This document outlines a federal contract opportunity for roof replacement services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 is soliciting proposals under solicitation number 36C25722B0018 to replace the roof of Building 7 at an unspecified VA medical center. Contractors should submit proposals to replace the existing roof as described in the Statement of Work and Drawing.pdf file referenced in the opportunity. The work must be completed by the end of the 2022 fiscal year. Minority, veteran, and women-owned small businesses are encouraged to apply. The award date and other contractual terms are not specified in this document.

View the file

Other files

File Type Posted
36C25722B0018 0001.docx DOCX document
S02 - 504-22-105 SPECS - Roof Bldg. 7.pdf PDF
SELF-PERFORMED CALCULATIONS 9-5-2019.docx DOCX document
36C25722B0018_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS

AMARILLO VA HEALTH CARE SYSTEM

6010 AMARILLO BLVD WEST

AMARILLO, TX 79106

REPLACE ROOF BUILDING 7

504-22-105

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OI&T

AutoCAD SHX Text

AutoCAD SHX Text

U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285

AutoCAD SHX Text

VA FORM 08-6231, FEB. 1983

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text one and one-half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text three-quarters inch = one foot

AutoCAD SHX Text one-half inch = one foot

AutoCAD SHX Text three-eighths inch = one foot

AutoCAD SHX Text one-quarter inch = one foot

AutoCAD SHX Text one-eighth inch = one foot

AutoCAD SHX Text Date

AutoCAD SHX Text Revisions

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Service Director

AutoCAD SHX Text Approved: Division Chief

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Location

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Title

AutoCAD SHX Text Dwg. Of

AutoCAD SHX Text Date

AutoCAD SHX Text Project No.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

AMARILLO, TEXAS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R7-1

AutoCAD SHX Text

S HOBBS

AutoCAD SHX Text

AutoCAD SHX Text 504-22-105

AutoCAD SHX Text 09/30/2021

AutoCAD SHX Text

REPLACE ROOF BUILDING 7

AutoCAD SHX Text

COVER SHEET

1. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS, STATE OF TEXAS LAW CONCERNING ROOF

WORK AND VA SAFETY GUIDELINES.

2. DAVIS/BACON WAGE RATES APPLY (POTTER COUNTY).

3. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS PER THE GUIDELINES SET FORTH IN THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, LATEST EDITION, SHALL BE OBSERVED DURING

CONSTRUCTION WHILE WHENEVER TRAFFIC IS IMPEDED.

4. FLAGGER(S) REQUIRED TO DIRECT TRAFFIC WHEN ANY ONE LANE IS BLOCKED.

5. CONTRACTOR MUST NOTIFY ENGINEERING BEFORE CLOSING ANY LANE OR SIDEWALK. THE REQUEST MUST BE MADE AT LEAST TEN (10) BUSINESS DAYS PRIOR TO THE DATE FOR WHICH THE CLOSURE IS

PROJECTED.

6. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL COMPARE THE DIMENSIONS SHOWN ON THE CONSTRUCTION PLANS WITH THOSE MEASURED IN THE FIELD. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OR CONTRACTING OFFICER REPRESENTATIVE IMMEDIATELY.

7. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS.

8. CONTRACTOR SHALL PROVIDE SILT BARRIER TYPE FENCE WHENEVER BLOCKAGE OF PEDESTRIAN TRAFFIC

OR ANY AREA IS TO BE BLOCKED OFF.

9. CONTRACTOR TO TAKE NECESSARY PRECAUTIONS TO PROTECT ALL SHRUBS, PLANTS AND TREES ALONG

AREAS WHERE WORK MAY BE PERFORMED.

10. ALL AREAS INVOLVED AND NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES. ERECT BARRICADES AND WARNING SIGNS TO DIVERT

AND WARN PASSERS-BY OF THE CONSTRUCTION WORK.

11. ALL MATERIAL DEVELOPED AND ACCUMULATED DURING DEMOLITION, UNLESS OTHERWISE NOTED TO BE REUSED, SHALL BECOME PROPERTY OF THE CONTRACTORS AND LEGALLY RECYCLED OR DISPOSED OF OFF-SITE. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS AND ALL RECYCLED AND WASTE

RECEIPTS SHALL BE TURNED OVER TO THE C.O.R. WITHIN FIVE (5) BUSINESS DAYS.

12. ANY DAMAGE CAUSED TO THE BUILDING OR GOVERNMENT EQUIPMENT (A.K.A: AIR HANDLERS, LOUVERS, ETC.) SHALL BE REPAIRED OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO

THE GOVERNMENT. IF THERE IS PRIOR DAMAGE, THE CONTRACTOR IS TO DOCUMENT AND TURN

PHOTOS IN TO THE CO AND COR PRIOR TO START OF WORK, OTHERWISE, THE CONTRACTOR WILL BE HELD ACCOUNTABLE IF IT APPEARS THAT THE DAMAGE MAY HAVE BEEN FROM A CONTRACTOR OF THIS

PROJECT.

13. COVER ALL AIR INLETS AIRTIGHT TO PREVENT DUST FROM ENTERING THE BUILDING.

14. PATCH AND REPAIR ALL IMPACTED AREAS TO ORIGINAL CONDITION WHERE DEMOLITION OR DAMAGE

OCCURRED.

15. STONE BALLASTED E.P.D.M. ROOF TO BE REPLACED WITH FULLY ADHERED T.P.O. ROOFING SYSTEM.

16. PITCHED ROOFS SHALL HAVE DECKING FULLY INSPECTED FOR WATER DAMAGE. DAMAGED DECKING TO

BE REPLACED. INSTALL NEW UNDERLAYMENT INSTALLED

17. ALL GUTTER, DOWNSPOUT, ROOF LADDER SHALL BE FULLY REFURBISHED.

18. ALL GUTTER, DOWNSPOUT, PEAKED ROOFS AND FLAT ROOFS SHALL BE WATER TESTED TO VERIFY NO LEAKS OCCUR IN ACCORDANCE TO ASTM D5957-98(2013) STANDARD GUIDE FOR FLOOD TESTING

HORIZONTAL WATERPROOFING INSTALLATIONS.

19. ALL GUTTER, DOWNSPOUT, PEAKED ROOFS AND FLAT ROOFS SHALL BE TESTED FOR CONTINUOUS WATER

FLOW.

20. ALL LIGHTNING PROTECTION MUST BE BROUGHT UP TO CURRENT CODE.

GENERAL NOTES

1. PEAKED ROOF APPROXIMATE BASE AREA OF 2,515 SQ.FT. WITH SLOPE 6-12, INCLUDING FOUR DORMER ROOFS. SPANISH CLAY OR CEMENT TILE OF SAME COLORATION AND PATTERN TO MATCH EXISTING.

ONLY TILES IN NEW OR EXCELLENT CONDITION MAY BE REUSED. DECKING TO BE COMPLETELY INSPECTED

AND REPLACED IF DAMAGED, REPLACE UNDERLAYMENT.

2. DORMER WALLS AND FRONT TO BE PAINTED EXISTING OR LIKE COLOR APPROVED BY VA.

3. PEAKED ROOF APPROXIMATE BASE AREAS OF 120 SQ.FT. WITH SLOPE 6-12 (TO BE VERIFIED). SPANISH CLAY OR CEMENT TILE OF SAME COLORATION AND PATTERN TO MATCH EXISTING. ONLY TILES IN NEW OR EXCELLENT CONDITION MAY BE REUSED. DECKING TO BE INSPECTED AND REPLACED IF DAMAGED, REPLACE UNDERLAYMENT.

4. FLAT ROOF, INCLUDES TWO AREAS, APPROXIMATE TOTAL 600 SQ.FT. (300 SQ FT EACH) TO BE REPLACED DOWN TO DECK WITH NEW SLOPED FULLY ADHERED T.P.O. SLOPE TO GUIDE WATER TO DRAINS.

5. CLEAN, SEAL AND SECURE COPING STONES AND TRIM TO MINIMIZE POSSIBLE WATER INTRUSION.

EXPOSED STONE TO BE SEALED, SURROUNDING EIFS/STUCCO WALLS TO BE REPAIRED AND SEALED. ALL

HOLES ARE TO BE FILLED FOR WATER TIGHTNESS.

6. ANY HOLES FOUND UNDERNEATH EXISTING E.P.D.M. TO BE PATCHED AND SEALED IN ACCORDANCE TO

INDUSTRY STANDARDS WITH CONCRETE.

7. ALL GUTTERS ARE TO BE CLEANED, AND REPAIRED (OR REPLACED IF UNREPAIRABLE) WITH FLOW REDIRECTED IN ORDER TO GIVE FLOW OF RAIN WATER. COPPER GUTTERS REPLACED SHALL BE TURNED OVER TO THE GOVERNMENT AND REPLACED TO MATCH EXISTING COLOR AND PATTERED (HISTORICAL).

8. ALL SURROUNDING GUTTERS SHALL BE CAULKED AND SEALED OR WELDED AT GUTTER JOINTS.

CONTRACTOR TO VERIFY EXISTING JOINTS.

9. ALL DOWNSPOUTS ARE TO BE CLEANED, AND REPAIRED (OR REPLACED IF UNREPAIRABLE) WITH FLOW

UNINTERRUPTED IN ORDER TO GIVE CONTINUOUS FLOW OF RAIN WATER. COPPER DOWNSPOUTS

REPLACED SHALL BE TURNED OVER TO THE GOVERNMENT AND REPLACED TO MATCH EXISTING COLOR

AND PATTERED (HISTORICAL).

10. SCUPPERS TO BE REPLACED WITH T.P.O. WITH FLOW OF WATER ABLE TO EASILY FLOW THROUGH

WITHOUT BECOMING CLOGGED.

11. ANY HOLES OR POOR STUCCO DUE TO AGE OR HAIL DAMAGE TO BE PATCHED TO MATCHED EXISTING.

12. PRIME AND PAINT STEEL LADDER. COLOR TO MATCH EXISTING GUTTERS.

13. INSTALL ANTI SLIP GRIPS TO ALL LADDER RUNGS.

14. T.P.O. WALKPADS TO BE INSTALLED PER INDUSTRY AND WARRANTY STANDARDS.

15. PAINT GUARDRAILS AND HANDRAILS ON STAIRWELL FROM BASEMENT.

16. REPAIR CRACK IN STUCCO AT PORCH NEAR THE LADDER ACCESS.

KEY NOTES

DIRECTIONAL SLOPE DRAIN (WEEP HOLE)

SLOPE EXISTING DOWNSPOUT

LADDER GUTTER

KEY NOTE REFERENCE NEW E.P.D.M. WALK PADS

LEGEND

1 BUILDING 7 OI&T ROOF

0'-1/8" = 1'-0"

9 9

54 6 14

2 BUILDING 7 ROOF ELEVATION & MEASURMENTS

NTS

3 BUILDING 7 DORMER

NTS

1154 6 1411

12 13

AutoCAD SHX Text

U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285

AutoCAD SHX Text

VA FORM 08-6231, FEB. 1983

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text one and one-half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text three-quarters inch = one foot

AutoCAD SHX Text one-half inch = one foot

AutoCAD SHX Text three-eighths inch = one foot

AutoCAD SHX Text one-quarter inch = one foot

AutoCAD SHX Text one-eighth inch = one foot

AutoCAD SHX Text Date

AutoCAD SHX Text Revisions

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Service Director

AutoCAD SHX Text Approved: Division Chief

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Location

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Title

AutoCAD SHX Text Dwg. Of

AutoCAD SHX Text Date

AutoCAD SHX Text Project No.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

AMARILLO, TEXAS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R7-2

AutoCAD SHX Text

S HOBBS

AutoCAD SHX Text

AutoCAD SHX Text 504-22-105

AutoCAD SHX Text 09/30/2021

AutoCAD SHX Text

REPLACE ROOF BUILDING 7

AutoCAD SHX Text

REPLACE ROOF BUILDING 7

BLDG 7 Roof CS
Sheets and Views
BLDG 4 Roof-504-22-105 BLDG 7 ROOF CS
BLDG 7 Roof N
Sheets and Views
BLDG 4 Roof-504-22-105 Replace Roof BLDG 7

File details come from the government source that posted it. Updated .