50013-BTB2859.pdf
PDF 5 MB Posted
- Solicitation number
- 50013-BTB2859
- Issued by
- Orleans Parish, New Orleans City, Louisiana
About this file
This is a state and local contract opportunity document from the University of New Orleans (UNO) for a Fume Hood Controls Replacement project at the Chemical Science Building. The project, designated as State Project #01-107-24-05, involves selective demolition and installation of new fume hood controls in Phase I, with sealed bids to be received on May 22, 2025, at 2:00 p.m. A mandatory pre-bid conference is scheduled for May 13, 2025, at 10:00 a.m. in the Chemical Science Annex Lounge 101. The contract duration is 180 consecutive calendar days, with liquidated damages of $300 per day for delays beyond the contract completion date.
The project is funded by the state and is open to contractors licensed under Louisiana Revised Statutes for mechanical work. The University of New Orleans encourages participation in the Small Entrepreneurship (SE) Program and the Veteran-Owned Small Entrepreneurships Program. Bidders must provide a bid security of 5% of the total bid amount and will be required to furnish a Performance and Payment Bond. The bid documents are available electronically from Crumb Engineering, LLC at no charge, with printed copies obtainable through reprographic firms. The project involves replacing existing fume hood controls, ductwork modifications, and associated mechanical and electrical work to upgrade the facility's laboratory infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 50013-BTB2859-3.pdf | ||
| 50013-BTB2859-1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP5285
UNIVERSITY of NEW ORLEANS
BID SPECIFICATIONS FOR
JOB ENTITLED
FUME HOOD CONTROLS REPLACEMENT – PHASE I
CHEMICAL SCIENCE BLDG
STATE PROJECT #01-107-24-05, F.01004601
SITE CODE 1-36-038, SITE ID 12533
Sealed Bid #BTB 2859
Bid Date: May 22, 2025
Bid Time: 2:00 p.m.
Pre-Bid Conference:
Date: May 13, 2025
10:00 a.m. at the
Location of Pre-Bid – Room and Building mmchamp2 Text Box
CHEMICAL SCIENCE ANNEX - LOUNGE 101
University of New Orleans Crumb Engineering, LLC
Chemical Science Annex Fume Hood Controls Replacement
TABLE OF CONTENTS
DIVISION 00- PROCUREMENT AND CONTRACTING REQUIREMENTS
Advertisement for Bids
Instructions to Bidders
Louisiana Uniform Public Work Bid Form
Bid Bond
General Conditions of the Contract for Construction, AIA A201-2017
Supplementary Conditions
Contract Between Owner and Contractor and Performance and Payment Bond
Attestation Affidavit
Pre-Construction Conference Agenda
Schedule of Values
Change Order
Recommendation of Acceptance
Partial Occupancy
TECHNICAL SPECIFICATIONS
01000 General Requirements
01040 Cutting and Patching
02221 Building Demolition
15050 General Mechanical
15250 Insulation
15800 Mechanical Systems and Piping
15850 Test and Balance
15950 Temperature Controls
16010 Electrical General
16050 Electrical Materials and Methods
16900 Electrical Equipment Connections
DRAWINGS
T1 Titlesheet
ME1 3rd Floor Plan – Mechanical & Electrical
ME2 Schedules and Details
ADVERTISEMENT FOR BIDS
Sealed bids will be received at the University of New Orleans Purchasing Office, Administration Annex Bldg, Room 1000G, New
Orleans, LA 70148. The deadline for receipt of bids is 2:00 PM on May22, 2025, at which time bids will be publicly opened for the following:
FOR: Chemical Science Annex Fume Hood Controls Replacement – Phase I
PROJECT NUMBER: 01-107-24-05, F.01004601
Complete Bid Documents for this project are available in electronic form. They may be obtained without charge and without deposit from Crumb Engineering, LLC. Printed copies are not available from the Designer, but arrangements can be made to obtain them through most reprographic firms. Plan holders are responsible for their own reproduction costs. Questions about this procedure shall be directed to the Designer at:
Crumb Engineering, LLC
4609 Fairfield Street Metairie, LA 70006
504.455.4450 jcrumb@crumbengineering.com
All bids shall be accompanied by bid security in an amount of five percent (5.0%) of the sum of the base bid and all alternates. The form of this security shall be as stated in the Instructions to Bidders included in the Bid Documents for this project.
The successful Bidder shall be required to furnish a Performance and Payment Bond written as described in the Instructions to Bidders included in the Bid Documents for this project.
A PRE-BID CONFERENCE WILL BE HELD
at 10:00 am on Thursday , May 13, 2025 at Chemical Science Annex, Lounge 101
Bids shall be accepted from Contractors who are licensed under LA. R.S. 37:2150-2192 for the classification of Mechanical work.
Bidder is required to comply with provisions and requirements of LA R.S. 38:2212(B)(5). No bid may be withdrawn for a period of forty-five (45) days after receipt of bids, except under the provisions of LA. R.S. 38:2214.
The Owner reserves the right to reject any and all bids for just cause. In accordance with La. R.S. 38:2212(B)(1), the provisions and requirements of this Section; and those stated in the bidding documents shall not be waived by any entity.
University of New Orleans is a participant in the Small Entrepreneurship (SE) Program (the Hudson Initiative) and the Veteran-
Owned and Service-Connected Disabled Veteran-Owned (LaVet) Small Entrepreneurships Program. Bidders are encouraged to consider participation. Information is available from the University of New Orleans Purchasing Office.
If you have a disability and would like to request an accommodation in order to participate in this meeting, please contact Melanie
Champagne at mmchamp2@uno.edu or (504) 280-3237 as soon as possible but no later than 48 hours before the scheduled meeting.
