State Parks Project – Lagoon, Shoreline, and Stream Restoration at Twanoh State Park
Solicitation number
SW-C2023A
Issued by
Lincoln County, Washington

About this file

This is a Federal Compliance Certification form for Contract #SW-C2023A, a Twanoh State Park Lagoon, Shoreline, and Stream Restoration project administered by Washington State Parks through the MRSC Bonfire Procurement Portal. The project encompasses removal of a concrete bulkhead, expansion of an existing saltwater lagoon, construction of a tidal channel, and replanting of salvaged native vegetation around the lagoon's perimeter. Additional work includes removing existing riprap and trees along the shoreline and streambanks, naturalizing the shoreline through installation of large woody debris and bioengineered softshore armoring, performing floodplain expansion work within Twanoh Creek, installing clusters of large woody debris within the stream, removing and replacing a pedestrian bridge and abutments, and installing bioengineered streambanks. Bidders must submit their bids through the designated procurement portal.

The certification requires bidders to comply with multiple federal and state requirements, including non-collusion and ethics standards, federal eligibility verification through SAM.gov for all subcontractors, anti-lobbying requirements with Standard Form-LLL disclosure if contract value exceeds $100,000, and the Bipartisan Infrastructure Law's domestic preference requirements mandating that manufactured products contain at least 55 percent domestic components. The project is subject to both Davis-Bacon federal prevailing wage requirements and Washington State RCW 39.12 prevailing wage requirements, with bidders obligated to pay the higher applicable rate and maintain certified payroll records. The bidder must also comply with the Copeland Anti-Kickback Act, environmental and cultural compliance protocols including Inadvertent Discovery Plans, and affirmative action requirements for minority businesses, women's business enterprises, and labor surplus area firms in subcontracting. Physical construction activities cannot commence until the owner issues a written Notice to Proceed following completion of all required federal and state environmental reviews.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Compliance

Twanoh State Park
Lagoon, Shoreline and Stream Restoration
Contract # SW-C2023A
https://mrscrosters.bonfirehub.com/portal
The Bidder will submit the Bid to State Parks Public Opportunities MRSC Bonfire Procurement Portal
Federal Compliance Certification
Consolidated Federal Compliance Certification
I, the undersigned, as an authorized representative of the bidding entity, hereby certify and declare under penalty of perjury under the laws of Washington State and the United States that the following statements are true and correct:will render the bid non-responsive. Acknowledging the form does not alter the bidder’s obligation to comply with all contract documents if awarded the project.
Section I: Non-Collusion and Ethics
The bidder has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with this project.
The bidder shall comply with the Copeland “Anti-Kickback” Act (40 U.S.C. 3145), ensuring that no person employed in the construction or repair of this public work has been induced to give up any part of their rightful compensation.
Section II: Federal Eligibility and Debarment
SAM.gov Status: Neither the bidder nor its principals are presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal department or agency.
The bidder agrees to verify the eligibility of all subcontractors via the System for Award Management (SAM.gov) prior to entering into any lower-tier covered transactions
Section III: Anti-Lobbying (31 U.S.C. 1352)
No Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency or a Member of Congress in connection with this award.
If the contract value exceeds $100,000 and any non-federal funds have been used for lobbying, the bidder has completed and submitted Standard Form-LLL ("Disclosure of Lobbying Activities").
Section IV: Domestic Preference (Build America, Buy America)
The bidder certifies that all iron, steel, manufactured products, and construction materials used in this project will be produced in the United States in accordance with 2 CFR Part 184 and the Bipartisan Infrastructure Law.
For manufactured products, the bidder certifies that the cost of domestic components exceeds the federally mandated threshold (currently 55%) of the total cost of all components.
Section V: Labor Standards and Dual Prevailing Wages
The bidder acknowledges that this project is subject to both Davis-Bacon (Federal) and RCW 39.12 (Washington State) prevailing wage requirements.
The bidder agrees to pay the higher of the two rates (State vs. Federal) for each labor classification and to maintain and submit certified payroll records as required.
Section VI: Environmental and Cultural Compliance
The bidder understands that physical construction activities shall not commence until the Owner issues a written Notice to Proceed following the completion of all required federal and state environmental reviews.
The bidder agrees to stop work immediately if inadvertent archaeological or historical materials are encountered and to follow all applicable cultural resource protection protocols and Inadvertent Discovery Plans (IDP).
Section VII: Socioeconomics Steps (2 CFR 200.321)
The bidder certifies they will take all necessary affirmative steps to ensure that minority businesses, women's business enterprises, and labor surplus area firms are used whenever subcontracts are let.
This includes placing qualified firms on solicitation lists and dividing requirements into smaller tasks to permit maximum participation.
Bidder Signature and Authorization
/s/ Signature of Authorized OfficialDate
Typing your name can count as a signature.

Chart Data

Total
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!

image2.png

File details come from the government source that posted it. Updated .