528-18-109 Air Monitor Drawing Set.pdf

PDF 4 MB Posted

Attached to
F999--NRM-SERVICES 528-18-109 AIR MONITOR 9C RENOVATION
Solicitation number
36C24223Q0887
Issued by

About this file

This solicitation is for air monitoring and environmental services at the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 facility located at 3495 Bailey Avenue in Buffalo, New York. The solicitation number is 36C24223Q0887 and it is for project 528-18-109. Services required include asbestos abatement, environmental monitoring, and medical gas system work during the 9C renovation project. The period of performance is from the award date through project completion, which is anticipated to be February 2023. The place of performance is the medical center located at 3495 Bailey Avenue in Buffalo.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

95 Perry Street, Suite 300 Buffalo, NY 14203

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT: WARD 9C RENOVATIONS

3495 BAILEY AVENUE BUFFALO, NY 14215

528-18-109

528-18-109-

45% DESIGN SUBMISSION

DESIGN DOCUMENT SUBMISSION 3-15-2021

8-7-2020

90% SUBMISSION 6-18-2021

100% SUBMISSION 10-29-2021

BID DOCUMENTS 2-25-2022

B

IM

/B u ff a lo

V A

W a rd

C

R e d e s ig n

C o n s tr u c ti o n /1

A R

C H

.r v t

/2

/2

:3

:5

P

M

G-000

TITLE SHEET

February 25, 2022 RAS RLB

VA PROJECT #:

CONSULTANT PROVIDING

ARCHITECTURAL &

ENVIRONMENTAL

SERVICES:

PATHFINDER ENGINEERS &

ARCHITECTS LLP

134 SOUTH FITZHUGH STREET

ROCHESTER, NY 14608

PHONE: (585) 325 6004

FAX: (585) 325 6005

DEPARTMENT OF VETERANS AFFAIRS

WARD 9C RENOVATIONS - WNYHS BUFFALO, NY

3495 BAILEY AVENUE

BUFFALO, NY 14215

DEPARTMENT OF VETERANS AFFAIRS

528-18-109

PRIME CONSULTANT PROVIDING

MECHANICAL, ELECTRICAL,

PLUMBING & FIRE PROTECTION

SERVICES:

WATTS ARCHITECTURE &

ENGINEERING

95 PERRY STREET, SUITE 300

BUFFALO, NEW YORK 14203

PHONE: (716) 206-5100

FAX: (716) 206-5199

BAILEY AVE

DRAWING INDEX:

GENERAL

ASBESTOS ABATEMENT

FIRE PROTECTION

ELECTRICAL

N O

R T

H

MECHANICAL CONT'D

MECHANICAL

D C

B A

ARCHITECTURAL

EI-702 ELECTRICAL CRITICAL POWER PARTIAL RISER DIAGRAM

EI-703 ELECTRICAL FIRE ALARM RISER DIAGRAM

EI-704 ELECTRICAL NURSE CALL RISER DIAGRAM

EI-705 IT PARTIAL RISER DIAGRAM

EI-706 LIFE SAFETY RISER ARC FLASH STUDY

EI-800 ELECTRICAL SCHEDULES

EI-801 ELECTRICAL SCHEDULES

EI-802 ELECTRICAL SCHEDULES

E-000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

ED-100 ELECTRICAL DEMOLITION PLAN - WING 8C

ED-101 ELECTRICAL DEMOLITION PLAN - WING 9C

EP-101 POWER PLAN - WING 8C

EP-102 POWER PLAN - WING 9C

EP-103 POWER PLAN - ROOF

EP-104 FIRST FLOOR POWER PLAN

EP-105 BASEMENT POWER PLAN

EP-106 SUB-BASEMENT POWER PLAN

EL-201 LIGHTING PLAN - WING 8C

EL-202 LIGHTING PLAN - WING 9C

EY-301 FIRE ALARM PLAN - WING 8C

EY-302 FIRE ALARM PLAN - WING 9C

EY-401 DATA SYSTEMS PLAN - WING 9C

EY-402 NURSE CALL SYSTEMS PLAN - WING 9C

EY-403 SECURITY SYSTEMS PLAN - WING 9C

EI-600 ELECTRICAL DETAILS

EI-601 ELECTRICAL DETAILS

EI-700 ELECTRICAL NORMAL POWER PARTIAL RISER DIAGRAM

EI-701 ELECTRICAL LIFE SAFETY POWER PARTIAL RISER DIAGRAM

F-000 FIRE PROTECTION SYMBOLS, NOTES & ABBREVIATIONS

FD-100 FIRE PROTECTION DEMOLITION PLAN - WING 8C

FD-101 FIRE PROTECTION DEMOLITION PLAN - WING 9C

F-100 FIRE PROTECTION PLAN - WING 8C

F-101 FIRE PROTECTION PLAN - WING 9C

PP-000 PLUMBING SYMBOLS, NOTES & ABBREVIATIONS

PD-100 PLUMBING DEMOLITION PLAN - WING 8C

PD-101 PLUMBING DEMOLITION PLAN - WING 9C

PD-102 MEDICAL GAS DEMOLITION PLAN - WING 9C

PG-300 MEDICAL GAS PLAN - WING 9C

PL-200 SANITARY PLAN - WING 8C

PL-201 SANITARY PLAN - WING 9C

PP-100 PLUMBING PLAN - WING 8C

PP-101 PLUMBING PLAN - WING 9C

PP-200 PLUMBING ENLARGED PLANS

PP-201 PLUMBING ENLARGED PLANS

PP-202 PLUMBING ENLARGED PLANS

PP-300 PLUMBING SCHEMATICS

PP-301 SANITARY SCHEMATICS

PP-400 PLUMBING DETAILS

MI-302 HVAC SCHEMATICS AHU-9C-3

MI-303 HVAC SCHEMATICS AHU-9C-4

MI-304 HVAC SCHEMATICS AHU-9C-5

MI-305 HYDRONIC SCHEMATICS

MI-500 AIR DISTRIBUTION DETAILS I

MI-501 AIR DISTRIBUTION DETAILS II

MI-502 AIR DISTRIBUTION DETAILS III

MI-503 HYDRONIC DETAILS I

MI-504 HYDRONIC DETAILS II

MI-505 STEAM DETAILS

MI-506 ROOF DETAILS

MI-600 MECHANICAL CONTROLS

MI-601 MECHANICAL CONTROLS

MI-602 MECHANICAL CONTROLSM-001 GENERAL MECHANICAL SCHEDULES

M-002 MECHANICAL SCHEDULES AHU-9C-1

M-003 MECHANICAL SCHEDULES AHU-9C-2

M-004 MECHANICAL SCHEDULES AHU-9C-3

M-005 MECHANICAL SCHEDULES AHU-9C-4

M-006 MECHANICAL SCHEDULES AHU-9C-5

MD-101 HVAC DEMOLITION PLAN - WING 9C

MH-101 HVAC PLAN - WING 8C

MH-102 HVAC PLAN - WING 9C

MH-103 HVAC PLAN - WING 10C & 11C

MH-104 HVAC PLAN - ROOF AREA C

MH-401 ENLARGED HVAC PLANS I

MH-402 ENLARGED HVAC PLANS II

MP-201 HYDRONIC PIPING PLAN - WING 8C

MP-202 HYDRONIC PIPING PLAN - WING 9C

MP-401 ENLARGED HYDRONIC PLANS

MI-300 HVAC SCHEMATICS AHU-9C-1

MI-301 HVAC SCHEMATICS AHU-9C-2

A-501 SECTIONS & DETAILS

A-502 PLAN DETAILS

A-503 TYPICAL DETAILS & SECTION DETAILS

A-504 TYPICAL DETAILS

A-505 MILLWORK ELEVATIONS & SECTIONS

A-506 MILLWORK SECTIONS & DETAILS

A-507 MILLWORK SECTIONS & DETAILS

A-601 PARTITION TYPES, WINDOW TYPES & DETAILS

A-602 DOOR TYPES, SCHEDULE & DETAILS, LOUVER DETAILS

A-603 ROOM FINISH SCHEDULE

A-604 EQUIPMENT SCHEDULE

M-000 MECHANICAL SYMBOLS, NOTES & ABBREVIATIONS

AD-100 7TH FLOOR DEMOLITION CEILING PLAN

AD-101 8TH FLOOR DEMOLITION PLAN

AD-102 8TH FLOOR DEMOLITION CEILING PLAN

AD-103 9TH FLOOR DEMOLITION PLAN

AD-104 9TH FLOOR DEMOLITION CEILING PLAN

AD-105 10TH FLOOR & PARTIAL 11TH FLOOR DEMOLITION PLAN

A-100 8C OVERALL FLOOR PLAN

A-101 9C OVERALL FLOOR PLAN

A-102 10C OVERALL FLOOR PLAN

A-103 11C OVERALL FLOOR PLAN, ROOF PLAN

A-104 9TH FLOOR EQUIPMENT PLAN

A-105 9TH FLOOR FINISH PLAN

A-106 MILLWORK PLAN & SCHEDULE

A-107 9TH FLOOR - SIGNAGE

A-108 7C REFLECTED CEILING PLAN

A-109 8C REFLECTED CEILING PLAN

A-110 9C REFLECTED CEILING PLAN

A-201 INTERIOR ELEVATIONS

A-202 INTERIOR ELEVATIONS

A-203 INTERIOR ELEVATIONS

A-204 INTERIOR ELEVATIONS

A-205 CORRIDOR ELEVATIONS

A-206 CORRIDOR ELEVATIONS

A-401 9TH FLOOR - PARTIAL FLOOR PLAN - AREA 'A'

