528-18-109 Air Monitor Drawing Set.pdf
PDF 4 MB Posted
- Solicitation number
- 36C24223Q0887
About this file
This solicitation is for air monitoring and environmental services at the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 facility located at 3495 Bailey Avenue in Buffalo, New York. The solicitation number is 36C24223Q0887 and it is for project 528-18-109. Services required include asbestos abatement, environmental monitoring, and medical gas system work during the 9C renovation project. The period of performance is from the award date through project completion, which is anticipated to be February 2023. The place of performance is the medical center located at 3495 Bailey Avenue in Buffalo.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 528-18-109 Buffalo VAMC - 9C Project Schedule (1).pdf | ||
| 36C24223Q0887.docx | DOCX document | |
| 528-18-109 9C Abatement Air Monitoring 23JUN23 SOW.docx | DOCX document | |
| 528-18-109 Air Montor Specifications for 9C Renovations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
95 Perry Street, Suite 300 Buffalo, NY 14203
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT: WARD 9C RENOVATIONS
3495 BAILEY AVENUE BUFFALO, NY 14215
528-18-109
528-18-109-
45% DESIGN SUBMISSION
DESIGN DOCUMENT SUBMISSION 3-15-2021
8-7-2020
90% SUBMISSION 6-18-2021
100% SUBMISSION 10-29-2021
BID DOCUMENTS 2-25-2022
B
IM
/B u ff a lo
V A
W a rd
C
R e d e s ig n
C o n s tr u c ti o n /1
A R
C H
.r v t
/2
/2
:3
:5
P
M
G-000
TITLE SHEET
February 25, 2022 RAS RLB
VA PROJECT #:
CONSULTANT PROVIDING
ARCHITECTURAL &
ENVIRONMENTAL
SERVICES:
PATHFINDER ENGINEERS &
ARCHITECTS LLP
134 SOUTH FITZHUGH STREET
ROCHESTER, NY 14608
PHONE: (585) 325 6004
FAX: (585) 325 6005
DEPARTMENT OF VETERANS AFFAIRS
WARD 9C RENOVATIONS - WNYHS BUFFALO, NY
3495 BAILEY AVENUE
BUFFALO, NY 14215
DEPARTMENT OF VETERANS AFFAIRS
528-18-109
PRIME CONSULTANT PROVIDING
MECHANICAL, ELECTRICAL,
PLUMBING & FIRE PROTECTION
SERVICES:
WATTS ARCHITECTURE &
ENGINEERING
95 PERRY STREET, SUITE 300
BUFFALO, NEW YORK 14203
PHONE: (716) 206-5100
FAX: (716) 206-5199
BAILEY AVE
DRAWING INDEX:
GENERAL
ASBESTOS ABATEMENT
FIRE PROTECTION
ELECTRICAL
N O
R T
H
MECHANICAL CONT'D
MECHANICAL
D C
B A
ARCHITECTURAL
EI-702 ELECTRICAL CRITICAL POWER PARTIAL RISER DIAGRAM
EI-703 ELECTRICAL FIRE ALARM RISER DIAGRAM
EI-704 ELECTRICAL NURSE CALL RISER DIAGRAM
EI-705 IT PARTIAL RISER DIAGRAM
EI-706 LIFE SAFETY RISER ARC FLASH STUDY
EI-800 ELECTRICAL SCHEDULES
EI-801 ELECTRICAL SCHEDULES
EI-802 ELECTRICAL SCHEDULES
E-000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED-100 ELECTRICAL DEMOLITION PLAN - WING 8C
ED-101 ELECTRICAL DEMOLITION PLAN - WING 9C
EP-101 POWER PLAN - WING 8C
EP-102 POWER PLAN - WING 9C
EP-103 POWER PLAN - ROOF
EP-104 FIRST FLOOR POWER PLAN
EP-105 BASEMENT POWER PLAN
EP-106 SUB-BASEMENT POWER PLAN
EL-201 LIGHTING PLAN - WING 8C
EL-202 LIGHTING PLAN - WING 9C
EY-301 FIRE ALARM PLAN - WING 8C
EY-302 FIRE ALARM PLAN - WING 9C
EY-401 DATA SYSTEMS PLAN - WING 9C
EY-402 NURSE CALL SYSTEMS PLAN - WING 9C
EY-403 SECURITY SYSTEMS PLAN - WING 9C
EI-600 ELECTRICAL DETAILS
EI-601 ELECTRICAL DETAILS
EI-700 ELECTRICAL NORMAL POWER PARTIAL RISER DIAGRAM
EI-701 ELECTRICAL LIFE SAFETY POWER PARTIAL RISER DIAGRAM
F-000 FIRE PROTECTION SYMBOLS, NOTES & ABBREVIATIONS
FD-100 FIRE PROTECTION DEMOLITION PLAN - WING 8C
FD-101 FIRE PROTECTION DEMOLITION PLAN - WING 9C
F-100 FIRE PROTECTION PLAN - WING 8C
F-101 FIRE PROTECTION PLAN - WING 9C
PP-000 PLUMBING SYMBOLS, NOTES & ABBREVIATIONS
PD-100 PLUMBING DEMOLITION PLAN - WING 8C
PD-101 PLUMBING DEMOLITION PLAN - WING 9C
PD-102 MEDICAL GAS DEMOLITION PLAN - WING 9C
PG-300 MEDICAL GAS PLAN - WING 9C
PL-200 SANITARY PLAN - WING 8C
PL-201 SANITARY PLAN - WING 9C
PP-100 PLUMBING PLAN - WING 8C
PP-101 PLUMBING PLAN - WING 9C
PP-200 PLUMBING ENLARGED PLANS
PP-201 PLUMBING ENLARGED PLANS
PP-202 PLUMBING ENLARGED PLANS
PP-300 PLUMBING SCHEMATICS
PP-301 SANITARY SCHEMATICS
PP-400 PLUMBING DETAILS
MI-302 HVAC SCHEMATICS AHU-9C-3
MI-303 HVAC SCHEMATICS AHU-9C-4
MI-304 HVAC SCHEMATICS AHU-9C-5
MI-305 HYDRONIC SCHEMATICS
MI-500 AIR DISTRIBUTION DETAILS I
MI-501 AIR DISTRIBUTION DETAILS II
MI-502 AIR DISTRIBUTION DETAILS III
MI-503 HYDRONIC DETAILS I
MI-504 HYDRONIC DETAILS II
MI-505 STEAM DETAILS
MI-506 ROOF DETAILS
MI-600 MECHANICAL CONTROLS
MI-601 MECHANICAL CONTROLS
MI-602 MECHANICAL CONTROLSM-001 GENERAL MECHANICAL SCHEDULES
M-002 MECHANICAL SCHEDULES AHU-9C-1
M-003 MECHANICAL SCHEDULES AHU-9C-2
M-004 MECHANICAL SCHEDULES AHU-9C-3
M-005 MECHANICAL SCHEDULES AHU-9C-4
M-006 MECHANICAL SCHEDULES AHU-9C-5
MD-101 HVAC DEMOLITION PLAN - WING 9C
MH-101 HVAC PLAN - WING 8C
MH-102 HVAC PLAN - WING 9C
MH-103 HVAC PLAN - WING 10C & 11C
MH-104 HVAC PLAN - ROOF AREA C
MH-401 ENLARGED HVAC PLANS I
MH-402 ENLARGED HVAC PLANS II
MP-201 HYDRONIC PIPING PLAN - WING 8C
MP-202 HYDRONIC PIPING PLAN - WING 9C
MP-401 ENLARGED HYDRONIC PLANS
MI-300 HVAC SCHEMATICS AHU-9C-1
MI-301 HVAC SCHEMATICS AHU-9C-2
A-501 SECTIONS & DETAILS
A-502 PLAN DETAILS
A-503 TYPICAL DETAILS & SECTION DETAILS
A-504 TYPICAL DETAILS
A-505 MILLWORK ELEVATIONS & SECTIONS
A-506 MILLWORK SECTIONS & DETAILS
A-507 MILLWORK SECTIONS & DETAILS
A-601 PARTITION TYPES, WINDOW TYPES & DETAILS
A-602 DOOR TYPES, SCHEDULE & DETAILS, LOUVER DETAILS
A-603 ROOM FINISH SCHEDULE
A-604 EQUIPMENT SCHEDULE
M-000 MECHANICAL SYMBOLS, NOTES & ABBREVIATIONS
AD-100 7TH FLOOR DEMOLITION CEILING PLAN
AD-101 8TH FLOOR DEMOLITION PLAN
AD-102 8TH FLOOR DEMOLITION CEILING PLAN
AD-103 9TH FLOOR DEMOLITION PLAN
AD-104 9TH FLOOR DEMOLITION CEILING PLAN
AD-105 10TH FLOOR & PARTIAL 11TH FLOOR DEMOLITION PLAN
A-100 8C OVERALL FLOOR PLAN
A-101 9C OVERALL FLOOR PLAN
A-102 10C OVERALL FLOOR PLAN
A-103 11C OVERALL FLOOR PLAN, ROOF PLAN
A-104 9TH FLOOR EQUIPMENT PLAN
A-105 9TH FLOOR FINISH PLAN
A-106 MILLWORK PLAN & SCHEDULE
A-107 9TH FLOOR - SIGNAGE
A-108 7C REFLECTED CEILING PLAN
A-109 8C REFLECTED CEILING PLAN
A-110 9C REFLECTED CEILING PLAN
A-201 INTERIOR ELEVATIONS
A-202 INTERIOR ELEVATIONS
A-203 INTERIOR ELEVATIONS
A-204 INTERIOR ELEVATIONS
A-205 CORRIDOR ELEVATIONS
A-206 CORRIDOR ELEVATIONS
A-401 9TH FLOOR - PARTIAL FLOOR PLAN - AREA 'A'
A-402 9TH FLOOR - PARTIAL FLOOR PLAN - AREA 'B'
A-403 9TH FLOOR - PARTIAL FLOOR PLAN - AREA 'C'
A-404 9TH FLOOR - PARTIAL CEILING PLAN - AREA 'A'
A-405 9TH FLOOR - PARTIAL CEILING PLAN - AREA 'B'
A-406 9TH FLOOR - PARTIAL CEILING PLAN - AREA 'C'
S-001 GENERAL NOTES
S-100 8TH FLOOR FRAMING PLAN
S-101 9TH FLOOR FRAMING PLAN
S-102 10TH FLOOR FRAMING PLAN
S-103 11TH & PARTIAL 12TH FLOOR FRAMING PLANS
S-500 STRUCTURAL DETAILS
AA-100 8TH FLOOR ASBESTOS ABATEMENT PLAN
AA-101 9TH FLOOR ASBESTOS ABATEMENT PLAN AND DETAIL
AA-102 10TH & 11TH FLOOR ASBESTOS ABATEMENT PLANS
G-000 TITLE SHEET
G-001 GENERAL NOTES, ABBREVIATIONS, AND LEGENDS
G-002 8TH FLOOR CODE COMPLIANCE DRAWINGS
G-003 9TH FLOOR CODE COMPLIANCE DRAWINGS
G-004 10TH FLOOR CODE COMPLIANCE DRAWINGS
G-005 7TH FLOOR - PHASING FLOOR PLAN
G-006 8TH FLOOR - PHASING FLOOR PLAN
G-007 10TH FLOOR - PHASING FLOOR PLAN
G-008 11TH FLOOR - PHASING FLOOR PLAN
G-009 INTERIM LIFE SAFETY MEASURES
G-010 INFECTION CONTROL RISK PLAN
STRUCTURAL
PLUMBING
ARCHITECTURAL CONT'D ELECTRICAL CONT'D
Revisions: Date:
D C B A
DD
C.1
5.1
EFGH
CC
BB
AA
STAIR
STAIR
STAIR
DN
UP
DN
UP
D N
U P
ANTE ROOM
WALK OFF MATS
C
B A
D
KEY PLAN
INFECTION CONTROL RISK ASSESSMENT NOTES
MINIMUM REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS | BEFORE AND
DURING WORK ACTIVITY:
1. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241
REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS
REMOVED, TO THE DECK ABOVE.
2. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE
COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS
MUST BE EFFECTIVELY AFFIXED TO GROUND AND CEILING AND SECURE FROM
MOVEMENT OR DAMAGE. APPLY TAPE THAT WILL NOT LEAVE A RESIDUE TO SEAL
GAPS BETWEEN BARRIERS, CEILING OR FLOOR.
3. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND
CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE
FOR BARRIER TYPE).
4. CONTAINMENT UNITS OR ENVIRONMENTAL CONTAINMENT UNITS (ECUS)
APPROVED FOR CLASS IV PRECAUTIONS IN SMALL AREAS TOTALLY CONTAINED BY
THE UNIT AND THAT HAS HEPA-FILTERED EXHAUST AIR.
5. REMOVE OR ISOLATE RETURN AIR DIFFUSERS TO AVOID DUST ENTERING THE
HVAC SYSTEM.
6. REMOVE OR ISOLATE THE SUPPLY AIR DIFFUSERS TO AVOID POSITIVE
PRESSURIZATION OF THE SPACE.
7. NEGATIVE AIRFLOW PATTERN MUST BE MAINTAINED FROM THE ENTRY POINT TO
THE ANTEROOM AND INTO THE CONSTRUCTION AREA. THE AIRFLOW MUST
CASCADE FROM OUTSIDE TO INSIDE THE CONSTRUCTION AREA. THE ENTIRE
CONSTRUCTION AREA MUST REMAIN NEGATIVELY PRESSURIZED.
8. MAINTAIN NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF
HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS. EXHAUST DISCHARGED
DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM ENTRANCES,
AIR INTAKES AND WINDOWS DOES NOT REQUIRE HEPA-FILTERED AIR.
9. IF EXHAUST IS DIRECTED INDOORS, THEN THE SYSTEM MUST BE HEPA FILTERED.
PRIOR TO START OF WORK, HEPA FILTRATION MUST BE VERIFIED BY PARTICULATE
MEASUREMENT AS NO LESS THAN 99.97% EFFICIENCY AND MUST NOT ALTER OR
CHANGE AIRFLOW/PRESSURE RELATIONSHIPS IN OTHER AREAS.
10. EXHAUST INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED
EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS NOT ACCEPTABLE.
11. INSTALL DEVICE (E.G., MAGNEHELIC, MANOMETER, OR DIGITAL MONITORING) ON
EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR NEGATIVE
PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR APPARATUS ARE NOT
ACCEPTABLE.
12. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA.
13. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE
USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS.
THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF VISIBLE
DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.
14. WORKER CLOTHING MUST BE CLEAN AND FREE OF VISIBLE DUST BEFORE
LEAVING THE WORK AREA. HEPA VACUUMING OF CLOTHING OR USE OF COVER
SUITES IS ACCEPTABLE.
15. WORKERS MUST WEAR SHOE COVERS PRIOR TO ENTRY INTO THE WORK AREA.
SHOE COVERS MUST BE CHANGED PRIOR TO EXITING THE ANTEROOM TO THE
OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE
IMMEDIATELY CHANGED.
16. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK
AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY
AND WHEN VISIBLY SOILED.
17. CONSIDER COLLECTION OF PARTICULATE DATA DURING WORK TO MONITOR AND
ENSURE THAT CONTAMINATES DO NOT ENTER THE OCCUPIED SPACES. ROUTINE
COLLECTION OF PARTICULATE SAMPLES MAY BE USED TO VERIFY HEPA
FILTRATION EFFICIENCIES.
MINIMUM REQUIRED INFECTION CONTROL PRECAUTIONS - UPON COMPLETION OF
WORK ACTIVITY:
CLASS III (TYPE C ACTIVITIES ONLY), IV, AND V PRECAUTIONS REQUIRE INSPECTION
AND DOCUMENTATION FOR DOWNGRADED ICRA PRECAUTIONS.
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST OR
DESIGNEE AND ENGINEERING REPRESENTATIVE FOR DISCONTINUATION OR
DOWNGRADING OF ICRA PRECAUTIONS.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH
HORIZONTAL SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION
ON UPPER SURFACES AS WELL AS AIR DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING
DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE
TOUCH-UP WORK. THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA
CLEANING HAS BEEN PERFORMED.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN
A MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING
PRECAUTIONS WHEN REMOVING HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-
HELD HEPA VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING
OUTER HARD BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE
GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINATES
FROM THE WORK AREA.
2. NEGATIVE AIR DEVICES MUST REMAIN OPERATIONAL AT ALL TIMES AND IN
PLACE FOR A PERIOD AFTER COMPLETION OF DUST CREATING ACTIVITIES TO
REMOVE CONTAMINANTS FROM THE WORK AREA AND BEFORE REMOVAL OF
CRITICAL BARRIERS.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM
IN AREAS WHERE WORK IS BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
3. VERIFY THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR EXCHANGE
DESIGN SPECIFICATIONS.
95 Perry Street, Suite 300 Buffalo, NY 14203
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT: WARD 9C RENOVATIONS
3495 BAILEY AVENUE BUFFALO, NY 14215
528-18-109
528-18-109-
45% DESIGN SUBMISSION
DESIGN DOCUMENT SUBMISSION 3-15-2021
8-7-2020
90% SUBMISSION 6-18-2021
100% SUBMISSION 10-29-2021
BID DOCUMENTS 2-25-2022
B
IM
/B u ff a lo
V A
W a rd
C
R e d e s ig n
C o n s tr u c ti o n /1
A R
C H
.r v t
/2
/2
:5
:0
A
M
G-010
INFECTION CONTROL RISK PLAN
February 25, 2022 RAS SRK
1/8" = 1'-0"1
9TH FLOOR INFECTION CONTROL RISK PLAN
NORTH
1/8" = 1'-0"
0' 4' 8' 16' 32'
Revisions: Date:
PROPERLY REMOVE AND DISPOSE OF THE
RECESSED RADIATOR HEAT SHIELD AND
ALL ASBESTOS INSULATION ON THE BACK
OF THE SHIELD. REMOVE ALL INSULATION
ON ANY PIPING. THE SHIELD AND ALL
INSULATION SHALL BE REMOVED AND
DISPOSED OF AS ASBESTOS-WASTE.
