Addendum #2 to Building Equipment Addition Project at Institute for Micromanufacturing, Louisiana Tech University
This Addendum #2, issued by Consulting Engineers on October 26, 2026, provides modifications and clarifications to the drawing and project manual for the Building Equipment Addition at the Institute for Micromanufacturing at Louisiana Tech University. The addendum includes general notes regarding the existing roof slope (approximately 1 in 12) and roof membrane type (Johns Manville PVC SD Plus FB 60), electrical drawing clarifications identifying existing bus plugs as "GE Spectra Series," and the addition of a new mechanical specification section for PVC Chemical Exhaust Ductwork (Section 233116). The contractor is required to verify the existing roof slope on-site prior to ordering roof curb. No specific contract response date or award date is identified in this addendum document.
Section 233116 establishes comprehensive specifications for furnishing and installing a complete PVC ductwork system for the ENIG process chemical exhaust system, requiring rigid, unplasticized PVC conforming to ASTM D1784 Type I Grade I with a minimum nominal 1/4-inch wall thickness. The specifications mandate airtight, corrosion-resistant joints using approved solvent welding or thermoplastic welding per ASTM D2564 and D2855, corrosion-resistant supports with proper spacing and thermal expansion provisions, and field quality control including leak testing and verification of no collapse or excessive deformation at maximum design negative pressure. Installation must be performed by personnel experienced in chemical exhaust systems, with all work coordinated with ENIG equipment manufacturer specifications and compliance with applicable International Mechanical Code, International Fire Code, and NFPA 91 standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 50012-667-27-1.pdf | ||
| 50012-667-27.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 1 -
ADDENDUM #2
BUILDING EQUIPMENT ADDITION
INSTITUTE FOR MICROMANUFACTURING
LOUISIANA TECH UNIVERSITY
AFJMc 25.164
October 26, 2026
THE FOLLOWING MODIFICATIONS AND/OR CLARIFICATIONS SHALL BE MADE TO THE DRAWING
AND PROJECT MANUAL FOR THE CAPTIONED PROJECT:
GENERAL
1. The existing roof slope is approximately 1 in 12. Contractor shall verify on site prior to ordering roof curb.
2. The existing roof is a Johns Manville PVC SD Plus FB 60 membrane.
ELECTRICAL
DRAWINGS
1. Sheet 3:
Detail A: Existing bus plugs are “GE Spectra Series”.
MECHANICAL
SPECIFICATIONS
1. Add specification section 23 3116 PVC Chemical Exhaust Ductwork included in this addendum to the bid specifications.
END ADDENDUM #2
CONSULTING ENGINEERS
10/26/26
PVC CHEMICAL EXHAUST DUCTWORK 233116-1
SECTION 233116 - PVC CHEMICAL EXHAUST DUCTWORK
PART 1 - GENERAL
1.1 SUMMARY
Furnish and install PVC ductwork, fittings, supports, connections, and accessories for the ENIG process chemical exhaust system.
Provide a complete, airtight, corrosion-resistant exhaust duct system suitable for continuous negative-pressure operation.
1.2 REFERENCES
ASTM D1784 – Rigid PVC compounds.
ASTM D1785 – Schedule 40 PVC pipe (where used).
ASTM D2564 and ASTM D2855 – PVC solvent cement and joint procedures (where applicable).
Applicable adopted International Mechanical Code and International Fire Code.
NFPA 91 – Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Particulate Solids.
1.3 SUBMITTALS
Submit product data, fabrication drawings, wall thicknesses, reinforcement, support spacing, and joint details.
Submit documented compatibility with ENIG exhaust chemistry and expected temperature.
Provide manufacturer’s maximum allowable negative static pressure and operating temperature.
1.4 QUALITY ASSURANCE
Fabricate and install by personnel experienced in chemical exhaust systems.
Confirm exhaust classification and applicable fire-code approval before procuring combustible PVC ductwork.
PVC CHEMICAL EXHAUST DUCTWORK 233116-2
PART 2 - PRODUCTS
2.1 PVC EXHAUST DUCTWORK
Rigid, unplasticized PVC, ASTM D1784 Type I Grade I, cell classification 12454, or approved equivalent.
Fabricated round PVC duct: minimum nominal 1/4-inch wall thickness, subject to manufacturer’s verification for duct diameter, maximum negative pressure, temperature, and support spacing.
Increase wall thickness or add external reinforcement as necessary to prevent buckling, ovalization, and excessive deflection.
Smooth internal surfaces; fittings to have equivalent corrosion resistance and adequate structural strength.
Schedule 40 PVC pipe conforming to ASTM D1785 may be used for smaller duct sizes when suitable for this service.
2.2 FITTINGS
Use long-radius elbows, minimum centerline radius 1.5 times duct diameter where practical.
Provide streamlined branches, smooth transitions, and inspection access where required.
2.3 JOINTS
Provide airtight, chemical-resistant joints.
Use approved solvent welding or thermoplastic welding as recommended for the selected fabricated duct system.
Where applicable, solvent cement shall comply with ASTM D2564 and assembly procedures with
ASTM D2855.
Provide flanged joints where disassembly is required.
2.4 SUPPORTS
Provide corrosion-resistant supports with saddles or other bearing surfaces that avoid point loading.
Size and space supports for duct dimensions, temperature, and loads per manufacturer’s requirements.
Provide guides and anchors to accommodate thermal expansion.
PVC CHEMICAL EXHAUST DUCTWORK 233116-3
2.5 FLEXIBLE CONNECTIONS
Provide chemical-resistant flexible connections where required for vibration isolation; prevent collapse under operating vacuum.
PART 3 - EXECUTION
3.1 INSTALLATION
Install per approved shop drawings and manufacturer instructions.
Provide smooth transitions, access for inspection, and protection from heat and mechanical damage.
Where liquid accumulation is possible, slope ductwork toward designated compatible drainage points.
Coordinate connections with ENIG equipment manufacturer.
3.2 FIELD QUALITY CONTROL
Inspect joints, alignment, supports, and expansion provisions.
Leak-test under specified operating conditions and correct defects.
Demonstrate no collapse or excessive deformation at maximum design negative pressure.
3.3 CLEANING AND STARTUP
Remove debris, clean interiors, and protect open duct ends during construction.
Coordinate startup and verify exhaust airflow and static pressure at all connections.
END OF SECTION 233116