A-402 9TH FLOOR - PARTIAL FLOOR PLAN - AREA 'B'

A-403 9TH FLOOR - PARTIAL FLOOR PLAN - AREA 'C'

A-404 9TH FLOOR - PARTIAL CEILING PLAN - AREA 'A'

A-405 9TH FLOOR - PARTIAL CEILING PLAN - AREA 'B'

A-406 9TH FLOOR - PARTIAL CEILING PLAN - AREA 'C'

S-001 GENERAL NOTES

S-100 8TH FLOOR FRAMING PLAN

S-101 9TH FLOOR FRAMING PLAN

S-102 10TH FLOOR FRAMING PLAN

S-103 11TH & PARTIAL 12TH FLOOR FRAMING PLANS

S-500 STRUCTURAL DETAILS

AA-100 8TH FLOOR ASBESTOS ABATEMENT PLAN

AA-101 9TH FLOOR ASBESTOS ABATEMENT PLAN AND DETAIL

AA-102 10TH & 11TH FLOOR ASBESTOS ABATEMENT PLANS

G-000 TITLE SHEET

G-001 GENERAL NOTES, ABBREVIATIONS, AND LEGENDS

G-002 8TH FLOOR CODE COMPLIANCE DRAWINGS

G-003 9TH FLOOR CODE COMPLIANCE DRAWINGS

G-004 10TH FLOOR CODE COMPLIANCE DRAWINGS

G-005 7TH FLOOR - PHASING FLOOR PLAN

G-006 8TH FLOOR - PHASING FLOOR PLAN

G-007 10TH FLOOR - PHASING FLOOR PLAN

G-008 11TH FLOOR - PHASING FLOOR PLAN

G-009 INTERIM LIFE SAFETY MEASURES

G-010 INFECTION CONTROL RISK PLAN

STRUCTURAL

PLUMBING

ARCHITECTURAL CONT'D ELECTRICAL CONT'D

Revisions: Date:

D C B A

DD

C.1

5.1

EFGH

CC

BB

AA

STAIR

STAIR

STAIR

DN

UP

DN

UP

D N

U P

ANTE ROOM

WALK OFF MATS

C

B A

D

KEY PLAN

INFECTION CONTROL RISK ASSESSMENT NOTES

MINIMUM REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS | BEFORE AND

DURING WORK ACTIVITY:

1. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241

REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS

REMOVED, TO THE DECK ABOVE.

2. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE

COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS

MUST BE EFFECTIVELY AFFIXED TO GROUND AND CEILING AND SECURE FROM

MOVEMENT OR DAMAGE. APPLY TAPE THAT WILL NOT LEAVE A RESIDUE TO SEAL

GAPS BETWEEN BARRIERS, CEILING OR FLOOR.

3. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND

CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE

FOR BARRIER TYPE).

4. CONTAINMENT UNITS OR ENVIRONMENTAL CONTAINMENT UNITS (ECUS)

APPROVED FOR CLASS IV PRECAUTIONS IN SMALL AREAS TOTALLY CONTAINED BY

THE UNIT AND THAT HAS HEPA-FILTERED EXHAUST AIR.

5. REMOVE OR ISOLATE RETURN AIR DIFFUSERS TO AVOID DUST ENTERING THE

HVAC SYSTEM.

6. REMOVE OR ISOLATE THE SUPPLY AIR DIFFUSERS TO AVOID POSITIVE

PRESSURIZATION OF THE SPACE.

7. NEGATIVE AIRFLOW PATTERN MUST BE MAINTAINED FROM THE ENTRY POINT TO

THE ANTEROOM AND INTO THE CONSTRUCTION AREA. THE AIRFLOW MUST

CASCADE FROM OUTSIDE TO INSIDE THE CONSTRUCTION AREA. THE ENTIRE

CONSTRUCTION AREA MUST REMAIN NEGATIVELY PRESSURIZED.

8. MAINTAIN NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF

HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS. EXHAUST DISCHARGED

DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM ENTRANCES,

AIR INTAKES AND WINDOWS DOES NOT REQUIRE HEPA-FILTERED AIR.

9. IF EXHAUST IS DIRECTED INDOORS, THEN THE SYSTEM MUST BE HEPA FILTERED.

PRIOR TO START OF WORK, HEPA FILTRATION MUST BE VERIFIED BY PARTICULATE

MEASUREMENT AS NO LESS THAN 99.97% EFFICIENCY AND MUST NOT ALTER OR

CHANGE AIRFLOW/PRESSURE RELATIONSHIPS IN OTHER AREAS.

10. EXHAUST INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED

EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS NOT ACCEPTABLE.

11. INSTALL DEVICE (E.G., MAGNEHELIC, MANOMETER, OR DIGITAL MONITORING) ON

EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR NEGATIVE

PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR APPARATUS ARE NOT

ACCEPTABLE.

12. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA.

13. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE

USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS.

THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF VISIBLE

DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.

14. WORKER CLOTHING MUST BE CLEAN AND FREE OF VISIBLE DUST BEFORE

LEAVING THE WORK AREA. HEPA VACUUMING OF CLOTHING OR USE OF COVER

SUITES IS ACCEPTABLE.

15. WORKERS MUST WEAR SHOE COVERS PRIOR TO ENTRY INTO THE WORK AREA.

SHOE COVERS MUST BE CHANGED PRIOR TO EXITING THE ANTEROOM TO THE

OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE

IMMEDIATELY CHANGED.

16. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK

AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY

AND WHEN VISIBLY SOILED.

17. CONSIDER COLLECTION OF PARTICULATE DATA DURING WORK TO MONITOR AND

ENSURE THAT CONTAMINATES DO NOT ENTER THE OCCUPIED SPACES. ROUTINE

COLLECTION OF PARTICULATE SAMPLES MAY BE USED TO VERIFY HEPA

FILTRATION EFFICIENCIES.

MINIMUM REQUIRED INFECTION CONTROL PRECAUTIONS - UPON COMPLETION OF

WORK ACTIVITY:

CLASS III (TYPE C ACTIVITIES ONLY), IV, AND V PRECAUTIONS REQUIRE INSPECTION

AND DOCUMENTATION FOR DOWNGRADED ICRA PRECAUTIONS.

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST OR

DESIGNEE AND ENGINEERING REPRESENTATIVE FOR DISCONTINUATION OR

DOWNGRADING OF ICRA PRECAUTIONS.

WORK AREA CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH

HORIZONTAL SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION

ON UPPER SURFACES AS WELL AS AIR DIFFUSER SURFACES.

REMOVAL OF CRITICAL BARRIERS:

1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING

DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE

TOUCH-UP WORK. THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA

CLEANING HAS BEEN PERFORMED.

2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN

A MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING

PRECAUTIONS WHEN REMOVING HARD BARRIERS:

1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-

HELD HEPA VACUUM.

3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING

OUTER HARD BARRIER.

5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE

GENERATED.

NEGATIVE AIR REQUIREMENTS:

1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINATES

FROM THE WORK AREA.

2. NEGATIVE AIR DEVICES MUST REMAIN OPERATIONAL AT ALL TIMES AND IN

PLACE FOR A PERIOD AFTER COMPLETION OF DUST CREATING ACTIVITIES TO

REMOVE CONTAMINANTS FROM THE WORK AREA AND BEFORE REMOVAL OF

CRITICAL BARRIERS.

HVAC SYSTEMS:

1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM

IN AREAS WHERE WORK IS BEING PERFORMED.

2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

3. VERIFY THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR EXCHANGE

DESIGN SPECIFICATIONS.

