ANNUAL_555_513_FM-200_Test_ Gaylord Hood Clean and Inspect_Norvell.docx
DOCX document 35 KB Posted
- Attached to
- CGC Margaret Norvell – FM200 Hoses and Annual inspection/ Gaylord Hood Clean and Inspect
- Solicitation number
- 52000QR260023277
About this file
This is a Statement of Work (SOW) for two separate maintenance work items on the CGC Margaret Norvell, a U.S. Coast Guard cutter located at 100 MacArthur Causeway, Miami, FL 33139.
Work Item 1: FM-200 Fire Suppression System Inspection and Test requires a certified Chemetron Fire Systems technical representative to inspect, test, and install new hoses on three FM-200 Fixed Fire Suppression Systems located in the Engine Room (3-27-0-E), Generator Room (3-36-0-E), and Emergency Generator Room (1-10-0-E). The contractor must remove solenoid pilot valves, verify fire panel operation, test pre-discharge delays, confirm all alarms activate, and simulate pressure switch activation. The work includes renewal of 15 Chemetron hoses in various sizes and lengths, inspection and testing of compressed gas cylinders for CFR Title 49 Section 173.34 compliance, cylinder weight and pressure checks, replenishment of all three primary and secondary systems, and post-repair operational testing. Critical safety warnings include FM-200 inhalation hazards causing unconsciousness within 16 seconds and potential cardiac arrest or death without immediate CPR.
Work Item 2: Gaylord Hood Ventilation System Inspection and Fire Extinguishing System Recertification requires interior inspection of the galley's Gaylord Hood supply and exhaust ventilation system, removal and cleaning of all intake and exhaust screens, system cleaning from air entry to discharge points, restoration of damper positions, testing and recertification of the attached R-102 fire extinguishing system per manufacturer requirements, initial and post-repair operational testing in the presence of a Coast Guard Inspector, and submission of a Certified Fire Report (CFR) with all images. Both work items are scheduled for performance April 29-30, 2026, under solicitation number 52000QR260023277, issued as a Request for Quote for small business set-asides on a firm-fixed-price basis using FAR Part 12 commercial item procedures. Vendors must provide detailed cost breakdowns and product data sheets, with the government reserving the right to award on an all-or-none basis to the lowest aggregate price offeror.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3277 FAR CLAUSES.pdf | ||
| 3277 FAR CLAUSES.pdf | ||
| (SOW) ANNUAL_555_513_FM-200_Test_ Gaylord Hood Clean and Inspect_Norvell.docx | DOCX document | |
| SOW_FM-200_Test_ CGC Margaret Norvell.docx | DOCX document | |
| 3277 FAR CLAUSES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
55500_ENV_0319_154WPC
1. FM-200 Fire Suppression System, Inspect and Test
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect, test, and install new hoses that shall be procured by the KTR for the FM-200 Fixed Fire Suppression System IAW MPC N31015.D - FM200 Fire Extinguishing Sys in the following locations: Request funding for below scheduled maintenance Table 1 - fm-200 Location
| Protected area |
| Location |
| Engine Room |
| 3-27-0-E |
| Generator Room |
| 3-36-0-E |
| Emergency Generator Room |
| 1-10-0-E |
1.2 Government-furnished property.
None
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 154 WPC 436-301, Rev B, Fire Detection System Coast Guard Drawing 154 WPC 555-201, Rev B, Fixed Fire Extinguishing System A&D FM-200 & R-102 Coast Guard Drawing 154 WPC 555-301, Rev D, Fixed Fire Extinguishing System Diagram Coast Guard Drawing 154 WPC 601-302, Rev C, General Arrangement Coast Guard Publications Coast Guard Technical Publication (TP) 8095, SWBS 555, Jun 2009, FM-200 Beta Fire Protection System Heptafluoropropane Suppression Design, Installation, Operation & Service Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Other References Code of Federal Regulations (CFR), Title 49, Section 173.34
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep. The Contractor shall provide the services of a certified Tech Rep, who is familiar with the FM 200 fire suppression equipment/system to accomplish the following tasks – on site:
· Provide manufacturer's proprietary information, software, and tools pertinent to the equipment/system.
· Assist with proper repair methods, and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.
Ensure that the Tech Rep is a Certified Representative of Chemetron Fire Systems.
Submit the Tech Rep’s name and résumé to the COR at the Arrival Conference.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
· Wiring
· Mounting brackets
· Machinery
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Testing procedure coordination. Prior to accomplishing the below listed tasks, the Contractor shall coordinate all test procedures, review all applicable safety precautions and cutter safety checklist with the COR.
warning Inhalation of FM-200 concentrations of 10% or more may cause headache, disorientation, vertigo, sweating, numbness, loss of limb control, mental confusion, and loss of consciousness in as little as 16 seconds. Cardiac arrest within seconds of unconsciousness, permanent brain damage in 3-5 minutes or death, unless effective CPR is initiated within the first minutes of cardiac arrest.
3.3 Equipment inspection. The Contractor shall perform a complete annual inspection on the three installed FM-200 systems as shown in Table 1, FM-200 Location, using the Coast Guard Drawings listed in Section 2 References and TP 8095 (Sections 7) as reference.
caution Failure to remove the solenoids at each tank will result in the activation of the FM-200 system.
3.3.1 The Contractor shall accomplish the following test on all primary and secondary FM-200 systems for the main engine room, generator room and emergency generator room:
Remove the solenoid pilot valves from the primary and secondary cylinders in the port and starboard steering gear rooms and damage control locker.
Verify that the fire panel is in the normal operation mode.
Verify that the associated supply and exhaust ventilation fans and dampers are on/open.
Operate the associated FM-200 release station.
Time the pre-discharge delay and that the solenoid valve energizes after 30 seconds.
Verify that all sirens, bells and strobe lights activate.
Verify that the associated ventilation system, (fans and dampers) shut down.
Verify that the MCMS indicates the shuts down of all associated engines, pumps and valves.
Verify that the pilothouse alarm panel, Human Machine Interface (HMI) ventilation display, and MCMS indicate that the FM-200 system was activated.
Simulate the FM-200 pressure switch activation by pulling down on the plunger located on the bottom of the pressure switch.
Submit a CFR for any and all discrepancies.
Renew all applicable hoses provided by unit.
3.3.2 The Contractor shall renew the following FM-200 system hoses:
1. 3/16” x 28” Chemtron Hose (P/N: 62-10260303-000) – Qty 7
1. 3/16” x 20” Chemtron Hose (P/N: 62-10260267-000) – Qty 6
1. 3/16” x 16” Chemtron Hose (P/N: 62-10260260-000) – Qty 2
3.4 Inspection of compressed gas cylinders. The Contractor shall inspect and test all cylinders for compliance with CFR Title 49, Section 173.34. Cylinder weight and pressure checks shall be accomplished using TP 8095, paragraph 7 as reference. Submit a CFR
NOTE
The location for the 40# FM-200 bottles is the Emergency Generator Room. The location for the 150# FM-200 bottles is the starboard steering gear room. The location for the 550 #FM-200 bottles is the port steering gear room.
3.5 FM-200 system restoration. The Contractor shall ensure all three primary and secondary systems are replenished to the required cylinder weight.
3.6 Operational test, post-repair. After completion of work and in the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
4. NOTES
4.1 Additional information. The COR may provide additional information in the form of maintenance procedure card (MPC) N31015.D providing greater details, if requested.
Service is to be completed between APRIL 29th and 30th 2026 and it will be conducted at their home port. 100 MacArthur Causeway Miami, FL 33139. References above can also be provided upon request.
51300_ENV_0319_154WPC
1. Gaylord Hood Ventilation System Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect the interior of the Galley’s Gaylord Hood supply and exhaust ventilation system and recertify the fix fire extinguishing system.
1.2 Government-furnished property.
None
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 154 WPC 513-201, Rev 1, Machinery Ventilation Arrangement Coast Guard Drawing 154 WPC 513-301, Rev C, Machinery Ventilation Diagram Coast Guard Drawing 154 WPC 555-301, Rev -, Fix Fire Extinguishing System Diagram Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean Shipboard Ventilation Systems Coast Guard Technical Publication (TP) 8123, 07 Jun 2018, Heating, Ventilation, and Air Conditioning System - Frc-514-P1 Coast Guard Technical Publication (TP) 8057, 07 Jun 2017, Range Hood Fire Fighting System R-102-1T-4N-6F Other References None
3. REQUIREMENTS
3.1 General. The Contractor shall comply with all requirements invoked by this work item, such as SFLC Std Spec 0000 and SFLC Std Spec 5100 (e.g. mark and restore damper positions; remove all intake and exhaust screens, clean vent systems in their entirety from the point where the air enters the system to the point where the air is discharged from the system; restore, renew, or repair all articles or component removed or disturbed to their original condition if damaged or modified during contract work, etc).
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
· Piping
· Electrical wiring
3.2 Notification. The Contractor shall give written notification to the COR, 48 hours before starting ventilation cleaning work.
Note Coast Guard personnel will operate all shipboard machinery and equipment.
3.3 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard Personnel perform an initial operational test of the Galley’s Gaylord Hood supply and exhaust ventilation systems to ascertain its operational condition.
3.4 Galley hood fire extinguishing system recertification. After completion of inspection, the Contractor shall test and recertify the Gaylord Hood fire extinguishing system in accordance with the manufacturer’s requirements and instructions. Use TP 8057 and Coast Guard Drawing 154 WPC 555-301, sheet 4, as guidance. Provide associated documentation with the final CFR submission.
3.5 Operational test, post repairs. The Contractor shall thoroughly test, in the presence of the Coast Guard Inspector, and demonstrate that the Gaylord Hood supply and exhaust ventilation systems is in satisfactory operating condition. Submit a CFR to include all images in the final report.
4. NOTES
Service is to be completed between APRIL 29th and 30th 2026 and it will be conducted at their home port. 100 MacArthur Causeway Miami, FL 33139. References above can also be provided upon request.