REMOVE EXISTING
COVER. REFER TO
DRAWING M-100.
REMOVE AND
PROPERLY DISPOSE
OF ALL INSULATION
ON EXISTING STEAM
RISERS WITHIN
EXTERIOR WALL
CAVITY. INSULATION
IS ASSUMED TO BE
ASBESTOS-CONTAINING.
NO INSULATION
SHALL REMAIN.
EL
PS
EL
PR
FINISHED FLOOR
EXISTING
WINDOW
REMOVE EXISTING BRANCH LPS & LPR PIPING TO THE EXTENT
SHOWN INCLUDING STEAM TRAP AND CONTROL VALVE. REFER
TO DRAWING M-100.
(CONTRACTOR SHALL ASSUME THAT CONCEALED LPS &
LPR PIPING IS COVERED WITH ASBESTOS INSULATION)
TYPICAL ELEVATION VIEW
EXISTING EXTERIOR
WALL
D C B A
D C B A
DD
C.1
5.1
EFGH
CC
BB
AA
13 13
1/8" = 1'-0"1 7TH FLOOR ASBESTOS ABATEMENT PLAN
ASBESTOS ABATEMENT NOTES
AA-1 NOT USED
AA-2 NOT USED
AA-3 NOT USED
AA-4 NOT USED
AA-5 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE ASBESTOS-CONTAINING RED-BROWN MASTIC ON THE NON-ASBESTOS-CONTAINING CORK PIPE INSULATION. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION OF SUSPENDED CEILINGS TO ACCESS THE MASTIC.
AA-6 NOT USED
AA-7 NOT USED
AA-8 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING PIPE AND MUD FITTING INSULATION THAT IS WITHIN WALL CHASES TO ACCOMMODATE ALL DEMOLITION, REMOVAL, AND INSTALLATION OF PIPING AND HVAC DUCTWORK. REFER TO PLUMBING AND MECHANICAL PLANS FOR APPROXIMATE LOCATIONS OF NEW PIPING AND DUCTS. ALL INSULATION AND PIPING WITHIN DESIGNATED CHASES SHALL BE REMOVED WITHIN THE REGULATED ASBESTOS ABATEMENT WORK AREA. CLEAN
CHASES TO ALLOW FOR INSTALLATION OF NEW PIPING AND DUCTWORK.
AA-9 NOT USED
AA-10 CONTRACTOR SHALL CONDUCT CEILING DEMOLITION WITHIN PROJECT LIMITS AND REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING PIPE AND MUD FITTING INSULATION THAT IS ABOVE CEILINGS THAT BECOME ACCESSIBLE AS A RESULT OF THE DEMOLITION/RENOVATION WORK. ALL CEILING DEMOLITION SHALL OCCUR UNDER NEGATIVE PRESSURE WITHIN THE REGULATED ASBESTOS ABATEMENT WORK AREA. REFER TO ARCHITECTURAL DEMOLITION PLANS FOR LIMITS OF CEILING DEMOLITION. ALL PIPE INSULATION, HARD CEILINGS, AND ASSOCIATED DEBRIS SHALL BE DISPOSED OF AS ASBESTOS-WASTE. SALVAGE SUSPENDED CEILING TILES AND ASSOCIATED SUPPORT GRID WORK, CLEAN OFF ANY ASBESTOS DEBRIS AND TURN OVER TO THE
OWNER/OWNER'S REPRESENTATIVE FOR RE-INSTALLATION BY OTHER TRADES.
NORTH
KEY PLAN
C D
AB
0' 4' 8' 16' 32'
1/8" = 1'-0"
DRAWING NOTES
A. THERE IS AN ASBESTOS-CONTAINING INSULATION BOARD BEHIND THE RECESSED RADIATOR HEAT SHIELDS. ONLY THE RECESSED RADIATORS ON THE NINTH FLOOR ARE TO BE DISTURBED. THE RADIATORS CAN ONLY BE SHUT DOWN DURING THE NON-HEATING SEASON. CAREFULLY COORDINATE WORK TO PERFORM THE REQUIRED ABATEMENT DURING THE
NON-HEATING PERIODS. ALL OTHER RADIATORS SHALL NOT BE REMOVED OR DISTURBED.
B. THERE IS AN ASBESTOS-CONTAINING BLACK PAPER AND TAR COVERING THE COPPER FLASHING BELOW THE WINDOWS. THE MATERIAL IS NOT SCHEDULED TO BE DISTURBED AS A
RESULT OF THIS PROJECT.
C. ALL CEILINGS WITHIN THE NINTH FLOOR PROJECT LIMITS SHALL BE DEMOLISHED. LIMITED CEILING DEMOLITION IS SCHEDULED TO TAKE PLACE ON THE EIGHTH FLOOR DIRECTLY BELOW THE NINTH FLOOR TO REMOVE AND REPLACE THE WASTE PIPING AND TO PERFORM TIE-INS TO THE PLUMBING AND MECHANICAL LINES ASSOCIATED WITH THE NINTH FLOOR RENOVATIONS. THERE IS ASBESTOS INSULATION ON THE HEATING AND DOMESTIC WATER LINES AND ASBESTOS DEBRIS ABOVE ALL HARD CEILINGS. CONTRACTOR SHALL ASSUME THERE WILL BE SOME ABATEMENT WORK AT EACH RISER LOCATION ON THE EIGHTH FLOOR WHERE NEW CONNECTIONS WILL BE MADE FOR THE SANITARY LINES. THE CEILING TILES AND CEILING PLASTER IN THE BUILDING DO NOT CONTAIN ASBESTOS AND THE WASTE PIPING IS NOT INSULATED. DEMOLITION OF CEILING AND REMOVAL OF ANY PLUMBING OR
WASTE PIPING ABOVE CEILINGS MUST BE CONDUCTED AS AN ASBESTOS PROJECT.
D. REFER TO MECHANICAL DEMOLITION DRAWINGS MD-101 AND MD-102 AND PLUMBING DEMOLITION DRAWINGS PD-100, PD-101, AND PD-102 FOR ADDITIONAL INFORMATION REGARDING THE LOCATION OF ASBESTOS INSULATED PIPING. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR EXTENTS OF DEMOLITION.
E. REFER TO DRAWINGS G-005 THROUGH G-009 FOR REQUIREMENTS PERTAINING TO LIFE SAFETY MEASURES AND TO COORDINATE PHASING OF THE WORK.
F. REFER TO THE RECORD DRAWINGS THAT HAVE BEEN INCLUDED WITH THE BID DOCUMENTS FOR ADDITIONAL INFORMATION REGARDING THE LOCATION OF PLUMBING AND STEAM LINES THAT MAY BE COVERED WITH ASBESTOS INSULATION. ASSUME ALL HOT AND COLD WATER LINES AND STEAM LINES HAVE ASBESTOS INSULATION. THE RECORD DRAWINGS
HAVE BEEN INCLUDED FOR REFERENCE ONLY.
G. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
H. THE ABATEMENT WORK WILL OCCUR IN PHASES. REFER TO DRAWING G-005 AND G-006 FOR PHASING PLANS. ALL DEMOLITION OF CEILINGS AND WALL CHASES SHALL BE PERFORMED WHILE THE ABATEMENT CONTRACTOR IS ON SITE AND THE AREA IS UNDER NEGATIVE PRESSURE. ABATEMENT CONTRACTOR SHALL VERIFY THAT ALL AREAS WHERE ASBESTOS PIPE INSULATION MAY BE PRESENT, I.E. INSIDE WALL CHASES AND COLUMNS, IS REMOVED PRIOR TO THE ABATEMENT CONTRACTOR DEMOBILIZING.
I. ALL SHUT DOWNS MUST BE APPROVED BY VAMC FACILITIES DEPARTMENT PRIOR TO IMPLEMENTATION.
GENERAL NOTES
A. CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL APPLICABLE FEDERAL AND STATE RULES, REGULATIONS, GUIDELINES AND THE
CONTRACT DOCUMENTS.
B. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. CONTRACTOR IS RESPONSIBLE
FOR FIELD VERIFICATION OF EXISTING CONDITIONS PRIOR TO BIDDING.
C. THE LOCATION OF ANY SITE STORAGE OF MATERIAL, EQUIPMENT, AND WASTE TRAILER/DUMPSTER SHALL BE COORDINATED WITH AND APPROVED BY THE
RESIDENT ENGINEER.
D. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT AND SUPPLIES.
E. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION. CONTRACTOR SHALL ENSURE THAT UNCERTIFIED PERSONNEL
OR UNAUTHORIZED VISITORS DO NOT ENTER ACTIVE WORK AREAS AT ANY TIME.
F. THE REMOVAL OR DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL SHALL BE PERFORMED BY A NYS LICENSED ASBESTOS ABATEMENT CONTRACTOR.
REFER TO SPECIFICATION SECTIONS 028213.13 AND 028213.19 FOR ADDITIONAL REQUIREMENTS FOR THE REMOVAL OF ASBESTOS-CONTAINING MATERIALS.
G. THE CONSTRUCTION AREA SHALL BE COMPLETELY SEPARATED FROM OTHER PORTIONS OF THE BUILDING BY USING TEMPORARY CONSTRUCTION DETAILS AS
SHOWN ON DRAWING G-005.
H. NEGATIVE PRESSURE SHALL BE ESTABLISHED INSIDE THE INTERIOR WORK AREA(S) PRIOR TO THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL.
ROUTING OF THE NEGATIVE AIR EXHAUST DUCT SHALL BE DECIDED UPON AFTER CONSULTATION WITH VAMC AND VAMC'S REPRESENTATIVE.
I. CONTRACTOR SHALL COORDINATE THE REMOVAL OF THE ASBESTOS WASTE MATERIALS FROM THE BUILDING WITH VAMC AND VAMC'S REPRESENTATIVE. THE REMOVAL OF THE ASBESTOS WASTE SHALL BE PERFORMED AT TIMES WHEN IT DOES NOT INTERFERE WITH NORMAL FACILITY ACTIVITIES.
J. ALL ASBESTOS-CONTAINING MATERIAL SHALL BE PROPERLY PACKAGED PRIOR TO BEING REMOVED FROM THE WORK AREA. ASBESTOS WARNING LABELS SHALL BE APPLIED TO THE ASBESTOS WASTE BAGS. ALL ASBESTOS MATERIALS THAT ARE REMOVED FROM THE SITE SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. THE COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE VAMC AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE
SHIPMENT RECORDS MUST BE PROVIDED WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.
K. CONTRACTOR SHALL CLEAN ALL AREAS OUTSIDE THE WORK AREA AND ANY AREAS WHERE CONTRACTOR'S PERSONNEL TRAVEL THROUGH THE BUILDING. THESE AREAS SHALL BE LEFT IN A CONDITION AS CLEAN AS OR CLEANER THAN WHEN THE CONTRACTOR ARRIVED ON SITE.
L. THE OTHER THREE WINGS ON THE 9TH FLOOR AND WING C ON THE 7TH, 8TH AND 10TH FLOORS WILL REMAIN OCCUPIED DURING THE ABATEMENT PROJECT.
THEREFORE, ALL ABATEMENT WORK, INCLUDING PREPARATION, MUST BE PERFORMED OFF HOURS, EITHER AT NIGHT OR ON THE WEEKEND. WORK SHALL BE
PERFORMED IN PHASES.
M. IF A REMOTE DECONTAMINATION ENCLOSURE IS UTILIZED FOR THIS WORK, AN AIRLOCK MUST BE ATTACHED TO EACH WORK AREA. THE AIRLOCK SHALL BE SIZED LARGE ENOUGH TO ALLOW FOR THE WORKERS TO CHANGE THEIR SUITS PRIOR TO LEAVING THE WORK AREA. THE DECONTAMINATION ENCLOSURE SHALL BE
CONSTRUCTED IN ACCORDANCE WITH 29 CFR 1926.
N. CONTRACTOR SHALL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN DESCRIBING THE WORK AREA PREPARATION, REMOVAL AND HANDLING PROCEDURES, AS WELL AS DECONTAMINATION ENCLOSURES AND NEGATIVE AIR EXHAUST LOCATIONS PRIOR TO BEING ALLOWED TO START THE PROJECT. THIS WORK PLAN WILL NEED TO BE REVIEWED AND ACCEPTED BY VAMC HEALTH AND SAFETY PERSONNEL PRIOR TO THE START OF WORK.
AA-100
7TH FLOOR ASBESTOS
ABATEMENT PLAN
EJ CD
AA-5
AA-5
AA-5
AA-8
AA-10
AA-10
AA-10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ABATEMENT CONSULTANT:
Revisions: Date:
WARD 9C RENOVATIONS
3495 BAILEY AVENUE BUFFALO, NY 14215
528-18-109
528-18-109-
45% DESIGN SUBMISSION
DESIGN DOCUMENT SUBMISSION
8-7-2020 3-15-2021
90% DESIGN SUBMISSION 6-18-2021
100% DESIGN SUBMISSION 10-29-2021
BID DOCUMENTS 2-25-2022
95 Perry Street, Suite 300 Buffalo, NY 14203 February 25, 2022
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
ENVIRONMENTAL NOTES
E-1 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND DISPOSE OF FLUORESCENT BULBS IN LIGHTING SCHEDULED FOR REMOVAL WITHIN THE PROJECT WORK AREA. REFER TO ELECTRICAL DEMOLITION PLANS. RECYCLE ALL REMOVED BULBS IN ACCORDANCE WITH THE 40 CFR PART 273 US EPA UNIVERSAL WASTE RULE.
ANY FLUORESCENT LAMPS BROKEN DURING DEMOLITION SHALL BE DISPOSED OF AS HAZARDOUS WASTE.
E-2 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND DISPOSE OF FLUORESCENT BALLASTS SCHEDULED FOR REMOVAL WITHIN THE PROJECT WORK AREA.
REFER TO ELECTRICAL DEMOLITION PLANS. THE BALLASTS REMOVED FOR THIS PROJECT MAY CONTAIN DEHP AND/OR PCBS. CONTRACTOR TO PROPERLY
DISPOSE OF ALL BALLASTS.
E-3 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND RECYCLE BATTERIES IN EXIT LIGHTS SCHEDULED FOR DEMOLITION. REFER TO ELECTRICAL
DEMOLITION PLANS.
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
LEAD AWARENESS NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION; INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR
EXPOSURE ABOVE THE PERMISSIBLE EXPOSURE LIMIT.
2. AREAS OF THE BUILDING HAVE BEEN INVESTIGATED FOR THE PRESENCE OF LEAD DURING PAST PROJECTS AND LEAD-BASED PAINT HAS BEEN IDENTIFIED. SURFACES IDENTIFIED TO BE COATED WITH LEAD-BASED PAINT INCLUDE BUT ARE NOT LIMITED TO INCLUDE:
· GREEN CERAMIC WALL TILES.
· WHITE WITH BEIGE SPECKLES CERAMIC WALL TILES.
· TAN CERAMIC WALL TILES.
· WHITE BED PAN SINKS.
· BLACK WINDOW INFILL PANELS.
· OFF-WHITE METAL RADIATOR COVERS.
3. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE THE CONTRACTOR OF ITS RESPONSIBILITIES UNDER OSHA TO DETERMINE THE PRESENCE, LOCATION, AND QUANTITY OF EXISTING LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE EXPOSED TO, AND TO WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF LEAD-CONTAINING MATERIALS.
DD
C.1
5.1
EFGH
CC
BB
AA
813-C
816-C
817-C
811-C
810C-1
808-C
806-C
805-C
808-2
837-C
836-C
835-C
834-C
833-C
834C-1
831-C 831C-1
830C-1831C-2
830-C 818C-1
829-C
828-C
827C-1
827-C
826-C
825C-1
825-C
823C
822C-1
822C
821C
820C-1
820C
819C
818C
814-44
800C-1
819C-1
829C-1
814C-3
810-C
809-C
814C-4 815-C
814C-2 814C-1
1/8" = 1'-0"1 8TH FLOOR ASBESTOS ABATEMENT PLAN
ASBESTOS ABATEMENT NOTES
AA-1 NOT USED
AA-2 NOT USED
AA-3 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE VINYL COVEBASE AND THE ASBESTOS-CONTAINING 12” X 12” WHITE STREAKED FLOOR TILE. THE COVEBASE AND FLOOR TILE MASTIC ARE NON-ASBESTOS. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY ITEMS (CABINETS, CARPETING, ETC.)
OR EQUIPMENT THAT ARE ON TOP OF THE FLOOR TILE. THE MASTIC SHALL BE REMOVED AFTER CLEARANCE SAMPLES ARE OBTAINED. CONTRACTOR SHALL NEUTRALIZE ALL SOLVENTS (PER THE MANUFACTURER'S DIRECTIONS) TO ALLOW FOR INSTALLATION OF NEW FLOORING.
AA-4 NOT USED
AA-5 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE ASBESTOS-CONTAINING RED-BROWN MASTIC ON THE NON-ASBESTOS-CONTAINING CORK PIPE INSULATION. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION OF SUSPENDED CEILINGS TO ACCESS THE MASTIC.