95 Perry Street, Suite 300 Buffalo, NY 14203

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT: WARD 9C RENOVATIONS

3495 BAILEY AVENUE BUFFALO, NY 14215

528-18-109

528-18-109-

45% DESIGN SUBMISSION

DESIGN DOCUMENT SUBMISSION 3-15-2021

8-7-2020

90% SUBMISSION 6-18-2021

100% SUBMISSION 10-29-2021

BID DOCUMENTS 2-25-2022

B

IM

/B u ff a lo

V A

W a rd

C

R e d e s ig n

C o n s tr u c ti o n /1

A R

C H

.r v t

/2

/2

:5

:0

A

M

G-010

INFECTION CONTROL RISK PLAN

February 25, 2022 RAS SRK

1/8" = 1'-0"1

9TH FLOOR INFECTION CONTROL RISK PLAN

NORTH

1/8" = 1'-0"

0' 4' 8' 16' 32'

Revisions: Date:

PROPERLY REMOVE AND DISPOSE OF THE

RECESSED RADIATOR HEAT SHIELD AND

ALL ASBESTOS INSULATION ON THE BACK

OF THE SHIELD. REMOVE ALL INSULATION

ON ANY PIPING. THE SHIELD AND ALL

INSULATION SHALL BE REMOVED AND

DISPOSED OF AS ASBESTOS-WASTE.

REMOVE EXISTING

COVER. REFER TO

DRAWING M-100.

REMOVE AND

PROPERLY DISPOSE

OF ALL INSULATION

ON EXISTING STEAM

RISERS WITHIN

EXTERIOR WALL

CAVITY. INSULATION

IS ASSUMED TO BE

ASBESTOS-CONTAINING.

NO INSULATION

SHALL REMAIN.

EL

PS

EL

PR

FINISHED FLOOR

EXISTING

WINDOW

REMOVE EXISTING BRANCH LPS & LPR PIPING TO THE EXTENT

SHOWN INCLUDING STEAM TRAP AND CONTROL VALVE. REFER

TO DRAWING M-100.

(CONTRACTOR SHALL ASSUME THAT CONCEALED LPS &

LPR PIPING IS COVERED WITH ASBESTOS INSULATION)

TYPICAL ELEVATION VIEW

EXISTING EXTERIOR

WALL

D C B A

D C B A

DD

C.1

5.1

EFGH

CC

BB

AA

13 13

1/8" = 1'-0"1 7TH FLOOR ASBESTOS ABATEMENT PLAN

ASBESTOS ABATEMENT NOTES

AA-1 NOT USED

AA-2 NOT USED

AA-3 NOT USED

AA-4 NOT USED

AA-5 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE ASBESTOS-CONTAINING RED-BROWN MASTIC ON THE NON-ASBESTOS-CONTAINING CORK PIPE INSULATION. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION OF SUSPENDED CEILINGS TO ACCESS THE MASTIC.

AA-6 NOT USED

AA-7 NOT USED

AA-8 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING PIPE AND MUD FITTING INSULATION THAT IS WITHIN WALL CHASES TO ACCOMMODATE ALL DEMOLITION, REMOVAL, AND INSTALLATION OF PIPING AND HVAC DUCTWORK. REFER TO PLUMBING AND MECHANICAL PLANS FOR APPROXIMATE LOCATIONS OF NEW PIPING AND DUCTS. ALL INSULATION AND PIPING WITHIN DESIGNATED CHASES SHALL BE REMOVED WITHIN THE REGULATED ASBESTOS ABATEMENT WORK AREA. CLEAN

CHASES TO ALLOW FOR INSTALLATION OF NEW PIPING AND DUCTWORK.

AA-9 NOT USED

AA-10 CONTRACTOR SHALL CONDUCT CEILING DEMOLITION WITHIN PROJECT LIMITS AND REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING PIPE AND MUD FITTING INSULATION THAT IS ABOVE CEILINGS THAT BECOME ACCESSIBLE AS A RESULT OF THE DEMOLITION/RENOVATION WORK. ALL CEILING DEMOLITION SHALL OCCUR UNDER NEGATIVE PRESSURE WITHIN THE REGULATED ASBESTOS ABATEMENT WORK AREA. REFER TO ARCHITECTURAL DEMOLITION PLANS FOR LIMITS OF CEILING DEMOLITION. ALL PIPE INSULATION, HARD CEILINGS, AND ASSOCIATED DEBRIS SHALL BE DISPOSED OF AS ASBESTOS-WASTE. SALVAGE SUSPENDED CEILING TILES AND ASSOCIATED SUPPORT GRID WORK, CLEAN OFF ANY ASBESTOS DEBRIS AND TURN OVER TO THE

OWNER/OWNER'S REPRESENTATIVE FOR RE-INSTALLATION BY OTHER TRADES.

NORTH

KEY PLAN

C D

AB

0' 4' 8' 16' 32'

1/8" = 1'-0"

DRAWING NOTES

A. THERE IS AN ASBESTOS-CONTAINING INSULATION BOARD BEHIND THE RECESSED RADIATOR HEAT SHIELDS. ONLY THE RECESSED RADIATORS ON THE NINTH FLOOR ARE TO BE DISTURBED. THE RADIATORS CAN ONLY BE SHUT DOWN DURING THE NON-HEATING SEASON. CAREFULLY COORDINATE WORK TO PERFORM THE REQUIRED ABATEMENT DURING THE

NON-HEATING PERIODS. ALL OTHER RADIATORS SHALL NOT BE REMOVED OR DISTURBED.

B. THERE IS AN ASBESTOS-CONTAINING BLACK PAPER AND TAR COVERING THE COPPER FLASHING BELOW THE WINDOWS. THE MATERIAL IS NOT SCHEDULED TO BE DISTURBED AS A

RESULT OF THIS PROJECT.

C. ALL CEILINGS WITHIN THE NINTH FLOOR PROJECT LIMITS SHALL BE DEMOLISHED. LIMITED CEILING DEMOLITION IS SCHEDULED TO TAKE PLACE ON THE EIGHTH FLOOR DIRECTLY BELOW THE NINTH FLOOR TO REMOVE AND REPLACE THE WASTE PIPING AND TO PERFORM TIE-INS TO THE PLUMBING AND MECHANICAL LINES ASSOCIATED WITH THE NINTH FLOOR RENOVATIONS. THERE IS ASBESTOS INSULATION ON THE HEATING AND DOMESTIC WATER LINES AND ASBESTOS DEBRIS ABOVE ALL HARD CEILINGS. CONTRACTOR SHALL ASSUME THERE WILL BE SOME ABATEMENT WORK AT EACH RISER LOCATION ON THE EIGHTH FLOOR WHERE NEW CONNECTIONS WILL BE MADE FOR THE SANITARY LINES. THE CEILING TILES AND CEILING PLASTER IN THE BUILDING DO NOT CONTAIN ASBESTOS AND THE WASTE PIPING IS NOT INSULATED. DEMOLITION OF CEILING AND REMOVAL OF ANY PLUMBING OR

WASTE PIPING ABOVE CEILINGS MUST BE CONDUCTED AS AN ASBESTOS PROJECT.

D. REFER TO MECHANICAL DEMOLITION DRAWINGS MD-101 AND MD-102 AND PLUMBING DEMOLITION DRAWINGS PD-100, PD-101, AND PD-102 FOR ADDITIONAL INFORMATION REGARDING THE LOCATION OF ASBESTOS INSULATED PIPING. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR EXTENTS OF DEMOLITION.

E. REFER TO DRAWINGS G-005 THROUGH G-009 FOR REQUIREMENTS PERTAINING TO LIFE SAFETY MEASURES AND TO COORDINATE PHASING OF THE WORK.

F. REFER TO THE RECORD DRAWINGS THAT HAVE BEEN INCLUDED WITH THE BID DOCUMENTS FOR ADDITIONAL INFORMATION REGARDING THE LOCATION OF PLUMBING AND STEAM LINES THAT MAY BE COVERED WITH ASBESTOS INSULATION. ASSUME ALL HOT AND COLD WATER LINES AND STEAM LINES HAVE ASBESTOS INSULATION. THE RECORD DRAWINGS

HAVE BEEN INCLUDED FOR REFERENCE ONLY.

G. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.

H. THE ABATEMENT WORK WILL OCCUR IN PHASES. REFER TO DRAWING G-005 AND G-006 FOR PHASING PLANS. ALL DEMOLITION OF CEILINGS AND WALL CHASES SHALL BE PERFORMED WHILE THE ABATEMENT CONTRACTOR IS ON SITE AND THE AREA IS UNDER NEGATIVE PRESSURE. ABATEMENT CONTRACTOR SHALL VERIFY THAT ALL AREAS WHERE ASBESTOS PIPE INSULATION MAY BE PRESENT, I.E. INSIDE WALL CHASES AND COLUMNS, IS REMOVED PRIOR TO THE ABATEMENT CONTRACTOR DEMOBILIZING.

I. ALL SHUT DOWNS MUST BE APPROVED BY VAMC FACILITIES DEPARTMENT PRIOR TO IMPLEMENTATION.

GENERAL NOTES

A. CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL APPLICABLE FEDERAL AND STATE RULES, REGULATIONS, GUIDELINES AND THE

CONTRACT DOCUMENTS.

B. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. CONTRACTOR IS RESPONSIBLE

FOR FIELD VERIFICATION OF EXISTING CONDITIONS PRIOR TO BIDDING.

C. THE LOCATION OF ANY SITE STORAGE OF MATERIAL, EQUIPMENT, AND WASTE TRAILER/DUMPSTER SHALL BE COORDINATED WITH AND APPROVED BY THE

RESIDENT ENGINEER.

D. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT AND SUPPLIES.

E. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION. CONTRACTOR SHALL ENSURE THAT UNCERTIFIED PERSONNEL

OR UNAUTHORIZED VISITORS DO NOT ENTER ACTIVE WORK AREAS AT ANY TIME.

F. THE REMOVAL OR DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL SHALL BE PERFORMED BY A NYS LICENSED ASBESTOS ABATEMENT CONTRACTOR.

REFER TO SPECIFICATION SECTIONS 028213.13 AND 028213.19 FOR ADDITIONAL REQUIREMENTS FOR THE REMOVAL OF ASBESTOS-CONTAINING MATERIALS.

G. THE CONSTRUCTION AREA SHALL BE COMPLETELY SEPARATED FROM OTHER PORTIONS OF THE BUILDING BY USING TEMPORARY CONSTRUCTION DETAILS AS

SHOWN ON DRAWING G-005.

H. NEGATIVE PRESSURE SHALL BE ESTABLISHED INSIDE THE INTERIOR WORK AREA(S) PRIOR TO THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL.

ROUTING OF THE NEGATIVE AIR EXHAUST DUCT SHALL BE DECIDED UPON AFTER CONSULTATION WITH VAMC AND VAMC'S REPRESENTATIVE.

I. CONTRACTOR SHALL COORDINATE THE REMOVAL OF THE ASBESTOS WASTE MATERIALS FROM THE BUILDING WITH VAMC AND VAMC'S REPRESENTATIVE. THE REMOVAL OF THE ASBESTOS WASTE SHALL BE PERFORMED AT TIMES WHEN IT DOES NOT INTERFERE WITH NORMAL FACILITY ACTIVITIES.

J. ALL ASBESTOS-CONTAINING MATERIAL SHALL BE PROPERLY PACKAGED PRIOR TO BEING REMOVED FROM THE WORK AREA. ASBESTOS WARNING LABELS SHALL BE APPLIED TO THE ASBESTOS WASTE BAGS. ALL ASBESTOS MATERIALS THAT ARE REMOVED FROM THE SITE SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. THE COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE VAMC AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE

SHIPMENT RECORDS MUST BE PROVIDED WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.

K. CONTRACTOR SHALL CLEAN ALL AREAS OUTSIDE THE WORK AREA AND ANY AREAS WHERE CONTRACTOR'S PERSONNEL TRAVEL THROUGH THE BUILDING. THESE AREAS SHALL BE LEFT IN A CONDITION AS CLEAN AS OR CLEANER THAN WHEN THE CONTRACTOR ARRIVED ON SITE.

L. THE OTHER THREE WINGS ON THE 9TH FLOOR AND WING C ON THE 7TH, 8TH AND 10TH FLOORS WILL REMAIN OCCUPIED DURING THE ABATEMENT PROJECT.

THEREFORE, ALL ABATEMENT WORK, INCLUDING PREPARATION, MUST BE PERFORMED OFF HOURS, EITHER AT NIGHT OR ON THE WEEKEND. WORK SHALL BE

PERFORMED IN PHASES.

M. IF A REMOTE DECONTAMINATION ENCLOSURE IS UTILIZED FOR THIS WORK, AN AIRLOCK MUST BE ATTACHED TO EACH WORK AREA. THE AIRLOCK SHALL BE SIZED LARGE ENOUGH TO ALLOW FOR THE WORKERS TO CHANGE THEIR SUITS PRIOR TO LEAVING THE WORK AREA. THE DECONTAMINATION ENCLOSURE SHALL BE

CONSTRUCTED IN ACCORDANCE WITH 29 CFR 1926.

N. CONTRACTOR SHALL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN DESCRIBING THE WORK AREA PREPARATION, REMOVAL AND HANDLING PROCEDURES, AS WELL AS DECONTAMINATION ENCLOSURES AND NEGATIVE AIR EXHAUST LOCATIONS PRIOR TO BEING ALLOWED TO START THE PROJECT. THIS WORK PLAN WILL NEED TO BE REVIEWED AND ACCEPTED BY VAMC HEALTH AND SAFETY PERSONNEL PRIOR TO THE START OF WORK.

AA-100

7TH FLOOR ASBESTOS

ABATEMENT PLAN

EJ CD

AA-5

AA-5

AA-5

AA-8

AA-10

AA-10

AA-10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ABATEMENT CONSULTANT:

Revisions: Date:

WARD 9C RENOVATIONS

3495 BAILEY AVENUE BUFFALO, NY 14215

528-18-109

528-18-109-

45% DESIGN SUBMISSION

DESIGN DOCUMENT SUBMISSION

8-7-2020 3-15-2021

90% DESIGN SUBMISSION 6-18-2021

100% DESIGN SUBMISSION 10-29-2021

BID DOCUMENTS 2-25-2022

95 Perry Street, Suite 300 Buffalo, NY 14203 February 25, 2022

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

ENVIRONMENTAL NOTES

E-1 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND DISPOSE OF FLUORESCENT BULBS IN LIGHTING SCHEDULED FOR REMOVAL WITHIN THE PROJECT WORK AREA. REFER TO ELECTRICAL DEMOLITION PLANS. RECYCLE ALL REMOVED BULBS IN ACCORDANCE WITH THE 40 CFR PART 273 US EPA UNIVERSAL WASTE RULE.

ANY FLUORESCENT LAMPS BROKEN DURING DEMOLITION SHALL BE DISPOSED OF AS HAZARDOUS WASTE.

E-2 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND DISPOSE OF FLUORESCENT BALLASTS SCHEDULED FOR REMOVAL WITHIN THE PROJECT WORK AREA.

REFER TO ELECTRICAL DEMOLITION PLANS. THE BALLASTS REMOVED FOR THIS PROJECT MAY CONTAIN DEHP AND/OR PCBS. CONTRACTOR TO PROPERLY

DISPOSE OF ALL BALLASTS.

E-3 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND RECYCLE BATTERIES IN EXIT LIGHTS SCHEDULED FOR DEMOLITION. REFER TO ELECTRICAL

DEMOLITION PLANS.

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

LEAD AWARENESS NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION; INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR

EXPOSURE ABOVE THE PERMISSIBLE EXPOSURE LIMIT.

2. AREAS OF THE BUILDING HAVE BEEN INVESTIGATED FOR THE PRESENCE OF LEAD DURING PAST PROJECTS AND LEAD-BASED PAINT HAS BEEN IDENTIFIED. SURFACES IDENTIFIED TO BE COATED WITH LEAD-BASED PAINT INCLUDE BUT ARE NOT LIMITED TO INCLUDE:

· GREEN CERAMIC WALL TILES.

· WHITE WITH BEIGE SPECKLES CERAMIC WALL TILES.

· TAN CERAMIC WALL TILES.

· WHITE BED PAN SINKS.

· BLACK WINDOW INFILL PANELS.

· OFF-WHITE METAL RADIATOR COVERS.

3. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE THE CONTRACTOR OF ITS RESPONSIBILITIES UNDER OSHA TO DETERMINE THE PRESENCE, LOCATION, AND QUANTITY OF EXISTING LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE EXPOSED TO, AND TO WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF LEAD-CONTAINING MATERIALS.

DD

C.1

5.1

EFGH

CC

BB

AA

813-C

816-C

817-C

811-C

810C-1

808-C

806-C

805-C

808-2

837-C

836-C

835-C

834-C

833-C

834C-1

831-C 831C-1

830C-1831C-2

830-C 818C-1

829-C

828-C

827C-1

827-C

826-C

825C-1

825-C

823C

822C-1

822C

821C

820C-1

820C

819C

818C

814-44

800C-1

819C-1

829C-1

814C-3

810-C

809-C

814C-4 815-C

814C-2 814C-1

1/8" = 1'-0"1 8TH FLOOR ASBESTOS ABATEMENT PLAN

ASBESTOS ABATEMENT NOTES

AA-1 NOT USED

AA-2 NOT USED

AA-3 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE VINYL COVEBASE AND THE ASBESTOS-CONTAINING 12” X 12” WHITE STREAKED FLOOR TILE. THE COVEBASE AND FLOOR TILE MASTIC ARE NON-ASBESTOS. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY ITEMS (CABINETS, CARPETING, ETC.)

OR EQUIPMENT THAT ARE ON TOP OF THE FLOOR TILE. THE MASTIC SHALL BE REMOVED AFTER CLEARANCE SAMPLES ARE OBTAINED. CONTRACTOR SHALL NEUTRALIZE ALL SOLVENTS (PER THE MANUFACTURER'S DIRECTIONS) TO ALLOW FOR INSTALLATION OF NEW FLOORING.

AA-4 NOT USED

AA-5 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE ASBESTOS-CONTAINING RED-BROWN MASTIC ON THE NON-ASBESTOS-CONTAINING CORK PIPE INSULATION. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION OF SUSPENDED CEILINGS TO ACCESS THE MASTIC.

AA-6 NOT USED

AA-7 NOT USED

AA-8 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING PIPE AND MUD FITTING INSULATION THAT IS WITHIN WALL CHASES TO ACCOMMODATE ALL DEMOLITION, REMOVAL, AND INSTALLATION OF PIPING AND HVAC DUCTWORK. REFER TO PLUMBING AND MECHANICAL PLANS FOR APPROXIMATE LOCATIONS OF NEW PIPING AND DUCTS. ALL INSULATION AND PIPING WITHIN DESIGNATED CHASES SHALL BE REMOVED WITHIN THE REGULATED ASBESTOS ABATEMENT WORK AREA. CLEAN CHASES TO ALLOW FOR INSTALLATION OF NEW PIPING AND DUCTWORK.

CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION OF THE CHASES AS REQUIRED TO ACCESS THE ASBESTOS INSULATION AND TO ALLOW FOR THE

PLUMBING WORK AND INSTALLATION OF NEW HVAC DUCTS.

AA-9 NOT USED

AA-10 CONTRACTOR SHALL CONDUCT CEILING DEMOLITION WITHIN PROJECT LIMITS AND REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING PIPE AND MUD FITTING INSULATION THAT IS ABOVE CEILINGS THAT BECOME ACCESSIBLE AS A RESULT OF THE DEMOLITION/RENOVATION WORK. ALL CEILING DEMOLITION SHALL OCCUR UNDER NEGATIVE AIR CONTAINMENT WITHIN THE REGULATED ASBESTOS ABATEMENT WORK AREA. REFER TO ARCHITECTURAL DEMOLITION PLANS FOR LIMITS OF CEILING DEMOLITION. ALL PIPE INSULATION, HARD CEILINGS, AND ASSOCIATED DEBRIS SHALL BE DISPOSED OF AS ASBESTOS-WASTE. SALVAGE SUSPENDED CEILING TILES AND ASSOCIATED SUPPORT GRID WORK, CLEAN OFF ANY ASBESTOS DEBRIS AND TURN OVER TO THE

OWNER/OWNER'S REPRESENTATIVE FOR RE-INSTALLATION BY OTHER TRADES.

NORTH

KEY PLAN

C D

AB

0' 4' 8' 16' 32'

1/8" = 1'-0"

DRAWING NOTES

A. THERE IS AN ASBESTOS-CONTAINING INSULATION BOARD BEHIND THE RECESSED RADIATOR HEAT SHIELDS. ONLY THE RECESSED RADIATORS ON THE NINTH FLOOR ARE TO BE DISTURBED. THE RADIATORS CAN ONLY BE SHUT DOWN DURING THE NON-HEATING SEASON. CAREFULLY COORDINATE WORK TO PERFORM THE REQUIRED ABATEMENT DURING THE

NON-HEATING PERIODS. ALL OTHER RADIATORS SHALL NOT BE REMOVED OR DISTURBED.

B. THERE IS AN ASBESTOS-CONTAINING BLACK PAPER AND TAR COVERING THE COPPER FLASHING BELOW THE WINDOWS. THE MATERIAL IS NOT SCHEDULED TO BE DISTURBED AS A

RESULT OF THIS PROJECT.

C. ALL CEILINGS WITHIN THE NINTH FLOOR PROJECT LIMITS SHALL BE DEMOLISHED. LIMITED CEILING DEMOLITION IS SCHEDULED TO TAKE PLACE ON THE EIGHTH FLOOR DIRECTLY BELOW THE NINTH FLOOR TO REMOVE AND REPLACE THE WASTE PIPING AND TO PERFORM TIE-INS TO THE PLUMBING AND MECHANICAL LINES ASSOCIATED WITH THE NINTH FLOOR RENOVATIONS. THERE IS ASBESTOS INSULATION ON THE HEATING AND DOMESTIC WATER LINES AND ASBESTOS DEBRIS ABOVE ALL HARD CEILINGS. CONTRACTOR SHALL ASSUME THERE WILL BE SOME ABATEMENT WORK AT EACH RISER LOCATION ON THE EIGHTH FLOOR WHERE NEW CONNECTIONS WILL BE MADE FOR THE SANITARY LINES. THE CEILING TILES AND CEILING PLASTER IN THE BUILDING DO NOT CONTAIN ASBESTOS AND THE WASTE PIPING IS NOT INSULATED. DEMOLITION OF CEILING AND REMOVAL OF ANY PLUMBING OR

WASTE PIPING ABOVE CEILINGS MUST BE CONDUCTED AS AN ASBESTOS PROJECT.

D. REFER TO MECHANICAL DEMOLITION DRAWINGS MD-101 AND MD-102 AND PLUMBING DEMOLITION DRAWINGS PD-100, PD-101, AND PD-102 FOR ADDITIONAL INFORMATION REGARDING THE LOCATION OF ASBESTOS INSULATED PIPING. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR EXTENTS OF DEMOLITION.

E. REFER TO DRAWINGS G-005 THROUGH G-009 FOR REQUIREMENTS PERTAINING TO LIFE SAFETY MEASURES AND TO COORDINATE PHASING OF THE WORK.

F. REFER TO THE RECORD DRAWINGS THAT HAVE BEEN INCLUDED WITH THE BID DOCUMENTS FOR ADDITIONAL INFORMATION REGARDING THE LOCATION OF PLUMBING AND STEAM LINES THAT MAY BE COVERED WITH ASBESTOS INSULATION. ASSUME ALL HOT AND COLD WATER LINES AND STEAM LINES HAVE ASBESTOS INSULATION. THE RECORD DRAWINGS

HAVE BEEN INCLUDED FOR REFERENCE ONLY.

G. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.

H. THE ABATEMENT WORK WILL OCCUR IN PHASES. REFER TO DRAWING G-005 AND G-006 FOR PHASING PLANS. ALL DEMOLITION OF CEILINGS AND WALL CHASES SHALL BE PERFORMED WHILE THE ABATEMENT CONTRACTOR IS ON SITE AND THE AREA IS UNDER NEGATIVE PRESSURE. ABATEMENT CONTRACTOR SHALL VERIFY THAT ALL AREAS WHERE ASBESTOS PIPE INSULATION MAY BE PRESENT, I.E. INSIDE WALL CHASES AND COLUMNS, IS REMOVED PRIOR TO THE ABATEMENT CONTRACTOR DEMOBILIZING.

I. ALL SHUT DOWNS MUST BE APPROVED BY VAMC FACILITIES DEPARTMENT PRIOR TO IMPLEMENTATION.

AA-101

8TH FLOOR ASBESTOS

ABATEMENT PLAN

EJ CD

AA-5 AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-8

AA-8

AA-8

AA-8

AA-8

AA-10

AA-8

AA-8

AA-10

AA-10

AA-10 AA-10

AA-10

AA-10

AA-10

AA-10 AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-8

AA-8

AA-8

AA-8

AA-8

AA-8

AA-8

AA-8

AA-8

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ABATEMENT CONSULTANT:

Revisions: Date:

WARD 9C RENOVATIONS

3495 BAILEY AVENUE BUFFALO, NY 14215

528-18-109

528-18-109-

45% DESIGN SUBMISSION

DESIGN DOCUMENT SUBMISSION

8-7-2020 3-15-2021

90% DESIGN SUBMISSION 6-18-2021

100% DESIGN SUBMISSION 10-29-2021

BID DOCUMENTS 2-25-2022

95 Perry Street, Suite 300 Buffalo, NY 14203 February 25, 2022

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5 AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

ENVIRONMENTAL NOTES

E-1 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND DISPOSE OF FLUORESCENT BULBS IN LIGHTING SCHEDULED FOR REMOVAL WITHIN THE PROJECT WORK AREA. REFER TO ELECTRICAL DEMOLITION PLANS. RECYCLE ALL REMOVED BULBS IN ACCORDANCE WITH THE 40 CFR PART 273 US EPA UNIVERSAL WASTE RULE.

ANY FLUORESCENT LAMPS BROKEN DURING DEMOLITION SHALL BE DISPOSED OF AS HAZARDOUS WASTE.

E-2 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND DISPOSE OF FLUORESCENT BALLASTS SCHEDULED FOR REMOVAL WITHIN THE PROJECT WORK AREA.

REFER TO ELECTRICAL DEMOLITION PLANS. THE BALLASTS REMOVED FOR THIS PROJECT MAY CONTAIN DEHP AND/OR PCBS. CONTRACTOR TO PROPERLY

DISPOSE OF ALL BALLASTS.

E-3 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND RECYCLE BATTERIES IN EXIT LIGHTS SCHEDULED FOR DEMOLITION. REFER TO ELECTRICAL

DEMOLITION PLANS.