Ad Dates: 4/22/2025
4/29/2025
5/6/2025
June 2024 IB -1
INSTRUCTIONS TO BIDDERS
COMPLETION TIME:
The Bidder shall agree to fully complete the contract within 180 consecutive calendar days, subject to such extensions as may be granted under Paragraph 8.3, in the General Conditions and the Supplementary Conditions, and acknowledges that this construction time will start on or before the date specified in the written “Notice to Proceed” from the Owner.
LIQUIDATED DAMAGES:
The Bidder shall agree to pay as Liquidated Damages the amount of Three Hundred Dollars ($300.00) for each consecutive calendar day for which the work is not complete, beginning with the first day beyond the contract completion date stated on the “Notice to Proceed” or as amended by change order.
ARTICLE 1
DEFINITIONS
1.1 The Bid Documents include the following:
Advertisement for Bids Instructions to Bidders Bid Form Bid Bond General Conditions of the Contract for Construction, AIA Document A201, 2017 Edition Supplementary Conditions Contract Between Owner and Contractor and Performance and Payment Bond Affidavit User Agency Documents (if applicable) Change Order Form Partial Occupancy Form Recommendation of Acceptance Asbestos Abatement (if applicable) Other Documents (if applicable) Specifications & Drawings Addenda issued during the bid period and acknowledged in the Bid Form
1.2 All definitions set forth in the General Conditions
of the Contract for Construction, AIA Document A201 and the Supplementary Conditions are applicable to the Bid Documents.
1.3 Addenda are written and/or graphic instruments
issued by the Architect prior to the opening of bids, which modify or interpret the Bid Documents by additions, deletions, clarifications, corrections and prior approvals.
1.4 A bid is a complete and properly signed proposal
to do the work or designated portion thereof for the sums stipulated therein supported by data called for by the Bid Documents.
1.5 Base bid is the sum stated in the bid for which the
Bidder offers to perform the work described as the base, to which work may be added, or deleted for sums stated in alternate bids.
1.6 An alternate bid (or alternate) is an amount stated
in the bid to be added to the amount of the base bid if the corresponding change in project scope or materials or methods of construction described in the Bid Documents is accepted.
1.7 A Bidder is one who submits a bid for a prime
Contract with the Owner for the work described in the Bid Documents.
1.8 A Sub-bidder is one who submits a bid to a
Bidder for materials and/or labor for a portion of the work.
1.9 Where the word "Architect" is used in any of the
documents, it shall refer to the Prime Designer of the project, regardless of discipline.
ARTICLE 2
PRE-BID CONFERENCE
2.1 A Pre-Bid Conference shall be held at least 10
days before the date for receipt for bids. The Architect shall coordinate the setting of the date, time and place for the Pre-Bid Conference with the User Agency and shall notify in writing the Owner and all who have received sets of the Bid Documents to
June 2024 IB -2 attend. The purpose of the Pre-Bid Conference is to familiarize Bidders with the requirements of the Project and the intent of the Bid Documents, and to receive comments and information from interested Bidders. If the Pre-Bid Conference is stated in the Advertisement for Bids to be a Mandatory Pre-Bid Conference, bids shall be accepted only from those bidders who attend the Pre-Bid Conference.
Contractors who are not in attendance for the entire Pre-Bid Conference will be considered to have not attended.
2.2 Any revision of the Bid Documents made as a
result of the Pre-Bid Conference shall not be valid unless included in an addendum.
ARTICLE 3
BIDDER'S REPRESENTATION
3.1 Each Bidder by making his bid represents that:
3.1.1 He has read and understands the Bid
Documents and his bid is made in accordance therewith.
3.1.2 He has visited the site and has familiarized
himself with the local conditions under which the work is to be performed.
3.1.3 His bid is based solely upon the materials, systems and equipment described in the Bid Documents as advertised and as modified by addenda.
3.1.4 His bid is not based on any verbal
instructions contrary to the Bid Documents and addenda.
3.1.5 He is familiar with Code of Governmental
Ethics requirement that prohibits public servants and/or their immediate family members from bidding on or entering into contracts; he is aware that the Designer and its principal owners are considered Public Servants under the Code of Governmental Ethics for the limited purposes and scope of the Design Contract with the State on this Project (see Ethics Board Advisory Opinion, No. 2009-378 and 2010-128); and neither he nor any principal of the Bidder with a controlling interest therein has an immediate family relationship with the Designer or any principal within the Designer’s firm (see La. R.S.
42:1113). Any Bidder submitting a bid in violation of this clause shall be disqualified and any contract entered into in violation of this clause shall be null and void.
3.2 The Bidder must be fully qualified under any
State or local licensing law for Contractors in effect at the time and at the location of the work before submitting his bid. In the State of Louisiana, Revised Statutes 37:2150, et seq. will be considered, if applicable.
The Contractor shall be responsible for determining that all of his Sub-bidders or prospective Subcontractors are duly licensed in accordance with law.
ARTICLE 4
BID DOCUMENTS
4.1 Copies
4.1.1 Bid Documents may be obtained from the
Engineer for a deposit as stated in the Advertisement for Bids. The deposit will be refunded as stated in the Advertisement for Bids. No deposits will be refunded on Bid Documents returned later than ten days after receipt of bids.
4.1.1.2 As an alternative method of distribution, the
Designer may provide the Bid Documents in electronic format. They may be obtained without charge and without deposit as stated in the Advertisement for Bids.
4.1.1.2.1 If electronic distribution is available, printed copies will not be available from the Designer, but arrangements can be made to obtain them through most reprographic firms and/or plan rooms.
4.1.1.2.2 If electronic distribution is available, the
reproduction cost on the first paper plan set acquired by bona fide prime bidders will be fully refunded by the Designer upon delivery of the documents to the Designer in good condition no later than ten days after receipt of bids.
