5-Ton Single Girder Top Running Crane Specifications.docx
DOCX document 27 KB Posted
- Attached to
- 5-Ton Single Girder Top Running Crane Havre
- Solicitation number
- MDT-315414-RP
- Issued by
- Montana
About this file
This document is a detailed specification for a 5-ton single girder top running bridge crane for the Montana Department of Transportation (MDT) Havre Welding Shop. The specification requires the procurement, delivery, and installation of a new crane with specific technical requirements, including a 10,000-pound capacity CMAA Class 'C' crane with a 20/3.2 FPM hoisting speed, 65 FPM trolley speed, and 100 FPM bridge speed. The crane must include a Williams wireless remote system, rigid 'C' track with flat cable festoon system, and an overload protection device. Additional components include a 40lb runway rail system, a 110-amp runway electrification system, and comprehensive installation requirements with operational and OSHA load testing.
The specification outlines additional requirements such as providing current repair and parts manuals, two operator's manuals, and on-site training for Havre Equipment Shop personnel. Installation is to be completed during shop hours of 7:00 am - 3:30 pm, with the specific completion date to be discussed at a pre-award meeting. Manufacturers' literature must accompany all bids, and the vendor will be responsible for providing a schedule and all necessary materials and equipment for installation. While the related contract opportunity describes a different procurement for camera equipment for large game monitoring, this specific document focuses solely on the crane specifications for the MDT Havre Welding Shop.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Detail Drawings.pdf | ||
| 1186025-event.pdf | ||
| Prevailing Wage Rates.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5-TON SINGLE GIRDER TOP RUNNING CRANE SPECIFICATIONS
SPECIFICATIONS FOR WORK
Provide, deliver, and install F.O.B. MDT Havre Welding Shop, new 5-ton girder top running bridge crane with R&M components per the following specifications.
Installation times will coincide with our current shop hours 7:00 am – 3:30 pm.
Successful vendor will provide a schedule and all materials and equipment needed to perform installation.
Note: Manufacturer's literature must accompany all bids.
MAKE AND MODEL BID:
1.1 5-Ton SGTR Crane:
1) Provide and install one 5-ton single girder crane, Model ASI-SGTR-RM 25.5, CMAA Class ‘C’ 10,000lb capacity. See the detailed drawings for span measurements.
2) 20/3.2 FPM hoisting speed see detailed drawings measurement of available lift.
3) 65 FPM 2-step VFC trolley speed and 100FPM 2-step VFC bridge speed.
4) 208/3/60 mainline voltage, 115-volt controls. Mainline contactor, bridge panel disconnect. See detailed drawings.
5) Geared upper and lower limit switch.
6) Independent sliding push button pendent.
7) Williams wireless remote system consisting of two transmitters, one receiver and OSHA required signaling device
8) Rigid ‘C’ track with flat cable festoon system.
9) Overload protection system device set at 110 percent.
1.2 Runway Rail:
1) Provide and install see detailed drawings for measurement of 40lb runway rail system complete with see detailed drawings for LF 40lb punched rail, splice bars with hardware, hook bolts with hardware and end stops.
1.3 Electrical:
1) Provide and install see detailed drawing for measurements of four conductor 110-amp runway electrification system complete with beam brackets, conductor hangers, see detailed drawings for LF of conductor bar, center power feeds, end caps and tandem articulating collector assemblies.
1.4 Load Test:
1) Perform operational and OSHA load testing at the time of installation with test weights.
1.5 Manuals:
1) Current repair manual covering all components.
2) Current parts catalog covering all components.
3) Two (2) operator’s manuals shall be provided.
1.6 Training:
1) Provide training to Havre Equipment Shop personnel on operation and maintenance of equipment.
DESIGNATED CONTRACT COMPLETION DATE:
WORK IS REQUIRED TO BE COMPLETED ON OR BEFORE: TO BE DISCUSSED AT PRE-AWARD MEETING
- 2 -
- 1 –
REVISED: 823/04