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

E-1 E-2 E-3

AA-3

AA-3 AA-3

AA-3

AA-3

AA-3

AA-3

AA-3

AA-3

AA-3

AA-3

AA-3

AA-3

AA-3

AA-3

E-1 E-2 E-3

GENERAL NOTES

A. CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL APPLICABLE FEDERAL AND STATE RULES, REGULATIONS, GUIDELINES AND THE

CONTRACT DOCUMENTS.

B. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. CONTRACTOR IS RESPONSIBLE

FOR FIELD VERIFICATION OF EXISTING CONDITIONS PRIOR TO BIDDING.

C. THE LOCATION OF ANY SITE STORAGE OF MATERIAL, EQUIPMENT, AND WASTE TRAILER/DUMPSTER SHALL BE COORDINATED WITH AND APPROVED BY THE

RESIDENT ENGINEER.

D. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT AND SUPPLIES.

E. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION. CONTRACTOR SHALL ENSURE THAT UNCERTIFIED PERSONNEL

OR UNAUTHORIZED VISITORS DO NOT ENTER ACTIVE WORK AREAS AT ANY TIME.

F. THE REMOVAL OR DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL SHALL BE PERFORMED BY A NYS LICENSED ASBESTOS ABATEMENT CONTRACTOR.

REFER TO SPECIFICATION SECTIONS 028213.13 AND 028213.19 FOR ADDITIONAL REQUIREMENTS FOR THE REMOVAL OF ASBESTOS-CONTAINING MATERIALS.

G. THE CONSTRUCTION AREA SHALL BE COMPLETELY SEPARATED FROM OTHER PORTIONS OF THE BUILDING BY USING TEMPORARY CONSTRUCTION DETAILS AS

SHOWN ON DRAWING G-005.

H. NEGATIVE PRESSURE SHALL BE ESTABLISHED INSIDE THE INTERIOR WORK AREA(S) PRIOR TO THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL.

ROUTING OF THE NEGATIVE AIR EXHAUST DUCT SHALL BE DECIDED UPON AFTER CONSULTATION WITH VAMC AND VAMC'S REPRESENTATIVE.

I. CONTRACTOR SHALL COORDINATE THE REMOVAL OF THE ASBESTOS WASTE MATERIALS FROM THE BUILDING WITH VAMC AND VAMC'S REPRESENTATIVE. THE REMOVAL OF THE ASBESTOS WASTE SHALL BE PERFORMED AT TIMES WHEN IT DOES NOT INTERFERE WITH NORMAL FACILITY ACTIVITIES.

J. ALL ASBESTOS-CONTAINING MATERIAL SHALL BE PROPERLY PACKAGED PRIOR TO BEING REMOVED FROM THE WORK AREA. ASBESTOS WARNING LABELS SHALL BE APPLIED TO THE ASBESTOS WASTE BAGS. ALL ASBESTOS MATERIALS THAT ARE REMOVED FROM THE SITE SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. THE COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE VAMC AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE

SHIPMENT RECORDS MUST BE PROVIDED WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.

K. CONTRACTOR SHALL CLEAN ALL AREAS OUTSIDE THE WORK AREA AND ANY AREAS WHERE CONTRACTOR'S PERSONNEL TRAVEL THROUGH THE BUILDING. THESE AREAS SHALL BE LEFT IN A CONDITION AS CLEAN AS OR CLEANER THAN WHEN THE CONTRACTOR ARRIVED ON SITE.

L. THE OTHER THREE WINGS ON THE 9TH FLOOR AND WING C ON THE 7TH, 8TH AND 10TH FLOORS WILL REMAIN OCCUPIED DURING THE ABATEMENT PROJECT.

THEREFORE, ALL ABATEMENT WORK, INCLUDING PREPARATION, MUST BE PERFORMED OFF HOURS, EITHER AT NIGHT OR ON THE WEEKEND. WORK SHALL BE

PERFORMED IN PHASES.

M. IF A REMOTE DECONTAMINATION ENCLOSURE IS UTILIZED FOR THIS WORK, AN AIRLOCK MUST BE ATTACHED TO EACH WORK AREA. THE AIRLOCK SHALL BE SIZED LARGE ENOUGH TO ALLOW FOR THE WORKERS TO CHANGE THEIR SUITS PRIOR TO LEAVING THE WORK AREA. THE DECONTAMINATION ENCLOSURE SHALL BE

CONSTRUCTED IN ACCORDANCE WITH 29 CFR 1926.

N. CONTRACTOR SHALL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN DESCRIBING THE WORK AREA PREPARATION, REMOVAL AND HANDLING PROCEDURES, AS WELL AS DECONTAMINATION ENCLOSURES AND NEGATIVE AIR EXHAUST LOCATIONS PRIOR TO BEING ALLOWED TO START THE PROJECT. THIS WORK PLAN WILL NEED TO BE REVIEWED AND ACCEPTED BY VAMC HEALTH AND SAFETY PERSONNEL PRIOR TO THE START OF WORK.

E-1 E-2 E-3

(TYP.)

E-1 E-2 E-3

(TYP.)

LEAD AWARENESS NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION; INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR

EXPOSURE ABOVE THE PERMISSIBLE EXPOSURE LIMIT.

2. AREAS OF THE BUILDING HAVE BEEN INVESTIGATED FOR THE PRESENCE OF LEAD DURING PAST PROJECTS AND LEAD-BASED PAINT HAS BEEN IDENTIFIED. SURFACES IDENTIFIED TO BE COATED WITH LEAD-BASED PAINT INCLUDE BUT ARE NOT LIMITED TO INCLUDE:

· GREEN CERAMIC WALL TILES.

· WHITE WITH BEIGE SPECKLES CERAMIC WALL TILES.

· TAN CERAMIC WALL TILES.

· WHITE BED PAN SINKS.

· BLACK WINDOW INFILL PANELS.

· OFF-WHITE METAL RADIATOR COVERS.

3. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE THE CONTRACTOR OF ITS RESPONSIBILITIES UNDER OSHA TO DETERMINE THE PRESENCE, LOCATION, AND QUANTITY OF EXISTING LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE EXPOSED TO, AND TO WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF LEAD-CONTAINING MATERIALS.

AA-8AA-8

(TYP.)(TYP.)

AA-8

(TYP.)

AA-8

(TYP.)

AA-8

(TYP.)

DD

C.1

5.1

EFGH

CC

BB

AA

DN

UP

DN

UP

DN

UP

TEAM

ROOM

924C

PATIENT

RM.

926C

PATIENT

RM.

916C

CLEAN

SUPPLY

910C

SHARED

PATIENT

RM.

911C

STAIR

PATIENT

RM.

912C

PATIENT

RM.

914C1

ROOM

933C1

ROOM

908C1

SUPPLY

ROOM

908C

OFFICE

907C

NURSE

LOUNGE

934C

OFFICE

935C

ROOM

936C

ROOM

904C

ROOM

905C

STAIR

STAIR

CENTRAL

NURSE

STATION

932C

PATIENT

RM.

923C

PATIENT

RM.

922C

PATIENT

RM.

921C

PATIENT

RM.

920C

PATIENT

RM.

928C

PATIENT

RM.

929C

ROOM

930C

PATIENT

RM.

931C

PATIENT

ROOM

918C

PATIENT

RM.

913C

RM.

914C

SHOWER

ROOM

919C

PATIENT

RM.

915C

PATIENT

TLT. RM.

915C1

PATIENT

TLT. RM.

913C1

PATIENT

TLT. RM.

914C2

PATIENT

RM.

917C

PATIENT

TLT. RM.

917D

SOILED

UTILITY

910C1

PATIENT

TLT. RM.

911C1

PATIENT

TLT. RM.

923C1

PATIENT

TLT. RM.

922C1

PATIENT

TLT. RM.

921C

PATIENT

TLT. RM.

927C1

PATIENT

RM.

927C

PATIENT

TLT. RM.

931C

PATIENT

ROOM

925C

HSKPG

906C

DATA

906C1

TLT. RM.

921C6

PATIENT

TLT. RM.

920C

PATIENT

TLT. RM.

929C

PATIENT

TLT. RM.

924C1

PROPERLY REMOVE AND DISPOSE OF THE

RECESSED RADIATOR HEAT SHIELD AND

ALL ASBESTOS INSULATION ON THE BACK

OF THE SHIELD. REMOVE ALL INSULATION

ON ANY PIPING. THE SHIELD AND ALL

INSULATION SHALL BE REMOVED AND

DISPOSED OF AS ASBESTOS-WASTE.

REMOVE EXISTING

COVER. REFER TO

DRAWING M-100.

REMOVE AND

PROPERLY DISPOSE

OF ALL INSULATION

ON EXISTING STEAM

RISERS WITHIN

EXTERIOR WALL

CAVITY. INSULATION

IS ASSUMED TO BE

ASBESTOS-CONTAINING.

NO INSULATION

SHALL REMAIN.

