This is a bid tabulation document for the Columbia Borough Collection System Rehabilitation 2026 project, administered by the Lancaster Area Sewer Authority in Pennsylvania. The project involves trenchless rehabilitation of sewer collection systems, specifically cured-in-place lining installation in 50 sections of 8-inch and 10-inch diameter sewer mains totaling 10,719 linear feet and reinstatement of 216 active sewer connections. Seven contractors submitted bids for the project: Abel Recon, Insight Pipe Contracting LLC, Mobile Dredging & Video Pipe Inc., Mr. Rehab LLC, SAK Construction LLC, Vortex Services LLC, and Wilson Excavating. Online sealed bids were received via the PennBid Program until October 21, 2026 at 11:00 am, with a mandatory pre-bid meeting held on October 8, 2026 at 10:00 am at the Lancaster Area Sewer Authority office. Bid security in the form of a certified check, bank check, or bid bond was required at 10 percent of the total bid amount, with the lowest responsible bidder required to submit actual bid security within three business days after bid opening.
The base bid pricing ranged from $573,291.70 to $961,294.99. The three primary work items included trenchless rehabilitation of 8-inch diameter sewer sections at unit prices ranging from $41.50 to $76.21 per linear foot; reinstatement of active sewer connections at unit prices ranging from $322.00 to $850.00 per each; and trenchless rehabilitation of 10-inch diameter sewer sections at unit prices ranging from $44.60 to $86.21 per linear foot. Mr. Rehab LLC submitted the lowest total bid at $573,291.70, while Abel Recon submitted the highest total bid at $961,294.99. The Lancaster Area Sewer Authority reserved the right to reject any and all bids and waive any omissions, errors, mistakes, defects, or irregularities in any bid submitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-TABULATION.xlsx | XLSX spreadsheet | |
| 1-Columbia 2026 plans.pdf | ||
| 3-PREBID MEETING NOTES.pdf | ||
| 2-Columbia 2026 relineing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| Abel Recon | Insight Pipe Contracting, LLC | Mobile Dredging & Video Pipe, Inc. | Mr. Rehab LLC | SAK Construction, LLC | Vortex Services LLC | Wilson Excavating | ||||
| Total Cost | $961,294.99 | $687,272.80 | $573,291.70 | $614,602.70 | $858,285.00 | $691,082.00 | $685,690.00 | |||
| # | Items | Unit |
of
| Measure | Quantity |
| Required | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
Cost
| Base Bid Pricing: Totals | $961,294.99 | $687,272.80 | $573,291.70 | $614,602.70 | $858,285.00 | $691,082.00 | $685,690.00 | ||||||||||
| #1-1 | Trenchless Rehabilitation of 8-inch diameter sewer sections as described on the project plans and in the summary of work Section 01010. Complete in place including easement grubbing, bypass pumping, cleaning, removing intruding laterals, pre and post televising, traffic control and restoration. | Linear foot | 9347 | $76.21 | $712,334.87 | $46.40 | $433,700.80 | $41.50 | $387,900.50 | $48.10 | $449,590.70 | $63.00 | $588,861.00 | $56.00 | $523,432.00 | $54.00 | $504,738.00 |
| #1-2 | Reinstatement of active sewer connections to the 8-inch and 10-inch diameter sewer main encountered in the scope of trenchless rehabilitation, complete in place including grouting, sealing, bypass pumping and traffic control. | Each | 216 | $605.00 | $130,680.00 | $850.00 | $183,600.00 | $575.00 | $124,200.00 | $440.00 | $95,040.00 | $790.00 | $170,640.00 | $322.00 | $69,552.00 | $355.00 | $76,680.00 |
| #1-3 | Trenchless Rehabilitation of 10-inch diameter sewer sections as described on the project plans and in the Summary of Work Section 01010. Complete in place including easement, grubbing, bypass pumping, clearing and grubbing, bypass pumping, cleaning, removing intruding laterals, pre and post televising, traffic control and restoration. | Linear foot | 1372 | $86.21 | $118,280.12 | $51.00 | $69,972.00 | $44.60 | $61,191.20 | $51.00 | $69,972.00 | $72.00 | $98,784.00 | $71.50 | $98,098.00 | $76.00 | $104,272.00 |