Summary of Emergency Light Package and Installation Solicitation
This is a Request for Quote (RFQ) issued by the Internal Revenue Service Criminal Investigation (IRS-CI) for the procurement of emergency light packages and installation services for three 2025 Chevrolet Suburbans. Solicitation Number 2023H2-26-Q-00025 seeks a single vendor to supply and install comprehensive emergency lighting systems, including 360-degree LED light bars, headlight and taillight flashers, sirens (200-watt Rumbler speaker), interior and exterior lighting components, control systems, and secure storage vaults (BOSS StrongBox). The vehicles are assigned to the Commissioner's Protection Detail (CPD) to support protective operations for the IRS Commissioner and Chief Executive Officer. All items must be delivered within 15 days of award to the IRS Criminal Investigation Asset & Knowledge Management office at 1111 Constitution Ave NW, Room 3320, Washington, DC 20224. The contract includes professional labor and shop supplies such as wiring, fuse kits, and installation hardware for all three units.
Award will be made to the lowest-priced responsive and responsible quoter whose quote is technically acceptable. Technical acceptability will be evaluated based on the quoter's capability to satisfy Statement of Work requirements and will receive a rating of either "Acceptable" or "Unacceptable." Pricing evaluation will establish a total evaluated price for all Contract Line Items (CLINs) and assess fair and reasonableness through multiple price analysis techniques. Invoicing must be submitted electronically through the IRS Invoice Processing Platform (IPP), with payment processed in accordance with the Prompt Payment Act within 30 days. The Contracting Officer is Ezilda Warthaw (Ezilda.U.Warthaw@irs.gov), and the primary point of contact for delivery and technical matters is Gregory Pico at 202-317-3480 or Gregory.Pico@ci.irs.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1_b SOW-CPD Lights_04302026.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Antenna Site Lease Solicitation Number: 2023H2-25-Q-00021
EMERGENCY LIGHT PACKAGE AND INSTALLATION Request for Quote (RFQ) Department of Treasury Internal Revenue (IRS) Criminal Investigations (CI)
Solicitation Number: 2023H2-26-Q-00025 Emergency Light Package and Installation Solicitation Number: 2023H2-26-Q-00025
Table of Contents
Section I – Table of EMERGENCY LIGHT PACKAGE AND INSTALLATION Section II – Statement of Work Section III – Clauses
Section IV – Instructions to Quoter
SECTION I – EMERGENCY LIGHT PACKAGE AND INSTALLATION
Line-Item Table
| FY |
| Description |
| Item ID |
| Qty |
| 2026 |
| Headlight Flashers |
(6) QS Surface Mount W/ Brackets Front Grill 200 Watt Speaker Rumbler: Aftershock with Brackets 360° R/B LED Next-Gen Hideaway Front Bumper All Panels Ceramic Nano Tint including LE Brow (Limo) FNX QS Covert, high-intensity NF Interior Visor LED Bar RB On/Off Master Switch with Relay (Negates Batt Drain) Full Function Typhoon Handheld Remote Storm Pro 200W Controller Q400 Side-Mounted Collision RB LED Light Bar Q800 Rear Deck 8 Heads high Intensity LED RB Light Bar No Drill Remote M-22 Tactical Magnetic Retention System BOSS StrongBox - Pull Out Drawer - 38"W x 14"D x 14"H W/ T handle Lock system (3Locking Points) 180® Next-Gen Under-Mirror Puck: High-Intensity 180° Perimeter LED RB. including Bracket Fenix Rocker 10 Heads 49" Low Profile RB Running Board LED Light Kit 360° R/B LED Next-Gen Hideaway Rear License Plates Rear Taillight Flashers Total Professional Labor Shop Supplies & Consumables: Includes Wiring, fuse kits, and installation hardware. (3) Units
| 0001 |
| 3 |
SECTION II – STATEMENT OF WORK
STATEMENT OF WORK
INTERNAL REVENUE SERVICE
CRIMINAL INVESTIGATION (IRS-CI)
SHOPPING CART # 5000229262
1. Introduction/Overview
The Internal Revenue Service Criminal Investigation (IRS-CI) requires the purchase of three vehicle light packages for 2025 Chevrolet Suburban’s. These vehicles are assigned to the Commissioner’s Protection Detail (CPD), which is responsible for providing protective services to the IRS-CI Commissioner and Chief Executive Officer.
2. Background
The foremost responsibility of a protection detail is to safeguard the well-being and mobility of the IRS Commissioner/Chief Executive Officer, particularly in urgent or high-risk situations. Installing 360-degree emergency lights, sirens, and vaults in our vehicles is essential to fulfilling this mission. These tools enable the team to signal the need for immediate action and heightened awareness, ensuring that both internal personnel and external agencies recognize the seriousness of the situation and respond appropriately. This capability supports the rapid initiation of security protocols and facilitates swift access to secure areas during emergencies.
Historically, the Commissioner’s Protection Detail has equipped vehicles—including 2022 Chevrolet Suburban’s, 2018 Ford Expeditions, and 2016 Lincoln Navigators—with emergency lighting, sirens, and vaults. This precedent underscores the established operational need and effectiveness of such equipment in enabling safe, efficient, and exigent movements during critical assignments.
Moreover, emergency lights and sirens serve as clear indicators of authority, distinguishing protection vehicles during time-sensitive operations. Their presence enhances coordination with law enforcement and emergency services, streamlining communication and enabling a unified response. Vaults are also required to securely store protective equipment in accordance with policy, including the temporary storage of weapons.
Ultimately, these enhancements enable IRS-CI to carry out its mission effectively, ensure the protection of VIPs, and respond decisively in urgent circumstances.
3. Scope
The scope of this SOW encompasses purchasing the following:
| FY |
| Description |
| Item ID |
| Qty |
| 2026 |
| Headlight Flashers |
(6) QS Surface Mount W/ Brackets Front Grill 200 Watt Speaker Rumbler: Aftershock with Brackets 360° R/B LED Next-Gen Hideaway Front Bumper All Panels Ceramic Nano Tint including LE Brow (Limo) FNX QS Covert, high-intensity NF Interior Visor LED Bar RB On/Off Master Switch with Relay (Negates Batt Drain) Full Function Typhoon Handheld Remote Storm Pro 200W Controller Q400 Side-Mounted Collision RB LED Light Bar Q800 Rear Deck 8 Heads high Intensity LED RB Light Bar No Drill Remote M-22 Tactical Magnetic Retention System BOSS StrongBox - Pull Out Drawer - 38"W x 14"D x 14"H W/ T handle Lock system (3Locking Points) 180® Next-Gen Under-Mirror Puck: High-Intensity 180° Perimeter LED RB. including Bracket Fenix Rocker 10 Heads 49" Low Profile RB Running Board LED Light Kit 360° R/B LED Next-Gen Hideaway Rear License Plates Rear Taillight Flashers Total Professional Labor Shop Supplies & Consumables: Includes Wiring, fuse kits, and installation hardware. (3) Units
| 0001 |
| 3 |
4. Place of Performance/Delivery POC
Contractor shall contact Gregory.Pico@ci.irs.gov, Ryan.Rickey@ci.irs.gov and Lance.Love2@ci.irs.gov with delivery schedule and tracking immediately upon availability.