EL

PS

EL

PR

FINISHED FLOOR

EXISTING

WINDOW

REMOVE EXISTING BRANCH LPS & LPR PIPING TO THE EXTENT

SHOWN INCLUDING STEAM TRAP AND CONTROL VALVE. REFER

TO DRAWING M-100.

(CONTRACTOR SHALL ASSUME THAT CONCEALED LPS &

LPR PIPING IS COVERED WITH ASBESTOS INSULATION)

TYPICAL ELEVATION VIEW

EXISTING EXTERIOR

WALL

1/8" = 1'-0"1 9TH FLOOR ASBESTOS ABATEMENT PLAN

ASBESTOS ABATEMENT NOTES

AA-1 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF RECESSED WALL RADIATORS WITH ASBESTOS-CONTAINING INSULATION ON THE BACK OF THE HEAT SHIELD. IN ADDITION, REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING INSULATION ON PIPING LEADING TO THE RADIATORS. APPROXIMATELY 50 RADIATORS WILL BE RAISED IN HEIGHT ABOVE FLOOR LEVEL. REMOVE ALL ASBESTOS FROM THE HEAT SHIELDS. NO INSULATION IS TO REMAIN AT THE RECESSED WALL RADIATOR CAVITIES. REFER TO DRAWING MD-100 FOR LOCATIONS. ALL RADIATORS AND INSULATION SHALL BE DISPOSED OF AS

ASBESTOS-WASTE.

THERE IS ASBESTOS-CONTAINING PIPE INSULATION ON THE PIPE RUNS FEEDING THE RADIATORS. ALL PIPE INSULATION SHALL BE REMOVED ON PIPING IN CHASES AT THE RECESSED WALL RADIATORS. REFER TO DETAIL 2. REMOVE ALL ASBESTOS INSULATION ON THE BRANCH LINES BACK TO THE RISERS. ALL INSULATION SHALL BE REMOVED FROM RISERS AND LATERALS. COORDINATE ACCESS WITH THE GENERAL CONTRACTOR, MECHANICAL CONTRACTOR OR APPROPRIATE TRADES FOR ACCESS TO ALL PIPING. DISPOSE OF ALL INSULATION AS FRIABLE ASBESTOS WASTE.

AA-2 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE STAINLESS STEEL SINK WITH ASBESTOS-CONTAINING PINK UNDERCOATING.

AA-3 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE VINYL COVE BASE AND THE ASBESTOS-CONTAINING 12” X 12” WHITE STREAKED FLOOR TILE. THE COVE BASE AND FLOOR TILE MASTIC ARE NON-ASBESTOS. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY ITEMS (CABINETS, CARPETING, ETC.) OR EQUIPMENT THAT ARE ON TOP OF THE FLOOR TILE. THE MASTIC SHALL BE REMOVED AFTER CLEARANCE SAMPLES ARE OBTAINED. CONTRACTOR SHALL NEUTRALIZE ALL SOLVENTS (PER THE MANUFACTURER'S DIRECTIONS) TO ALLOW FOR INSTALLATION OF NEW FLOORING.

AA-4 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE VINYL COVE BASE, 12” X 12” LIGHT GREEN FLOOR TILE AND THE ASBESTOS-CONTAINING FLOOR TILE MASTIC. THE COVE BASE AND FLOOR TILE ARE NON-ASBESTOS. ALL FLOORING MATERIAL SHALL BE REMOVED COMPLETELY TO THE CONCRETE SLAB.

CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY ITEMS (CABINETS, CARPETING, ETC.) OR EQUIPMENT THAT ARE ON TOP OF THE FLOOR TILE.

CONTRACTOR SHALL NEUTRALIZE ALL SOLVENTS (PER THE MANUFACTURER'S DIRECTIONS) TO ALLOW FOR INSTALLATION OF NEW FLOORING.

AA-5 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE ASBESTOS-CONTAINING RED-BROWN MASTIC ON THE NON-ASBESTOS-CONTAINING CORK PIPE INSULATION. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION OF SUSPENDED CEILINGS TO ACCESS THE MASTIC.

AA-6 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE TERRAZZO SHOWER BASIN AND ASBESTOS-CONTAINING WATERPROOFING/VAPOR BARRIER BELOW THE TERRAZZO SHOWER BASIN. ALL WATERPROOFING/VAPOR BARRIER SHALL BE REMOVED COMPLETELY TO THE CONCRETE SLAB.

AA-7 NOT USED

AA-8 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING PIPE AND MUD FITTING INSULATION THAT IS WITHIN WALL CHASES TO ACCOMMODATE ALL DEMOLITION, REMOVAL, AND INSTALLATION OF NEW PIPING AND HVAC DUCTWORK. REFER TO PLUMBING AND MECHANICAL PLANS FOR APPROXIMATE LOCATIONS OF NEW PIPING AND DUCTS. ALL INSULATION AND PIPING WITHIN DESIGNATED CHASES SHALL BE REMOVED WITHIN THE REGULATED ASBESTOS ABATEMENT WORK AREA. CLEAN

CHASES TO ALLOW FOR INSTALLATION OF NEW PIPING AND DUCTWORK.

CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION OF THE CHASES AS REQUIRED TO ACCESS THE ASBESTOS INSULATION AND TO ALLOW FOR THE

PLUMBING WORK AND INSTALLATION OF NEW HVAC DUCTS.

AA-9 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF SHEET METAL DUCTWORK WITH ASBESTOS-CONTAINING FLANGE SEALANT ON SECTIONS SCHEDULED FOR REMOVAL. REFER TO MECHANICAL DEMOLITION DRAWINGS FOR SECTIONS TO BE REMOVED. DUCTS ARE LOCATED ABOVE CEILINGS. WRAP SECTIONS OF DUCT WITH FLANGE SEALANT WITH TWO LAYERS OF 6-MIL PLASTIC SHEETING. PRIOR TO LEAVING THE REGULATED ASBESTOS ABATEMENT WORK AREA. ALL

SECTIONS OF DUCTWORK WITH FLANGE SEALANT SHALL BE DISPOSED OF AS ASBESTOS WASTE.

AA-10 CONTRACTOR SHALL CONDUCT CEILING DEMOLITION WITHIN PROJECT LIMITS AND REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING PIPE AND MUD FITTING INSULATION THAT IS ABOVE CEILINGS THAT BECOME ACCESSIBLE AS A RESULT OF THE DEMOLITION/RENOVATION WORK. ALL CEILING DEMOLITION SHALL OCCUR UNDER NEGATIVE AIR CONTAINMENT WITHIN THE REGULATED ASBESTOS ABATEMENT WORK AREA. REFER TO ARCHITECTURAL DEMOLITION PLANS FOR LIMITS OF CEILING DEMOLITION. ALL PIPE INSULATION, HARD CEILINGS, AND ASSOCIATED DEBRIS SHALL BE DISPOSED OF AS ASBESTOS-WASTE. SALVAGE SUSPENDED CEILING TILES AND ASSOCIATED SUPPORT GRID WORK, CLEAN OFF ANY ASBESTOS DEBRIS AND TURN OVER TO THE OWNER/OWNER'S

REPRESENTATIVE FOR RE-INSTALLATION BY OTHER TRADES.

AA-1

AA-3

AA-3

AA-3

AA-3 AA-3

AA-3 AA-3

AA-3 AA-3

AA-3

AA-3

AA-3 AA-3 AA-3 AA-3

AA-3

AA-3 AA-3

AA-3

AA-3

AA-3

AA-3

AA-4

AA-4

AA-4

AA-4

AA-4

AA-4

AA-1

AA-1

AA-1

AA-1 AA-1

AA-8

AA-2

AA-8

AA-8

AA-5

AA-6

AA-8

AA-8

AA-8

AA-8

AA-8

AA-1

AA-1

AA-1

AA-1

AA-8

AA-1 AA-1

AA-1

AA-4

AA-8

AA-8

AA-1

AA-3

AA-1

AA-1

AA-1

AA-1

AA-1

AA-1

AA-1

AA-1

AA-1

AA-1

AA-1

NORTH

KEY PLAN

C D

AB

0' 4' 8' 16' 32'

1/8" = 1'-0"

NOT TO SCALE2 EXISTING STEAM RADIATOR REMOVAL DETAIL

NOTE: THE BRANCH LINES OFF OF THE STEAM RISERS

MAY FEED MORE THAN ONE RADIATOR.

AA-3

DRAWING NOTES

A. THERE IS AN ASBESTOS-CONTAINING INSULATION BOARD BEHIND THE RECESSED RADIATOR HEAT SHIELDS. ONLY THE RECESSED RADIATORS ON THE NINTH FLOOR ARE TO BE DISTURBED. THE RADIATORS CAN ONLY BE SHUT DOWN DURING THE NON-HEATING SEASON. CAREFULLY COORDINATE WORK TO PERFORM THE REQUIRED ABATEMENT DURING THE

NON-HEATING PERIODS. ALL OTHER RADIATORS SHALL NOT BE REMOVED OR DISTURBED.

