501904_ENPFMBR_05_Electrical_08.02.2024.pdf

PDF 31 MB Posted

Attached to
Request for Information (RFI): National Park Service (NPS) Rehabilitate Marina Bulkheads at Flamingo
Solicitation number
W912EP24Z0047
Issued by

About this file

This document is a Request for Information (RFI) from the U.S. Army Corps of Engineers, Jacksonville District, regarding the rehabilitation of the marina bulkheads at Flamingo in Everglades National Park. The project has an estimated construction value of $25-100 million and a period of performance of 895 calendar days. The project involves installing cantilevered sheet pile in front of the existing bulkhead system using a press-in method to minimize disturbance. The government is seeking industry feedback on technical aspects of the project, such as sheet pile installation, pre-auguring methods, CLSM placement, turbidity control, and environmental considerations. Additionally, the government is requesting information on the potential use of a Project Labor Agreement (PLA) for this project, including any local area experience, skilled labor shortages, scheduling impacts, and cost implications. Responses are due by October 4, 2024.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .