50-M0083-25-CP134_Sole Source Certification 2025.pdf.PDF

PDF 554 KB Posted

Attached to
SERVICE MAINTENANCE AGREEMENT FOR GE CENTRICITY CARDIAC WORKFLOW (CCW) SOFTWARE REPORTING SYSTEM.
Solicitation number
50-H6901-25-CP137
Issued by
Luna County, Rowe CDP, New Mexico

About this file

This document is a Sole Source Certification letter from the Ruidoso-Ruidoso Downs Wastewater Treatment Plant in New Mexico, dated March 25, 2025, addressing a specific chemical procurement requirement. The document details the plant's need for Aluminum Sulfate to aid in phosphorous removal from the effluent stream, specifically to meet the Environmental Protection Agency (EPA) and New Mexico Environmental Department (NMED) regulatory requirement of a 1.67 30-day Average, lbs./day Phosphorous limit.

The letter identifies Chameleon Industries from Mesquite, Texas, as the sole source provider of the required liquid Aluminum Sulfate, highlighting their unique capability to deliver bulk tank trucks of the chemical at a more cost-effective rate compared to other potential suppliers. The document emphasizes the long-standing relationship between the treatment plant and Chameleon Industries, noting they have been the primary supplier for 11 years and have consistently helped the facility meet its regulatory phosphorous removal requirements. The sole source justification is further reinforced by the assertion that an alternative distributor from Georgia would result in chemical crystallization before delivery, rendering the product unsuitable for the treatment plant's needs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VILLAGE OF--------

!!!!!D~:o

NEW MEXICO

March 25, 2025

RE: Letter of Determination

Dear Christy Coker, 313 CREE MEADOWS DRIVE

RUIDOSO, NM, 88345

575-258-4343

WWW.RUIDOSO-NM.GOV

The Ruidoso-Ruidoso Downs Wastewater Treatment Plant requires an Aluminum Sulfate injection to aid in the removal of Phosphorous from the Effluent stream.

To meet the 1.67 30-day Average, lbs./day Phosphorous limit requires a high-quality liquid Aluminum Sulfate which is provided by Chameleon Industries out of Mesquite, Texas.

Chameleon Industries brings bulk tank trucks of Aluminum Sulfate which is much less expensive than other competitors. The only other company that can deliver bulk Aluminum Sulfate is a distributor out of Georgia which will crystalize by the time it reaches our facility.

We have been using Chameleon Industries for the last 11 years and have met our current permit of 1.67 30-day Average, lbs./day Phosphorous limit required by Environmental Protection Agency (EPA) and New Mexico Environmental Department

(NMED).

Sincerely, Isaac Garcia

Ruidoso-Ruidoso Downs Wastewater Treatment Plant

Director

File details come from the government source that posted it. Updated .