525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf
PDF 30 KB Posted
- Attached to
- Emergency Bypass Pumps Rental & Delivery (Disaster Contract) State and local contract opportunity
- Solicitation number
- ITB 25-075
- Issued by
- Lee County, Fruitville CDP, Florida
About this file
This document is a LAP (Local Agency Program) Certification of Current Capacity form from the State of Florida Department of Transportation (FDOT), specifically designed for pre-qualified contractors bidding on transportation projects. The form requires contractors to certify their current contracting capacity by detailing their total uncompleted work, ensuring they do not exceed their maximum capacity rating. The certification must be prepared according to specific timing rules: if the letting is before the 25th of the month, the report reflects uncompleted work as of the 15th of the preceding month; if after the 25th, it reflects work in progress as of the 15th of the letting month. All new contracts awarded within five days of the letting date must be included and charged against the contractor's total rating.
The document provides a detailed "Status of Contracts on Hand" report template where contractors must comprehensively list all current projects, including both prime and subcontracts, regardless of their stage of completion. The report requires six columns of information: project details, total contract amount, amount sublet to others, balance of contract amount, and uncompleted amounts to be done as a prime or subcontractor. Contractors can consolidate smaller contracts that individually do not exceed 3% of the total and collectively are less than 20% of the total. The form emphasizes transparency and accuracy, requiring the contractor to swear to the completeness and correctness of the information provided, with space for signature, date, and title.
View the file
Other files for this state and local contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
525-010-46
09/20
STATE OF FLOR DA DEPARTMENT OF TRANSPORTATION
PROGRAM MANAGEMENT LAP CERTIFICATION OF CURRENT CAPACITY
CONFIDENTIAL per Ch 337.14(1) F.S.
Fill in your FDOT Vendor Number For bids to be received on
(Letting Date) VF
(Only applicable to FDOT pre-qualified contractors)
CERTIFICATE
I hereby certify that the amount of any proposal submitted by this bidder for the above letting does not exceed the amount of the Firm’s CURRENT CAPACITY (maximum capacity rating less total uncompleted work).
The total uncompleted work as shown on the “Status of Contracts on Hand” report (page 2) $
I further certify that the “Status of Contracts on Hand” report (page 2) was prepared as follows:
1. If the letting is before the 25th day of the month, the certificate and report reflect the uncompleted work as of the 15th day of the month, last preceding the month of the letting.
2. If the letting is after the 25th day of the month, the certificate and report reflects the uncompleted work in progress as of the 15th day of the month of the letting.
3. All new contracts (and subcontracts) awarded earlier than five days before the letting date are included in the report and charged against our total rating.
I certify that the information above is correct. NAME OF FIRM
Sworn to and subscribed this of , 20 day By:
Title
525-010-46
PROGRAM MANAGEMENT
STATUS OF CONTRACTS ON HAND 09/20
(Furnish complete information about all your contracts, whether prime or subcontracts;
whether in progress or awarded, but not yet begun; and regardless of whom contracted with.)
1 2 3 4 5 6
PROJECTS
OWNER, LOCATION AND DESCRIPTION
CONTRACT (OR
SUBCONTRACT)
AMOUNT
AMOUNT
SUBLET
TO OTHERS
BALANCE OF
CONTRACT
AMOUNT
UNCOMPLETED AMOUNT TO BE DONE
BY YOU
AS PRIME
CONTRACTOR
AS
SUBCONTRACTOR
NOTE: Columns 2 and 3 to show total contract (or subcontract) amounts. Column 4 to be difference between columns 2 and 3. Amount in columns 5 or 6 to be uncompleted portion of amount in column 4. All amounts to be shown to nearest $100. The Contractor may consolidate and list as a single item all contracts which, individually, do not exceed 3% of total, and which, in the aggregate, amount to less than 20% of the total.
TOTALS $0.00 $0.00
TOTAL UNCOMPLETED WORK ON
HAND TO BE DONE BY YOU
(TOTAL COLUMNS 5 AND 6)
$0.00
File details come from the government source that posted it. Updated .