B. THERE IS AN ASBESTOS-CONTAINING BLACK PAPER AND TAR COVERING THE COPPER FLASHING BELOW THE WINDOWS. THE MATERIAL IS NOT SCHEDULED TO BE DISTURBED AS A

RESULT OF THIS PROJECT.

C. ALL CEILINGS WITHIN THE NINTH FLOOR PROJECT LIMITS SHALL BE DEMOLISHED. LIMITED CEILING DEMOLITION IS SCHEDULED TO TAKE PLACE ON THE EIGHTH FLOOR DIRECTLY BELOW THE NINTH FLOOR TO REMOVE AND REPLACE THE WASTE PIPING AND TO PERFORM TIE-INS TO THE PLUMBING AND MECHANICAL LINES ASSOCIATED WITH THE NINTH FLOOR RENOVATIONS. THERE IS ASBESTOS INSULATION ON THE HEATING AND DOMESTIC WATER LINES AND ASBESTOS DEBRIS ABOVE ALL HARD CEILINGS. CONTRACTOR SHALL ASSUME THERE WILL BE SOME ABATEMENT WORK AT EACH RISER LOCATION ON THE EIGHTH FLOOR WHERE NEW CONNECTIONS WILL BE MADE FOR THE SANITARY LINES. THE CEILING TILES AND CEILING PLASTER IN THE BUILDING DO NOT CONTAIN ASBESTOS AND THE WASTE PIPING IS NOT INSULATED. DEMOLITION OF CEILING AND REMOVAL OF ANY PLUMBING OR

WASTE PIPING ABOVE CEILINGS MUST BE CONDUCTED AS AN ASBESTOS PROJECT.

D. REFER TO MECHANICAL DEMOLITION DRAWINGS MD-101 AND MD-102 AND PLUMBING DEMOLITION DRAWINGS PD-100, PD-101, AND PD-102 FOR ADDITIONAL INFORMATION REGARDING THE LOCATION OF ASBESTOS INSULATED PIPING. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR EXTENTS OF DEMOLITION.

E. REFER TO DRAWINGS G-005 THROUGH G-009 FOR REQUIREMENTS PERTAINING TO LIFE SAFETY MEASURES AND TO COORDINATE PHASING OF THE WORK.

F. REFER TO THE RECORD DRAWINGS THAT HAVE BEEN INCLUDED WITH THE BID DOCUMENTS FOR ADDITIONAL INFORMATION REGARDING THE LOCATION OF PLUMBING AND STEAM LINES THAT MAY BE COVERED WITH ASBESTOS INSULATION. ASSUME ALL HOT AND COLD WATER LINES AND STEAM LINES HAVE ASBESTOS INSULATION. THE RECORD DRAWINGS

HAVE BEEN INCLUDED FOR REFERENCE ONLY.

G. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.

H. THE ABATEMENT WORK WILL OCCUR IN PHASES. REFER TO DRAWING G-005 AND G-006 FOR PHASING PLANS. ALL DEMOLITION OF CEILINGS AND WALL CHASES SHALL BE PERFORMED WHILE THE ABATEMENT CONTRACTOR IS ON SITE AND THE AREA IS UNDER NEGATIVE PRESSURE. ABATEMENT CONTRACTOR SHALL VERIFY THAT ALL AREAS WHERE ASBESTOS PIPE INSULATION MAY BE PRESENT, I.E. INSIDE WALL CHASES AND COLUMNS, IS REMOVED PRIOR TO THE ABATEMENT CONTRACTOR DEMOBILIZING.

I. ALL SHUT DOWNS MUST BE APPROVED BY VAMC FACILITIES DEPARTMENT PRIOR TO IMPLEMENTATION.

AA-102

9TH FLOOR ASBESTOS

ABATEMENT PLAN AND DETAIL

EJ CD

AA-8

AA-8

AA-8

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10 AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-10

AA-9

AA-9 AA-9

AA-9

AA-7

AA-8

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ABATEMENT CONSULTANT:

Revisions: Date:

WARD 9C RENOVATIONS

3495 BAILEY AVENUE BUFFALO, NY 14215

528-18-109

528-18-109-

45% DESIGN SUBMISSION

DESIGN DOCUMENT SUBMISSION

8-7-2020 3-15-2021

90% DESIGN SUBMISSION 6-18-2021

100% DESIGN SUBMISSION 10-29-2021

BID DOCUMENTS 2-25-2022

95 Perry Street, Suite 300 Buffalo, NY 14203 February 25, 2022

AA-5 AA-5

AA-5

AA-5AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5 AA-5

AA-5AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

AA-5

TYP.

TYP.

TYP.

TYP.

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

ENVIRONMENTAL NOTES

E-1 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND DISPOSE OF FLUORESCENT BULBS IN LIGHTING SCHEDULED FOR REMOVAL WITHIN THE PROJECT WORK AREA. REFER TO ELECTRICAL DEMOLITION PLANS. RECYCLE ALL REMOVED BULBS IN ACCORDANCE WITH THE 40 CFR PART 273 US EPA UNIVERSAL WASTE RULE.

ANY FLUORESCENT LAMPS BROKEN DURING DEMOLITION SHALL BE DISPOSED OF AS HAZARDOUS WASTE.

E-2 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND DISPOSE OF FLUORESCENT BALLASTS SCHEDULED FOR REMOVAL WITHIN THE PROJECT WORK AREA.

REFER TO ELECTRICAL DEMOLITION PLANS. THE BALLASTS REMOVED FOR THIS PROJECT MAY CONTAIN DEHP AND/OR PCBS. CONTRACTOR TO PROPERLY

DISPOSE OF ALL BALLASTS.

E-3 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND RECYCLE BATTERIES IN EXIT LIGHTS SCHEDULED FOR DEMOLITION. REFER TO ELECTRICAL

DEMOLITION PLANS.

E-1 E-2 E-3

TYP.

E-1 E-2 E-3

TYP.

E-1 E-2 E-3

TYP.

AA-1

AA-1

AA-1

AA-1

AA-1

SINK

GENERAL NOTES

A. CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL APPLICABLE FEDERAL AND STATE RULES, REGULATIONS, GUIDELINES

AND THE CONTRACT DOCUMENTS.

B. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. CONTRACTOR IS

RESPONSIBLE FOR FIELD VERIFICATION OF EXISTING CONDITIONS PRIOR TO BIDDING.

C. THE LOCATION OF ANY SITE STORAGE OF MATERIAL, EQUIPMENT, AND WASTE TRAILER/DUMPSTER SHALL BE COORDINATED WITH AND APPROVED BY

THE RESIDENT ENGINEER.

D. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT AND SUPPLIES.

E. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION. CONTRACTOR SHALL ENSURE THAT UNCERTIFIED

PERSONNEL OR UNAUTHORIZED VISITORS DO NOT ENTER ACTIVE WORK AREAS AT ANY TIME.

F. THE REMOVAL OR DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL SHALL BE PERFORMED BY A NYS LICENSED ASBESTOS ABATEMENT CONTRACTOR. REFER TO SPECIFICATION SECTIONS 028213.13 AND 028213.19 FOR ADDITIONAL REQUIREMENTS FOR THE REMOVAL OF

ASBESTOS-CONTAINING MATERIALS.

G. THE CONSTRUCTION AREA SHALL BE COMPLETELY SEPARATED FROM OTHER PORTIONS OF THE BUILDING BY USING TEMPORARY CONSTRUCTION

DETAILS AS SHOWN ON DRAWING G-005.

H. NEGATIVE PRESSURE SHALL BE ESTABLISHED INSIDE THE INTERIOR WORK AREA(S) PRIOR TO THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL. ROUTING OF THE NEGATIVE AIR EXHAUST DUCT SHALL BE DECIDED UPON AFTER CONSULTATION WITH VAMC AND VAMC'S

REPRESENTATIVE.

I. CONTRACTOR SHALL COORDINATE THE REMOVAL OF THE ASBESTOS WASTE MATERIALS FROM THE BUILDING WITH VAMC AND VAMC'S REPRESENTATIVE. THE REMOVAL OF THE ASBESTOS WASTE SHALL BE PERFORMED AT TIMES WHEN IT DOES NOT INTERFERE WITH NORMAL FACILITY

ACTIVITIES.

J. ALL ASBESTOS-CONTAINING MATERIAL SHALL BE PROPERLY PACKAGED PRIOR TO BEING REMOVED FROM THE WORK AREA. ASBESTOS WARNING LABELS SHALL BE APPLIED TO THE ASBESTOS WASTE BAGS. ALL ASBESTOS MATERIALS THAT ARE REMOVED FROM THE SITE SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. THE COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE VAMC AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.

K. CONTRACTOR SHALL CLEAN ALL AREAS OUTSIDE THE WORK AREA AND ANY AREAS WHERE CONTRACTOR'S PERSONNEL TRAVEL THROUGH THE BUILDING.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .