This is a bid tabulation spreadsheet for the Columbia Borough Collection System Rehabilitation 2026 project administered by the Lancaster Area Sewer Authority in Lancaster, Pennsylvania. The project encompasses trenchless rehabilitation of cured-in-place lining in 50 sections of 8-inch and 10-inch diameter sewer mains totaling 10,719 linear feet, along with reinstatement of 216 active sewer connections. Seven contractors submitted bids for the base bid pricing: Abel Recon ($961,294.99), Insight Pipe Contracting, LLC ($687,272.80), Mobile Dredging & Video Pipe, Inc. ($573,291.70), Mr. Rehab LLC ($614,602.70), SAK Construction, LLC ($858,285.00), Vortex Services LLC ($691,082.00), and Wilson Excavating ($685,690.00). The sealed bid opening was scheduled for October 21, 2026 at 11:00 a.m., with a mandatory pre-bid meeting held on October 8, 2026 at 10:00 a.m. at the Authority's offices at 130 Centerville Road, Lancaster, PA 17603.
The tabulation details three line items with unit pricing: Item #1-1 for 8-inch diameter sewer rehabilitation at 9,347 linear feet; Item #1-2 for connection reinstatement at 216 each; and Item #1-3 for 10-inch diameter sewer rehabilitation at 1,372 linear feet. Bid prices ranged significantly across contractors, with Mobile Dredging & Video Pipe, Inc. submitting the lowest total bid at $573,291.70 and Abel Recon the highest at $961,294.99. All bidders were required to submit bid security equal to 10 percent of their total bid amount in the form of a certified check, bank check, or bid bond, with the lowest responsible bidder required to submit actual bid security within three business days after bid opening. Contract documents were available at no cost through PennBid.net, and all bid questions were to be submitted through that platform.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-TABULATION.xlsx | XLSX spreadsheet | |
| 1-Columbia 2026 plans.pdf | ||
| 3-PREBID MEETING NOTES.pdf | ||
| 2-Columbia 2026 relineing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| Abel Recon | Insight Pipe Contracting, LLC | Mobile Dredging & Video Pipe, Inc. | Mr. Rehab LLC | SAK Construction, LLC | Vortex Services LLC | Wilson Excavating | ||||
| Total Cost | $961,294.99 | $687,272.80 | $573,291.70 | $614,602.70 | $858,285.00 | $691,082.00 | $685,690.00 | |||
| # | Items | Unit |
of
| Measure | Quantity |
| Required | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
Cost
| Base Bid Pricing: Totals | $961,294.99 | $687,272.80 | $573,291.70 | $614,602.70 | $858,285.00 | $691,082.00 | $685,690.00 | ||||||||||
| #1-1 | Trenchless Rehabilitation of 8-inch diameter sewer sections as described on the project plans and in the summary of work Section 01010. Complete in place including easement grubbing, bypass pumping, cleaning, removing intruding laterals, pre and post televising, traffic control and restoration. | Linear foot | 9347 | $76.21 | $712,334.87 | $46.40 | $433,700.80 | $41.50 | $387,900.50 | $48.10 | $449,590.70 | $63.00 | $588,861.00 | $56.00 | $523,432.00 | $54.00 | $504,738.00 |
| #1-2 | Reinstatement of active sewer connections to the 8-inch and 10-inch diameter sewer main encountered in the scope of trenchless rehabilitation, complete in place including grouting, sealing, bypass pumping and traffic control. | Each | 216 | $605.00 | $130,680.00 | $850.00 | $183,600.00 | $575.00 | $124,200.00 | $440.00 | $95,040.00 | $790.00 | $170,640.00 | $322.00 | $69,552.00 | $355.00 | $76,680.00 |
| #1-3 | Trenchless Rehabilitation of 10-inch diameter sewer sections as described on the project plans and in the Summary of Work Section 01010. Complete in place including easement, grubbing, bypass pumping, clearing and grubbing, bypass pumping, cleaning, removing intruding laterals, pre and post televising, traffic control and restoration. | Linear foot | 1372 | $86.21 | $118,280.12 | $51.00 | $69,972.00 | $44.60 | $61,191.20 | $51.00 | $69,972.00 | $72.00 | $98,784.00 | $71.50 | $98,098.00 | $76.00 | $104,272.00 |
File details come from the government source that posted it. Updated .