4.1.1.2.3 If electronic distribution is available, all
other plan holders are responsible for their own reproduction costs.
June 2024 IB -3
4.1.2 Complete sets of Bid Documents shall be
used in preparing bids; neither the Owner nor the Architect assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bid Documents.
4.1.3 The Owner or Architect in making copies of
the Bid Documents available on the above terms, do so only for the purpose of obtaining bids on the work and do not confer a license or grant for any other use.
4.2 Interpretation or Correction of Bid Documents
4.2.1 Bidders shall promptly notify the Architect
of any ambiguity, inconsistency or error which they may discover upon examination of the Bid Documents or of the site and local conditions.
4.2.2 Bidders requiring clarification or
interpretation of the Bid Documents shall make a written request to the Architect, to reach him at least seven days prior to the date for receipt of bids.
4.2.3 Any interpretation, correction or change of
the Bid Documents will be made by addendum.
Interpretations, corrections or changes of the Bid Documents made in any other manner will not be binding and Bidders shall not rely upon such interpretations, corrections and changes.
4.3 Substitutions
4.3.1 The materials, products and equipment
described in the Bid Documents establish a standard of required function, dimension, appearance and quality to be met by any proposed substitution. No substitutions shall be allowed after bids are received.
4.3.2 No substitution will be considered unless
written request for approval has been submitted by the Proposer and has been received by the Architect at least fourteen (14) working days prior to the opening of bids. (La. R.S. 38:2295(C)) Each such request shall include the name of the material or equipment for which it is to be substituted and a complete description of the proposed substitute including model numbers, drawings, cuts, performance and test data and any other information necessary for an evaluation. A statement setting forth any changes in other materials, equipment or work that incorporation of the substitute would require shall be included. It shall be the responsibility of the proposer to include in his proposal all changes required of the Bid Documents if the proposed product is used. Prior approval, if given, is contingent upon supplier being responsible for any costs which may be necessary to modify the space or facilities needed to accommodate the materials and equipment approved.
4.3.3 If the Architect approves any proposed
substitution, such approval shall be set forth in an addendum. Bidders shall not rely upon approvals made in any other manner.
4.4 Addenda
4.4.1 Addenda will be transmitted to all who are
known by the Architect to have received a complete set of Bid Documents.
4.4.2 Copies of addenda will be made available for
inspection wherever Bid Documents are on file for that purpose.
4.4.3 Except as described herein, addenda shall
not be issued within a period of seventy-two (72) hours prior to the advertised time for the opening of bids, excluding Saturdays, Sundays, and any other legal holidays. If the necessity arises of issuing an addendum modifying plans and specifications within the seventy-two (72) hour period prior to the advertised time for the opening of bids, then the opening of bids shall be extended at least seven but no more than twenty-one (21) working days, without the requirement of re-advertising. Facility Planning shall be consulted prior to issuance of such an addendum and shall approve such issuance. The revised time and date for the opening of bids shall be stated in the addendum.
4.4.4 Each Bidder shall ascertain from the
Architect prior to submitting his bid that he has received all addenda issued, and he shall acknowledge their receipt on the Bid Form.
4.4.5 The Owner shall have the right to extend the
bid date by up to (30) thirty days without the requirement of re-advertising. Any such extension shall be made by addendum issued by the Architect.
June 2024 IB -4
ARTICLE 5
BID PROCEDURE
5.1 Form and Style of Bids
5.1.1 Bids shall be submitted on the Louisiana
Uniform Public Work Bid Form provided by the Architect for this project.
5.1.2 The Bidder shall ensure that all applicable
blanks on the bid form are completely and accurately filled in.
5.1.3 Bid sums shall be expressed in both words
and figures, and in case of discrepancy between the two, the written words shall govern.
5.1.4 Any interlineation, alteration or erasure must
be initialed by the signer of the bid or his authorized representative.
5.1.5 Bidders are cautioned to complete all
alternates should such be required in the Bid Form.
Failure to submit alternate prices will render the bid non responsive and shall cause its rejection.
5.1.6 Bidders are cautioned to complete all unit
prices should such be required in the Bid Form. Unit prices represent a price proposal to do a specified quantity and quality of work. Unit prices are incorporated into the base bid or alternates, as indicated on the Unit Price Form, but are not the sole components thereof.
5.1.7 Bidder shall make no additional stipulations
on the Bid Form nor qualify his bid in any other manner.
5.1.8 Written evidence of the authority of the
person signing the bid for the public work shall be submitted in accordance with La. R.S. 38:2212 (B)(5).
5.1.9 On any bid in excess of fifty thousand dollars
($50,000.00), the Contractor shall certify that he is licensed under La. R.S. 37: 2150-2173 and show his license number on the bid above his signature or his duly authorized representative.
5.2 Bid Security
5.2.1 No bid shall be considered or accepted
unless the bid is accompanied by bid security in an amount of five percent (5.0%) of the base bid and all alternates.
The bid security shall be in the form of a certified check or cashier's check drawn on a bank insured by the Federal Deposit Insurance Corporation, or a Bid Bond written by a surety company licensed to do business in Louisiana and signed by the surety's agent or attorney-in-fact. The Bid Bond shall be written on the University of New Orleans Bid Bond Form, and the surety for the bond must meet the qualifications stated thereon. The Bid Bond shall include the legal name of the bidder be in favor of the State of Louisiana, University of New Orleans , and shall be accompanied by appropriate power of attorney. The Bid Bond must be signed by both the bidder/principal and the surety in the space provided on the University of New Orleans Bid Bond Form. Failure by the bidder/principal or the surety to sign the bid bond shall result in the rejection of the bid.
Bid security furnished by the Contractor shall guarantee that the Contractor will, if awarded the work according to the terms of his proposal, enter into the Contract and furnish Performance and Payment Bonds as required by these Bid Documents, within fifteen (15) days after written notice that the instrument is ready for his signature.
Should the Bidder refuse to enter into such Contract or fail to furnish such bonds, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as penalty.
5.2.2 The Owner will have the right to retain the
bid security of Bidders until either (a) the Contract has been executed and bonds have been furnished, or
(b) the specified time has elapsed so that bids may be withdrawn, or (c) all bids have been rejected.
5.3 Submission of Bids
5.3.1 The Bid shall be sealed in an opaque
envelope. The bid envelope shall be identified on the outside with the name of the project, and the name, address, and license number of the Bidder.
The envelope shall not contain multiple bid forms, and will be received until the time specified and at the place specified in the Advertisement for Bids. It shall be the specific responsibility of the Bidder to deliver his sealed bid to University of New Orleans Purchasing Department at the appointed place and prior to the announced time for the opening of bids.
June 2024 IB -5
Late delivery of a bid for any reason, including late delivery by United States Mail, or express delivery, shall disqualify the bid.
If the bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation "Bid Enclosed" on the face thereof. Such bids shall be sent by Registered or Certified Mail, Return Receipt Requested, addressed to:
University of New Orleans - Purchasing
Suite 1004, Room G Administration Annex Building 2000 Lakeshore Drive New Orleans, Louisiana 70148
Bids sent by express delivery shall be delivered to:
University of New Orleans - Purchasing Suite 1004, Room G Administration Annex Building 6652 Milneburg Road New Orleans, Louisiana 70148
5.3.2 Bids shall be deposited at the designated
location prior to the time on the date for receipt of bids indicated in the Advertisement for Bids, or any extension thereof made by addendum. Bids received after the time and date for receipt of bids will be returned unopened.
5.3.3 Bidder shall assume full responsibility for
timely delivery at location designated for receipt of bids.
5.3.4 Oral, telephonic or telegraphic bids are
invalid and shall not receive consideration. Owner shall not consider notations written on outside of bid envelope which have the effect of amending the bid.
Written modifications enclosed in the bid envelope, and signed or initialed by the Contractor or his representative, shall be accepted.
5.4 Modification or Withdrawal of Bid
5.4.1 A bid may not be modified, withdrawn or
canceled by the Bidder during the time stipulated in the Advertisement for Bids, for the period following the time and bid date designated for the receipt of bids, and Bidder so agrees in submitting his bid, except in accordance with R.S. 38:2214 which states, in part, "Bids containing patently obvious, unintentional, and substantial mechanical, clerical, or mathematical errors, or errors of unintentional omission of a substantial quantity of work, labor, material, or services made directly in the compilation of the bid, may be withdrawn by the contractor if clear and convincing sworn, written evidence of such errors is furnished to the public entity within forty-eight hours of the bid opening excluding Saturdays, Sundays, and legal holidays".
5.4.2 Prior to the time and date designated for
receipt of bids, bids submitted early may be modified or withdrawn only by notice to the party receiving bids at the place and prior to the time designated for receipt of bids.
5.4.3 Withdrawn bids may be resubmitted up to
the time designated for the receipt of bids provided that they are then fully in conformance with these Instructions to Bidders.
5.4.4 Bid Security shall be in an amount sufficient
for the bid as modified or resubmitted.
5.5 Prohibition of Discriminatory Boycotts of Israel
By submitting a bid, the bidder certifies and agrees that the following information is correct:
In preparing its bid, the bidder has considered all proposals submitted from qualified, potential subcontractors and suppliers, and has not, in the solicitation, selection, or commercial treatment of any subcontractor or supplier, refused to transact or terminated business activities, or taken other actions intended to limit commercial relations, with a person or entity that is engaging in commercial transactions in Israel or Israel-controlled territories, with the specific intent to accomplish a boycott or divestment of Israel. The bidder has also not retaliated against any person or other entity for reporting such refusal, termination, or commercially limiting actions. The state reserves the right to reject any bid if this certification is subsequently determined to be false and to terminate any contract awarded based on such a false response.
ARTICLE 6
CONSIDERATION OF BIDS
6.1 Opening of Bids
6.1.1 The properly identified Bids received on
time will be opened publicly and will be read aloud, June 2024 IB -6 and a tabulation abstract of the amounts of the base bids and alternates, if any, will be made available to Bidders.
6.2 Rejection of Bids
6.2.1 The Owner shall have the right to reject any
or all bids and in particular to reject a bid not accompanied by any required bid security or data required by the Bid Documents or a bid in any way incomplete or irregular.
6.3 Acceptance of Bid
6.3.1 It is the intent of the Owner, if he accepts any
alternates, to accept them in the order in which they are listed in the Bid Form. Determination of the Low Bidder shall be on the basis of the sum of the base bid and the alternates accepted. However, the Owner shall reserve the right to accept alternates in any order which does not affect determination of the Low Bidder.
ARTICLE 7
POST-BID INFORMATION
7.1 Submissions
7.1.1 At the Pre-Construction Conference, the
Contractor shall submit the following information to the Architect.
7.1.1.1 A designation of the work to be performed
by the Contractor with his own forces.
7.1.1.2 A breakdown of the Contract cost
attributable to each item listed in the Schedule of Values Form (attached). No payments will be made to the Contractor until this is received.
7.1.1.3 The proprietary names and the suppliers of
principal items or systems of material and equipment proposed for the work.
7.1.1.4 A list of names and business domiciles of all
Subcontractors, manufacturers, suppliers or other persons or organizations (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the work. It is the preference of the Owner that, to the greatest extent possible or practical, the Contractor utilize Louisiana Subcontractors, manufacturers, suppliers and labor.
7.1.2 The General Contractor shall be responsible
for actions or inactions of Subcontractors and/or material suppliers.
The General Contractor is totally responsible for any lost time or extra expense incurred due to a Subcontractor's or Material Supplier's failure to perform. Failure to perform includes, but is not limited to, a Subcontractor's financial failure, abandonment of the project, failure to make prompt delivery, or failure to do work up to standard. Under no circumstances shall the Owner mitigate the General Contractor's losses or reimburse the General Contractor for losses caused by these events.
7.1.3 The lowest responsive and responsible
bidder shall submit to the Architect and the Owner within ten days after the bid opening a letter/letters from the manufacturer stating that the manufacturer will issue the roof system guarantee complying with the requirements of Facility Planning and Control based on the specified roof system and include the name of the applicator acceptable to the manufacturer at the highest level of certification for installing the specified roof system. This manufacturer shall be one that has received prior approval or is named in the specifications.
In accordance with La. R.S. 38:2227 [references La R.S. 38:2212(A)(3)(c)(ii), which has since been renumbered as La R.S. 38:2212(B)(3)], La. R.S.
38:2212.10 and La. R.S. 23:1726(B) the apparent low bidder on this project shall submit the completed Attestations Affidavit (Past Criminal Convictions of Bidders, Verification of Employees and Certification Regarding Unpaid Workers Compensation Insurance) form found within this bid package to University of New Orleans within 10 days after the opening of bids.
ARTICLE 8
PERFORMANCE AND PAYMENT BOND
8.1 Bond Required
8.1.1 The Contractor shall furnish and pay for a
Performance and Payment Bond written by a company licensed to do business in Louisiana, which
June 2024 IB -7 shall be signed by the surety's agent or attorney-in-fact, in an amount equal to 100% of the Contract amount. Surety must be listed currently on the U. S. Department of Treasury Financial Management Service List (Treasury List) as approved for an amount equal to or greater than the contract amount, or must be an insurance company domiciled in Louisiana or owned by Louisiana residents. If surety is qualified other than by listing on the Treasury list, the contract amount may not exceed fifteen percent of policyholders' surplus as shown by surety's most recent financial statements filed with the Louisiana Department of Insurance and may not exceed the amount of $500,000. However, a Louisiana domiciled insurance company with at least an A- rating in the latest printing of the A. M.
Best's Key Rating Guide shall not be subject to the $500,000 limitation, provided that the contract amount does not exceed ten percent of policyholders' surplus as shown in the latest A. M. Best's Key Rating Guide nor fifteen percent of policyholders' surplus as shown by surety's most recent financial statements filed with the Louisiana Department of Insurance.
The Bond shall be signed by the surety's agent or attorney-in-fact. The Bond shall be in favor of the State of Louisiana, University of New Orleans .
8.2 Time of Delivery and Form of Bond
8.2.1 The Bidder shall deliver the required bond to
the Owner simultaneous with the execution of the Contract.
8.2.2 Bond shall be in the form furnished by
Facility Planning and Control, entitled CONTRACT
BETWEEN OWNER AND CONTRACTOR AND
PERFORMANCE AND PAYMENT BOND, a copy of which is included in the Bid Documents.
8.2.3 The Bidder shall require the
Attorney-in-Fact who executes the required bond on behalf of the surety to affix thereto a certified and current copy of his power of Attorney.
ARTICLE 9
FORM OF AGREEMENT BETWEEN OWNER
AND CONTRACTOR
9.1 Form to be Used
9.1.1 Form of the Contract to be used shall be
furnished by University of New Orleans, an example of which is bound in the Bid Documents.
9.2 Award
9.2.1 After award of the Contract, the successful
Bidder, if a corporation, shall furnish to the Owner the most current copy of a Disclosure of Ownership Affidavit on file with the Secretary of State.
9.2.2 In accordance with Louisiana Law, when the
Contract is awarded, the successful Bidder shall, at the time of the signing of the Contract, execute the Non-Collusion Affidavit included in the Contract Documents
9.2.3 When this project is financed either partially
or entirely with State Bonds, the award of this Contract is contingent upon the sale of bonds by the State Bond Commission. The State shall incur no obligation to the Contractor until the Contract Between Owner and Contractor is duly executed.
9.2.4 The Contractor at his own expense, shall
record the original executed Contract and the Performance and Labor and Material Bond with the Recorder of Mortgages, Orleans Parish, within five (5) working days of Contract signing.
A NOTICE OF THIS RECORDING SHALL
BE SENT TO THE UNIVERSITY OF NEW
ORLEANS PURCHASING OFFICE BEFORE
A NOTICE TO PROCEED IS ISSUED.
BID FORM SP5285
LOUISIANA UNIFORM PUBLIC WORK BID FORM
TO: _University of New Orleans – Main Campus_____
_Purchasing Office______ ___________________
_Administration Annex, Room 1004G __________
_New Orleans, Louisiana 70148_______________ (Owner to provide name and address of owner)
BID FOR: Fume Hood Controls Replacement – Phase 1
Chemical Science Building
SP5285 BTB2859
STATE PROJECT #01-107-24-05, F.01004601
(Owner to provide name of project and other identifying information)
The undersigned bidder hereby declares and represents that she/he: a) has carefully examined and understands the Bidding
Documents, b) has not received, relied on, or based his bid on any verbal instructions contrary to the Bidding Documents or any addenda, c) has personally inspected and is familiar with the project site, and hereby proposes to provide all labor, materials, tools, appliances and facilities as required to perform, in a workmanlike manner, all work and services for the construction and completion of the referenced project, all in strict accordance with the Bidding Documents prepared by:
Crumb Engineering, LLC dated 01-23-2025.
(Owner to provide name of entity preparing bidding documents.)
Bidders must acknowledge all addenda. The Bidder acknowledges receipt of the following ADDENDA: (Enter the number the
Designer has assigned to each of the addenda that the Bidder is acknowledging)_______________________________________ .
TOTAL BASE BID: For all work required by the Bidding Documents (including any and all unit prices designated “Base
Bid” * but not alternates) the sum of:
Dollars ($ )
ALTERNATES: For any and all work required by the Bidding Documents for Alternates including any and all unit prices designated as alternates in the unit price description.
Alternate No. 1 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:
Alternate No. 2 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:
Alternate No. 3 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:
NAME OF BIDDER:
ADDRESS OF BIDDER:
LOUISIANA CONTRACTOR’S LICENSE NUMBER:
NAME OF AUTHORIZED SIGNATORY OF BIDDER:
TITLE OF AUTHORIZED SIGNATORY OF BIDDER:
SIGNATURE OF AUTHORIZED SIGNATORY OF BIDDER **:
DATE: _______________________
THE FOLLOWING ITEMS ARE TO BE INCLUDED WITH THE SUBMISSION OF THIS
LOUISIANA UNIFORM PUBLIC WORK BID FORM:
* The Unit Price Form shall be used if the contract includes unit prices. Otherwise it is not required and need not be included with the form. The number of unit prices that may be included is not limited and additional sheets may be included if needed.
** A CORPORATE RESOLUTION OR WRITTEN EVIDENCE of the authority of the person signing the bid for the public work as prescribed by LA R.S. 38:2212(B)(5).
BID SECURITY in the form of a bid bond, certified check or cashier’s check as prescribed by LA R.S. 38:2218(A) attached to and made a part of this bid.
N/A
N/A
N/A
BID FORM SP5285
LOUISIANA UNIFORM PUBLIC WORK BID FORM
UNIT PRICE FORM
TO: BID FOR:
(Owner to provide name and address of owner) (Owner to provide name of project and other identifying information)
UNIT PRICES: This form shall be used for any and all work required by the Bidding Documents and described as unit prices. Amounts shall be stated in figures and only in figures.
DESCRIPTION: ❑ Base Bid or ❑ Alt.# ___
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)
Wording for “DESCRIPTION” is to be provided by the Owner.
All quantities are estimated. The contractor will be paid based upon actual quantities as verified by the Owner.
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
BID FOR: Fume Hood Controls Replacement – Phase 1
Chemical Science Building
SP5285 BTB2859
STATE PROJECT #01-107-24-05, F.01004601
(Owner to provide name of project and other identifying information)
TO: _University of New Orleans – Main Campus_____
_Purchasing Office______ ___________________
_Administration Annex, Room 1004G __________
_New Orleans, Louisiana 70148_______________ (Owner to provide name and address of owner)
BID BOND
Date:
KNOW ALL MEN BY THESE PRESENTS:
That of , as
Principal, and , as Surety, are held and firmly bound unto the State of Louisiana, University of New Orleans (Obligee), in the full and just sum of five (5%) percent of the total amount of this proposal, including all alternates, lawful money of the United
States, for payment of which sum, well and truly be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally firmly by these presents.
Surety represents that it is listed on the current U. S. Department of the Treasury Financial
Management Service list of approved bonding companies as approved for an amount equal to or greater that the amount for which it obligates itself in this instrument or that it is a Louisiana domiciled insurance company with at least an A - rating in the latest printing of the A. M. Best's Key Rating Guide. If surety qualifies by virtue of its Best's listing, the Bond amount may not exceed ten percent of policyholders' surplus as shown in the latest A. M. Best's Key Rating Guide.
Surety further represents that it is licensed to do business in the State of Louisiana and that this Bond is signed by surety's agent or attorney-in-fact. This Bid Bond is accompanied by appropriate power of attorney.
THE CONDITION OF THIS OBLIGATION IS SUCH that, whereas said Principal is herewith submitting its proposal to the Obligee on a Contract for:
NOW, THEREFORE, if the said Contract be awarded to the Principal and the Principal shall, within such time as may be specified, enter into the Contract in writing and give a good and sufficient bond to secure the performance of the terms and conditions of the Contract with surety acceptable to the Obligee, then this obligation shall be void; otherwise this obligation shall become due and payable.
PRINCIPAL (BIDDER) SURETY
BY: BY:
AUTHORIZED OFFICER-OWNER-PARTNER AGENT OR ATTORNEY-IN-FACT(SEAL)
July 2021
July 2021 SC 1
SUPPLEMENTARY CONDITIONS
These Supplementary Conditions modify, change, delete from or add to the General Conditions of the Contract for Construction, AIA Document A201, 2017 Edition. Where any Article of the General Conditions is modified or any Section, Paragraph, Subparagraph or Clause thereof is modified or deleted by these supplements, the unaltered provisions of that Section, Article, Paragraph, Subparagraph or Clause shall remain in effect.
Articles, Sections, Paragraphs, Subparagraphs or Clauses modified or deleted have the same numerical designation as those occurring in the General Conditions.
ARTICLE 1
GENERAL PROVISIONS
1.1 BASIC DEFINITIONS
1.1.1. The Contract Documents
In Section 1.1.1 delete the third sentence, and add the following sentence:
The Contract Documents shall include the Bid Documents as listed in the Instructions to Bidders and any modifications made thereto by addenda.
1.1.8 Initial Decision Maker
Delete all after the words, “shall not show partiality to the Owner or Contractor”.
1.5 OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS AND OTHER
INSTRUMENTS OF SERVICE [REFER TO La R.S. 38:2317]
1.5.1 Delete the first sentence of the paragraph.
1.5.1 In the third sentence: delete the remainder after the word “publication”.
1.7 DIGITAL DATA USE AND TRANSMISSION
In the first sentence after the words, “in digital form” delete “. The parties will use AIA Document E203 2013, Building Information Modeling and Digital Data Exhibit”.
1.8 BUILDING INFORMATION MODELS USE AND RELIANCE
Delete Section 1.8.
ARTICLE 2
OWNER
2.2 EVIDENCE OF THE OWNER’S FINANCIAL ARRANGEMENTS
Delete Section 2.2.
July 2021 SC 2
2.3 INFORMATION AND SERVICES REQUIRED OF THE OWNER
2.3.1 In the first sentence, delete: all before “the Owner shall secure…”
Delete Section 2.3.2 and substitute the following:
2.3.2 The term Architect, when used in the Contract Documents, shall mean the prime Designer (Architect, Engineer, or Landscape Architect), or his authorized representative, lawfully licensed to practice architecture, engineering, or landscape architecture in the State of Louisiana, identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number.
2.3.3 Delete the words: “to whom the Contractor has no reasonable objection and”.
ARTICLE 3
CONTRACTOR
3.4 LABOR AND MATERIALS
3.4.2 Delete Section 3.4.2.
Delete Section 3.4.3 and substitute with the following:
3.4.3 Contractor and its employees, officers, agents, representatives, and Subcontractors shall conduct themselves in an appropriate and professional manner, in accordance with the Owner’s requirements, at all times while working on the Project. Any such individual who behaves in an inappropriate manner or who engages in the use of inappropriate language or conduct while on Owner’s property, as determined by the Owner, shall be removed from the Project at the Owner’s request. Such individual shall not be permitted to return without the written permission of the Owner. The Owner shall not be responsible or liable to Contractor or any Subcontractor for any additional costs, expenses, losses, claims or damages incurred by Contractor or its Subcontractor as a result of the removal of an individual from the Owner’s property pursuant to this Section.
The Contractor shall not permit employment of unfit persons or persons not properly skilled in tasks assigned to them.
3.5 WARRANTY
3.5.2 Replace reference to “Section 9.8.4” with “Section 9.8.6”.
3.7 PERMITS, FEES, NOTICES, AND COMPLIANCE WITH LAWS (La R.S. 40:1724[A])
3.7.1 Delete Section 3.7.1.
3.7.2 In Section 3.7.2, replace the word “public” with the word “State”.
July 2021 SC 3
Delete Section 3.7.5 and substitute the following:
3.7.5 If, during the course of the Work, the Contractor discovers human remains, unmarked burial or archaeological sites, burial artifacts, or wetlands, which are not indicated in the Contract Documents, the Contractor shall follow all procedures mandated by State and Federal law, including but not limited to La R.S. 8:671 et seq., the Office of Coastal Protection and Restoration, and Sections 401 & 404 of the Federal Clean Water Act.
Request for adjustment of the Contract Sum and Contract Time arising from the existence of such remains or features shall be submitted in writing to the Owner pursuant to the Contract Documents.
3.8 ALLOWANCES
Delete Sections 3.8.1, 3.8.2, and 3.8.3 in their entirety and add the following new Section 3.8.1:
3.8.1 Allowances shall not be made on any of the Work.
3.9 SUPERINTENDENT
3.9.1 Add the following to the end of the paragraph:
Important communications shall be confirmed in writing. Other communications shall be similarly confirmed on written request in each case.
3.10 CONTRACTOR’S CONSTRUCTION AND SUBMITTAL SCHEDULES
3.10.1 Add the following: For projects with a contract sum greater than $1,000,000.00, the Contractor shall include with the schedule, for the Owner’s and Architect’s information, a network analysis to identify those tasks which are on the critical path, i.e., where any delay in the completion of these tasks will lengthen the project timescale, unless action is taken. A revised schedule shall be submitted with each Application and Certificate for Payment. No payment shall be made until this schedule is received.
3.10.3 In the first sentence, delete the word “general”.
After the first sentence, add the following:
If the Work is not on schedule, as determined by the Architect, and the Contractor fails to take action to bring the Work on schedule, then the Contractor shall be deemed in default under this Contract and the progress of the Work shall be deemed unsatisfactory.
Such default may be considered grounds for termination by the Owner for cause in accordance with Section 14.2.
Add the following Sections:
3.10.4 Add the following: Submittal by the contractor of a schedule or other documentation showing a completion date for his Work prior to the completion date stated in the contract shall not impose any obligation or responsibility on the Owner or Architect for the earlier completion date.
July 2021 SC 4
3.10.5 In the event the Owner employs a commissioning consultant, the Contractor shall cooperate fully in the commissioning process and shall require all subcontractors and others under his control to cooperate. The purpose of such services shall be to ensure that all systems perform correctly and interactively according to the provisions of the Contract Documents.
3.11 DOCUMENTS AND SAMPLES AT THE SITE
Add the following: This requirement is of the essence of the contract. The Architect shall determine the value of these documents and this amount shall not be approved for payment to the Contractor until all of the listed documents are delivered to the Architect in good order, completely marked with field changes and otherwise complete in all aspects.
ARTICLE 4
ARCHITECT
4.2 ADMINISTRATION OF THE CONTRACT
4.2.1 In the first sentence, delete the phrase: “the date the Architect issues the final Certificate for Payment” and replace with the phrase “final payment is due, and with the Owner’s concurrence, from time to time during the one year period for correction of Work described in Section 12.2.”
4.2.2 In the first sentence, after the phrase: “become generally familiar with”; insert the following: “and to keep the Owner informed about”.
In the first sentence, after the phrase “portion of the Work completed”, insert the following: “to endeavor to guard the Owner against defects and deficiencies in the Work,”
4.2.4 In the first sentence, delete all after “The Owner and Contractor”, and add the following “may communicate directly with each other, when deemed necessary by the Owner, and the Owner will notify the Architect of any decision.”
4.2.10 Add the following sentence to the end of Section 4.2.10: There shall be no restriction on the Owner having a Representative.
4.2.11 Add the following sentence to the end of Section 4.2.11:
If no agreement is made concerning the time within which interpretation required of the Architect shall be furnished in compliance with this Section 4.2, then delay shall not be recognized on account of failure by the Architect to furnish such interpretation until 15 days after written request is made for them.
July 2021 SC 5
4.2.14 Insert the following sentence between the second and third sentences of Section 4.2.14:
If no agreement is made concerning the time within which interpretation required of the Architect shall be furnished in compliance with this Section 4.2, then delay shall not be recognized on account of failure by the Architect to furnish such interpretation until 15 days after written request is made for them.
ARTICLE 5
SUBCONTRACTORS
5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE
WORK
Delete Section 5.2.1, and substitute the following:
5.2.1 Unless otherwise required by the Contract Documents, the Contractor shall furnish at the Pre-Construction Conference, to the Owner and the Architect, in writing, the names of the persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for each of the principal portions of the Work.
No Contractor payments shall be made until this information is received.
Delete Section 5.2.2, and substitute the following:
5.2.2 The Contractor shall be solely responsible for selection and performance of all subcontractors. The Contractor shall not be entitled to claims for additional time and/or an increase in the contract sum due to a problem with performance or nonperformance of a subcontractor.
Delete Sections 5.2.3 and 5.2.4 and substitute the following:
5.2.3 The Contractor shall notify the Architect and the Owner when a subcontractor is to be changed and substituted with another subcontractor.
5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS
Delete Sections 5.4, 5.4.1, 5.4.2 and 5.4.3
ARTICLE 7
CHANGES IN THE WORK
7.1 GENERAL
Add the following Sections:
7.1.4 As part of the pre-construction conference submittals, the Contractor shall submit the following prior to the Contractor’s initial request for payment:
July 2021 SC 6
7.1.4.1 Fixed job site overhead cost itemized with documentation to support daily rates.
7.1.4.2 Bond Premium Rate with supporting information from the General Contractor’s carrier.
7.1.4.3 Labor Burden by trade for both Subcontractors and General Contractor. The
Labor Burden shall be supported by the Worker’s Compensation and Employer’s Liability Insurance Policy Information Page. Provide for all trades.
7.1.4.4 Internal Rate Charges for all significant company owned equipment.
7.1.5 If the General Contractor fails to submit the aforementioned documentation as part of the pre-construction submittals, then pay applications shall not be processed until such time as the Owner receives this information.
7.2 CHANGE ORDERS
Delete Section 7.2.1, and substitute the following Sections:
7.2.1 A Change Order is a written instrument prepared by the Architect and signed by the Owner, the Architect, and the Contractor issued after execution of the Contract, authorizing a change in the Work and/or an adjustment in the Contract Sum and/or the Contract Time. The Contract Sum and the Contract Time may be changed only by Change Order. A Change Order signed by the Contractor indicates his agreement therewith, including the adjustment in the Contract Sum or the Contract Time. Any reservation of rights, stipulation, or other modification made on the change order by the contractor shall have no effect.
7.2.2 “Cost of the Work” for the purpose of Change Orders shall be the eligible costs required to be incurred in performance of the Work and paid by the Contractor and Subcontractors which eligible costs shall be limited to:
7.2.2.1 Actual wages paid directly to labor personnel, with a labor burden markup exclusively limited to applicable payroll taxes, worker’s compensation insurance, unemployment compensation, and social security taxes for those labor personnel performing the Work. Wages shall be the basic hourly labor rate paid an employee exclusive of fringe benefits or other employee costs. The labor burden percentage for the “Cost of the Work” is limited to categories listed herein.
Employer-provided health insurance, fringe benefits, employee training (whether a requirement of employment or not), vacation pay, etc., are examples of ineligible labor burden costs which shall not be included, as these costs are already compensated by the Overhead and Profit markup.
Supervision shall not be included as a line item in the “Cost of the Work”, except when the change results in a documented delay in the critical path, as described in Section 7.2.7.
July 2021 SC 7
7.2.2.2 Cost of all materials and supplies necessary and required to perform the Work, identifying each item and its individual cost, including taxes. Incidental consumables are not eligible costs and shall not be included.
7.2.2.3 Cost of each necessary piece of machinery and equipment required to perform the Work, identifying each item and its individual cost, including taxes.
Incidental small tools of a specific trade (i.e., shovels, saws, hammers, air compressors, etc.,) and general use vehicles, such as pickup trucks even for moving items around the site, fuel for these general use vehicles, travel, lodging, and/or meals are not eligible and shall not be included.
7.2.2.4 Eligible Insurance costs shall be limited to documented increases in “Builder’s
Risk” insurance premium / costs only. Commercial General Liability, Automobile Liability, and all other required insurances, where referenced in the Contract shall be considered part of normal overhead. These costs are already compensated by the Overhead and Profit markup.
7.2.2.5 Cost for the General Contractor Performance and Payment Bond premium, where the documented cost of the premiums have been increased due to the Change Order.
7.2.3 Overhead and Profit - The Contractor and Subcontractor shall be due home office fixed overhead and profits on the Cost of the Work, but shall not exceed a total of 16% of the direct cost of any portion of Work.
The credit to the Owner resulting from a change in the Work shall be the sum of those items above, including overhead and profit. Where a change results in both credits to the Owner and extras to the Contractor for related items, overhead and profit shall be computed for credits to the Owner and extras to the Contractor. The Owner shall receive full credit for the computed overhead and profit on credit change order items.
7.2.4 The cost to the Owner resulting from a change in the Work shall be the sum of: Cost of the Work (as defined at Section 7.2.2) and Overhead and…