AA-6 NOT USED
AA-7 NOT USED
AA-8 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING PIPE AND MUD FITTING INSULATION THAT IS WITHIN WALL CHASES TO ACCOMMODATE ALL DEMOLITION, REMOVAL, AND INSTALLATION OF PIPING AND HVAC DUCTWORK. REFER TO PLUMBING AND MECHANICAL PLANS FOR APPROXIMATE LOCATIONS OF NEW PIPING AND DUCTS. ALL INSULATION AND PIPING WITHIN DESIGNATED CHASES SHALL BE REMOVED WITHIN THE REGULATED ASBESTOS ABATEMENT WORK AREA. CLEAN CHASES TO ALLOW FOR INSTALLATION OF NEW PIPING AND DUCTWORK.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION OF THE CHASES AS REQUIRED TO ACCESS THE ASBESTOS INSULATION AND TO ALLOW FOR THE
PLUMBING WORK AND INSTALLATION OF NEW HVAC DUCTS.
AA-9 NOT USED
AA-10 CONTRACTOR SHALL CONDUCT CEILING DEMOLITION WITHIN PROJECT LIMITS AND REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING PIPE AND MUD FITTING INSULATION THAT IS ABOVE CEILINGS THAT BECOME ACCESSIBLE AS A RESULT OF THE DEMOLITION/RENOVATION WORK. ALL CEILING DEMOLITION SHALL OCCUR UNDER NEGATIVE AIR CONTAINMENT WITHIN THE REGULATED ASBESTOS ABATEMENT WORK AREA. REFER TO ARCHITECTURAL DEMOLITION PLANS FOR LIMITS OF CEILING DEMOLITION. ALL PIPE INSULATION, HARD CEILINGS, AND ASSOCIATED DEBRIS SHALL BE DISPOSED OF AS ASBESTOS-WASTE. SALVAGE SUSPENDED CEILING TILES AND ASSOCIATED SUPPORT GRID WORK, CLEAN OFF ANY ASBESTOS DEBRIS AND TURN OVER TO THE
OWNER/OWNER'S REPRESENTATIVE FOR RE-INSTALLATION BY OTHER TRADES.
NORTH
KEY PLAN
C D
AB
0' 4' 8' 16' 32'
1/8" = 1'-0"
DRAWING NOTES
A. THERE IS AN ASBESTOS-CONTAINING INSULATION BOARD BEHIND THE RECESSED RADIATOR HEAT SHIELDS. ONLY THE RECESSED RADIATORS ON THE NINTH FLOOR ARE TO BE DISTURBED. THE RADIATORS CAN ONLY BE SHUT DOWN DURING THE NON-HEATING SEASON. CAREFULLY COORDINATE WORK TO PERFORM THE REQUIRED ABATEMENT DURING THE
NON-HEATING PERIODS. ALL OTHER RADIATORS SHALL NOT BE REMOVED OR DISTURBED.
B. THERE IS AN ASBESTOS-CONTAINING BLACK PAPER AND TAR COVERING THE COPPER FLASHING BELOW THE WINDOWS. THE MATERIAL IS NOT SCHEDULED TO BE DISTURBED AS A
RESULT OF THIS PROJECT.
C. ALL CEILINGS WITHIN THE NINTH FLOOR PROJECT LIMITS SHALL BE DEMOLISHED. LIMITED CEILING DEMOLITION IS SCHEDULED TO TAKE PLACE ON THE EIGHTH FLOOR DIRECTLY BELOW THE NINTH FLOOR TO REMOVE AND REPLACE THE WASTE PIPING AND TO PERFORM TIE-INS TO THE PLUMBING AND MECHANICAL LINES ASSOCIATED WITH THE NINTH FLOOR RENOVATIONS. THERE IS ASBESTOS INSULATION ON THE HEATING AND DOMESTIC WATER LINES AND ASBESTOS DEBRIS ABOVE ALL HARD CEILINGS. CONTRACTOR SHALL ASSUME THERE WILL BE SOME ABATEMENT WORK AT EACH RISER LOCATION ON THE EIGHTH FLOOR WHERE NEW CONNECTIONS WILL BE MADE FOR THE SANITARY LINES. THE CEILING TILES AND CEILING PLASTER IN THE BUILDING DO NOT CONTAIN ASBESTOS AND THE WASTE PIPING IS NOT INSULATED. DEMOLITION OF CEILING AND REMOVAL OF ANY PLUMBING OR
WASTE PIPING ABOVE CEILINGS MUST BE CONDUCTED AS AN ASBESTOS PROJECT.
D. REFER TO MECHANICAL DEMOLITION DRAWINGS MD-101 AND MD-102 AND PLUMBING DEMOLITION DRAWINGS PD-100, PD-101, AND PD-102 FOR ADDITIONAL INFORMATION REGARDING THE LOCATION OF ASBESTOS INSULATED PIPING. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR EXTENTS OF DEMOLITION.
E. REFER TO DRAWINGS G-005 THROUGH G-009 FOR REQUIREMENTS PERTAINING TO LIFE SAFETY MEASURES AND TO COORDINATE PHASING OF THE WORK.
F. REFER TO THE RECORD DRAWINGS THAT HAVE BEEN INCLUDED WITH THE BID DOCUMENTS FOR ADDITIONAL INFORMATION REGARDING THE LOCATION OF PLUMBING AND STEAM LINES THAT MAY BE COVERED WITH ASBESTOS INSULATION. ASSUME ALL HOT AND COLD WATER LINES AND STEAM LINES HAVE ASBESTOS INSULATION. THE RECORD DRAWINGS
HAVE BEEN INCLUDED FOR REFERENCE ONLY.
G. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
H. THE ABATEMENT WORK WILL OCCUR IN PHASES. REFER TO DRAWING G-005 AND G-006 FOR PHASING PLANS. ALL DEMOLITION OF CEILINGS AND WALL CHASES SHALL BE PERFORMED WHILE THE ABATEMENT CONTRACTOR IS ON SITE AND THE AREA IS UNDER NEGATIVE PRESSURE. ABATEMENT CONTRACTOR SHALL VERIFY THAT ALL AREAS WHERE ASBESTOS PIPE INSULATION MAY BE PRESENT, I.E. INSIDE WALL CHASES AND COLUMNS, IS REMOVED PRIOR TO THE ABATEMENT CONTRACTOR DEMOBILIZING.
I. ALL SHUT DOWNS MUST BE APPROVED BY VAMC FACILITIES DEPARTMENT PRIOR TO IMPLEMENTATION.
AA-101
8TH FLOOR ASBESTOS
ABATEMENT PLAN
EJ CD
AA-5 AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-8
AA-8
AA-8
AA-8
AA-8
AA-10
AA-8
AA-8
AA-10
AA-10
AA-10 AA-10
AA-10
AA-10
AA-10
AA-10 AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-8
AA-8
AA-8
AA-8
AA-8
AA-8
AA-8
AA-8
AA-8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ABATEMENT CONSULTANT:
Revisions: Date:
WARD 9C RENOVATIONS
3495 BAILEY AVENUE BUFFALO, NY 14215
528-18-109
528-18-109-
45% DESIGN SUBMISSION
DESIGN DOCUMENT SUBMISSION
8-7-2020 3-15-2021
90% DESIGN SUBMISSION 6-18-2021
100% DESIGN SUBMISSION 10-29-2021
BID DOCUMENTS 2-25-2022
95 Perry Street, Suite 300 Buffalo, NY 14203 February 25, 2022
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5 AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
ENVIRONMENTAL NOTES
E-1 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND DISPOSE OF FLUORESCENT BULBS IN LIGHTING SCHEDULED FOR REMOVAL WITHIN THE PROJECT WORK AREA. REFER TO ELECTRICAL DEMOLITION PLANS. RECYCLE ALL REMOVED BULBS IN ACCORDANCE WITH THE 40 CFR PART 273 US EPA UNIVERSAL WASTE RULE.
ANY FLUORESCENT LAMPS BROKEN DURING DEMOLITION SHALL BE DISPOSED OF AS HAZARDOUS WASTE.
E-2 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND DISPOSE OF FLUORESCENT BALLASTS SCHEDULED FOR REMOVAL WITHIN THE PROJECT WORK AREA.
REFER TO ELECTRICAL DEMOLITION PLANS. THE BALLASTS REMOVED FOR THIS PROJECT MAY CONTAIN DEHP AND/OR PCBS. CONTRACTOR TO PROPERLY
DISPOSE OF ALL BALLASTS.
E-3 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND RECYCLE BATTERIES IN EXIT LIGHTS SCHEDULED FOR DEMOLITION. REFER TO ELECTRICAL
DEMOLITION PLANS.
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
E-1 E-2 E-3
AA-3
AA-3 AA-3
AA-3
AA-3
AA-3
AA-3
AA-3
AA-3
AA-3
AA-3
AA-3
AA-3
AA-3
AA-3
E-1 E-2 E-3
GENERAL NOTES
A. CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL APPLICABLE FEDERAL AND STATE RULES, REGULATIONS, GUIDELINES AND THE
CONTRACT DOCUMENTS.
B. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. CONTRACTOR IS RESPONSIBLE
FOR FIELD VERIFICATION OF EXISTING CONDITIONS PRIOR TO BIDDING.
C. THE LOCATION OF ANY SITE STORAGE OF MATERIAL, EQUIPMENT, AND WASTE TRAILER/DUMPSTER SHALL BE COORDINATED WITH AND APPROVED BY THE
RESIDENT ENGINEER.
D. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT AND SUPPLIES.
E. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION. CONTRACTOR SHALL ENSURE THAT UNCERTIFIED PERSONNEL
OR UNAUTHORIZED VISITORS DO NOT ENTER ACTIVE WORK AREAS AT ANY TIME.
F. THE REMOVAL OR DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL SHALL BE PERFORMED BY A NYS LICENSED ASBESTOS ABATEMENT CONTRACTOR.
REFER TO SPECIFICATION SECTIONS 028213.13 AND 028213.19 FOR ADDITIONAL REQUIREMENTS FOR THE REMOVAL OF ASBESTOS-CONTAINING MATERIALS.
G. THE CONSTRUCTION AREA SHALL BE COMPLETELY SEPARATED FROM OTHER PORTIONS OF THE BUILDING BY USING TEMPORARY CONSTRUCTION DETAILS AS
SHOWN ON DRAWING G-005.
H. NEGATIVE PRESSURE SHALL BE ESTABLISHED INSIDE THE INTERIOR WORK AREA(S) PRIOR TO THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL.
ROUTING OF THE NEGATIVE AIR EXHAUST DUCT SHALL BE DECIDED UPON AFTER CONSULTATION WITH VAMC AND VAMC'S REPRESENTATIVE.
I. CONTRACTOR SHALL COORDINATE THE REMOVAL OF THE ASBESTOS WASTE MATERIALS FROM THE BUILDING WITH VAMC AND VAMC'S REPRESENTATIVE. THE REMOVAL OF THE ASBESTOS WASTE SHALL BE PERFORMED AT TIMES WHEN IT DOES NOT INTERFERE WITH NORMAL FACILITY ACTIVITIES.
J. ALL ASBESTOS-CONTAINING MATERIAL SHALL BE PROPERLY PACKAGED PRIOR TO BEING REMOVED FROM THE WORK AREA. ASBESTOS WARNING LABELS SHALL BE APPLIED TO THE ASBESTOS WASTE BAGS. ALL ASBESTOS MATERIALS THAT ARE REMOVED FROM THE SITE SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. THE COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE VAMC AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE
SHIPMENT RECORDS MUST BE PROVIDED WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.
K. CONTRACTOR SHALL CLEAN ALL AREAS OUTSIDE THE WORK AREA AND ANY AREAS WHERE CONTRACTOR'S PERSONNEL TRAVEL THROUGH THE BUILDING. THESE AREAS SHALL BE LEFT IN A CONDITION AS CLEAN AS OR CLEANER THAN WHEN THE CONTRACTOR ARRIVED ON SITE.
L. THE OTHER THREE WINGS ON THE 9TH FLOOR AND WING C ON THE 7TH, 8TH AND 10TH FLOORS WILL REMAIN OCCUPIED DURING THE ABATEMENT PROJECT.
THEREFORE, ALL ABATEMENT WORK, INCLUDING PREPARATION, MUST BE PERFORMED OFF HOURS, EITHER AT NIGHT OR ON THE WEEKEND. WORK SHALL BE
PERFORMED IN PHASES.
M. IF A REMOTE DECONTAMINATION ENCLOSURE IS UTILIZED FOR THIS WORK, AN AIRLOCK MUST BE ATTACHED TO EACH WORK AREA. THE AIRLOCK SHALL BE SIZED LARGE ENOUGH TO ALLOW FOR THE WORKERS TO CHANGE THEIR SUITS PRIOR TO LEAVING THE WORK AREA. THE DECONTAMINATION ENCLOSURE SHALL BE
CONSTRUCTED IN ACCORDANCE WITH 29 CFR 1926.
N. CONTRACTOR SHALL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN DESCRIBING THE WORK AREA PREPARATION, REMOVAL AND HANDLING PROCEDURES, AS WELL AS DECONTAMINATION ENCLOSURES AND NEGATIVE AIR EXHAUST LOCATIONS PRIOR TO BEING ALLOWED TO START THE PROJECT. THIS WORK PLAN WILL NEED TO BE REVIEWED AND ACCEPTED BY VAMC HEALTH AND SAFETY PERSONNEL PRIOR TO THE START OF WORK.
E-1 E-2 E-3
(TYP.)
E-1 E-2 E-3
(TYP.)
LEAD AWARENESS NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION; INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR
EXPOSURE ABOVE THE PERMISSIBLE EXPOSURE LIMIT.
2. AREAS OF THE BUILDING HAVE BEEN INVESTIGATED FOR THE PRESENCE OF LEAD DURING PAST PROJECTS AND LEAD-BASED PAINT HAS BEEN IDENTIFIED. SURFACES IDENTIFIED TO BE COATED WITH LEAD-BASED PAINT INCLUDE BUT ARE NOT LIMITED TO INCLUDE:
· GREEN CERAMIC WALL TILES.
· WHITE WITH BEIGE SPECKLES CERAMIC WALL TILES.
· TAN CERAMIC WALL TILES.
· WHITE BED PAN SINKS.
· BLACK WINDOW INFILL PANELS.
· OFF-WHITE METAL RADIATOR COVERS.
3. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE THE CONTRACTOR OF ITS RESPONSIBILITIES UNDER OSHA TO DETERMINE THE PRESENCE, LOCATION, AND QUANTITY OF EXISTING LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE EXPOSED TO, AND TO WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF LEAD-CONTAINING MATERIALS.
AA-8AA-8
(TYP.)(TYP.)
AA-8
(TYP.)
AA-8
(TYP.)
AA-8
(TYP.)
DD
C.1
5.1
EFGH
CC
BB
AA
DN
UP
DN
UP
DN
UP
TEAM
ROOM
924C
PATIENT
RM.
926C
PATIENT
RM.
916C
CLEAN
SUPPLY
910C
SHARED
PATIENT
RM.
911C
STAIR
PATIENT
RM.
912C
PATIENT
RM.
914C1
ROOM
933C1
ROOM
908C1
SUPPLY
ROOM
908C
OFFICE
907C
NURSE
LOUNGE
934C
OFFICE
935C
ROOM
936C
ROOM
904C
ROOM
905C
STAIR
STAIR
CENTRAL
NURSE
STATION
932C
PATIENT
RM.
923C
PATIENT
RM.
922C
PATIENT
RM.
921C
PATIENT
RM.
920C
PATIENT
RM.
928C
PATIENT
RM.
929C
ROOM
930C
PATIENT
RM.
931C
PATIENT
ROOM
918C
PATIENT
RM.
913C
RM.
914C
SHOWER
ROOM
919C
PATIENT
RM.
915C
PATIENT
TLT. RM.
915C1
PATIENT
TLT. RM.
913C1
PATIENT
TLT. RM.
914C2
PATIENT
RM.
917C
PATIENT
TLT. RM.
917D
SOILED
UTILITY
910C1
PATIENT
TLT. RM.
911C1
PATIENT
TLT. RM.
923C1
PATIENT
TLT. RM.
922C1
PATIENT
TLT. RM.
921C
PATIENT
TLT. RM.
927C1
PATIENT
RM.
927C
PATIENT
TLT. RM.
931C
PATIENT
ROOM
925C
HSKPG
906C
DATA
906C1
TLT. RM.
921C6
PATIENT
TLT. RM.
920C
PATIENT
TLT. RM.
929C
PATIENT
TLT. RM.
924C1
PROPERLY REMOVE AND DISPOSE OF THE
RECESSED RADIATOR HEAT SHIELD AND
ALL ASBESTOS INSULATION ON THE BACK
OF THE SHIELD. REMOVE ALL INSULATION
ON ANY PIPING. THE SHIELD AND ALL
INSULATION SHALL BE REMOVED AND
DISPOSED OF AS ASBESTOS-WASTE.
REMOVE EXISTING
COVER. REFER TO
DRAWING M-100.
REMOVE AND
PROPERLY DISPOSE
OF ALL INSULATION
ON EXISTING STEAM
RISERS WITHIN
EXTERIOR WALL
CAVITY. INSULATION
IS ASSUMED TO BE
ASBESTOS-CONTAINING.
NO INSULATION
SHALL REMAIN.
EL
PS
EL
PR
FINISHED FLOOR
EXISTING
WINDOW
REMOVE EXISTING BRANCH LPS & LPR PIPING TO THE EXTENT
SHOWN INCLUDING STEAM TRAP AND CONTROL VALVE. REFER
TO DRAWING M-100.
(CONTRACTOR SHALL ASSUME THAT CONCEALED LPS &
LPR PIPING IS COVERED WITH ASBESTOS INSULATION)
TYPICAL ELEVATION VIEW
EXISTING EXTERIOR
WALL
1/8" = 1'-0"1 9TH FLOOR ASBESTOS ABATEMENT PLAN
ASBESTOS ABATEMENT NOTES
AA-1 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF RECESSED WALL RADIATORS WITH ASBESTOS-CONTAINING INSULATION ON THE BACK OF THE HEAT SHIELD. IN ADDITION, REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING INSULATION ON PIPING LEADING TO THE RADIATORS. APPROXIMATELY 50 RADIATORS WILL BE RAISED IN HEIGHT ABOVE FLOOR LEVEL. REMOVE ALL ASBESTOS FROM THE HEAT SHIELDS. NO INSULATION IS TO REMAIN AT THE RECESSED WALL RADIATOR CAVITIES. REFER TO DRAWING MD-100 FOR LOCATIONS. ALL RADIATORS AND INSULATION SHALL BE DISPOSED OF AS
ASBESTOS-WASTE.
THERE IS ASBESTOS-CONTAINING PIPE INSULATION ON THE PIPE RUNS FEEDING THE RADIATORS. ALL PIPE INSULATION SHALL BE REMOVED ON PIPING IN CHASES AT THE RECESSED WALL RADIATORS. REFER TO DETAIL 2. REMOVE ALL ASBESTOS INSULATION ON THE BRANCH LINES BACK TO THE RISERS. ALL INSULATION SHALL BE REMOVED FROM RISERS AND LATERALS. COORDINATE ACCESS WITH THE GENERAL CONTRACTOR, MECHANICAL CONTRACTOR OR APPROPRIATE TRADES FOR ACCESS TO ALL PIPING. DISPOSE OF ALL INSULATION AS FRIABLE ASBESTOS WASTE.
AA-2 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE STAINLESS STEEL SINK WITH ASBESTOS-CONTAINING PINK UNDERCOATING.
AA-3 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE VINYL COVE BASE AND THE ASBESTOS-CONTAINING 12” X 12” WHITE STREAKED FLOOR TILE. THE COVE BASE AND FLOOR TILE MASTIC ARE NON-ASBESTOS. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY ITEMS (CABINETS, CARPETING, ETC.) OR EQUIPMENT THAT ARE ON TOP OF THE FLOOR TILE. THE MASTIC SHALL BE REMOVED AFTER CLEARANCE SAMPLES ARE OBTAINED. CONTRACTOR SHALL NEUTRALIZE ALL SOLVENTS (PER THE MANUFACTURER'S DIRECTIONS) TO ALLOW FOR INSTALLATION OF NEW FLOORING.
AA-4 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE VINYL COVE BASE, 12” X 12” LIGHT GREEN FLOOR TILE AND THE ASBESTOS-CONTAINING FLOOR TILE MASTIC. THE COVE BASE AND FLOOR TILE ARE NON-ASBESTOS. ALL FLOORING MATERIAL SHALL BE REMOVED COMPLETELY TO THE CONCRETE SLAB.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY ITEMS (CABINETS, CARPETING, ETC.) OR EQUIPMENT THAT ARE ON TOP OF THE FLOOR TILE.
CONTRACTOR SHALL NEUTRALIZE ALL SOLVENTS (PER THE MANUFACTURER'S DIRECTIONS) TO ALLOW FOR INSTALLATION OF NEW FLOORING.
AA-5 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE ASBESTOS-CONTAINING RED-BROWN MASTIC ON THE NON-ASBESTOS-CONTAINING CORK PIPE INSULATION. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION OF SUSPENDED CEILINGS TO ACCESS THE MASTIC.
AA-6 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE TERRAZZO SHOWER BASIN AND ASBESTOS-CONTAINING WATERPROOFING/VAPOR BARRIER BELOW THE TERRAZZO SHOWER BASIN. ALL WATERPROOFING/VAPOR BARRIER SHALL BE REMOVED COMPLETELY TO THE CONCRETE SLAB.
AA-7 NOT USED
AA-8 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING PIPE AND MUD FITTING INSULATION THAT IS WITHIN WALL CHASES TO ACCOMMODATE ALL DEMOLITION, REMOVAL, AND INSTALLATION OF NEW PIPING AND HVAC DUCTWORK. REFER TO PLUMBING AND MECHANICAL PLANS FOR APPROXIMATE LOCATIONS OF NEW PIPING AND DUCTS. ALL INSULATION AND PIPING WITHIN DESIGNATED CHASES SHALL BE REMOVED WITHIN THE REGULATED ASBESTOS ABATEMENT WORK AREA. CLEAN
CHASES TO ALLOW FOR INSTALLATION OF NEW PIPING AND DUCTWORK.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION OF THE CHASES AS REQUIRED TO ACCESS THE ASBESTOS INSULATION AND TO ALLOW FOR THE
PLUMBING WORK AND INSTALLATION OF NEW HVAC DUCTS.
AA-9 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF SHEET METAL DUCTWORK WITH ASBESTOS-CONTAINING FLANGE SEALANT ON SECTIONS SCHEDULED FOR REMOVAL. REFER TO MECHANICAL DEMOLITION DRAWINGS FOR SECTIONS TO BE REMOVED. DUCTS ARE LOCATED ABOVE CEILINGS. WRAP SECTIONS OF DUCT WITH FLANGE SEALANT WITH TWO LAYERS OF 6-MIL PLASTIC SHEETING. PRIOR TO LEAVING THE REGULATED ASBESTOS ABATEMENT WORK AREA. ALL
SECTIONS OF DUCTWORK WITH FLANGE SEALANT SHALL BE DISPOSED OF AS ASBESTOS WASTE.
AA-10 CONTRACTOR SHALL CONDUCT CEILING DEMOLITION WITHIN PROJECT LIMITS AND REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING PIPE AND MUD FITTING INSULATION THAT IS ABOVE CEILINGS THAT BECOME ACCESSIBLE AS A RESULT OF THE DEMOLITION/RENOVATION WORK. ALL CEILING DEMOLITION SHALL OCCUR UNDER NEGATIVE AIR CONTAINMENT WITHIN THE REGULATED ASBESTOS ABATEMENT WORK AREA. REFER TO ARCHITECTURAL DEMOLITION PLANS FOR LIMITS OF CEILING DEMOLITION. ALL PIPE INSULATION, HARD CEILINGS, AND ASSOCIATED DEBRIS SHALL BE DISPOSED OF AS ASBESTOS-WASTE. SALVAGE SUSPENDED CEILING TILES AND ASSOCIATED SUPPORT GRID WORK, CLEAN OFF ANY ASBESTOS DEBRIS AND TURN OVER TO THE OWNER/OWNER'S
REPRESENTATIVE FOR RE-INSTALLATION BY OTHER TRADES.
AA-1
AA-3
AA-3
AA-3
AA-3 AA-3
AA-3 AA-3
AA-3 AA-3
AA-3
AA-3
AA-3 AA-3 AA-3 AA-3
AA-3
AA-3 AA-3
AA-3
AA-3
AA-3
AA-3
AA-4
AA-4
AA-4
AA-4
AA-4
AA-4
AA-1
AA-1
AA-1
AA-1 AA-1
AA-8
AA-2
AA-8
AA-8
AA-5
AA-6
AA-8
AA-8
AA-8
AA-8
AA-8
AA-1
AA-1
AA-1
AA-1
AA-8
AA-1 AA-1
AA-1
AA-4
AA-8
AA-8
AA-1
AA-3
AA-1
AA-1
AA-1
AA-1
AA-1
AA-1
AA-1
AA-1
AA-1
AA-1
AA-1
NORTH
KEY PLAN
C D
AB
0' 4' 8' 16' 32'
1/8" = 1'-0"
NOT TO SCALE2 EXISTING STEAM RADIATOR REMOVAL DETAIL
NOTE: THE BRANCH LINES OFF OF THE STEAM RISERS
MAY FEED MORE THAN ONE RADIATOR.
AA-3
DRAWING NOTES
A. THERE IS AN ASBESTOS-CONTAINING INSULATION BOARD BEHIND THE RECESSED RADIATOR HEAT SHIELDS. ONLY THE RECESSED RADIATORS ON THE NINTH FLOOR ARE TO BE DISTURBED. THE RADIATORS CAN ONLY BE SHUT DOWN DURING THE NON-HEATING SEASON. CAREFULLY COORDINATE WORK TO PERFORM THE REQUIRED ABATEMENT DURING THE
NON-HEATING PERIODS. ALL OTHER RADIATORS SHALL NOT BE REMOVED OR DISTURBED.
B. THERE IS AN ASBESTOS-CONTAINING BLACK PAPER AND TAR COVERING THE COPPER FLASHING BELOW THE WINDOWS. THE MATERIAL IS NOT SCHEDULED TO BE DISTURBED AS A
RESULT OF THIS PROJECT.
C. ALL CEILINGS WITHIN THE NINTH FLOOR PROJECT LIMITS SHALL BE DEMOLISHED. LIMITED CEILING DEMOLITION IS SCHEDULED TO TAKE PLACE ON THE EIGHTH FLOOR DIRECTLY BELOW THE NINTH FLOOR TO REMOVE AND REPLACE THE WASTE PIPING AND TO PERFORM TIE-INS TO THE PLUMBING AND MECHANICAL LINES ASSOCIATED WITH THE NINTH FLOOR RENOVATIONS. THERE IS ASBESTOS INSULATION ON THE HEATING AND DOMESTIC WATER LINES AND ASBESTOS DEBRIS ABOVE ALL HARD CEILINGS. CONTRACTOR SHALL ASSUME THERE WILL BE SOME ABATEMENT WORK AT EACH RISER LOCATION ON THE EIGHTH FLOOR WHERE NEW CONNECTIONS WILL BE MADE FOR THE SANITARY LINES. THE CEILING TILES AND CEILING PLASTER IN THE BUILDING DO NOT CONTAIN ASBESTOS AND THE WASTE PIPING IS NOT INSULATED. DEMOLITION OF CEILING AND REMOVAL OF ANY PLUMBING OR
WASTE PIPING ABOVE CEILINGS MUST BE CONDUCTED AS AN ASBESTOS PROJECT.
D. REFER TO MECHANICAL DEMOLITION DRAWINGS MD-101 AND MD-102 AND PLUMBING DEMOLITION DRAWINGS PD-100, PD-101, AND PD-102 FOR ADDITIONAL INFORMATION REGARDING THE LOCATION OF ASBESTOS INSULATED PIPING. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR EXTENTS OF DEMOLITION.
E. REFER TO DRAWINGS G-005 THROUGH G-009 FOR REQUIREMENTS PERTAINING TO LIFE SAFETY MEASURES AND TO COORDINATE PHASING OF THE WORK.
F. REFER TO THE RECORD DRAWINGS THAT HAVE BEEN INCLUDED WITH THE BID DOCUMENTS FOR ADDITIONAL INFORMATION REGARDING THE LOCATION OF PLUMBING AND STEAM LINES THAT MAY BE COVERED WITH ASBESTOS INSULATION. ASSUME ALL HOT AND COLD WATER LINES AND STEAM LINES HAVE ASBESTOS INSULATION. THE RECORD DRAWINGS
HAVE BEEN INCLUDED FOR REFERENCE ONLY.
G. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
H. THE ABATEMENT WORK WILL OCCUR IN PHASES. REFER TO DRAWING G-005 AND G-006 FOR PHASING PLANS. ALL DEMOLITION OF CEILINGS AND WALL CHASES SHALL BE PERFORMED WHILE THE ABATEMENT CONTRACTOR IS ON SITE AND THE AREA IS UNDER NEGATIVE PRESSURE. ABATEMENT CONTRACTOR SHALL VERIFY THAT ALL AREAS WHERE ASBESTOS PIPE INSULATION MAY BE PRESENT, I.E. INSIDE WALL CHASES AND COLUMNS, IS REMOVED PRIOR TO THE ABATEMENT CONTRACTOR DEMOBILIZING.
I. ALL SHUT DOWNS MUST BE APPROVED BY VAMC FACILITIES DEPARTMENT PRIOR TO IMPLEMENTATION.
AA-102
9TH FLOOR ASBESTOS
ABATEMENT PLAN AND DETAIL
EJ CD
AA-8
AA-8
AA-8
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10 AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-10
AA-9
AA-9 AA-9
AA-9
AA-7
AA-8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ABATEMENT CONSULTANT:
Revisions: Date:
WARD 9C RENOVATIONS
3495 BAILEY AVENUE BUFFALO, NY 14215
528-18-109
528-18-109-
45% DESIGN SUBMISSION
DESIGN DOCUMENT SUBMISSION
8-7-2020 3-15-2021
90% DESIGN SUBMISSION 6-18-2021
100% DESIGN SUBMISSION 10-29-2021
BID DOCUMENTS 2-25-2022
95 Perry Street, Suite 300 Buffalo, NY 14203 February 25, 2022
AA-5 AA-5
AA-5
AA-5AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5 AA-5
AA-5AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
AA-5
TYP.
TYP.
TYP.
TYP.
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
AA-10
AA-5
ENVIRONMENTAL NOTES
E-1 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND DISPOSE OF FLUORESCENT BULBS IN LIGHTING SCHEDULED FOR REMOVAL WITHIN THE PROJECT WORK AREA. REFER TO ELECTRICAL DEMOLITION PLANS. RECYCLE ALL REMOVED BULBS IN ACCORDANCE WITH THE 40 CFR PART 273 US EPA UNIVERSAL WASTE RULE.
ANY FLUORESCENT LAMPS BROKEN DURING DEMOLITION SHALL BE DISPOSED OF AS HAZARDOUS WASTE.
E-2 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND DISPOSE OF FLUORESCENT BALLASTS SCHEDULED FOR REMOVAL WITHIN THE PROJECT WORK AREA.
REFER TO ELECTRICAL DEMOLITION PLANS. THE BALLASTS REMOVED FOR THIS PROJECT MAY CONTAIN DEHP AND/OR PCBS. CONTRACTOR TO PROPERLY
DISPOSE OF ALL BALLASTS.
E-3 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND RECYCLE BATTERIES IN EXIT LIGHTS SCHEDULED FOR DEMOLITION. REFER TO ELECTRICAL
DEMOLITION PLANS.
E-1 E-2 E-3
TYP.
E-1 E-2 E-3
TYP.
E-1 E-2 E-3
TYP.
AA-1
AA-1
AA-1
AA-1
AA-1
SINK
GENERAL NOTES
A. CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL APPLICABLE FEDERAL AND STATE RULES, REGULATIONS, GUIDELINES
AND THE CONTRACT DOCUMENTS.
B. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. CONTRACTOR IS
RESPONSIBLE FOR FIELD VERIFICATION OF EXISTING CONDITIONS PRIOR TO BIDDING.
C. THE LOCATION OF ANY SITE STORAGE OF MATERIAL, EQUIPMENT, AND WASTE TRAILER/DUMPSTER SHALL BE COORDINATED WITH AND APPROVED BY
THE RESIDENT ENGINEER.
D. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT AND SUPPLIES.
E. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION. CONTRACTOR SHALL ENSURE THAT UNCERTIFIED
PERSONNEL OR UNAUTHORIZED VISITORS DO NOT ENTER ACTIVE WORK AREAS AT ANY TIME.
F. THE REMOVAL OR DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL SHALL BE PERFORMED BY A NYS LICENSED ASBESTOS ABATEMENT CONTRACTOR. REFER TO SPECIFICATION SECTIONS 028213.13 AND 028213.19 FOR ADDITIONAL REQUIREMENTS FOR THE REMOVAL OF
ASBESTOS-CONTAINING MATERIALS.
G. THE CONSTRUCTION AREA SHALL BE COMPLETELY SEPARATED FROM OTHER PORTIONS OF THE BUILDING BY USING TEMPORARY CONSTRUCTION
DETAILS AS SHOWN ON DRAWING G-005.
H. NEGATIVE PRESSURE SHALL BE ESTABLISHED INSIDE THE INTERIOR WORK AREA(S) PRIOR TO THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL. ROUTING OF THE NEGATIVE AIR EXHAUST DUCT SHALL BE DECIDED UPON AFTER CONSULTATION WITH VAMC AND VAMC'S
REPRESENTATIVE.
I. CONTRACTOR SHALL COORDINATE THE REMOVAL OF THE ASBESTOS WASTE MATERIALS FROM THE BUILDING WITH VAMC AND VAMC'S REPRESENTATIVE. THE REMOVAL OF THE ASBESTOS WASTE SHALL BE PERFORMED AT TIMES WHEN IT DOES NOT INTERFERE WITH NORMAL FACILITY
ACTIVITIES.
J. ALL ASBESTOS-CONTAINING MATERIAL SHALL BE PROPERLY PACKAGED PRIOR TO BEING REMOVED FROM THE WORK AREA. ASBESTOS WARNING LABELS SHALL BE APPLIED TO THE ASBESTOS WASTE BAGS. ALL ASBESTOS MATERIALS THAT ARE REMOVED FROM THE SITE SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. THE COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE VAMC AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.
K. CONTRACTOR SHALL CLEAN ALL AREAS OUTSIDE THE WORK AREA AND ANY AREAS WHERE CONTRACTOR'S PERSONNEL TRAVEL THROUGH THE BUILDING.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .