX Text
48" MAX.
AutoCAD SHX Text
SUPPORTED PIPE SIZE "A"
AutoCAD SHX Text
STANCHION SIZE "P"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
SUPPORT BASE
AutoCAD SHX Text
HORIZ. PIPE SUPPORT
AutoCAD SHX Text
ELBOW SUPPORT
AutoCAD SHX Text
ANCHOR BOLT DIA. "D"
AutoCAD SHX Text
PLATE SIZE "G"
AutoCAD SHX Text
HOLE DIA. "H"
AutoCAD SHX Text
SUPPORTED PIPE DIA. "A"
AutoCAD SHX Text
CONTINUOUS WELD; DO NOT PENETRATE PIPE
AutoCAD SHX Text
PIPE STANCHION; SCH. 40 PIPE SIZE "P"
AutoCAD SHX Text
14" VENT HOLE
AutoCAD SHX Text
MIN. " GROUT12" GROUT
AutoCAD SHX Text
UP TO 5"
AutoCAD SHX Text
5" TO 8"
AutoCAD SHX Text
10" TO 16"
AutoCAD SHX Text 5"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 4"
AutoCAD SHX Text 5"
AutoCAD SHX Text 6"
AutoCAD SHX Text "G"
AutoCAD SHX Text "B"
AutoCAD SHX Text "H"
AutoCAD SHX Text 14"
AutoCAD SHX Text 12"
AutoCAD SHX Text 34"
AutoCAD SHX Text 1316"
AutoCAD SHX Text 1116"
AutoCAD SHX Text 916"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1 "14"
AutoCAD SHX Text 38"x10"x10"
AutoCAD SHX Text 38"x10"x10"
AutoCAD SHX Text 38"x8"x8"
AutoCAD SHX Text 38"x8"x8"
AutoCAD SHX Text 38"x6"x6"
AutoCAD SHX Text
STANCHION SCH. 40 PIPE SIZE
AutoCAD SHX Text
BASE PLATE DIMENSION
AutoCAD SHX Text "D"
AutoCAD SHX Text 1 "14"
AutoCAD SHX Text 1 "14"
AutoCAD SHX Text 1 "14"
AutoCAD SHX Text 916"
AutoCAD SHX Text 1116"
AutoCAD SHX Text 14"
AutoCAD SHX Text 12"
AutoCAD SHX Text
TRIPLE-DUTY VALVE (SIZED FOR 1-3 PSI P.D. @ DESIGN FLOW RATE)
RATED BARRIER PENETRATION-INSULATED PIPE
SCALE: NONE4
SECURING PIPE OR DUCTWORK HANGER
RODS FROM CONCRETE DECK DETAILS
SCALE: NONE2
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
10/15/2025
GENERAL PROJECT INFORMATION
100% SPRINKLERED
DWG.
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-23-103REPLACE SCI STEAM COILS
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
\52
8A 7-
-1
R ep lac e S
CI
S tea m Co ils \D es ign
C on tra ct\
Dr aw ing s\C
AD
\08
_M ec ha nic al\
8A 7-
-1
_A ll.d wg
1307 OF
MG-501
JDMA
MECHANICAL DETAILS
PIPE DRAIN INSTALLATION DETAIL
SCALE: NONE5
HORIZONTAL PIPE ANCHOR DETAIL
SCALE: NONE6
3-WAY CONTROL VALVE DETAIL
SCALE: NONE7
WATER COILS - PIPING CONNECTIONS
SCALE: NONE12
INTERIOR CONCRETE EQUIPMENT PAD DETAIL
SCALE: NONE11
PLATE AND FRAME HEAT EXCHANGER
SCALE: NONE10
AVAV
AVAV
HEATING STATION DETAIL - HEATING GLYCOL
SCALE: NONE9
CLOSED LOOP HYDRONIC
SYSTEMS FILTER
SCALE: NONE14
T
POT FEEDER DETAIL
SCALE: NONE13
INDIRECT GLYCOL MAKE-UP
SYSTEM (PIPING AND CONTROLS)
SCALE: NONE3
PIPE HANGERS
SCALE: NONE1
BASE MOUNTED PUMP DETAIL
SCALE: NONE15
DECOUPLED LOOP TO VAV HW SYSTEM
SCALE: NONE16
1- REVISION TO NOTE 3 COMPLETED 12-4-2025
2- REVISION TO DETAIL 7/MG-501 12-4-2025
AutoCAD SHX Text
NOTE: UL SYSTEM W-J-5048
AutoCAD SHX Text
AAV
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
HGS TO SYSTEM
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text
MIN
AutoCAD SHX Text
WATER FILTER (SEE DETAIL 14/MG-501)
AutoCAD SHX Text
CHEMICAL TREATMENT POT FEEDER (SEE DETAIL 13/MG-501)
AutoCAD SHX Text
HGS FROM PLATE & FRAME HEAT EXCHANGER; SEE DETAIL 10/MG-501
AutoCAD SHX Text
HGR
AutoCAD SHX Text
HGS
AutoCAD SHX Text
HGS
AutoCAD SHX Text
HGS
AutoCAD SHX Text
HGS
AutoCAD SHX Text
HGS
AutoCAD SHX Text
HGS
AutoCAD SHX Text
HGS
AutoCAD SHX Text
HGS
AutoCAD SHX Text
HGS
AutoCAD SHX Text
HGS
AutoCAD SHX Text
HGS
AutoCAD SHX Text
GS
AutoCAD SHX Text
AAV
AutoCAD SHX Text
NOTE: SIZE WATER SIZE WATER FILTER FOR 5% OF TOTAL SYSTEM FLOW.
AutoCAD SHX Text
WATER FILTER
AutoCAD SHX Text
FROM PUMP DISCHARGE
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .