5_-_IFB_Exhibit_A-1.docx
DOCX document 20 KB Posted
- Attached to
- Annual ACM-Mold-Lead Paint Abatements
- Solicitation number
- NE269201XT
- Issued by
- Tulare County, California
About this file
This is an Exhibit A pricing schedule for an Invitation for Bid (IFB) solicitation for asbestos-containing material (ACM), mold, and lead paint removal and disposal services. The scope of work encompasses multiple removal and disposal tasks including ceiling and wall materials removal (200 square feet estimated), pipe and fitting insulation removal (150 linear feet estimated), floor material and mastic removal (100 square feet estimated), equipment insulation removal (750 square feet estimated), lead-based paint removal from metal surfaces (50 square feet estimated), lead-based paint removal from wood surfaces (50 square feet estimated), and mold-contaminated material removal (100 square feet estimated). The contractor must also provide emergency response services with a required 24-hour response time for emergency abatement calls and labor support for removal of miscellaneous items unrelated to ACM abatement. A trip charge applies as a minimum charge for each removal call, with all pricing submitted on a unit rate basis.
Bidders must provide unit pricing for each line item including per-square-foot rates for material removal, per-linear-foot rates for pipe insulation removal, per-hour rates for labor charges and emergency calls, and a per-call rate for emergency abatement mobilization. The quantities listed represent estimates only based on services performed during prior years and are used solely to identify the lowest responsible bidder for contract award purposes. All line items must be completed with no exceptions, and bidders must submit a total bid amount on the associated Exhibit A form. The contractor's company name and business information must be included with the bid submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2_-_IFB_Notice_To_Contractors.doc | DOC document | |
| 8_-_IFB_Exhibit_D_-_Specifications.doc | DOC document | |
| 9_-_PDC_Map_with_Directions.docx | DOCX document | |
| 3_-_IFB_Instructions_To_Bidders_(new_-_nb).doc | DOC document | |
| 6_-_IFB_Exhibit_B_-_GTC_(2-2025).pdf | ||
| 1_-_IFB_Invitation_For_Bid.doc | DOC document | |
| 7_-_IFB_Exhibit_C_-_Special_Cond_(rev_2-21-25).doc | DOC document | |
| 4_-_IFB_Exhibit_A_-_Bid_Proposal_(Reg).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACM/Mold/Lead Paint Removal & Disposal Costs
EXHIBIT A1
Description
| Unit Price |
| Unit Measure |
Extension
Sq. Ft.
| Removal & Disposal of all ceiling/ wall materials (including the installation of pony walls &/or containment), etc. |
| X |
| $ |
| Per sq. ft. |
| = |
| $ |
Lin. Ft.
| Removal & Disposal of any sizes of pipe and fittings insulation (including the installation of pony walls &/or glove bag containment) &/or designated confined spaces, etc. |
| X |
| $ |
| Per Linear Ft. |
| = |
| $ |
Sq. Ft.
| Removal & disposal of any/or all floor materials, mastic, or non-mastic (including but not limited to, tile, sheet goods, carpet, etc. and the installation of pony walls, &/or containment), etc. |
| X |
| $ |
| Per sq. ft. |
| = |
| $ |
Sq. Ft.
| Removal & disposal of all thicknesses and sizes of insulation on equipment i.e., heat exchangers, vessels, tanks, etc. (including containment), etc. |
| X |
| $ |
| Per sq. ft. |
| = |
| $ |
| 50 Sq. Ft. |
| Removal of lead-based paint from metal surfaces |
| X |
| $ |
| Per sq. ft. |
| = |
| $ |
| 50 Sq. Ft. |
| Removal of lead-based paint from flat and/ or trim wood surfaces |
| X |
| $ |
| Per sq. ft. |
| = |
| $ |
| 100 Sq. Ft. |
| Removal of mold contaminated containing materials (sheetrock, plaster walls, ceiling tiles, etc.) |
| X |
| $ |
| Per sq. ft. |
| = |
| $ |
Hours
| Labor charges per man for emergency call. Per man hour (including the installation of pony walls, &/or glove bag, containment), etc. |
| X |
| $ |
| Per hour |
| = |
| $ |
Emergency Calls
| Emergency Abatement calls, including mobilization charges. (Contractor to respond within 24 hours per call) |
| X |
| $ |
| Per call |
| = |
| $ |
Hours
| Labor Charges per man to remove items other than miscellaneous items & material related to ACM abatement (Per Man Hour) |
| X |
| $ |
| Per hour |
| = |
| $ |
Trip Charge Trip Charge (minimum charge for each removal call)
| $ |
| Per trip |
| = |
| $ |
Quantities indicated represent an estimate only of services performed during prior years. This estimate is provided to identify the lowest responsible bidder for the purpose of awarding this contract.
NOTE: Emergency Calls – Labor charges per man for emergency call includes removal and disposal of any materials, example: ceiling tile, floor tile, tank, TSI, pipes, etc.
Total Bid: $_________________ This total bid amount must be reflected on Exhibit A.
All Above items must be completed, no exception.
Contractor’s Company/Business Name __________________________
File details come from the government source that posted it. Updated .