This document is an Addendum No. 1 for Invitation to Bid (ITB) #50-805-25-17148 issued by the New Mexico Department of Transportation (NMDOT) for the Anton Chico Water and Wastewater Improvements project. The addendum provides responses to 22 bidder questions and includes a pre-bid meeting sign-in sheet, with key project details indicating final completion is required prior to June 2026 when the owner's funding expires. The project involves water and wastewater improvements for rest areas, including infrastructure such as water distribution lines, septic systems, piping, valve installations, and associated components. A mandatory pre-bid meeting was held on April 16, 2025, and bidders were provided clarifications on technical specifications, including pipe materials, hydrant details, valve configurations, and installation requirements.
The project will be funded directly by NMDOT, with no specific domestic material requirements identified. Contractors are expected to submit product approvals during the pre-construction phase for items like floor drains, valve boxes, and metering assemblies. The geotechnical assessment indicated no rock encountered up to 6 feet deep, and backfill material will require proctor reports for engineer review. Permit applications for the septic system will be submitted by the engineer to NMED after project award. While an engineer's estimate was not distributed, the comprehensive nature of the infrastructure improvements suggests a significant project scope involving complex municipal water and wastewater system installations in a rural rest area environment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G e n e r a l O f f i c e P . O . B o x 1 1 4 9 S a n t a F e , N M 8 7 5 0 4
Michelle Lujan Grisham Governor
Ricky Serna Cabinet Secretary
Commissioners
John McElroy Commissioner District 1
Gary Tonjes
District 2
Hilma E. Chynoweth Commissioner, Vice Chairman District 3
Walter G. Adams Commissioner, Chairman District 4
Thomas C. Taylor
District 5
Charles Lundstrom Commissioner, Secretary District 6
April 21, 2025
NM State Purchasing 1120 St. Francis Drive Joseph Montoya Building Santa Fe, NM 87504
Subject: NMDOT ITB # 50-805-25-17148 Anton Chico Water and Waste Water Improvements
State Purchasing Agent, Attached is the request to amend ITB # 50-805-25-17148 Anton Chico Water and Waste Water Improvements.
Add the Pre-Bid meeting sign in sheet as well as answer to questions. See attached.
Should you have any questions, please do not hesitate to contact me.
Thank you for your assistance.
Angela Martinez NMDOT Purchasing Agent Supervisor Procurement Services Bureau Ph: (505) 570-7940
DB23.1049 | Anton Chico_Addendum No. 1_2025.04.16 1
Addendum No. 1 Anton Chico Rest Areas Water and Wastewater Improvements New Mexico Department of Transportation, District 4 April 21, 2025
The following responses to questions shall become a part of the Contract Documents. This Addendum contains 1 page of written text, 0 drawings and 1 attachment.
Pre-Bid Meeting Notes and sign-in sheet from the mandatory pre-bid meeting held on April 16, 2025 are provided as Attachment 1.
Answers to Questions from Bidders
1. What are the construction contract times?
Final completion shall be prior to June 2026, when the Owner’s funding expires. The Contractor shall provide a schedule for completion of the project.
2. Will Domestic Material be required for this project?
No.
3. What Entity or Agency is Funding this project?
The Owner (NMDOT) is paying for the project.
4. Plan sheet C-4 note 8: This fire hydrant is coming off of a 4” main. Can you confirm fire hydrant lead is 4”?
Yes, this hydrant is not intended for fire flow.
5. Plan sheet C-4 note 8: What bid item is this to be in?
Include the fire hydrant in Line Item 8 which is 4” PVC pipe, fittings and appurtenances.
6. Sheet C-19: The steel pipe for the drain and overflow line is called steel. What class of steel is required?
Addendum No. 1
Anton Chico Rest Areas
DB23.1049 | Anton Chico_Addendum No. 1_2025.04.16 2
This shall be specified by the tank manufacturer, in accordance with AWWA D100.
7. Sheet C-19: What type of pipe are you requiring as a riser to connect to the inlet and outlet of the tank?
Piping shall be steel from the bottom inlet and outlet to a location 5’ outside the wall of the tank at the location of the gate valve.
8. Bid item #8: Is existing pvc and will a mj sleeve be acceptable?
The existing pipe material is unknown but believed to be PVC. Yes, as long as the pipe is restrained per the drawings.
9. Could you provide a floor drain model number?
The Contractor shall submit a proposed product to the Engineer for approval during the pre-construction process.
10. Could you provide a cleanout detail?
See attached for sewer cleanout detail when located in a driving isle.
11. Sheet C-16 Dtl 4: What class of 4” for the perf monitor tube?
SCH 40 PVC.
12. Sheet C-16 dtl 2 & 4: Are the irrigation valve boxes DI or can you provide a model #?
Irrigation valve boxes may be plastic. The Contractor shall submit a proposed product to the Engineer for approval during the pre-construction process.
13. Sheet c-12: Is the pipe after the first DBox perforated or solid pipe and could you confirm quantity of perforated and solid pipe?
Yes and the quantity may be tabulated from the Plans, approximately 300 LF.
14. Could you provide a model number for the DBoxes?
The Contractor shall submit a proposed product to the Engineer for approval during the pre-construction process.
15. Bid item #62: Is this the same meter assembly as bid item #26?
No, reference the Specifications and Plans for the metering manhole.
Addendum No. 1
Anton Chico Rest Areas
DB23.1049 | Anton Chico_Addendum No. 1_2025.04.16 3
16. Bid item #4 sheet C-8: Could you provide details and specs for the trench drain and catch basin?
Details on the trench drain and catch basin are included in the drawings. The Contractor shall submit a proposed product to the Engineer for approval during the pre-construction process.
17. Are we allowed to use a pre-cast building or does it need to be a built CMU building?
The project shall be bid as is and any changes to the design will be discussed with the awarded Contractor.
18. Do you have an engineer’s estimate on the project?
The Owner has elected to not distribute the EOPC.
19. What is the completion of the project?
Reference the response to question 1.
20. Looks like there were only 2 soil borings done on the project does anyone know if there will be rock encountered onsite and will we have to bring in material for backfill, fill, and bedding?
Test holes and percolation testing were completed at the locations of the disposal fields and no rock was encountered up to 6 feet deep. Backfill material proctor reports shall be submitted to the Engineer during the pre-construction phase and will be reviewed in conformance with the specifications for suitable backfill material. The geotechnical report outlines the requirements for import material at the building sites.
21. Please see attached for maybe re-alinement on the water line for a shorter distance and where valves are needed we can hook into the HDPE
The project shall be bid as is and any changes to the design will be discussed with the awarded Contractor.
22. Permit for septic will a licensed plumber have to file for the permit?
The permit applications will be submitted by the Engineer to NMED once the project has been awarded.
Nate Arnold, Project Engineer
Attachment 1
Pre-Bid Sign-In Cleanout Detail
SEWER SERVICE LINE CLEANOUTS
NTS
7A
PLAN VIEW
SEWER SERVICE LINE CLEANOUTS
7A
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
4" PVC (CLOSE)
AutoCAD SHX Text
4" COMBO OR WYE & 45°
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
4" COMBO OR WYE & 45°
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text 4" IPS THREADED BRASS HEX SOCKET PLUG (EQUAL TO TYLER LOW SQUARE HEAD) INTO CAST IRON FITTING, CONNECTED TO PVC WITH FERNCO CONNECTOR AND S.S. STRAPS (2 EA.)
AutoCAD SHX Text PROVIDE A RECTANGULAR CONCRETE COLLAR AROUND BOTH CLEANOUTS WITH A MINIMUM OF 6" OF CONCRETE AROUND EACH CLEANOUT. REINFORCE WITH WELDED WIRE MESH 6 X 6-W1.4 X W1.4.
AutoCAD SHX Text
DETAIL NO.
AutoCAD SHX Text
FILE NAME:
AutoCAD SHX Text
DETAIL NAME:
AutoCAD SHX Text
IHS-STD-BLOCKS-2021
AutoCAD SHX Text
INDIAN HEALTH SERVICE
AutoCAD SHX Text
PUBLIC HEALTH SERVICE
AutoCAD SHX Text
DEPT. OF HEALTH & HUMAN SERVICES
AutoCAD SHX Text
ALBUQUERQUE AREA DSFC
| 50-805-25-17148 Anton Chico Water and Waste Water Improvements B001.pdf |
| Anton Chico_Addendum No. 1_2025.04.21.pdf |
| Pre-Bid Meeting |
| Answers to Questions from Bidders |
File details come from the government source that posted it. Updated .