50-M0083-25-CP134_Sole Source Certification 2025.pdf.PDF
PDF 554 KB Posted
- Solicitation number
- 50-M0083-25-CP134
- Issued by
- Luna County, Rowe CDP, New Mexico
About this file
The document is a Sole Source Certification letter dated March 25, 2025, issued by the Ruidoso-Ruidoso Downs Wastewater Treatment Plant in New Mexico, specifically addressing the procurement of Aluminum Sulfate for phosphorous removal from the effluent stream. The treatment plant requires a high-quality liquid Aluminum Sulfate to meet the EPA and New Mexico Environmental Department's phosphorous limit of 1.67 30-day Average lbs./day, which can only be effectively provided by Chameleon Industries from Mesquite, Texas.
Chameleon Industries has been the exclusive supplier for the Ruidoso-Ruidoso Downs Wastewater Treatment Plant for 11 consecutive years, delivering bulk tank trucks of Aluminum Sulfate at a more competitive price compared to other potential providers. The sole source certification highlights that alternative suppliers, such as a distributor from Georgia, would result in crystallization of the Aluminum Sulfate before reaching the facility, rendering their product ineffective. The documentation demonstrates the plant's strategic approach to maintaining environmental compliance by selecting a reliable, long-standing vendor capable of consistently meeting stringent regulatory phosphorous removal requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 50-50500-25-30160_50-50500-25-30160-CMC 72HD+ ARBOR PRO SPECIALTY LIFT.pdf.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VILLAGE OF--------
!!!!!D~:o
NEW MEXICO
March 25, 2025
RE: Letter of Determination
Dear Christy Coker, 313 CREE MEADOWS DRIVE
RUIDOSO, NM, 88345
575-258-4343
WWW.RUIDOSO-NM.GOV
The Ruidoso-Ruidoso Downs Wastewater Treatment Plant requires an Aluminum Sulfate injection to aid in the removal of Phosphorous from the Effluent stream.
To meet the 1.67 30-day Average, lbs./day Phosphorous limit requires a high-quality liquid Aluminum Sulfate which is provided by Chameleon Industries out of Mesquite, Texas.
Chameleon Industries brings bulk tank trucks of Aluminum Sulfate which is much less expensive than other competitors. The only other company that can deliver bulk Aluminum Sulfate is a distributor out of Georgia which will crystalize by the time it reaches our facility.
We have been using Chameleon Industries for the last 11 years and have met our current permit of 1.67 30-day Average, lbs./day Phosphorous limit required by Environmental Protection Agency (EPA) and New Mexico Environmental Department
(NMED).
Sincerely, Isaac Garcia
Ruidoso-Ruidoso Downs Wastewater Treatment Plant
Director
File details come from the government source that posted it. Updated .