Statement of Work.docx

DOCX document 54 KB Posted

Attached to
Gary water Pumps & Parts (Re-Solicitation) Federal contract opportunity
Solicitation number
52000PR260026814
Issued by
Department of Homeland Security US Coast Guard

About this file

This is a Statement of Work (SOW) and Technical Specification for graywater transfer pump units required for the USCGC Healy (WAGB-20) Service Life Extension Program (SLEP).

The Department of Homeland Security's United States Coast Guard is procuring three (3) new graywater transfer pump units assembled with pumps, motors, couplings (if applicable), and mounting bases. The pump specifications require centrifugal, close-coupled, end-suction, non-clogging pumps with recessed impellers capable of vertical or horizontal orientation and rated for wastewater service. Pump performance requirements include a design flow rate of 200 GPM at 95 FT total dynamic head (TDH), with a secondary design point of 300 GPM at 90 FT TDH, a shutoff head of 103 FT, and 3" NPS ASME 150# B16.5 flanged suction and discharge connections. All wetted components must be constructed of 316 stainless steel or CD4MCu. The motor must be a 20 HP, 1800 RPM induction motor with TEFC enclosure, rated for 460 VAC 3-phase 60 Hz ungrounded power systems, and designed for below-deck marine service per IEEE Standard 45. Equipment must operate continuously in ambient temperatures of 40°F to 120°F with relative humidity from 0% to 95%, and withstand dynamic ship conditions including 60-degree rolls, 6-degree pitch, and 4-foot heave. The vendor must supply Provisioning Technical Data (PTD) including manufacturer manuals, drawings, and pump curves, as well as Engineering Data for Provisioning (EDFP) to support maintenance procedure card development. Delivery is required within eight to eleven months after receipt of order, with skid-mounted shipping containers meeting ASTM D3951 standards. Additionally, vendors must provide a recommended onboard repair parts (OBRP) list for twelve-month sparing and system stock parts list for two-year support, with delivery within twelve months after receipt of order.

View the file

Other files for this federal contract opportunity

Other files attached to Gary water Pumps & Parts (Re-Solicitation), newest first.
File Type Posted
Combined Synopsis Solicitation.docx DOCX document
Graywater_Pump_Procurement_Spec_FINAL.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATION: GRAYWATER TRANSFER PUMP UNIT

Department of Homeland Security (DHS)

United States Coast Guard (USCG)

420 (WAGB) SERVICE LIFE EXTENSION PROGRAM (SLEP)

TECHNICAL SPECIFICATION:

GRAYWATER TRANSFER PUMP UNIT

AugustJuly 14 20, 2026

1.0Applicable Information
1.1References and drawings listed below can be provided upon request. Unless otherwise specified, technical publications and drawings are applicable to USCGC HEALY.
1.2Order of Precedence
1.2.1In the event of a conflict between Technical Specification and the references and requirements cited herein, this Technical Specification takes precedence.
1.2.2The Contractor must notify the Contracting Officer (KO) in writing for a resolution of any ambiguity or conflict found in the Technical Specification and references prior to proceeding with any work.
1.3References
1.3.1SFLC Standard Specification 0850, General Requirements for Drawing Preparation, 2020
1.3.2SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures, 2020
1.4Standards and Specifications
1.4.1International Electrotechnical Commission (IEC), IEC 61131-3, System Hardware and Software Technical Requirements, Edition 3.0, 2013.
1.4.2Institute of Electrical and Electronic Engineers (IEEE), IEEE Standard 45, Recommended Practice and Electrical Installation on Shipboard, 2019
1.4.3National Electrical Manufacturers Association (NEMA), NEMA MG 1, Motors and Generators, 2021
2.0Components, Parts, and Accessories
2.1This specification describes the requirements for the procurement of three (3) new graywater transfer pump units for USCGC Healy (WAGB-20). This specification DOES NOT include installation of the equipment but DOES include limited technical support by the Vendor to the United States Coast Guard (USCG) to ensure that the equipment is installed and functions correctly.
2.2The graywater transfer pump unit is defined as an assembled pump, motor, coupling (if applicable), and mounting base.
2.3The Vendor shall supply Provisioning Technical Data (PTD), Attachment 1, with their proposal response that includes:
2.3.1Manufacturer technical manuals
2.3.2Drawings
2.3.3Pump curves
2.3.4The technical manual, drawings and pump curves that describe the pump shall provide the United States Coast Guard (USCG) with sufficient information to produce ship specific installation drawings.
2.4The Vendor shall supply Engineering Data for Provisioning (EDFP), Attachment 2, on system components concurrent with the delivery of the graywater transfer pump units to allow the USCG to produce maintenance procedure cards.
2.5The Vendor shall provide a maintenance parts list and pricing for these recommended onboard repair parts (OBRP) list for the pump.
3.0General Requirements
3.1Operational Requirements:

Unless otherwise specified within the Technical Specification, all components, parts, and accessories shall operate satisfactory under the following conditions:

3.1.1Dynamic Operating Conditions – A ship roll of 60 degrees (double amplitude) in 9.5 seconds, a pitch of 6 degrees (double amplitude) in 6 seconds and a heave of 4 feet (double amplitude) in 11 seconds.
3.2.2Static Conditions - A 15-degree list (either side) and a 5-degree trim (by bow or stern).
3.2Marine Use:
3.2.1The graywater transfer pump unit shall be designed and approved for marine use. All furnished equipment shall be suitable for use indoors and below decks in a marine environment.
3.2.2The graywater transfer pump unit shall be capable of continuous operation in an environment with ambient air temperatures ranging from 40°F to 120°F and with relative humidity from 0% to 95% inclusive.
3.2.3Identification and Labeling: A corrosion resistant metal label plate shall be permanently affixed, one (1) to each pump casing and one (1) to each motor housing. Each label plate shall be engraved with pump and motor defining characteristics to include manufacturer model and serial number.
4.0Specific Requirements:
4.1Pump Characteristics
4.1.1Pump Type: Centrifugal, close-coupled, end-suction, non-clogging, recessed impeller
4.1.2Orientation: vertical or horizontal
4.1.3Fluid service: wastewater

4.1.4 Suction Connection: 3” NPS, ASME 150# B16.5 flange

4.1.5 Discharge Connection: 3” NPS, ASME 150# B16.5 flange

4.1.64Design Flow Rate:200 GPM
4.1.75Total Dynamic Head (TDH): 95 FT
4.1.86Shutoff Head: 103 FT
4.1.97Design Point #2: 300 GPM at 90 FT
4.1.108Construction: All 316 Stainless steel or CD4MCu
4.1.119Impeller: 316 Stainless steel
4.1.120Shaft Seal: hard face, double seal, with flush line & filter Mechanical Seal Assembly
4.2Motor Characteristics:
4.2.1Type: Induction
4.2.2Power Rated: 20 HP
4.2.3RPM: 1800
4.2.4Enclosure: TEFC
4.2.5Power Supply: 460 VAC, 3 Phase, 60 Hz, ungrounded power system
4.2.6Temperature rating: 50C ambient temperature

4.2.7 Standards: The motor shall be in accordance with the requirements contained in IEEE Standard 45 for below deck service.

4.3Electrical Controls:
4.3.1Electrical controls shall be in accordance with the requirements contained in IEC Standard 6-1131-3, IEEE-STD-45 and 46CFR, Subchapter J.
4.3.2Wiring shall be in accordance with the requirements contained in IEEE-STD-45, 46CFR, Subchapter J and NEMA ICS. Wiring harnesses shall be clamped so as to minimize chaffing and shall be positioned so as not to interfere with operation, maintenance and servicing of the compressor unit.
4.3.3Junction boxes shall preclude the entrance of water, oil and dust. Junction boxes with pre-punched perforated holes shall be prohibited. Junction boxes shall be provided with terminal blocks for wiring connections. Wire and cable connections for power and control within controllers and junction boxes shall be connected to devices or terminal blocks by means of compression/crimp loop type terminal lugs. These connections shall be in accordance with UL 486A or equivalent.
5.0Shipping
5.1The Contractor shall provide shipping containers for equipment delivery. Shipping containers shall meet the requirements of ASTM D3951 for commercial packaging.
5.2The Contractor shall notify the KO and COR via email of pending shipment at least seven (7) calendar days prior to shipment.
5.3Large items (length + girth of box greater than 130 inches) and items over 70 lbs shall be packaged in skid mounted shipping containers, suitable for handling with a forklift.
5.4Shipping containers shall be completely enclosed and structurally suitable for stacking. The containers shall be suitable for outside stowage in the weather including precipitation, temperatures ranging from -10° F to 110° F, and dew point up to 80° F. Shipping containers shall be assembled with bolts or screws to permit ease of removal of the cover or lid from the base.
5.5Major components shall be bolted to the framing system. Loose components shall be intermediate boxed and shall be restrained within the shipping container. Suitable cribbing shall be provided to prevent damage during shipment. Protrusions, projections, corners, sharp edges and fragile areas shall be cushioned to protect the equipment and to prevent rupture of shrink-wrap materials.
5.6A copy of the packing list for each box or shipping container within the shipset of material shall be prepared and electronically forwarded to the KO and COR for use as a check-off sheet by Seattle SFLC Shipping/Receiving warehouse personnel. A copy of the list shall be posted inside a waterproof, clear plastic envelope on the outside of one shipping container. The packing list shall clearly indicate how many containers or boxes are part of the shipment.
5.7Shipping Containers (Crates)
5.7.1Each crate top shall be attached to the skid using bolts or screws so the top may be removed without damage and reused.
5.7.2Each crate top shall have a minimum of two (2) lifting eyes attached to aid in top removal using a crane.
5.7.3The crate shall be so constructed that it may be hoisted from both sides by a forklift.
5.8Equipment shall be delivered within eight (11) months after receipt of order or sooner if mutually agreed upon within the delivery order.
6.0Miscellaneous
6.1Original Equipment Manufacturers’ label plates and other identification supplied on the equipment shall not be removed, erased or otherwise destroyed from the equipment.
6.2All equipment, parts and accessories supplied under this specification shall comply with the requirements listed herein.
6.3The requirements listed within this Technical Specification shall meet quality assurance requirements.
7.0Recommended Spare Parts
7.1The Contractor shall provide include a recommended spare parts list and pricing for onboard repair parts (OBRP) and system stock parts. All spare parts shall also be identified in the applicable Technical Publication. The USCG reserves the right to order part quantities less than or greater than the recommended quantity within the Contractor provided parts list.
7.1.1Onboard Repair Parts (OBRP) – Onboard repair parts are items that personnel can replace at the organizational level without special tools or technical support. The Contractor shall provide a list of OBRP including the price and quantity recommended by the Contractor to provide initial sparing to support the end item for a period of twelve (12) months. The list shall include the OBRP Kit part number, OEM Part Number, CAGE Code, part description, National Stock Number (Parts already identified in the Federal Stock System), quantity, estimated cost per part. OBRP supply shall be delivered within twelve (12) months after receipt of order or sooner if mutually agreed upon within the delivery order.
7.1.2System Stock - System stock shall be the long lead time material (material with lead times over 60 days) and/or manufacturer designated critical items. The Contractor shall provide a list of system stock parts including the price and quantity recommended by the Contractor to support the end item for a period of two (2) years. This list shall include the OEM Part Number, CAGE Code, part description, National Stock Number (Parts already identified in the Federal Stock System), quantity, estimated retail cost per part. System stock shall be delivered within twelve (12) months after receipt of order or sooner if mutually agreed upon within the delivery order. Contractor shall notify the KO if the commercial lead times for any item exceeds 12 months.
7.1.3Additional Long Lead Time Material - The Contractor shall list any additional equipment and components that are OEM specific and are either greater than $2,500.00 in price or have a lead time greater than six (6) weeks not previously defined in the System Stock.

Rev1

Rev1