Furthermore, any questions related to this contract request should be directed to Gregory Pico at 202-317-3480
All items shall be shipped directly to:
IRS Criminal Investigation Asset & Knowledge Management 1111 Constitution Ave NW, Room 3320 Washington, DC 20224 Phone: 202-317-3480 Email: Gregory.Pico@ci.irs.gov
Primary Delivery POC:
Gregory Pico Phone: 202-317-3480 Email: Gregory.Pico@ci.irs.gov
Secondary Delivery POC:
Ryan Rickey Phone: 202-317-4285 Email: Ryan.Rickey@ci.irs.gov
Tertiary Delivery POC:
Lance Love Phone: 912-672-7270 Email: Lance.Love2@ci.irs.gov
5. Period of Performance
Delivery of products shall begin within 15 days of award
6. Contract Administration Data
The Contracting Officer for this requirement is:
Internal Revenue Service Office of Procurement
| Name: | Ezilda Warthaw |
| Email: | Ezilda.U.Warthaw@irs.gov |
The COR and Agency’s Point-of-Contact (POC) for R&A for this reason is:
Internal Revenue Service Criminal Investigation
| Name: | Lance Love |
| Phone: | 912-672-7270 |
Email: Lance.Love2@ci.irs.gov
7. Government Furnished Property
Access to Government-Furnished property does not apply.
8. Government Furnished Information
Access to Government-Furnished information does not apply.
9. Security Requirements
Security requirements do not apply.
10. Section 508 Compliance
508 review and approval not obtained
SECTION III - CLAUSES
Clauses Incorporated by Reference.
| 52.202-1 |
| Definitions (Jun 2020) |
| 52.203-3 |
| Gratuities (Apr 1984) |
| 52.203-5 |
| Covenant Against Contingent Fees (May 2014) |
| 52.203-7 |
| Anti-Kickback Procedures (Jun 2020) |
| 52.203-10 |
| Price or Fee Adjustment for Illegal or Improper Activity (May 2014) |
| 52.203-12 |
| Limitation on Payments to Influence Certain Federal Transactions (Jun 2020) |
| 52.203-17 |
| Contractor Employee Whistleblower Rights (Nov 2023) |
| 52.203-19 |
| Agreements or Statements—Representation (Jan 2017) |
Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017)
| 52.204-19 |
| Incorporation by Reference of Representations and Certifications (Dec 2014) |
| 52.209-10 |
| Prohibition on Contracting with Inverted Domestic Corporations (Oct 2025) |
| 52.224-1 |
| Privacy Act Notification (Apr 1984) |
| 52.224-2 |
| Privacy Act (Apr 1984) |
| 52.224-3 |
| Privacy Training (Jan 2017) Alternate I (Jan 2017) |
| 52.227-1 |
| Authorization and Consent (Jun 2020) |
| 52.227-2 |
| Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) |
| 52.228-5 |
| Insurance—Work on a Government Installation (Jan 1997) |
| 52.229-3 |
| Federal, State, and Local Taxes (Oct 2025) |
| 52.232-1 |
| Payments (Apr 1984) |
| 52.232-11 |
| Extras (Apr 1984) |
| 52.232-17 |
| Interest (May 2014) |
| 52.232-18 |
| Availability of Funds (Apr 1984) |
| 52.232-23 |
| Assignment of Claims (May 2014) |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations (Jun 2013) |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) |
| 52.242-13 |
| Bankruptcy (July 1995) |
| 52.242-15 |
| Stop-Work Order (Aug 1989) |
| 52.243-1 |
| Changes—Fixed-Price (Oct 2025) Alternate II (Oct 2025) |
| 52.252-2 |
| Clauses Incorporated by Reference (Feb 1998) |
| 1052.228-70 |
| Insurance (Apr 2015) |
| 1052.232-7003 |
| Electronic Submission of Payment Requests (Apr 2015) |
Clauses Incorporated by Full Text:
52.212-4 TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025)
(a) Definitions. The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.
(b) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(c) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(d) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(e) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause FAR 52.233-1, Disputes, which is incorporated in this contract by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall—
(1) Notify the Contracting Officer in writing as soon as possible;
(2) Remedy the delay as quickly as possible; and
(3) Notify the Contracting Officer when the occurrence is over.
(g) Invoice. The Government will handle invoices according to the Prompt Payment Act (31 U.S.C. 3903) and 5 CFR part 1315. The Contractor shall submit invoices to the address designated in the contract to receive invoices. An invoice must include the information required by 5 CFR part 1315.9(b).
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees, and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark, or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act ( 31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(4) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable;
(D) Contractor point of contact; and
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(5) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by FAR part 33 if–
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR part 32).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a termination for cause.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures for interest credits prescribed in FAR part 32 in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon—
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. The Government will send a cure notice to the Contractor, unless the reason for the termination is late delivery. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered under this contract are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Government-financed air transportation; and 41 U.S.C. chapter 21 relating to procurement integrity.
(r) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services;
(2) The Disputes, Payments, Invoice, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) Other contract clauses incorporated in the solicitation or contract;
(4) Addenda to this solicitation or contract;
(5) Solicitation provisions incorporated in the solicitation;
(6) Other paragraphs of this clause;
(7) Other documents, exhibits, and attachments; and
(8) The specification.
(s) Unauthorized obligations.
(1) Except as stated in paragraph (s)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government-authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (s)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(t) Comptroller General examination of record. This paragraph applies if this contract was awarded using other than sealed bid procedures and is in excess of the simplified acquisition threshold on the date of award of this contract.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices, at all reasonable times, the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR part 4, longer period required by statute, or periods specified in other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This clause does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(u) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
(End of clause) 1052.201-70 CONTRACTING OFFICER’S REPRESENTATIVE (COR) APPOINTMENT AND AUTHORITY (APR 2015)
(a) The COR is Gregory Pico.
(b) Performance of work under this contract is subject to the technical direction of the COR identified above, or a representative designated in writing. The term “technical direction” includes, without limitation, direction to the contractor that directs or redirects the labor effort, shifts the work between work areas or locations, and/or fills in details and otherwise serves to ensure that tasks outlined in the work statement are accomplished satisfactorily.
(c) Technical direction must be within the scope of the contract specification(s)/work statement. The COR does not have authority to issue technical direction that:
(1) Constitutes a change of assignment or additional work outside the contract specification(s)/work statement;
(2) Constitutes a change as defined in the clause entitled “Changes”;
(3) In any manner causes an increase or decrease in the contract price, or the time required for contract performance;
(4) Changes any of the terms, conditions, or specification(s)/work statement of the contract;
(5) Interferes with the contractor's right to perform under the terms and conditions of the contract; or
(6) Directs, supervises or otherwise controls the actions of the Contractor's employees.
(d) Technical direction may be oral or in writing. The COR must confirm oral direction in writing within five workdays, with a copy to the Contracting Officer.
(e) The Contractor shall proceed promptly with performance resulting from the technical direction issued by the COR. If, in the opinion of the Contractor, any direction of the COR or the designated representative falls within the limitations of (c) above, the Contractor shall immediately notify the Contracting Officer no later than the beginning of the next Government workday.
(f) Failure of the Contractor and the Contracting Officer to agree that technical direction is within the scope of the contract shall be subject to the terms of the clause entitled “Disputes.”
(End of clause)
1052.210-70 CONTRACTOR PUBLICITY (APR 2015)
The Contractor, or any entity or representative acting on behalf of the Contractor, shall not refer to the supplies or services furnished pursuant to the provisions of this contract in any news release or commercial advertising, or in connection with any news release or commercial advertising, without first obtaining explicit written consent to do so from the Contracting Officer. Should any reference to such supplies or services appear in any news release or commercial advertising issued by or on behalf of the Contractor without the required consent, the Government shall consider institution of all remedies available under applicable law, including 31 U.S.C. 333, and this contract. Further, any violation of this clause may be considered as part of the evaluation of past performance.
(End of clause)
Electronic Invoicing and Payment Requirements for the Invoice Processing Platform (IPP) (JUL 2019)
(a) Definitions:
"Short payment" as used in this clause means the partial payment of an invoice for goods/services rendered at the time of payment when the invoice includes additional goods/services that have not yet been provided/rendered.
“Short payment” example: The contract requires the delivery of a set number of items, with the price, delivery location, and delivery due date also specified. The vendor delivers 50% of the items as specified but invoices for 100% of the items. Before implementation of the IPP, the IRS would have paid the vendor for the items delivered and instructed the vendor to re-invoice the IRS when the balances of the items were delivered. In other words, the IRS would "short pay" the invoice since the IRS did not remit payment for the full invoice amount. With implementation of the IPP, the IRS can no longer do this because the IRS cannot accept an electronic invoice that includes items not yet received. The IRS will reject the invoice. The vendor needs to submit an invoice for only the items received by the IRS (in this case, 50%), and, if these items meet all other contract terms and conditions, the IRS will pay the invoiced amount. The vendor submits subsequent invoice(s) for items as they are delivered and accepted.
(b) The Invoice Processing Platform (IPP) is a secure Web-based electronic invoicing and payment information service available to all Federal agencies and their suppliers. Effective October 1, 2012, invoicing for payment through the IPP will be mandatory for all new contract awards. Additional information regarding the IPP may be found at the IPP website address https://www.ipp.gov. Contractors must complete the contractor point of contact information below and submit it with their proposal submissions. Contractors may contact the IPP Helpdesk for assistance via e-mail at ippgroup@stls.frb.org or via phone at (866) 973-3131. Once a contract award has been made, the contractor will be contacted by the IPP via e-mail to set-up an account. It will be necessary for contractors to login to their IPP accounts every 90 days to keep their IPP accounts active.
(c) Contractor Point of Contact Information Contractor Name: __________________________________ Contractor IPP Point of Contact Name: _________________ Contractor Phone Number: ___________________________ Contractor E-mail Address:___________________________
(d) Electronic Invoicing and Payment Requirements Vendor invoices submitted electronically through the IPP should be in the proper format and contain the information required for payment processing. To be approved for payment, a “proper invoice” must list the items specified in FAR 52.232-25 (a)(3)(i) through (a)(3)(x), or in the case of a Commercial Item Contract, the items included in 52.212-4(g)(1)(i) through (g)(1)(x).
If the vendor is offering a discount via the IPP, the discount must be reflected on the invoice. The vendor will select 'Create Invoice'. The IPP system will default to ‘Net 30 Prompt Pay’ under the Payment Terms dropdown box. The vendor will select from 54 different discount options for the invoice that is being created. If the vendor chooses to offer a discount on the invoice screen, the information will interface to the payment system for processing. Discounts that are offered on attachments rather than the invoice itself cannot be accepted.
Under this contract, the following documents are required to be submitted as an attachment to the invoice (Contracting Officer fills in additional documentation that must be furnished by the contractor (e.g., timesheet)). Please do not submit into IPP any documentation/attachments that conflict with what is stated on the invoice: ____________________________________________________________________________
Payment and Invoice Questions For payment and invoice questions, contact the Ancillary Systems at (304) 254-3372 or via e- mail at cfo.fm.ipp.customer.support@irs.gov.
(e) Waiver If the Contractor is unable to use the IPP for submitting payment requests starting on October 1, 2012, then a waiver form must be completed and submitted with the contractor’s proposal submission for review and approval by the Contracting Officer based on one of the conditions listed in the waiver. The vendor will be notified prior to award as to whether their request for waiver has been approved or denied. If the waiver is granted, then a copy of the waiver must be submitted with each paper invoice that the vendor submits to the payment office, or the invoice will be returned.
(f) Short Payment Short payment on vendor submitted invoices will no longer be processed or paid. If any portion of the invoice does not meet the requirements for a proper invoice, the entire invoice shall be rejected and returned to the vendor unpaid.
IRS Invoice Processing Platform (IPP) Waiver Form The IRS invoicing and payment requirements clause (IR1052.232-9000) requires that all invoices under awards made (or effective) on or after October 1, 2012, be submitted electronically via the IPP unless a waiver is requested and granted. If the Contractor is unable to submit its invoice through the IPP, the Contractor shall complete this waiver form indicating the reason for the waiver request by selecting the appropriate box below and providing a narrative summarizing in detail the circumstances requiring a waiver.
For a solicitation, submit the waiver form with the proposal submission. For a modification that incorporates the IPP clause into an existing contract, submit the waiver form with the modification. The CO will notify the vendor via e-mail or another appropriate means of communication prior to award as to whether their waiver has been approved or denied. If the waiver is granted, then a copy of the approved waiver must be submitted with each invoice that the vendor submits to the payment office, or the invoice will be returned.
Reason for requesting a waiver of the requirement to submit an electronic invoice via the IPP:
1. Submission of invoices through IPP would impose a hardship on an individual (includes employees and sole proprietors) due to either a physical or mental disability; a geographic, language, or literacy barrier; or an undue financial burden. The requirement to submit invoices through the IPP is automatically waived for all individuals who do not have payment capability using ACH with a U.S. financial institution.
2. The political, financial or communications infrastructure where the place of business is located does not support access to the IPP for submitting invoices electronically.
3. The contractor is located within an area designated by the President of the United States or an authorized agency administration as a disaster area. (Please identify area/location.)
4. The submission of invoices electronically may pose a threat to national security, the life or physical safety of an individual may be endangered, or a law enforcement action may be compromised.
5. The agency does not expect to receive more than one invoice from the same contractor within a one-year period. i.e., the invoice submission is non- recurring.
6. The contractor customarily submits a high volume of invoices on a regular basis via file format, not currently supported by the IPP (i.e., uses a file format other than XML or CSV) and the high volume of invoices would cause a significant burden to the contractor if submitted through the IPP individually. If utilizing this exception, please identify the file formats supported by your invoicing system so that the IPP may consider implementing the requested file format at a later date. File format(s) used:
7. Other - Please explain:
Attach a separate sheet of paper with a summary narrative substantiating the circumstances for the waiver exception selected from above (1 through 7).
Waiver Submitted By:
Contractor Name
Name of Person Submitting Request for Waiver
Title Signature of Person Submitting Request for Waiver
E-mail Address Phone No.
Contract/Order No. Date Submitted
Waiver Approved By:
Contracting Officer’s Name Printed
Contracting Officer’s Signature Date
SECTION IV – INSTRUCTIONS TO QUOTER BASIS OF AWARD
General. The Government expects to award a single Purchase Order resulting from this RFQ to the responsive responsible Quoter whose technically acceptable quote conforming to the RFQ is the lowest-priced.
Technical Acceptability. Each responsive quote will be evaluated for technical acceptability. A technically evaluated quote will be assigned an adjectival rating of either “Acceptable” or “Unacceptable”.
Table: Technical Ratings
| RATING ACRONYM |
| RATING DESCRIPTION |
| DEFINITIONS |
| A |
| Acceptable |
| The proposal is technically acceptable as it meets and/or exceeds the minimum technical acceptability requirements of the RFQ |
| U |
| Unacceptable |
| The proposal is technically unacceptable as it does not meet the minimum technical acceptability requirements of the RFQ. |
Evaluations will be based solely on the materials included in the quote. Therefore, the Quoter’s initial quote should contain the Quoters best terms. After receipt of quotes, the Government will conduct an evaluation.
Volume I, Factor 1 - Technical: Technical Capability
Technical capability will be evaluated and will be rated acceptable or unacceptable. The Government will evaluate the Quoters technical capability to satisfy requirements of the Statement of Work.
Volume II, Factor 2 – Price Quote
The Government will establish a total evaluated price which is inclusive of all CLINS based on vendor’s submitted quote for the exact products and quantities identified in the Statement of Work.
The total evaluated price for all CLINS will be evaluated to determine fair and reasonableness through multiple price analysis techniques. A price volume failing to meet or comply with instructions may be deemed noncompliant.
File details come from the government source that posted it. Updated .