Fort Bragg 525 EMIB IDS Installation to Existing System
Solicitation number
W91247-26-R-9990
Issued by

About this file

This is a Draft Scope of Work for an Intrusion Detection System (IDS) integration project at Fort Bragg, North Carolina. The contractor shall integrate IDS monitoring capabilities into an Army prototype vehicle system located in a Temporary Sensitive Compartmented Information Facility (TSCIF) for the 525th Expeditionary-Military Intelligence Brigade. The work involves installing one motion sensor inside the vehicle and two door-monitoring sensors outside, which will interface with an existing Balanced Magnetic Switch (BMS) on the rear door and integrate into the existing DAQ IDS system managed by Fort Bragg's Directorate of Emergency Services (DES) for Military Police response. The contractor must also install a RIOX board in the existing Remote Area Data Collector (RADC) to monitor sensor trigger points.

The contractor must possess a valid Top-Secret clearance upon contract award and may require Secret Facility Clearance to access the facility. Installation work shall occur during normal business hours (Monday through Friday, approximately 8 a.m. to 5 p.m. EST) and must be completed by February 9, 2026. The contractor will have access to vehicle panels for cable routing without affecting warranty, with available capacity in existing molex plugs for the required wiring. The scope includes coordination with compound personnel and DES staff for connections, programming, and testing, as well as providing training for the systems upon completion. All work must comply with Fort Bragg base access procedures.

View the file

Other files

File Type Posted
Sources Sought Notice - 525 EMIB IDS Install.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft Scope of Work

Contractor shall possess valid Top-Secret clearance upon award of contract to enter a Top- Secret facility. May also require a Secret Facility Clearance. Contractor will provide integration to existing equipment to add Intrusion Detection System (IDS) monitoring through Fort Bragg Directorate of Emergency Services (DES) to an Army prototype system being placed in a Temporary Sensitive Compartmented Information Facility (TSCIF) for the 525th Expeditionary-Military Intelligence Brigade (525th E-MIB).

Contractor shall add (1) motion sensor inside the vehicle and (2) sensors outside to monitor the doors on the prototype vehicle. All sensors will interface to the existing Balanced Magnetic Switch (BMS) on the rear door and integrate those into the existing DAQ IDS system to the DES/PMO for MP response. These signals will be programmed as a 24/7 zone that will be armed/disarmed with the existing system. The BMS will be installed and in good working condition. The contractor will have access to the panels to pull cable inside the vehicle platform without effecting warranty OR someone will remove/reinstall those panels so they can pull the necessary cable. There is room in the existing molex plugs for

(8) additional wires; (2) for low voltage power to the motion sensors, (4) for trigger points on both motions and (2) for trigger on the existing BMS. There are conductors from the platform to the interface panel on the rear loading dock in the existing whip to get to the building. Contractor shall add a RIOX board in the existing Remote Area Data Collector (RADC) to monitor these points. Contractor shall communicate with personnel within the compound, and DES personnel to coordinate the connections, programming and testing required for integration.

The installation will be done during normal duty hours, M-F. Approximately 8 am to 5 pm EST. Work shall commence upon award and installed equipment must be functional no later than 9 February 2026.

Contractor shall provide training for systems at the end of this effort.

Place of performance is Fort Bragg, NC. Contractor must follow Fort Bragg, NC base access procedures.