(SOW) ANNUAL_555_513_FM-200_Test_ Gaylord Hood Clean and Inspect_Norvell.docx

DOCX document 35 KB Posted

Attached to
CGC Margaret Norvell – FM200 Hoses and Annual inspection/ Gaylord Hood Clean and Inspect
Solicitation number
52000QR260023277
Issued by

About this file

This document is a Statement of Work (SOW) containing two separate work items for maintenance and inspection services on the Coast Guard Cutter (CGC) Margaret Norvell at 100 MacArthur Causeway, Miami, FL 33139, with a performance period of April 8-9, 2026.

The first work item requires inspection and testing of three FM-200 Fixed Fire Suppression Systems located in the Engine Room (3-27-0-E), Generator Room (3-36-0-E), and Emergency Generator Room (1-10-0-E). The contractor must provide a certified Chemetron Fire Systems representative with manufacturer-specific proprietary information, software, and tools. Specific requirements include removing solenoid pilot valves from primary and secondary cylinders, verifying fire panel operation, testing the 30-second pre-discharge delay, confirming activation of sirens/bells/strobe lights, verifying ventilation system shutdown, and simulating pressure switch activation. The contractor must inspect all cylinders for compliance with CFR Title 49, Section 173.34, perform weight and pressure checks per Technical Publication 8095, replenish all systems to required cylinder weights, and conduct post-repair operational testing in the presence of the Coast Guard Inspector. All hoses must be renewed, and any discrepancies must be documented via Corrective and Failure Report (CFR).

The second work item requires cleaning and inspection of the Galley's Gaylord Hood supply and exhaust ventilation system (approximately 15 linear feet of interior ducting) in accordance with Surface Forces Logistics Center Standard Specification 5100. The contractor must provide 48 hours written notice before commencing work, document the initial system condition with digital photographs, clean the entire ventilation system from air entry to discharge point, and conduct post-cleaning testing and recertification of the Gaylord Hood fire extinguishing system per Technical Publication 8057. Before and after photographs must be included in the final CFR submission. The procurement is issued as Request for Quote 52000QR260023277 under FAR Part 12 as a total small business set aside with a NAICS code of 336611 and small business size standard of 1,300 employees, with award on a firm-fixed price basis potentially on an all-or-none basis.

View the file

Other files

File Type Posted
3277 FAR CLAUSES.pdf PDF
ANNUAL_555_513_FM-200_Test_ Gaylord Hood Clean and Inspect_Norvell.docx DOCX document
3277 FAR CLAUSES.pdf PDF
SOW_FM-200_Test_ CGC Margaret Norvell.docx DOCX document
3277 FAR CLAUSES.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

55500_ENV_0319_154WPC

1. FM-200 Fire Suppression System, Inspect and Test

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect and test the FM-200 Fixed Fire Suppression System IAW MPC N31015.D - FM200 Fire Extinguishing Sys in the following locations: Request funding for below scheduled maintenance Table 1 - fm-200 Location

Protected area
Location
Engine Room
3-27-0-E
Generator Room
3-36-0-E
Emergency Generator Room
1-10-0-E

1.2 Government-furnished property.

None

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 154 WPC 436-301, Rev B, Fire Detection System Coast Guard Drawing 154 WPC 555-201, Rev B, Fixed Fire Extinguishing System A&D FM-200 & R-102 Coast Guard Drawing 154 WPC 555-301, Rev D, Fixed Fire Extinguishing System Diagram Coast Guard Drawing 154 WPC 601-302, Rev C, General Arrangement Coast Guard Publications Coast Guard Technical Publication (TP) 8095, SWBS 555, Jun 2009, FM-200 Beta Fire Protection System Heptafluoropropane Suppression Design, Installation, Operation & Service Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Other References Code of Federal Regulations (CFR), Title 49, Section 173.34

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep. The Contractor shall provide the services of a certified Tech Rep, who is familiar with the FM 200 fire suppression equipment/system to accomplish the following tasks – on site:

· Provide manufacturer's proprietary information, software, and tools pertinent to the equipment/system.

· Assist with proper repair methods, and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.

Ensure that the Tech Rep is a Certified Representative of Chemetron Fire Systems.

Submit the Tech Rep’s name and résumé to the COR at the Arrival Conference.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

· Wiring

· Mounting brackets

· Machinery

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Testing procedure coordination. Prior to accomplishing the below listed tasks, the Contractor shall coordinate all test procedures, review all applicable safety precautions and cutter safety checklist with the COR.

warning Inhalation of FM-200 concentrations of 10% or more may cause headache, disorientation, vertigo, sweating, numbness, loss of limb control, mental confusion, and loss of consciousness in as little as 16 seconds. Cardiac arrest within seconds of unconsciousness, permanent brain damage in 3-5 minutes or death, unless effective CPR is initiated within the first minutes of cardiac arrest.

3.3 Equipment inspection. The Contractor shall perform a complete annual inspection on the three installed FM-200 systems as shown in Table 1, FM-200 Location, using the Coast Guard Drawings listed in Section 2 References and TP 8095 (Sections 7) as reference.

caution Failure to remove the solenoids at each tank will result in the activation of the FM-200 system.

3.3.1 The Contractor shall accomplish the following test on all primary and secondary FM-200 systems for the main engine room, generator room and emergency generator room:

Remove the solenoid pilot valves from the primary and secondary cylinders in the port and starboard steering gear rooms and damage control locker.

Verify that the fire panel is in the normal operation mode.

Verify that the associated supply and exhaust ventilation fans and dampers are on/open.

Operate the associated FM-200 release station.

Time the pre-discharge delay and that the solenoid valve energizes after 30 seconds.

Verify that all sirens, bells and strobe lights activate.

Verify that the associated ventilation system, (fans and dampers) shut down.

Verify that the MCMS indicates the shuts down of all associated engines, pumps and valves.

Verify that the pilothouse alarm panel, Human Machine Interface (HMI) ventilation display, and MCMS indicate that the FM-200 system was activated.

Simulate the FM-200 pressure switch activation by pulling down on the plunger located on the bottom of the pressure switch.

Submit a CFR for any and all discrepancies.

Renew all applicable hoses provided by unit.

3.4 Inspection of compressed gas cylinders. The Contractor shall inspect and test all cylinders for compliance with CFR Title 49, Section 173.34. Cylinder weight and pressure checks shall be accomplished using TP 8095, paragraph 7 as reference. Submit a CFR

NOTE

The location for the 40# FM-200 bottles is the Emergency Generator Room. The location for the 150# FM-200 bottles is the starboard steering gear room. The location for the 550 #FM-200 bottles is the port steering gear room.

3.5 FM-200 system restoration. The Contractor shall ensure all three primary and secondary systems are replenished to the required cylinder weight.

3.6 Operational test, post-repair. After completion of work and in the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.

4. NOTES

4.1 Additional information. The COR may provide additional information in the form of maintenance procedure card (MPC) N31015.D providing greater details, if requested.

Service is to be completed between APRIL 8th and 9th 2026 and it will be conducted at their home port. 100 MacArthur Causeway Miami, FL 33139. References above can also be provided upon request.

51300_ENV_0319_154WPC

1. Gaylord Hood Ventilation System, Clean and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the interior of the Galley’s Gaylord Hood supply and exhaust ventilation system and recertify the fix fire extinguishing system.

1.2 Government-furnished property.

None

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 154 WPC 513-201, Rev 1, Machinery Ventilation Arrangement Coast Guard Drawing 154 WPC 513-301, Rev C, Machinery Ventilation Diagram Coast Guard Drawing 154 WPC 555-301, Rev -, Fix Fire Extinguishing System Diagram Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean Shipboard Ventilation Systems Coast Guard Technical Publication (TP) 8123, 07 Jun 2018, Heating, Ventilation, and Air Conditioning System - Frc-514-P1 Coast Guard Technical Publication (TP) 8057, 07 Jun 2017, Range Hood Fire Fighting System R-102-1T-4N-6F Other References None

3. REQUIREMENTS

3.1 General. The Contractor shall comply with all requirements invoked by this work item, such as SFLC Std Spec 0000 and SFLC Std Spec 5100 (e.g. mark and restore damper positions; remove all intake and exhaust screens, clean vent systems in their entirety from the point where the air enters the system to the point where the air is discharged from the system; restore, renew, or repair all articles or component removed or disturbed to their original condition if damaged or modified during contract work, etc).

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

· Piping

· Electrical wiring

3.2 Notification. The Contractor shall give written notification to the COR, 48 hours before starting ventilation cleaning work.

Note Coast Guard personnel will operate all shipboard machinery and equipment.

3.3 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard Personnel perform an initial operational test of the Galley’s Gaylord Hood supply and exhaust ventilation systems to ascertain its operational condition.

3.3.1 The Contractor shall take digital photos of all ducting interior surfaces at each opening to show the condition of the duct work prior to cleaning. Document any and all modifications to the system (e.g. new holes in existing duct, etc.) that will be required to perform the cleaning work. Do not perform modifications without Coast Guard authorization. Submit a CFR.

3.4 Cleaning requirements. The Contractor shall clean and inspect approximately 15 linear feet of interior ducting and associated componetcomponent surfaces of the entire Galley’s Gaylord Hood supply and exhaust ventilation system. Ventilation duct cleaning from the point where the air enters the system to the point where the air is discharged from the system shall be accomplished in accordance with SFLC Std Spec 5100. Use Coast Guard drawings and TPs listed in Section 2, as reference.

3.4.1 Galley hood fire extinguishing system recertification. After completion of cleaning work, the Contractor shall test and recertify the Gaylord Hood fire extinguishing system in accordance with the manufacturer’s requirements and instructions. Use TP 8057 and Coast Guard Drawing 154 WPC 555-301, sheet 4, as guidance. Provide associated documentation with the final CFR submission.

3.4.2 Duct Interior Images for Final Report. After completion of work and prior to closing the duct work accesses, the Contractor shall take post-cleaning images of the same areas originally photographed in paragraph 3.3.1. Provide these before and after images in the final report.

3.5 Operational test, post repairs. The Contractor shall thoroughly test, in the presence of the Coast Guard Inspector, and demonstrate that the Gaylord Hood supply and exhaust ventilation systems is in satisfactory operating condition. Submit a CFR to include all images in the final report.

4. NOTES

Service is to be completed between APRIL 8th and 9th 2026 and it will be conducted at their home port. 100 MacArthur Causeway Miami, FL 33139. References above can also be provided upon request.